For personal use only

Similar documents
MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

For personal use only

For personal use only

ASX ANNOUNCEMENT 12 MAY 2016

For personal use only

For personal use only. Minerals Explorer in South Korea

For personal use only

For personal use only

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

Australia s leading explorer in Mexico

For personal use only

For personal use only

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA

Second drill rig to accelerate major drilling program at Productora

For personal use only

Awak Mas DFS Optimisation - Metallurgical Breakthrough

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

For personal use only

New focus and new opportunities in Canadian graphite and coal

For personal use only

Maiden Inferred Iron Ore Resources for Gum Flat

Australia s leading explorer in Mexico

High purity lithium carbonate

PILOT SOLAR EVAPORATION PONDS COMMISSIONED AT LAKE WELLS POTASH PROJECT, WA

ABM Hits 3000 Ounce Target from Trial Mining

For personal use only

For personal use only

Gum Creek Gold Project Free Milling Scoping Study

Macquarie Australia Conference 2018 Warrick Ranson Chief Financial Officer. M a y 2018

Atlantic Ltd (ASX: ATI; Atlantic or the Company) is pleased to present its report for the quarter ended 30 June 2011.

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

HONEYMOON FIELD LEACH TRIAL

Windimurra Vanadium Plant Project Update. Investor Presentation August 2011

For personal use only

For personal use only

2014 MINERAL RESOURCES AND ORE RESERVES

209 million 36.1% Fe

For personal use only

Aitolampi Drilling Results Update

For personal use only

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company )

Valence Industries Australia s Only Graphite Producer

ASX Announcement 25 January 2017

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

Environmental Regulation & Mine Permitting in Ontario

For personal use only

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

EMERGING GRAPHITE AND IRON ORE PRODUCER 2 MINES IN 2 YEARS

Low-cost, rich, DRC copper

MINERAL RESOURCES LIMITED

For personal use only

Telephone Lake project

Mineral Resource and Mineral Reserve governance and reporting for AngloGold Ashanti

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project

WPG TO ENTER THE IRON ORE INDUSTRY

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase

Forward Looking Statement

8 January UPGRADED ORE RESERVE and EXTENDED MINELIFE MOLYHIL TUNGSTEN PROJECT

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

Confidence in Carrapateena project grows

For personal use only

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

Joyce Lake update, the new DSO zones at Lac Le Fer to Iron Arm Range

White Dam Gold Project Dump Leach

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

Champion Provides Year-End Review of the Consolidated Fire Lake North Project and Update on Feasibility Study Work

QUARTERLY REPORT March 2011

Horseshoe Metals Limited (HOR)

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Azure Minerals Ltd ASX Code:

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014

AGM - Lorena Gold Project

ASX Release ASX Code: YTC

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017

For personal use only

Investor Presentation Jogjakarta Iron Sands Project

CEF. Cumulative Effects Framework. Interim Policy. for the Natural Resource Sector. October Cumulative Effects Framework

CASE: Monetizing substantial lithium mineral deposits

Cement Plant Development Project in the Territory of Port-Daniel-Gascons

For personal use only

ASX / MEDIA ANNOUNCEMENT 5 March 2018

BUILDING AN EMERGING RESOURCE COMPANY UPDATE ON ACQUISITION OF COAL AND MANGANESE ASSETS IN INDONESIA

Magino Project Environmental Impact Statement. Technical Support Document Draft Fish Habitat Compensation Plan

For personal use only

Developing High Grade Projects in Mexico

FIRST MAJESTIC SILVER CORP.

(24 July 2015 to date) NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT 59 OF 2008

For personal use only

For personal use only

Rio Tinto Serbia Highlights Innovating to Develop New Resources

For personal use only

For personal use only

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

Alba Mineral Resources plc ( Alba or the Company )

Fresh drilling and metallurgical results advance plan to establish 100,000ozpa operation at Ashburton Project

Transcription:

13 APRIL 2018 AUTHIER PROJECT PRESENTATION TO KEY STAKEHOLDERS & PERMITTING UPDATE Sayona Mining Limited (ASX: SYA) ("Sayona" or the "Company") is pleased to announce that the Company held information sessions to present the Authier Lithium Project to local stakeholders. Two presentation evenings, including one in the La Motte Municipality where Authier is located, and a second in Pikogan to present the project to the members of the Abitibiwinni First Nation, where undertaken in accordance with the Mining Act guidelines. The objective of these meetings was to present the Authier project development plan, strategies for protecting the environment, employment and contract opportunities, and to outline the potential economic benefits to the community. Community concerns are being addressed and implemented in the ongoing development plans. In addition, the Company has an active communication strategy and has been engaging with the broader community outside the immediate project area. Meetings have been held with regional councils, other mining companies successfully operating in the region, Government organisations, and other key business stakeholders in the region. A high level focus in the meeting was outlining the Company s plans for the protection of the environment. The Company has commissioned a number of studies to examine whether the Authier mine has any physical, biological or social impacts on the environment and communities. The studies are being undertaken by highly reputable independent consultants with extensive experience and expertise in the region. A comprehensive base-line environmental study was completed at Authier in 2010 by environmental consultancy, Dessau. Since the Company s acquisition of the project in late 2016, all of the environmental studies have been updated, including: Creating a vegetation inventory, including wetlands and species with special status; Inventory of fish and fish habitats; Inventories of wildlife species with special status; Assessment of surface and ground water quality; and Hydrogeological and hydrological baseline conditions. The work to-date has not identified any material environmental issues and finalisation of the environmental studies will be completed in the second quarter of 2018.

The Company s development strategy is aimed at minimizing Authier s impact on the community and environment, and includes the following activities: Reagents used in the process plant will all be contained within the process plant compound and not discharged into the environment; All process plant, mine run-off and dewatering water will be contained within ponds and recycled through the process plant to minimise new water requirements. Process water will be 100% reused in the plant; The tailings produced from the processing operations will be filtered and dry stacked with waste rock from the mine, eliminating the need for a tailings dam, and keeping the project footprint small; The tailings and waste rock material are not acid generating and do not leach any heavy metals. The Company has been contacted by surrounding Municipalities enquiring about the use of mine waste rock for road base; Water in process ponds will be treated, if required, before any discharge into the environment; The scale of the mining operations are relatively small at around 1,900 tons per day which minimizes the impact on the community and environment; and Progressive site reclamation and remediation planning during operation and at the end of mine activities. The public consultation process is ongoing and a second series of presentations will be held in June 2018 to present the outcomes of the environmental base-line and definitive feasibility studies, as well as strategies that will be adopted to protect the environment and minimise potential impact on the local community. During the public consultation, all relevant reports will be made available to the public and the Company will be available to respond to questions about the Authier Project. Feedback will be used to ensure the Authier project delivers positive impacts to the local community. Permitting Update The Company is progressing through all the activities required for permitting by both the Ministry of Energy and Natural Resources ( MERN ) and the Ministry of Sustainable Development, Environment and the Fight against Climate Change ( MDDELCC ). The Company is targeting to have obtained all material permits required for the project by mid- 2019. Mining Lease Mining lease applications are submitted to the MERN pursuant to Section 100 of the Mining Act (Québec). A mining lease can only be granted after the following conditions are fulfilled: Completion of a feasibility study (in progress and due for completion 2Q2018); Completion of a scoping and marketing study for processing within Quebec (in progress); Rehabilitation and restoration plans have been approved (nearly complete); Page 2 of 5

The MDDELCC authorization required under the Environment Quality Act has been issued for the project (in progress); and A survey plan has been approved by the Office of the Surveyor-General of Québec (complete). The initial term of the lease is 20 years. The lease may then be renewed no more than three times for a period of 10 years each time. After the third renewal, the MERN may renew the lease for periods of five years. Within 30 days after the lease is issued, the lessee must establish a monitoring committee to foster the involvement of the local community in the project as a whole. Before a mining lease can be granted for a mine that has a production capacity of less than 2,000 metric tons per day, a public consultation initiated by the proponent must be held in the region in which the mine will be located. MDDELCC Authorisation The project is subject to various environmental laws and must be authorized by the MDDELCC pursuant to the Environment Quality Act. This permitting process involves the filing of various documents and environmental studies, including potential environmental impacts of the project and related monitoring and mitigation measures. The Company is targeting to submit its application to obtain the MDDELCC authorization in mid-2018, with the objective of obtaining this key authorization by mid-2019. In March 2018, amendments to the Environmental Quality Act came into force allowing the Government, in exceptional circumstances, on the recommendation of the Minister of MDDELCC, to submit a project to the environmental impact assessment and review procedure if in the Government s opinion the project may raise major environmental issues and public concern warrants it. The Company believes its environmental studies have demonstrated that Authier will have minimal impact on the environment and community. Corey Nolan, Chief Executive Officer, commented The presentation sessions were a great opportunity for our Canadian team to meet and exchange information with the local communities and the members of the Abitibiwinni First Nation. The Company is committed to maintaining a close relationship with all the stakeholders who will be impacted by the project. Furthermore, we strongly emphasise that the Company is fully committed to the protection of the environment and minimising its impact on the local community. The Company is looking forward to updating stakeholders in June on the outcomes of the studies and its plan for the future. Page 3 of 5

Figure 1: Sayona Canadian team meeting the local communities in La Motte. For more information, please contact: Corey Nolan Chief Executive Officer Phone: +61 (7) 3369 7058 Email: info@sayonamining.com.au Sayona Mining Limited is an Australian-based, ASX-listed (SYA) company focused on sourcing and developing the raw materials required to construct lithium-ion batteries for use in the rapidly growing new and green technology sectors. The Company s primary focus is the development of the advanced stage Authier lithium project in Quebec, Canada. Authier mineralisation is hosted in a spodumene-bearing pegmatite intrusion with more than 31,100 metres of drilling in 176 diamond holes. The Authier JORC (2012) compliant Ore Reserve and Mineral Resource estimates are tabulated below at a 0.45% Li20 cut-off grade. Authier JORC Ore Reserve Estimate (0.45% Li20 cut-off grade) Category Tonnes (Mt) Grades (%Li20) Contained Li20 Proven Reserve 4.9 0.99% 55,341 Probable Reserve 5.3 1.06% 64,363 Total Reserves 10.2 1.03% 120,098 Page 4 of 5

Authier JORC Mineral Resources Estimate (0.45% Li20 cut-off grade) Category Tonnes (Mt) Grades (% Li20) Contained Li20 Measured 6.09 1.01% 61,509 Indicated 11.55 1.04% 120,120 Inferred 2.82 0.98% 27,636 Total Resources 20.46 1.02% 209,265 The Authier lithium deposit is amenable to open-cut mining methods, and processing using a crushing, grinding and flotation flowsheet to produce on average 96kt per year of 6% Li20 concentrate over the projected 17 year mine life. The Company is currently completing a Definitive Feasibility Study, due for completion in 2Q0218. During the second half of 2018, the Company will complete the permitting, offtake and financing with the plan to commence construction in the 1Q2019 and first production in 2020. In addition, the Company controls a portfolio of lithium and graphite exploration projects in Western Australia. Sayona Mining is committed to the local communities in which we operate, the environment and responsible management of natural resources and the safety of our people, suppliers and communities. Please visit us as at www.sayonamining.com.au Forward Looking Statements This announcement may contain forward-looking statements. These forward-looking statements are based on Sayona s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sayona, which could cause actual results to differ materially from such statements. Sayona makes no undertaking to subsequently update or revise the forward-looking statements made in the announcement, to reflect the circumstances or events after the date of that announcement. Reference to Previous ASX Releases This document refers to the following previous ASX releases: Expanded Authier JORC Resource, 12 April 2018 Authier maiden JORC Ore Reserve estimate, 11 December 2017 The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and all material assumptions and technical parameters continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person s findings are presented have not been materially modified from the original market announcements. Page 5 of 5