PS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION.

Similar documents
POST FRAME BUILDING STANDARDS

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses

Colorado Chapter of the International Conference of Building Officials. Building Guide. The Colorado Chapter of the International

Table of Contents. Page Title

SECTION PLATE CONNECTED WOOD TRUSSES

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Smarter. Safer. Leaner.

ECONO 200 INPLANT OFFICE

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

4 EXTREME FOUNDATION PANELS

Concrete weighs about 150 pounds per cubic foot

Elevated Slab Sequence

ROOF MOUNT KIT OWNERS MANUAL

2003 International Residential Building Code

10 EXTREME BASEMENT PANELS

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

When I started tiling, we didn t do our own shower pans that BATHS

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

Safety on Heights: Our Policy

Administrative Changes

Steps in Building a Shed

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: ENERCEPT, INC.

OmniFlex 300 Plus Installation Instructions

YOUR LITE-DECK SECTIONS

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

US Pool Lift Model #114 (Independence) Installation Guide

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Prescriptive Design for Pole Barns Using the Larimer County Prescriptive Handout

Chapter 7. Roof Framing

Flotation Docking Systems, Inc.

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

Lintel Tables Design Notes and Limitations

Technical Data for. Headers. and Beams

SECTION PERMANENT FORMS - INSULATING CONCRETE FORMS Page 1 of 7

MID-RISE DESIGN & CONSTRUCTION

CHAPTER 3 BUILDINGS WITH WOOD FRAMED EXTERIOR WALLS 301 SCOPE

R Code and Commentary for 2012 NC Residential Code final 03/06/13

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION

Residential Detached Garage Handout

SIPs over a steel frame Raised SIP floor

PRECAST CONCRETE CONNECTIONS - US PRACTICE

Tips For Designing Constructable Concrete Buildings

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

Introducing TJ Insulated Structural Framing Components

4 EXTREME FOUNDATION PANELS

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Quality Control And Fabrication Manual Metal Stud Crete Metal Stud Crete Metal Stud Crete

Free standing Patio covers

BioPrism Solid Surface

LP OSB Sheathing & Structural 1 Sheathing

LPI 56 Technical Guide

Building Guide. Colorado Chapter of the International Code Council

PRECAST CONCRETE PRODUCTS

RESIDENTIAL DETACHED STORAGE STRUCTURES (GARAGE)

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE.

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

Residential Building Inspections

Haener Block General Building Tips

Installation Instructions

How to Construct a Feral Enclosure

Raised Basement. Mechanical Installation Guide

BEARING METAL STUD FRAMING

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

DETAIL DRAWINGS. RASTRA is a stay-in-place insulated concrete. form that is structurally strong, energy-efficient,

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

Zurn Z886. 6" Perma-Trench. Installation Instructions

RESIDENTIAL DETACHED GARAGE HANDOUT

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

Welcome. Integra Products

LVL Product Guide 2.0E LVL 1.5E LVL

INSPECTION GUIDELINES: JOIST AND UNDERFLOOR COMBO

Conergy SolarFamulus II

Installation Guide Wall Panels

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS

STAY-FORM TRANSFORMING MATERIALS. into products that make a better world

One and Two Family Additions

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

Title: Building Construction for the Fire Service. Time: 3 hours. Teaching Materials: White board Building Construction for the Fire Service (PDF)

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

Vertigo Cladding Board

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

Installation Guide and Safety Manual

Open-Web Truss Long Span Installation Guidelines

TOWN OF SOUTH KINGSTOWN REQUIREMENTS FOR BUILDING PERMITS RESIDENTIAL SINGLE FAMILY

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

Underground Exhaust System

2.2E Parallam PSL Deep Beam

Transcription:

C.9. DOOR AND WINDOW OPENINGS Openings for doors and windows are formed with bucks, or frames, which are constructed to the rough opening dimensions required for the doors and windows to be installed. These bucks are installed in the wall, at the designed locations, and PolySteel Forms are easily placed up to and around the openings to form the entire wall. The bucks also provide the structural attachment points for securing the door frames and/or windows to the wall system. We recommend the use of a vinyl material, called VBuck, for the construction of these bucks, which is a product manufactured specifically for this purpose. You may also construct bucks from wood, either pressure-treated or felt-protected may be required. In all cases, window and door openings have special reinforcement requirements, which should be considered before placing the bucks in the PolySteel walls. Refer to the Design Section of this manual for specific design considerations for openings. There will always be horizontal rebar required within 12 of the bottom of all window openings 2 or larger, which must extend 24 beyond each side of the opening. You may also be required to install vertical rebar below the opening, so be sure to understand these reinforcing requirements before putting window bucks in place. C.9.1 PREPARE IN ADVANCE. In order to speed the installation of the entire wall, it is recommended that you build your window bucks in advance and have them on the job site ready for installation when the PolySteel Forms are being put in place. All bucks should be constructed so that the inside dimension of the openings match the required rough openings ( R/O ) specified for the doors and windows to be used. Mark the footing or slab for the locations of window and door openings, and height of the bottom of the window buck to be installed, so that all bucks can be placed, and any necessary adjustment cuts can be made, on the proper course of forms. C.9.2 VBUCK CONSTRUCTION. VBuck is manufactured to match the width of the PolySteel Forms you are using. If you are using the 6 Forms (PS 3600), you would use the 9-1/4 VBuck. The 8 Forms (PS 3800) require the 11 VBuck, and the 10 Forms (PS 3100) need 14 material. VBuck is also constructed with hollow channels that are designed to receive a patented corner connector, extension splines, and reinforcement sleeves and provide for a secure attachment for windows and doors. VBuck also provides complete instructions on how to construct bucks with their product in all shapes and sizes you may require. The basic steps of assembly are: 1. Cut the material to the desired length and to the overall dimensions of the R/O required for the windows you have selected. Insert the corner connectors into the channels on the outside of all four corners. The 11 material, and wider, also requires the insertion of a center connector for reinforcement. 2. Square and brace the corners with VBuck s steel bracing, VBrace, and secure with self-drilling fasteners. (800) 977-3676 www.polysteel.com 64

C.9. DOOR AND WINDOW OPENINGS C.9.2 VBUCK CONSTRUCTION (continued) 3. Drill or cut ports or slots into the bottom of the window buck to allow the placement of concrete below the window. VBuck will provide pre-drilled lengths of product, however, it is often more advantageous to drill or cut the buck yourself on site to meet the specific needs of the job. 4. Install in the PolySteel wall at the proper height, as previously marked on the slab or footing. It is a snug fit. You might find it useful to use the flat edge of a corner connector to slip between the VBuck and the PolySteel and slide the VBuck onto the PolySteel wall. 5. For openings over three feet wide, add additional vertical and horizontal bracing to support the VBuck during the concrete pour. You may use lumber or VBuck s Power Brace for this purpose. See the illustration below. Vertical braces should be installed every 18. 6. For door openings, horizontal bracing should also be installed every 24 and at the bottom of the opening to keep the buck square and secure to the dimensions specified. 7. To reduce and/or eliminate the horizontal bracing for VBuck, you can drill a hole in the side of the buck and insert tie wire or an electrical zip tie (e.g., 1/2, 250 lb. rated) through the sides every 24 and secure the wire or tie to a PolySteel Form tie inside the wall. You might also ask your PolySteel Dealer about the Yoke and Tie fastening system from Vinyl Technologies developed specifically for this purpose.. 8. Consult with your PolySteel Dealer for more detailed instructions and for custom shapes and designs. Figure 3.8 TYPICAL WINDOW BUCK WITH V-BUCK (800) 977-3676 www.polysteel.com 65

WE RE BUILDING A BETTER WORLD C.9. DOOR AND WINDOW OPENINGS C.9.2 VBUCK CONSTRUCTION (continued) INSERT CORNER CONNECTORS ASSEMBLE BUCK TAPE ENDS TO PREVENT CONCRETE INTRUSION INSTALL BUCK (800) 977-3676 www.polysteel.com INSTALL BRACING ASSEMBLE IN ADVANCE DRILL OR CUT PORTS OR SLOTS 66 VBUCK PORTS

C.9. DOOR AND WINDOW OPENINGS C.9.3 WOOD BUCK CONSTRUCTION A common method of constructing bucks for windows and doors is to use dimensional lumber. PolySteel Forms are manufactured to match the current dimensions of a 2x10 (PS 3600) and 2x12 (PS 3800). If required by the building official, wood bucks may need to be protected from direct contact with concrete that is in direct contact with the soil. This can be achieved by using pressure-treated lumber or a waterproof material (such as roofing felt) wrapped around and secured to the lumber wherever concrete will come in contact with the buck. 1. Cut the framing material to the desired length and to the overall dimensions of the R/O required for the windows you have selected. Remember that the thickness of the lumber used needs to be taken into account when cutting the formwork to size for the buck. 2. For the bottom plate of the window buck, use a 2x6 piece of lumber cut to the dimension of the rough opening and rip it into two pieces. This will provide the opening necessary in the bottom of the buck to receive concrete. 3. It is necessary to frame the buck on each side to provide support for the PolySteel Forms fit into place around the opening (See Figure 3.9). Cut 2x4 s to match the inside horizontal dimension of the buck and screw to the outside edges of the top and bottom of the buck every 18. Full-size framing lumber can be used for the vertical portion of this frame and minimize the waste created by cutting lumber to size. These vertical pieces can be attached after setting the buck in place. 4. Square the buck and attach a diagonal cross brace to keep it square. 5. For window openings larger than two feet, install vertical and horizontal bracing every 24. 6. Once in place, at the proper height, as previously marked on the slab or footing, install Ringed Shank nails, large screws, or anchor bolts every 16 into the horizontal beam formed by the PS 3000 Forms to ensure a secure attachment to the concrete. Figure 3.9 TYPICAL WINDOW BUCK WITH WOOD WOOD BUCK INSTALLATION (800) 977-3676 www.polysteel.com 67

C.9. DOOR AND WINDOW OPENINGS (continued) C.9.4 MAKE IT LARGER NOT SMALLER. It is always possible to shim a door or window to make it fit in a rough opening that is oversized. It is much more difficult to cut, shave, chisel, or saw the buck or the concrete out to make up for a buck that is built too tight, or has swelled with moisture. Keep this in mind while constructing a buck of any material. C.9.5 REINFORCEMENT. The Figure below provides a general illustration of the reinforcement that is required around openings in a PolySteel wall. It is important to note the key reinforcement elements required so that you can plan your installation accordingly. The Design Tables for Lintels will provide you with details for the variety of load requirements that may apply to your project. Figure 3.10 REINFORCEMENT AROUND OPENINGS NOTES: 1. Wall reinforcement below openings shall be as required for the entire wall. 2. One vertical rebar (#4 minimum) is required within 12 of each side of the opening. Two are required if the opening is over 4 feet or the design calls for wind speeds in excess of 90 MPH. 3. One #4 rebar is required under all openings over 2 and shall extend 24 beyond each side of the opening. This can be achieved by bending the rebar around a tight corner, if necessary. 4. Rebar above all openings shall extend 24 beyond each side of the opening. 5. One continuous #4 rebar is required in the bond beam at the top of the wall. This rebar may be used as lintel reinforcement if applicable in the design. 6. Refer to the Design Tables for Lintels for proper reinforcement and the use of stirrups, as required. 7. If stirrups are required, see Section 9.5a Lintels and be sure to review the option of using a continuous stirrup, as described in Section 9.8 of the Tips & Techniques section of the Manual. (800) 977-3676 www.polysteel.com 68

C.9. DOOR AND WINDOW OPENINGS (continued) C.9.5a STIRRUPS AND LINTELS. Lintels (headers) over doors, windows, garage doors, and/or other openings in a PolySteel wall require additional steel reinforcement, depending on the load to be carried and the span of the opening. This is a critical area in the overall design of the wall and should be carefully designed, installed, and consolidated with concrete to ensure that the openings remain strong, stable, and true to their original form for the life of the building. The Tables for Lintels in Section E will help ensure a proper design. Stirrups fabricated from #3 rebar may be required to reinforce the lintel, in addition to the horizontal reinforcement specified. These stirrups may be fabricated in the shape of an S or a C, as illustrated below. Figure 3.11 illustrates the key design and installation features for these lintels, which should be used in conjunction with the Lintel Tables in the Design Section of this Manual. You should also consider using the Continuous Stirrup discussed in Detail in Section D.8. Lintels that are less than the full height of a 16 PolySteel Form are called shallow lintels. Proper reinforcement of these lintels may require the removal of foam from the narrow cavity of the PS 3000 Form to provide for the necessary amount of concrete for strength and adequate cover for the rebar required. See the Lintel Tables in Section E for the design and form modifications that may be required to construct these shallow lintels. (800) 977-3676 www.polysteel.com 69

C.9. DOOR AND WINDOW OPENINGS (continued) C.9.5a STIRRUPS AND LINTELS (continued). FIGURE 3.11 LINTELS (800) 977-3676 www.polysteel.com 70

C.9. DOOR AND WINDOW OPENINGS (continued) C.9.5.b DOOR BUCKS. Place the buck in its identified location and brace it plumb and square to ensure that it is installed with the proper dimensions. Cut a piece of lumber the width of the interior dimension and secure it in place at the bottom of the buck to maintain its stability. You can keep the buck open during the remainder of construction, however, prior to placing concrete, be sure to add additional interior vertical and horizontal bracing every 24 to support the buck. Install anchor bolts to line up with the horizontal concrete beam, as required for wood bucks. Cut forms to fit opening as you progress up the wall. C.9.5.c WINDOW BUCKS. Be sure that the all required rebar is in place below where the buck is to be installed. Place the buck in its proper location and brace it for plumb and square. Install supplemental internal support bracing, as required. Install nails, lag screws, or anchor bolts required for wood bucks. Make sure there is sufficient access in the bottom of the buck to allow the placement of concrete. Cut forms to fit opening as you progress up the wall. CUT FORMS TO FIT ARCHED WINDOWS DOOR BUCK INSTALLATION (800) 977-3676 www.polysteel.com 71 WOOD BUCKS INSTALLED & BRACED WOOD BUCKS