When demanding consistent quality, specify FIRM-FILL SCM-250 to assist in achieving highly improved IIC sound performance in multifamily

Similar documents
FIRM-FILL SCM-400 can be installed under a FIRM-FILL Gypsum Concrete Floor Underlayment to produce an exceptional vibration isolation floor system.

HACKER SOUND MAT II, to create a quieter living environment while meeting demanding project specifications in multi-family construction.

FIRM-FILL is Hacker Industries, Inc. s underlayment solution over plywood or OSB subfloors in apartments, condos, hotels and motels.

Build higher and faster with FIRM-FILL CMD (corrugated steel deck) from Hacker Industries, Inc., the leader in pourable floor underlayments.

PRODUCT GUIDELINES Hacker. Industries, Inc.

GenieMat FF. Floating Floor Systems for Airborne & Impact Sound and Vibration Isolation. It s not magic, it s engineering. Impact Sound Control

Triton DCI Decoupling Mat

PLYWOOD FLOATING FLOOR

1. The subfloor must be structurally sound and able to withstand live and dead loads with a deflection limitation of L/360.

Floor Insulation Underlayment Section Sound Control Matting

ENKASONIC FLOOR UNDERLAYMENT 9110

FOR: CEMCO - California Expanded Metal Products Co. Sound Transmission Loss Test

DIVISION: FINISHES SECTION: ACOUSTIC TREATMENT REPORT HOLDER: ECORE INTERNATIONAL, INC.

PinkWood Ltd. Revised September 29, 2017

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

FIRM-FILL High Strength

ULTIMATE SOUND CONTROL SYSTEMS

Suggested Specification for Tri-Patch Versatile Concrete Patching Compound

DIVISION: FINISHES SECTION: ACOUSTIC TREATMENT REPORT HOLDER: HOMASOTE COMPANY

RSIC-1 ACOUSTIC ASSEMBLY

DIVISION 9 - SECTION QTscu Re-bonded Recycled Rubber Impact Sound Insulation Patent No. RE 41,945

LISTING INFORMATION OF Weyerhaeuser - TJI Joists SPEC ID: 26948

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008

It s not magic, it s engineering. Impact and Airborne Sound Control. GenieClip. US Patent No. 7,895,803

INSTALLATION INSTRUCTIONS

ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING

ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

Signature Sports Flooring Installation Instructions. For SignaDeck Premium Rubber Tiles

Presented By: Jim O Neill. Acoustics

Report on Structural Stability of Engineered Lumber in Fire Conditions

ARDEX DS 70 TM. Acoustic Mat

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

RESILIENT CORK TILE 3 PART SPECIFICATION #Z 624

ARCHITECTURAL AND STRUCTURAL NOISE CONTROL SOLUTIONS

FLOORING INSTALLATION SYSTEMS. Product Catalog

UNDERLAYMENT INSTALLATION INSTRUCTIONS

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING

Design No. L565. Design No. L565

FlexLok Adhesive Tabs for Carpet Tile

USG Tile & Flooring Solutions. Lightweight cement board. Easy to cut and fasten. Faster installation USG DUROCK BRAND CEMENT BOARD INSTALLATION GUIDE

DIVISION 9 - SECTION ECOSilence Recycled Rubber Sound Underlayment US Patent No. RE 41,945

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

Recommended Design Considerations. and. Guide Specifications For. Commercial Building Insulation

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

SECTION SHEET MEMBRANE SOUND REDUCTION, CRACK ISOLATION / JOINT BRIDGING, AND WATERPROOFING

INSULATION OWENS CORNING INSULATION PRODUCTS IN THIS SECTION:

RESILIENT SOUND ISOLATION CLIPS

Page 1 of 5 PART 1 GENERAL

Gold Bond BRAND Gypsum Sheathing

Chapter 2. Basic practices. Topics. 7 Basic practices. Notes. 2.5 Existing flooring and adhesive residue Job site conditions 8

Table R (1) Allowable Spans and Loads for Wood Structural Panels for Roof and Subfloor. Sheathing and Combination Subfloor Underlayment

INSTALLATION INSTRUCTIONS LAMINATE

SECTION ARCHITECTURAL SPECIFICATIONS FOR INDOOR WOOD ATHLETIC FLOORING

SECTION WOOD FLOORING

2000 POCKET DOOR TECHNICAL DATA

SECTION SHEET MEMBRANE WATERPROOFING AND CRACK ISOLATION

DIVISION 9 - SECTION QTscu Recycled Rubber Sound Underlayment US Patent No. RE 41,945

Signatures are required on this document for an official laboratory test report. Copies of this document without signatures are for reference only.

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued October 1, Legacy report on the 1997 Uniform Building Code

Appendix D. -Weyerhaeuser Fire Rated Assembly Listings-

FIRE & SOUND MANUAL ARCHITECT VERSION 6.17

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

1 Firestone EPDM Roofing Systems

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

SPECIAL PROCEDURES INSTALLATION & WARRANTY

Section HIGH-TENSION Stretched-Fabric Wall Systems SoftWalls, Inc.

Product Installation Manual

Installation Guide LVP Glue Down

Firestone Polyiso Boards

SECTION WOOD FLOORING. 1. Section Above-Grade Vapor Retarders. 2. Section Below-Grade Vapor Retarders

ARDEX UI 720 FLEXBONE

A. Background on Floor/Ceiling Noise Issues. Addressing Floor/Ceiling Noise Issues in Multifamily Construction

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

RSIC-1. RSIC-1, the Low Cost, High Performance, Noise control Solution. RSIC-1 specifications:

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: WOOD I-JOISTS REPORT HOLDER: PACIFIC WOODTECH CORPORATION

A. Section includes hydraulic-cement-based, polymer-modified, self-leveling underlayment for application below interior floor coverings.

HIR 1 ACOUSTICAL, IMPACT RESISTANT, TACKABLE WALL PANEL SPECIFICATION

Fire protection for townhouses that share a common wall. AreaSeparationWall Systems

Acoustic Testing of CLT and Glulam Floor Assemblies Nordic Engineered Wood Report No. A August 2016 CONSTRUCTION

SECTION GYPSUM CEMENT UNDERLAYMENT RECOMMENDED SPECIFICATION FOR DURA-CAP FLOOR UNDERLAYMENT OVER EXTRUDED OR EXPANDED POLYSTYRENE FOAM

SIMEILINGS TORSION SPRING CEILING SYSTEM SPECIFICATION

Updated 1/25/13. Supercedes all previous versions. Check website for updates. ASE PREPARATIO

ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment

SECTION RESILIENT SHEET FLOORING

Thermasheath -3. Insulation for the Building Envelope ROOF WALL SPECIALTY

REPORT HOLDER: KINETICS NOISE CONTROL 6300 IRELAN PLACE DUBLIN, OHIO EVALUATION SUBJECT: KINETICS NOISE CONTROL WAVE HANGER

Fire Barrier Duct Wrap 615+

The GlasRoc Shaftliner Type X advantage...

Soundproofing of Wood-frame buildings

Series 3000 Pocket Doors

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250

ACOUSTICAL WALL TREATMENT SECTION 09840

Wood Floor Bonding Systems

3000 SERIES POCKET DOOR

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

KOSTER AMERICAN CORPORATION

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California *Revised April 2003

AcoustiFloat HI-SEP Floating Floor Specification (Canada)

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

Transcription:

When demanding consistent quality, specify FILL to assist in achieving highly improved sound performance in multifamily construction. FILL is an integral component of a well designed floor/ ceiling assembly. FILL may be installed under a FILL Floor Underlayment to produce an exceptional vibration isolation floor system. Assists in achieving improved sound performance Integral component of a well designed floor/ceiling assembly Performs well in wood frame construction and concrete structures Minimal deflection, no creep or long term degradation Lightweight and easy to install Installed by trained Licensed Applicators

1 - FLOOR COVERING / 2 - BRAND GYPSUM CONCRETE / 3 - SCM -250 / 4 - PLYWOOD OR OSB / 5 - NOMINAL WOOD JOIST 6 - BATT INSULATION / 7 - PARALLEL CHORD TRUSS / 8 - TJI JOIST / 9 - RESILIENT CHANNEL / 10 - GYPSUM WALLBOARD / 11-6 CONCRETE Compression Resistance 0.5 0.4 0.3 0.2 0.1 0 Beginning Thickness Deflection During Load Residual Thickness 42 lb/ft² 105 lb/ft² 505 lb/ft² Transmission Loss (db) 90 80 70 60 50 40 30 20 10 0 100 160 250 FILL 52 Reference Contour 4000 2500 1600 1000 630 400 Frequency (Hz) Ln (db) 100 90 80 70 60 50 40 30 20 10 0 50 FILL IC Contour 800 500 310 200 125 80 Frequency (Hz) 1250 2000 3150 5000 + + 2017 Hacker Industries, Inc. and the associated logos are trademarks of Hacker Industries, Inc., Newport Beach, CA. Performance in wood-frame and concrete structures Requires dryin (building must be fully enclosed before installation) Install isolation barrier around perimeter of floor Improves Impact Insulation Class () ratings May not be used as a vapor barrier Install mat with red mesh down Improves Transmission Class () ratings L/360 Deflection must not exceed L/360 live or dead load Tape all seams with duct tape or 2 wide tape Allows vapor to pass through to prevent trapped moisture Do not use Mechanical Fasteners Install Class A Fire-rated Product Must be used with Apply Hacker TopCoat SP when Specified Installed by Hacker Industries trained Licensed Applicators Robinson Wheel tested Extra Heavy Duty Install finished floor covering only when completely dry 102 Hacker Industries, Inc. Architect Binder Firm-Fill 2017

TECHNICAL DATA Roll Weight Thickness Width Core Color Benefits Assists in achieving improved sound performance Integral component of a well designed floor/ceiling assembly Minimal deflection, no creep or long term degradation Performance in wood frame construction and concrete structures Lightweight and easy to install Installed only by trained Licensed Applicators across North America Product Description FILL is a nominal 1/4, random filament, corrugated U - groove core sound control mat designed to limit impact noise between floors. Designed for critical applications in which FILL will be utilized. FILL prevents moisture from passing through to the substrate, an essential quality for wood frame construction. FILL is a Class A fire-rated product. Use in conjunction with a minimum FILL topping. Limitations Shall not be used in exterior locations, below grade or where continuous exposure to moisture is likely. Shall not be used without a FILL topping. Structure shall be designed so that deflection does not exceed L/360 live or dead load. Certain floor coverings, such as marble, limestone, travertine and wood, may have more restrictive deflection limits. Consult the appropriate floor covering manufacturer for their recommendations. Do not use mechanical fasteners to install FILL as mechanical fasteners conduct impact sound, reducing acoustical isolation. FILL shall be installed with a perimeter isolation strip. FILL is one component of an effective sound attenuation control system. Care must be taken in the installation of all components to ensure the ultimate design performance. Published acoustical and fire system tests were conducted under controlled laboratory and/or field conditions and reflected results are applicable only to those specific assemblies. Installation PROPERTIES 39 lb (17.7 kg) 1/4 in nominal 58.5 in (149 cm) Red Packaging Length 80 ft (24.5 m) Total Square Feet 400 ft² (37.16 m²) Effectiveness of Reducing Δ 20.0` Steiner Tunnel Test Class A Before, during and after installation, the building must be enclosed and the temperature maintained at a minimum of 50 F (10 C). Prior to installation, the subfloor shall be structurally sound (L/360), broom cleaned, dry and free from oil, grease, paraffin, laitance, wax or other contaminants. Attach perimeter isolation strip or approved alternative to the walls, conduit, flanges, ballasts, etc. in order to isolate or break the vibration transmission path between the floor and wall. Reinforcement is recommended in doorways and other high traffic or transition areas. Hacker Industries, Inc. Architect Binder Firm-Fill 2017 103

INSTALLATION (cont.) FILL is laid directly over the concrete, plywood or OSB subfloor, with the red mesh down and white/red fabric side up. It should be pushed up tightly to the isolation barrier. Alternately, the FILL may be pushed up tightly to the wall when the isolation barrier installed is FILL Perimeter. The gap between the floor and wall should not exceed 0.25. FILL edge must be placed adjacent to other pieces without any gap. Rolls are manufactured with the self-adhesive selvage edge folded over on the fabric top. When unrolled, the selvage edge remains in position. Starting at the base of the roll, smooth the selvage edge to the adjacent piece. If necessary, tape (duct tape or 2 [51 mm]-wide tape) the 3 (76 mm) fabric overlaps snug to the fabric on the adjoining FILL strip. Tape all seams to prevent penetration into the core material during pour. Double tape seams if necessary. Finished floor coverings can be installed when the FILL is completely dry. Consult flooring contractor for acceptable levels of moisture and recommended procedures to test for dryness. Reference Hacker Industries, Inc. s Guidelines for Installing Finished Floor Coverings. This guideline is not a warranty and shall be used as a guideline only. See ASTM F2419. Product Data Core Thickness: 1/4 in nominal Roll Weight: 39 lb (17.7 kg) Packaging Length: 80 ft (24.5 m) Core Width: 58.5 in (149 cm) Total square feet: 400 ft² (37.16 m²) Test & PURPOSE STATEMENT/DISCLAIMER These guidelines are designed to provide the architectural and building communities with detailed performance data on Hacker Industries, Inc. s comprehensive portfolio of sound attenuation tests and UL Fire Rated Designs. The tests for the assemblies included in these guidelines were conducted in a laboratory setting per ASTM C177, E84, E90, E492 and E2179. These guidelines are not warranties and should be used as guidelines only. The architects and general contractors recommendations supersede these guidelines. Field performance may vary. Subject to express Warranty stated on Hacker Industries, Inc. s website. Hacker Industries, Inc. regularly performs acoustical and fire (UL) testing to ensure performance standards for our products. Firm Fill SCM (sound control mats), including Firm Fill, were tested acoustically with the following floor assemblies and performed as noted. 104 Hacker Industries, Inc. Architect Binder Firm-Fill 2017

Firm-Fill Open Web 1 Insulation Truss Ceiling unfaced R-13 18" (457 mm) L/360 open web truss Clark Dietrich RCSD Resilient Channel Ceiling Finish Bare 60 50 D6435.22 7 mm Vinyl with Rubber Backing 62 53 D6435.23 61 53 D6435.24 61 54 D6435.25 59 58 D6435.26 13 mm 61 57 D6435.27 60 50 D6435.28 Firm-Fill Open Web 2 Insulation Truss Ceiling unfaced R-13 18" (457 mm) L/360 open web truss PAC Ceiling Finish Bare 62 53 F4545.01 62 56 F4545.02 62 56 F4545.03 62 56 F4545.04 13 mm 62 60 F4545.05 61 57 F4545.06 Open Web L521, L528, L529, L534, L542, L546, L550, L558, L563, L574, L576, L577, L579, L583, L585, L592, M500, M503, M508 Hacker Industries, Inc. Architect Binder Firm-Fill 2017 105

Firm-Fill Nominal Insulation Truss Ceiling R-13 9- (235 mm) 2x10 Clark Dietrich RCSD Resilient Channel Ceiling Finish Bare 59 -- E3146.01 7 mm Vinyl with Rubber Backing 59 50 E3146.02 60 50 E3146.03 59 51 E3146.04 58 56 E3146.05 13 mm 60 54 E3146.06 Laminate¹ Laminate¹ Carpet and Pad² Laminate² Laminate² 60 51 E3146.07 59 -- 5013115 -- 56 7013170 51 -- 5013113 58 -- 5013114 -- 50 7013168 ¹Assembly varies from above in the following: : 5/8 ²Assembly varies from above in the following: : 5/8 ; ceiling isolation: Cemco RC channel Nominal L006, L201, L202, L206, L208, L209, L210, L211, L212, L501, L502, L503, L504, L505, L506, L507, L508, L509, L510, L511, L512, L513, L514, L515, L516, L517, L519, L520, L522, L523, L525, L526, L532, L533, L535, L536, L537, L540, L541, L545, L557, L569, L588, L590, L593, L598, M504, M517, M519, M530, M531, M517 106 Hacker Industries, Inc. Architect Binder Firm-Fill 2017

2010+ (6 mm) Firm-Fill I-Joist Insulation Truss Ceiling R-11 12" (302 mm) Clark Dietrich RCSD Resilient Channel Ceiling Finish 1 layer Bare 58 -- E7891.01 7 mm Vinyl with Rubber Backing 61 52 E7891.02 62 52 E7891.03 59 54 E7891.04 60 57 E7891.05 Note: Preceding I-Joist with layer tests were conducted with increasing compressive strength and density, which may affect sound performance. Firm-Fill I-Joist 2 Insulation Truss Ceiling R-11 12" (302 mm) Clark Dietrich RCSD Resilient Channel Ceiling Finish 2 layers 7 mm Vinyl with Rubber Backing -- 55 E7891.11 -- 58 E7891.12 13 mm 59 57 E7891.13 61 53 E7891.14 I-Joist L518, L530, L538, L547, L556, L570, L581, L589, M502, M506, M512 Hacker Industries, Inc. Architect Binder Firm-Fill 2017 107

Firm-Fill I-Joist 3 Insulation Truss Ceiling R-13 12" (302 mm) PAC Ceiling Finish 2 layers Bare 62 52 F4543.01 13 mm Engineered 63 57 F4543.02 63 56 F4543.03 62 57 F4543.04 62 61 F4543.05 63 61 F4543.06 Note: Preceding I-Joist tests were conducted with increasing compressive strength and density, which may affect sound performance. I-Joist L518, L530, L538, L547, L556, L570, L581, L589, M502, M506, M512 Firm-Fill Assembly Insulation Truss Ceiling 6" (152 mm) concrete Ceiling Finish None None None None Bare 51 -- 5014075 Bare -- 20* 7014143 J917, J919, J920, J924, J927, J931, J957, J991, J994 *Tested in accordance with ASTM E2179 - Standard Test Method for Laboratory Measurement of Effectiveness of Floor Coverings in Reducing Impact Transmission Through Floors. 108 Hacker Industries, Inc. Architect Binder Firm-Fill 2017

Warranty Subject to express warranty stated on Hacker Industries, Inc. s website. Submittal Approvals Project Name Contractor/Architect Signature Date PRODUCT INFORMATION See www.hackerindustries.com for current recommended product specifications and literature., for use with Hacker Floor Underlayments, is a component in an overall floor/ceiling assembly. Its performance is affected by every other component and the likelihood of achieving code compliance is contingent upon many other trades, including framers, plumbers and drywall contractors. Developers and general contractors are responsible for building properly and testing field performance as soon as possible in order to ensure the reliability of the project. WARNING Laboratory tests are not a guarantee of field performance because of the issues noted above and many other design and/or construction errors that may occur. Please consult a professional acoustical consultant to ensure plans are proper and that the floor/ceiling assembly can perform to expectations. TRADEMARKS, GYP-SPAN, Let Our Products Floor You and the associated logos are trademarks of Hacker Industries, Inc. LEED is a registered trademark of the U.S. Green Building Council. WARRANTY HACKER INDUSTRIES, INC. SHALL NOT BE LIABLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES, DIRECTLY OR INDIRECTLY SUSTAINED, NOR FOR ANY LOSS CAUSED BY APPLICATION OF THESE GOODS NOT IN ACCORDANCE WITH CURRENT PRINTED INSTRUCTION OR FOR OTHER THAN THE INTENDED USE. HACKER'S LIABILITY IS EXPRESSLY LIMITED TO REPLACEMENT OF DEFECTIVE GOODS. ANY CLAIM SHALL BE DEEMED WAIVED UNLESS MADE IN WRITING TO HACKER INDUSTRIES, INC. WITHIN 30 DAYS FROM DATE IT WAS, OR REASONABLY SHOULD HAVE BEEN, DISCOVERED. SAFETY FIRST Follow good safety/industrial hygiene practices during installation. Wear appropriate personal protective equipment. Read specs, MSDS and literature prior to specification and installation. 2017 Hacker Industries, Inc., Newport Beach, CA. Hacker Industries, Inc. Architect Binder Firm-Fill 2017 109