WATER SECTOR DEVELOPMENT PROJECT (WSDP) PERFORMANCE BASED FINANCING TERMS OF REFERENCE (TOR)

Similar documents
Managing Losses in Water Distribution Networks

The International Water Association (IWA) defines Non - Revenue Water as a part of the water balance constituting of:

NRW - Danish technology and management solutions. David Yang

Terms of Reference. Application type: External vacancy Job Title: Category: Duty station:

CARIBBEAN DEVELOPMENT BANK TERMS OF REFERENCE DISASTER RISK MANAGEMENT STRATEGY AND OPERATIONAL GUIDELINES OF THE CARIBBEAN DEVELOPMENT BANK

Presentation outline Water Operators partnerships-a case of three East African Water utilities. Benefits of adopting WSP approach

Free water balance software Bulgarian version

Statement of Capability

Removing the Barriers to Efficient Water Leakage Management

Non-Revenue Water Management in Cyprus. Bambos Charalambous Managing Director Hydrocontrol Ltd

6. WATER CONSERVATION / DEMAND MANAGEMENT

M36. Water Audits and Loss Control Programs. Fourth Edition

B. Brunone University of Perugia C. Chiesa Metropolitana Milanese M. Ferrante - University of Perugia

UNICEF Evaluation Office Terms of Reference: External Assessment of UNICEF s Global Evaluation Reports Oversight System (GEROS)

TERMS OF REFERENCE (ToRs) FOR INTERCONNECTION TARIFF STUDY IN TELECOM INDUSTRY IN RWANDA

Template for ToR for Transaction Advisory Services

Terms of Reference for Individual Consultant

M36. Water Audits and Loss Control Programs. Fourth Edition

Terms of Reference. Senior Researcher / Study Consultant for the Educational Demand and Needs Assessment Study

3 months (with possible extension of up to 12 months)

Water Demand and Waste Water Management, Rajkot, India

Water Distribution Management and reduction of NRW

Jeddah water & wastewater management contract

An Overview of the IWA Water Loss Specialist Group. Jo Parker and Stuart Trow WLSG regional representatives for North West Europe

SCHEDULE A NORTH SUMTER COUNTY UTILITY DEPDENDENT DISTRICT NORTH SUMTER UTILITIES WATER AND WASTEWATER RATES AND CHARGES AS OF OCTOBER 1, 2017

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary:

VACANCY ANNOUNCEMENT

Improving Efficiency of Water Systems: practical examples

UNLIREC TERMS OF REFERENCE

Leak detection and water loss management

Role Type Pay Band Location Duration Reports to:

Experience and Strategy of the City of Yokohama Capabilities & Achievements of Yokohama Waterworks Bureau

Measuring Social Outcomes: Social Return on Investment

TERMS OF REFERENCE (TOR) FOR NORTHERN KENYA AND SOUTHERN ETHIOPIA LIVESTOCK MARKETS SURVEY AND VALUE CHAIN ANALYSIS CONSULTANCY

Guideline for a robust assessment of the potential savings from water conservation and water demand management

REQUIRED DOCUMENT FROM HIRING UNIT

REVISED TERMS OF REFERENCE

ANALYSIS OF WATER LOSS IN SEMARANG MUNICIPAL WATERWORKS

4 PLANNING DATA AND WATER DEMAND FORECASTING

SCOPING STUDY TO DEVELOP STRATEGIC APPROACH FOR ENTERPRISE DEVELOPMENT IN COASTAL FISHING COMMUNITIES IN KENYA

Benchmarking for Improving Water Supply Delivery

Water, Wastewater and Stormwater 2017 Budget 2018 Plan

Case Study for the 2006 HDR PRIVATE VERSUS PUBLIC IN WATER PROVISION: ENCOURAGING CASE OF SRI LANKA

Water Loss Management In Distribution Pipe Basic Knowledge

TERMS OF REFERENCE. Independent Evaluation of the ILO Action Plan for Gender Equality

ON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS

The PSM Consultant will work in close collaboration with UNDP Country Office staff, governments, UN agencies in the areas of their expertise.

REQUEST FOR QUOTES. for. Water Distribution System Leak Detection Equipment

Terms of Reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

European Green Capital Award 2015 Bristol UK Technical Bid

Studies and procedures of water loss reduction in the water supply system of the town of Vidin

Job Profile QUANTITY SURVEYOR (QS-GB-N14)

General Rate Case Application Information

The Manager s Non-Revenue Water Handbook. A Guide to Understanding Water Losses

Santa Margarita Water Audit and Water Loss Control Program Audit Period: Fiscal Year Water Loss Control Program Development

National Technical Advisor to Support the Development of the Action Plan to Implement the Child Protection Policy in Schools

Unit: CPC 415 Assess required outcomes and specify a sustainable supply of services (Commissioning, Procurement and Contracting)

Proposals will be received at 101 East 11 th Street, Suite G13, Chattanooga, TN until 4:00 P M, EST. End of Day on February 3, 2012 End of Day

Energy, the water sector and rapid urbanization in the South. Lessons from Asia, Africa and Latin America

National Water Demand Management Policy

CONSULTANT: Revision of Joint Programmes Guidelines

TITLE OF CONSULTANT: Individual Consultant (IC) to Develop a Strategic Plan and Implementation Program for Business Botswana

Vodafone Global M2M. Smart utilities solutions

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

Terms of Reference for a Gender Analysis

Terms of Reference for Skills and Employability Associate Advisers

REPUBLIC OF KENYA MINISTRY OF WATER AND IRRIGATION (MWI) WATER SECTOR TECHNICAL GROUP (WSTG)

Retail and Reducing Energy Costs: a Working Group of the Retail Consultation Forum Submission in response to CER Consultation CER/16/031

Practical experiences in applying advanced solutions for calculation of frequency of intervention with Active Leakage Control: results obtained

Water Loss Guidelines

Ex post evaluation India

1) Introduction to Information Systems

INTERNATIONAL SEED TESTING ASSOCIATION (ISTA)

Evaluation Office, UNICEF New York (HQ) Terms of Reference. Review of Adolescent Participation in UNICEF Programme Monitoring and Evaluation

GOVERNMENT OF THE REPUBLIC OF MALAWI. Ministry of Irrigation and Water Development. National Water Development Programme (ADB Component) Guidelines

Irish Water Capital Investments

TERMS OF REFERENCE - MONITORING & LEARNING Consultant Evolving a Women-centred Extension Model for Improved Cook Stoves Extension (SWITCH-Asia II)

Terms of Reference. For Individual Consultants/Contractors (IC)

PREQUALIFICATION OF BIDDERS FOR SUPPLY/PROVISION OF GOODS, SERVICES AND WORKS FOR 2016 FINANCIAL YEAR ENDING DECEMBER 2016 CATEGORY CHS/..

MINISTRY OF EDUCATION STATE DEPARTMENT OF BASIC EDUCATION KENYA PRIMARY EDUCATION DEVELOPMENT (PRIEDE) PROJECT TERMS OF REFERENCE

Terms of reference for hiring a consultant to conduct a midterm Value Chain Analysis for UNITAID Private Sector RDT Project in Uganda

CONSULTANT FOR ASSESSMENT OF TECHNICAL ASPECTS OF THE NSP INVESTING IN GRID-CONNECTED SOLAR PV IN THE GAMBIA GENERAL INFORMATION

NEPAD PLANNING AND COORDINATING AGENCY REQUEST FOR EXPRESSIONS OF INTEREST (RFP)

SOUTHWEST AIRLINES CO. AUDIT COMMITTEE CHARTER

Overall placement purpose and specific placement/ partner objectives:

Participatory rural planning processes

Programme Management Team. Assistant Director of Programmes

Malaysia s experience

Project Officer - WASH & Construction

CHAPTER 2 TECHNICAL APPROACH 2 TECHNICAL APPROACH

REACH ASSESSMENT OFFICER IN SOUTH SUDAN

External Evaluation of the Mahatma Gandhi Institute of Education for Peace and Sustainable Development (MGIEP) Terms of Reference

Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19

Terms of Reference for the evaluation of Public Administration Reform Monitoring Project (PARM)

Review of Trinidad and Tobago Water and Sewerage Authority Capital Expenditure Plans and Asset Valuation

VERMONT ELECTRIC COOPERATIVE, INC.

ANNEX I - TERMS OF REFERENCE

FERC Job Title Description (Updated 2/2/2018) Account Representative II, Capacity Services

REQUIRED DOCUMENT FROM HIRING UNIT

Transcription:

WATER SECTOR DEVELOPMENT PROJECT (WSDP) PERFORMANCE BASED FINANCING TERMS OF REFERENCE (TOR) Project/Assignment Title: Rapid Assessment of Scope of Non-Revenue Water Program through Performance-Based Contracts A. BACKGROUND NARUWASCO is a wholly owned water service provider (WSP) company of the County Government of Nakuru. It is responsible for provision of water and sanitation services within the larger parts of Nakuru County except Nakuru and Naivasha Urban Centers. Constitution of Kenya 2010 classifies water as a human right. Among the major challenge faced by the company is the high levels of Non-Revenue Water (NRW). We lose more than half of the water produced. We have now formed an NRW Management unit to strategically focus mainly on developing interventions towards management of NRW. The team reports to the technical manager. This TOR is part of a wider initiative for Country support for NRW performance based Contract (PBC) by the World Bank under the Water Sector Development Project (WSDP) on the World Bank to support Utilities. The World Bank supported program has been designed to catalyze increasingly better practices in the marketplace on PBCs for NRW Management. Better practices are identified in the short term as shorter and more costeffective preparation of PBC transactions and increased number of market participants (suppliers and seekers) active in the market, and in the medium-to-long term by improved efficiency of NRW reduction programs supported by donors (including better value-for-money of PBC activities in NRW management and better sustainability of NRW performance improvements in participating utilities after a PBC has been completed). Objective of this Assignment The objective of this assignment is to assess the status of data recording, network, metering and to develop the concept/outline of an initial scope of a potential nonrevenue water program for the purposes of planning. Specifically the scope of this proposed Rapid Assessment assignment are: Compilation of existing relevant data Description of data collection capacity and gaps in the utility in order to decide whether an extended baseline support is necessary A preliminary assessment of the level of loss and potential target in order to define a broad scope of a NRW program and the cost requirements

An assessment of the key constraints that will impede a successful NRW reduction program, including the availability of water and the level of effort and costs required to address this issue A preliminary assessment of the viewpoints and capacity of various stakeholders to support both the NRW reduction program and their willingness to work with the private sector in a PBC The output/deliverable is a report covering the above named aspects. B. SCOPE OF WORK This assignment expects a 20-40 day level of effort (depending on the size of the utility), mostly in the field from a specialist in non-revenue water management. For (utility), with (number) of connections in an area of (x sq km), a level of effort of (x) days has been established. There are 3 tasks: Compile Existing Relevant Data Based on available records from the utility, discussions with the different departments within the utility and national water institutions compile existing relevant data including an expert assessment of the accuracy of the data to support the decisions/assessments for this assignment. Data collection will include (preferably of 2 to 3 years where pressure and flow data concerned): Technical information o Examine existing distribution network maps, data and set up. o Prepare an overview on the quality, material, lengths and age of the network. o Review data on current network sectorisation, including pressure zones. o Collect data on actual pressure in the network and set points at production locations. o Collect data on the production water meters and their accuracy. o Review information on network monitoring equipment (flow data). o Determine the reservoirs in the network and the management of the reservoirs. o Review the specialized leak detection equipment currently possessed by the utility. o Evaluate leak repair data and determine the annual number of leaks repaired, differentiating them between leaks on service connections and main pipes, both for reported leaks and leaks detected by leak detection teams. o Examine pipeline replacement records as well as existing pipeline replacement plans. o Assess the availability of water supply against forecast demand o Identify key technical challenges to NRW management

Commercial information o Describe the overall management and operational structure of the utility and capacity of staff as it relates to ability to manage NRW program o Review information on current customer metering practices in the utility, including type, manufacturer and age of customer meters used as well as customer meter testing facilities and practices. o Review the customer database (type of customers, connection and disconnection policies, illegal connections) and their consumption profiles o Review the tariff structure (flat rates, unmetered, large customers) o Review billing policies (government structures, temples, etc.) o Review the billing process o Review the collection process o Appraise existing NRW activities including relevant data and records. Water balance o Conduct a water balance according to the methodology of the international water Association at 95% confidence level to estimate the current level of NRW and major root causes. o Development of a NRW reduction strategy and PBC transaction. On the basis of the findings in the above activities and in discussion with the utility staff and management, the adviser will provide recommendations on NRW improvement measures to be taken by the water utility in order to improve the operational performance. Such measures should include the following: a. Physical Losses i. Flow measurements bulk metering ii. Sectorisation District Metered Areas iii. Pressure management pressure zones iv. Leakage control leak repair b. Commercial Losses i. Customer metering meter under registration ii. Meter Management domestic and commercial customers iii. Meter reading Illegal connections iv. Data handling improve accuracy In their report, the consultant will also outline the key constraints that will impede a successful NRW reduction program, including the availability of water and the level of effort and costs required to address this issue and summarize the viewpoints and capacity of various stakeholders to support both the NRW reduction program and their willingness to work with the private sector in a PBC.

C. METHODOLOGY The Consultant will work with utility staff and managers. Most of the work is envisioned to be conducted in-situ. The Consultant will develop an inception report with his/her workplan, data requirements and methodology and whenever necessary to familiarize the different stakeholders in the utility and national oversight institutions during inception, provide a short orientation about NRW Reduction and performance-based contracts. The work will be qualitative and quantitative and will draw on information made available by the utility and data collected by the consultant in cooperation with the utility. The utility will provide all available data and cooperate with the consultant to ensure that the best possible data is provided and the correct analysis can be made. D. DELIVERABLES/SPECIFIC OUTPUTS EXPECTED FROM ASSIGNMENT Based on the above tasks the following reports to be produced: Report A Inception Report (Workplan and Method) 3 days from mobilization Report B Draft Assessment Report with compiled data 16 days from mobilization Report C Final Report 20 days from mobilization E. SPECIFIC INPUTS TO BE PRESENTED BY THE CLIENT The Utility will make available all relevant documents. All information should be treated as confidential and not used for any other purpose. F. SPECIAL TERMS & CONDITIONS / SPECIFIC CRITERIA Language The report should be prepared in English and delivered in Word format. Timing/Assignment Duration The Consultancy will start on [xxxx]. The assignment is expected to be completed in xxx days. Reporting The Consultants will report to the Managing Director who will coordinate with the other members of the Team. Payment Schedule To be included separately.

Required Qualifications and Experience NRW Advisor/Engineer The Team Leader shall have demonstrated successful experience in Non-Revenue Water projects. At all time, the Team Leader will be available for support and backstopping to the Technical Teams. He must have at least 10 years of experience in water supply in similar country contexts with demonstrated experience in NRW issues. Specific expertise on designing NRW projects will be a plus. The Specialist will have extensive familiarity with the use of the IWA Water Balance tools and in the use of performance-based contracts. Utility Commercial Specialist The Utility Commercial Specialist will have at least 10 years of experience dealing with commercial aspects of utility management of utilities (customer metering, billing systems, control of illegal connections and thefts, tariff structures and demand management programs, bills collection) in developing countries. The Utility Commercial Specialist will have advance financial skills and will be able to develop economic assessment of the proposed NRW PBC program. The Specialist will have extensive familiarity with the use of the IWA Water Balance tools. Key Background Documentation Relevant utility reports and documents. Potential Downstream Work (if applicable) Downstream work is possible following this assignment for the repetition or scale-up of the approach, including the support envisioned under the accompanying Terms of Reference for the Country Support: Development of a Performance-Based Contract in Non-Revenue Water Management.