THIS IS NOT A PERMIT DO NO START CONSTRUCTION. City of Pell City. Commercial Building Permit Application

Similar documents
Fill out all sections or mark with N/A (not applicable)

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Commercial Remodel Permit

Residential Building Permit & Inspection Procedures

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

PROCEDURE FOR REQUESTING A BUILDING PERMIT

*Note: Please contact the Soil Erosion Specialist at with questions regarding application requirements

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

Application for Commercial Plan Review and Building Permit. Address:

APPLICATION FOR PORCH / DECK PERMIT

All new construction, mobile home placement & additions.

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

RESIDENTIAL BUILDING PERMIT

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

The following materials and documents are required in order for you to obtain a Building Permit:

Required Information for Permit Issuance

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

PERMIT APPLICATION REQUIREMENTS INTERIOR RENOVATIONS/BUILD OUTS CODES USED: ADOPTED FLORIDA BUILDING CODE & NEC

RESIDENTIAL BUILDING PERMIT INFORMATION

Plainfield Township Building and Zoning Department P.O. Box 247 Hale, MI PH(989) FX(989) Authority: P.A. 230 of 1972 As Amended

CITY OF CARLISLE APPLICATION FOR BUILDING PERMIT

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

Residential New Home Requirements 200 South Main Blue Ridge, Texas

Application Requirements for obtaining a Building Permit

BUILDING PERMIT PROCEDURE PLEASE READ CAREFULLY AND FILL OUT COMPLETELY TO ASSURE QUICK AND ACCURATE SERVICE

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

BUILDING PERMIT APPLICATION

EXCAVATION PERMIT CHECKLIST

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

INC. VILLAGE OF COVE NECK OFFICE: (516) FAX: (516)

City of Donnelly. Permit Application Information and Instructions

PERMIT APPLICATION REQUIREMENTS NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC

II. IDENTIFICATION A. OWNER OR LESSEE ADDRESS (number, street, P. O. Box, Apt., etc.)

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

City of Jacksonville Development Guide Building Permits

COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION

Ordinance No Lot Surface Drainage

City of Centerville Building, Zoning & Code Enforcement Department

2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages

City of Combine CONTRACTOR REGISTRATION FORM TYPE OF CONTRACTOR LICENSE CONTRACTOR INFORMATION

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

THE FOLLOWING INFORMATION IS REQUIRED TO OBTAIN A CITY OF OTHELLO COMMERCIAL BUILDING PERMIT:

Title 15 BUILDINGS AND CONSTRUCTION

CITY OF CRANSTON PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

A homeowners/applicants guide to understanding and making application for a building permit.

SUBSTANTIAL IMPROVEMENT

BUILDING PERMIT GUIDELINES - RESIDENTIAL

City of Branson APPLICATION FOR CONSTRUCTION PERMIT

BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS

BASEMENT FINISH CONSTRUCTION

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

Application for Zoning Certificate and/or Building Permit

TOWN OF WINDSOR CONSTRUCTION GUIDELINES

City of Tacoma Planning and Development Services

BUILDING PERMIT SUBMITTAL REQUIREMENTS LIMITED AGRICULTURAL BUILDINGS

Residential Electrical Upgrade Permit Revised: 11/15/17

CERTIFICATE OF INSPECTION

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

New York State Unified Solar Permit Expedited Solar Permit Process for Small-Scale Roof-Mounted Residential and Commercial Solar Electric

PROJECT ADDRESS: PERMIT #

The Georgian Highlands Where Nature is your Amenity Guidelines to Property Owners Issue 1, July 22, 2003

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

Dave Harper, Building Official (509) Susan Davis, Administrative Secretary (509)

BUILDING PERMIT APPLICATION

Property Address: Builder: Phone #: Address:

Madison County Property Improvement Check List

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

RESIDENTIAL BUILDING PERMIT PROCEDURES

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Residential Building Permit Application

Code Inspections, Inc.

THE CONSTRUCTION SUPERVISOR

Plan Review, Permit & Inspection Fees Schedule

COMMUNITY DEVELOPMENT

Soil Erosion and Sedimentation Control Compliance Form

Last Updated March 15, 2016

HOW TO OBTAIN A BUILDING PERMIT

WE MUST HAVE 72 HOURS NOTICE. Phone

EARLY START PERMITS. Site cleaning, including removal of any existing asphalt, and/or concrete slab, Excavation work under the building footprint,

Building Permit Documentation Required:

NAME: Roadway Public Private *Site Plan (2 Sets) ZONING REVIEW DIVISIONS OF PROPERTY / / TO INSPECTOR / / FEES PAID: BUILDING PERMIT / / $ $ Rcpt.

FENCE PERMIT APPLICATION

Sub-Chapter B To Chapter 14, Building Code

MONROE COUNTY ZONING OFFICE

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the

COMMERCIAL PLAN REVIEW CHECKLIST

B U I L D I N G P E R M I T A P P L I C A T I O N

PUEBLO REGIONAL BUILDING DEPARTMENT WATER CONNECTED & UTILITY CONTRACTOR LICENSING PROCEDURES

CITY OF DENTON ON-SITE SEWAGE FACILITY PERMIT APPLICATION. Permit Number

PERMITS, ADDRESSES, AND INSPECTIONS

Transcription:

THIS IS NOT A PERMIT DO NO START CONSTRUCTION City of Pell City Commercial Building Permit Application Planning & Zoning/Permitting Department 1905 First Avenue North Pell City, AL 35125 (205) 338-2244 (205) 814-9088 Fax MLA

Commercial, Industrial, or Multi-Family Permit Application For office use only. Received application by Date Received: Time: NON-RESIDENTIAL BUILDING PERMIT If you are constructing a new non-family residential structure, an addition, or a renovation of a structure you are required to complete all sections of the attached Building Permit Application. Once completed, return the application package to the Planning and Zoning Department along with all drawings signed by a state approved Professional (Engineer or Architect). Unless there are some unusual circumstance surrounding an application, completed applications submitted prior to 2:00 p.m., Monday through Thursday, should be ready to collect within a minimum of 48 hours after submittal. Applications submitted on Fridays will be ready the following Tuesday. All permit fees will be due at the time you collect your permit. The total fees due upon collection of the permit will generally include all permit fees due from the Building Inspection, Planning and Zoning, Engineering, and Water Departments. The fees do not include Business License fees. A Business License can be obtained through the Revenue Department at City Hall. If you have any questions, please do not hesitate to contact City Hall at (205)338-2244. NOTE TO APPLICANT: Application will not be processed until all required information is provided and applicant signs application. This permit becomes null and void if authorized work or construction has not begun within six months of issuance of permit, or if work is not completed within one year. THIS IS NOT A PERMIT DO NOT START CONSTRUCTION Date of Application: City Limits (_) Police Jurisdiction (_) Permit No.: Zone: Project Street Address: Zip: Parcel No.: Subdivision and Lot No.: Owner/Tenant: Phone No: Cell No: General Contractor: Phone: Cell No: City Lic. No: State Lic. No: Architect/Engineer: Phone: Cell No: Full Estimated Valuation: $ Building Use: Description of Work: Class of Work: New (_) Addition (_) Alteration (_) Raze (_) Repair (_) Accessory (_) Remodel (_) Other (_) # of Floors # of Bedrooms # of Bathrooms Square footage: 1st & 2nd Floor: Total Heated area Total Unheated Area Basement: Total Heated Area Total Unheated Area Attached Garage Occupancy Type: Occupancy Load: TOTAL SQ. FT. Construction Type: IA IB IIA IIB IIIA IIIB IV VA VB Foundation: Slab on Grade (_) Monolithic (_) Crawl Space (_) Sewer Service: City (_) Septic Tank (_) Water Service: City (_) Rural-please specify Form: BPC 062016

SUB-CONTRACTORS SCHEDULE DATE: PERMIT NO: A completed copy of this schedule must be presented to the BUILDING DEPARTMENT WITHIN 15 DAYS OF THE ISSUANCE OF THE BUILDING PERMIT. Should the builder add any subcontractor to the project, the builder will submit the subcontractor s name, address and phone number to the City within three working days of hiring. It is the contractor's responsibility to notify the BUILDING DEPARTMENT of any changes from the original. ALL SUBCONTRACTORS MUST HAVE A CITY OF PELL CITY BUSINESS LICENSE BEFORE WORK IS COMMENCED. City Lic. No. TYPE OF SUB CONTRACTOR NAME & ADDRESS PHONE NO. SITE GRADING FOOTINGS CONCRETE SEPTIC TANK BLOCK/BRICK OTHER MASONRY DRIVIT FRAMER TRIM WORK ELECTRICAL (Will need to pull permit) PLUMBING (Will need to pull permit) HVAC (Will need to pull permit) SHEETROCK ROOFER INSULATION CABINETS CERAMIC TILE PAINT / WALLPAPER GLASS CARPET / VINYL / HARDWOOD LANDSCAPING GARAGE DOOR ALARM SYSTEM SIDING/GUTTERS WATERPROOFING TERMITE CONTROL OTHER

Land Disturbing All projects shall conform to the minimum GENERAL CRITERIA expressed in ADEM's Erosion & Sediment Control Handbook. The permit must be kept on the work site. The City must be notified, in writing, when work commences and when the project is completed. Other work (grading, excavating, construction, etc.) on the project shall not commence until sediment control measures are in place as specified on the approved plan. The applicant agrees to be responsible for any and all damages to installations already in place as a result of work covered by the permit. Applicant agrees to maintain the work in a manner approved upon its completion for a period of one year after final acceptance. A permit may be denied for any applicant, and all permits may be revoked, whenever, in the opinion of the City Engineer or his designated agent, the safety, use or maintenance of the property so requires. A Bond, Letter of Credit, Cash, or Cashier's Check, in the amount equal to 1 1/2 times the cost of implementing the approved Erosion Control Plan is required prior to issuing the permit. The cost of implementing the plan shall be certified as correct to the City Engineer by the engineer who prepared the plan. Release of such amounts posted shall be contingent upon the findings of the final inspection by the City Engineer and shall be made within thirty days after disturbed areas are deemed permanently stabilized by the City Engineer or his designated agent. Estimated Area of Disturbed Soil: Estimated Cost of Erosion Control Measures: Bond Amount (150%): $ Bond Must be Submitted with Application. Certification by Engineer: I,, a registered professional engineer in the State of Alabama, Certificate No. do hereby certify that the amount so noted above is that required to implement the approved erosion control plan. NOTICE - PROPOSED CONSTRUCTION SHALL MEET ALL APPLICABLE CODES I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of law and ordinances governing this work shall be complied with whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of the construction. I also hereby agree to adhere to the erosion and sediment control plan approved by the City for this project for the entire period of the project including regular maintenance of erosion control devices. I understand that violations may result in fines, imprisonment, and/or legal action against me. All correspondence, notice, and citations will be received by me at the above address. Signature of Contractor of Authorized Agent Date Agreement in Lieu of Bond for Erosion Control I, the undersigned applicant for a building permit to construct a 1 to 4 family residential structure in the jurisdiction of the City of Pell City, do hereby certify that I understand all necessary erosion control requirements and agree that, in consideration of the city's issuance of a grading permit to me for this project and the city's waiver of the erosion control bonding requirement for same, I will reimburse the city within 10 calendar days from the city's demand and for all costs and/or damages (including a reasonable attorney's fee and other legal costs) incurred by the city as a result of any violation of ADEM's erosion and sediment control requirements with respect to the project covered by said grading permit. All projects shall conform to the minimum GENERAL CRITERIA expressed in ADEMS's Erosion & Sediment Control Handbook, Responsible Party Date We appreciate the opportunity to assist you throughout the permitting and building process. Please call on us with questions or if you need additional information. Click here to email your application: lriggins@cityofpellcity.net or jjueckstock@cityofpellcity.net Thank You, Larry Riggins Building Inspector Jeanette Jueckstock Planning & Zoning Administrator Form: BPC 062016

F OR OFFICE USE ONLY Applicant Name: Project Address: Permit Fees: CITY OF PELL CITY RESIDENTIAL/COMMERCIAL PERMIT ROUTING FORM Planning: Zone: Site Plan Review: Yes (_) No (_) Date Approved $ Approved By: Date: Time: ******************************************************************************************************* Engineering: Flood Hazard: Yes (_) No (_) FFE: Basements: Yes (_) No (_) Cut: Yes (_) No (_) Fill: Yes (_) No (_) Fill Amt: Estimated Cost of Erosion Control Measures: $ Land Disturbance$ $ Bond Amount (150%): $ (must accompany application) Approved By: Date: Time: ****************************************************************************************************** Building Building: Electrical: Grading/Excavating: Sign: Inspector: Mechanical: Plumbing: Demolition: Other: Approved By: Date: Time: Total Building Permit Fees: $ Received By: Check Number: Water & Sewer Fees Commerical ( ) Residential ( ) Industrial ( ) Mobile Home ( ) Reviewed By: Date Comments: Reviewed By Water & Sewer Dept Head: Date Approved By: Date: Municipal Consultants: Date: Time: Utility Deposit Fee - Meter Fee (size ) - Water Inspection Fee - Water Capital Recovery Fee (WCR) - Sewer Impact Fee (SIF) - Sewer Tap Inspection Fee - Other Fee - - Total Water & Sewer Fees Due $0.00 Payment Received By: Check Number: ************************************************************************************************************ Plans reviewed and approved by Departments and City Engineers prior to issuing a Permit Mike Burdette, Fire Chief Shaun Clevenger, Assistant Fire Chief Freddy Hazelwood Date: Date: Date: CDG Engineers Municipal Consultants Other