SECTION HEAT TRACING FOR PLUMBING PIPING

Similar documents
SECTION SANITARY WASTE INTERCEPTORS

SnoTrace TM RGS TM Systems for Roof and Gutter Snow and Ice Melting

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

Nuheat WEATHER-READY ROOF & GUTTER DE - ICING SYSTEM. 13mm Self-Regulating Heating Cable. UV Resistant Polyolefin Outer Jacket

Type FLX Freezer Floor Frost Heave Protection DESIGN GUIDE

SECTION INSULATED WIRE AND CABLE

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

DIVISION LOW VOLTAGE DE-ICING / SNOW MELTING SYSTEM UNDER METAL ROOFING

Roof & Gutter Ice/Snow Melting Design Guide

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

A. Product Data shall be provided for each type of product indicated.

Section ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION WIRE AND CABLE Raceways and Conduit Motor Power and Control Wiring.

Standard of Practice - Campus Electrical Distribution System

SECTION ROOF SPECIALTIES

SECTION LOW-VOLTAGE SWITCHGEAR

SECTION GROUNDING AND BONDING

Installation of CSST Gas Piping Systems

SECTION INFLUENT EQUALIZATION TANK PUMPS

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

SECTION 9810 ACOUSTICAL SPACE UNITS BAFFLES AND CLOUDS

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

SECTION ACCORDION FOLDING PARTITIONS

ROOF ICE MELT RIM SYSTEM

SECTION EXPANSION CONTROL

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION

SELF-REGULATING ROOF HEAT CABLE. Installation Guide WS-SRIM V2.0

SpeedTrace Roof & Gutter Pre-Assembled Self-Regulating Heating Cable

SECTION ACTIVE VEHICLE BARRIERS

SECTION MANUFACTURED ROOF EXPANSION JOINTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

EDGEWATER, FLORIDA JUNE 14, 2010

*** Supercedes: BECO E and COM , , & ***

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

Permitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS

SECTION SLUDGE HOLDING TANK DECANTER PUMP

B. Shop Drawings: For air terminal units. Include plans, elevations, sections, details, and attachments to other work.

SECTION ALUMINUM STORM WINDOWS

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

DETAIL SPECIFICATION SHEET CABLE, ELECTRICAL, -20 C TO +105 C, 1000 VOLTS, TYPE LSFSGU

SECTION CHAIN-LINK FENCES AND GATES 02821/1

Installation Instructions Self-Regulating (sr) roof and gutter

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).

SECTION 07530CP EPDM MEMBRANE ROOFING

8.1.2 Under no circumstances shall a service entrance be left unmetered. Notify the Company if an unmetered service is encountered.

The University of Texas at Austin September 30, 2011

FLAT ROOF HEATING RIBBONS INSTALLATION INSTRUCTIONS

TECHNICAL SPECIFICATIONS DIVISION 16 - ELECTRICAL SECTION DETAIL SPECIFICATIONS FOR ELECTRICAL INSTALLATION

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

Conductor Shield A combination of semi-conducting tape and extruded thermosetting semi-conducting material meeting UL 1309, IEEE 1580 and UL1072.

DIVISION 26 ELECTRICAL Electrical Power Conductors and Cables

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

(Condensed from National Electric Code)

15 kv EPR Insulated, Jacketed, URD Cable

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Shur-Shot X-Proof Hydrogen Fluoride Alarm Operations Manual

SECTION DENTAL VACUUM AND EVACUATION EQUIPMENT

SECTION METAL ROOF PANELS

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Lamit Industries, Inc. 710 Marion Road Columbus, Ohio P-(614) F-(614)

Installation Guide 3CWC Floor Heating Cable System This guide is valid for all our 3CWC floor heating cable systems.

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

G. UNDERWRITERS LABORATORY, INC.: 1. UL 325: Electrical Door, Drapery, Gate, Louver, and Window Operators and Systems

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

Nuheat Mat FLOOR HEATING SYSTEM. Installation Guide TILE, STONE & MARBLE LAMINATE & ENGINEERED WOOD

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

SECTION COOLING TOWER

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

THERMOFIT ADHESIVE S Flex Fluid Resistant, High Temperature, One Part-Flexible Epoxy

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

SECTION PACKAGE BOOSTER PUMP STATIONS

Price Single Duct Terminal Units

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,

SOLAR SHADING SYSTEMS - Manual Solar Shade SECTION ROLLER WINDOW SHADES

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION REFLECTIVE-FACED, MASONRY CAVITY WALL INSULATION

SECTION MODIFIED BITUMINOUS SHEET WATERPROOFING

SECTION CHAIN LINK FENCES AND GATES

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

NEC 2014 Code Changes

SECTION RESILIENT SHEET FLOORING

Section Domestic Water Piping (Hot and Cold Water Potable Water Distribution)

Transcription:

SECTION 22 05 33 HEAT TRACING FOR PLUMBING PIPING PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. Coordinate electrical requirements with Electrical Engineer. Electrical power requirements shall be as shown on the drawings. 3. Heat tracing shall not be used in lieu of hot water circulation systems for domestic hot water. A. This section describes the requirement for supplying, installing, and testing of the electric heat tracing system of the plumbing piping. Freeze protection shall be utilized for domestic water piping in areas subject to freezing temperatures. Ice and snow melting shall be utilized for gutters, downspouts, roof drain bodies and roof drain leaders exposed to snow and ice accumulation. B. A complete listing of all acronyms and abbreviations are included in Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING. 1.2 RELATED WORK A. Section 01 00 00, GENERAL REQUIREMENTS. B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. C. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS. //D. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.// E. Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING. F. Section 22 07 11, PLUMBING INSULATION. //G. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.// H. Section 26 05 19, LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES. 1.3 APPLICABLE PUBLICATIONS SPEC WRITER NOTE: Make material requirements agree with applicable requirements specified in the referenced Applicable Publications. Verify and update the publication list to that which applies to the project, unless the reference applies to all plumbing systems. Publications that apply to all plumbing systems may not be specifically 22 05 33-1

referenced in the body of the specification, but, shall form a part of this specification. A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only. B. The Institute of Electrical and Electronic Engineers (IEEE): 515.1-2012...Standard for the Testing, Design, Installation, and Maintenance of Electrical Resistance Trace Heating for Commercial Applications C. International Code Council, (ICC): IPC-2012...International Plumbing Code D. National Fire Protection Association (NFPA): 70 2011...National Electrical Code (NEC) E. Underwriters' Laboratories, Inc. (UL): 508-99 (R2013)...Standard For Industrial Control Equipment 1.4 SUBMITTALS A. Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES. B. Information and material submitted under this section shall be marked SUBMITTED UNDER SECTION 22 05 33, HEAT TRACING FOR PLUMBING PIPING, with applicable paragraph identification. C. Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity. 1. Rated capacity. 2. Length of cable. 3. Cable spacing. 4. Electrical power requirements. 5. Controls. 6. Enclosures. 7. Accessories. D. The shop drawings shall include plans, sections, details, wiring diagrams, and attachments to other work. The wiring diagrams shall include power, signal, and control wiring. E. Field quality control test reports shall be submitted. 22 05 33-2

F. Operation and Maintenance data in accordance with section 1.6. 1.5 QUALITY ASSURANCE A. Manufacturer Qualifications: Ten years experience in design, engineering, manufacture and support of specified system and components. B. Product Requirements: 1. Pipe or tank tracing cable assembly shall be factory assembled, immersed in water for a minimum of 12 hours, and then tested for insulation resistance, high potential breakdown and continuity before leaving the factory. 2. Factory Mutual approved heating cable that has the same wattage per lineal foot (power output), throughout its entire length. 3. UL Listed, thermostat and contactor panel. 4. UL Listed Control/Monitor Panel. C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. D. Bio-Based Materials: For products designated by the USDA s Bio- Preferred Program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all performance requirements in this specifications section. For more information regarding the product categories covered by the Bio- Preferred Program, visit http://www.biopreferred.gov. 1.6 AS-BUILT DOCUMENTATION SPEC WRITER NOTE: Coordinate O&M Manual requirements with Section 01 00 00, GENERAL REQUIREMENTS. O&M manuals shall be submitted for content review as part of the close-out documents. A. Submit manufacturer s literature and data updated to include submittal review comments, construction revisions and any equipment substitutions. B. Submit operation and maintenance data updated to include submittal review comments shall be inserted into a three ring binder. All aspects of system operation and maintenance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the operation and maintenance manual. The operations and maintenance manual shall include troubleshooting techniques and 22 05 33-3

procedures for emergency situations. Notes on all special systems or devices such as damper and door closure interlocks shall be included. A List of recommended spare parts (manufacturer, model number, and quantity) shall be furnished. Information explaining any special knowledge or tools the owner will be required to employ shall be inserted into the As-Built documentation. PART 2 - PRODUCTS SPEC WRITER NOTE: Coordinate and assure that the electrical characteristics specified below are clearly shown on appropriate drawings. Coordinate with Electrical Engineer. 2.1 PLASTIC INSULATED SERIES RESISTANCE HEATING CABLES A. The plastic insulated series resistance heating cables shall comply with IEEE 515.1. B. The heating element shall be a single or dual strained resistor wire. Terminations shall be made with waterproof, factory assembled non heating leads with connectors at both ends. C. The electrical insulated jacket shall be a minimum 0.10 mm (4.0 mil) polymeric with silicone jacket, ETFE or polyolefin. The cable cover shall be aluminum braid //and silicone or Hylar outer jacket//. D. The maximum operating temperature shall be 150 degrees C (302 degrees F). E. Maximum exposure temperature shall be 85 degrees C (185 degrees F). F. The capacities and characteristics shall be: 1. Maximum heat output //19.7 W/m (6 W/foot// //24.6 W/m (7.5 W/foot)//. 2. Pipe Diameter: //INSERT Nominal Pipe Size VALUE//. 3. Number of parallel cables: //INSERT VALUE//. 4. Spiral wrap pitch: //INSERT VALUE//. 5. Volts: //INSERT VALUE//. 6. Phase: //INSERT VALUE//. 7. Hertz: //INSERT VALUE//. 8. Full load amps: //INSERT VALUE//. 9. Minimum circuit ampacity: //INSERT VALUE//. 10. Maximum over current Protection: //INSERT VALUE//. 2.2 SELF-REGULATING PARALLEL RESISTANCE HEATING CABLES A. Self-regulating parallel resistance heating cables shall comply with IEEE 515.1. 22 05 33-4

B. The heating element shall be a pair of parallel No. 16 AWG //tinned// //nickel coated// stranded copper bus wires embedded in cross linked conductive polymer core, which varies heat output in response to temperature along its length. Cables shall be terminated with waterproof, factory assembled non heating leads with connects at one and seal the opposite end watertight. The cable shall be capable of crossing over itself without overheating. C. The electrical insulating jacket shall be flame-retardant polyolefin. D. The cable cover shall be //tinned copper// //stainless steel// braid //,and polyolefin outer jacket with UV inhibitor//. E. The maximum power on operating temperature shall be 65 degrees C (150 degrees F). F. The maximum power off exposure temperature shall be 85 degrees C (185 degrees F). G. The capacities and characteristics shall be: 1. Maximum heat output //9.8 W/m (3.0 W/foot)// //16.4 W/m (5.0 W/foot)// //26.0 W/m (8.0 W/foot)// //32.8 W/m (10.0 W/foot)// //39.4 W/m (12.0 W/foot)//. 2. Pipe Diameter: //INSERT Nominal Pipe Size VALUE//. 3. Number of parallel cables: //INSERT VALUE//. 4. Spiral wrap pitch: //INSERT VALUE//. 5. Volts: //INSERT VALUE//. 6. Phase: //INSERT VALUE//. 7. Hertz: //INSERT VALUE//. 8. Full load amps: //INSERT VALUE//. 9. Minimum circuit ampacity: //INSERT VALUE//. 10. Maximum over current Protection: //INSERT VALUE//. 2.3 CONSTANT WATTAGE RESISTANCE HEATING CABLES A. Constant Wattage Resistance Heating Cables shall comply with IEEE 515.1. B. The heating element shall be a pair of parallel No. 12 AWG, //tinned// //nickel-coated// stranded copper bus wires with single stranded resistor wire connected between bus wires. The heating element shall be terminated with waterproof, factory assembled non-heating leads with connectors at one end, and seal the opposite end watertight. C. The electrical insulating jacket shall be flame retardant fluoropolymer. 22 05 33-5

D. The cable cover shall be //tinned copper// //stainless steel// braid and polyolefin outer jacket with UV inhibitor. E. The maximum operating temperature shall be 200 degrees C (392 degrees F). F. The maximum exposure temperature shall be 200 degrees C (392 degrees F). G. The capacities and characteristics shall be: 1. Maximum heat output //13.1 W/m (4.0 W/foot)// //26 W/m (8.0 W/foot)// //39.4 W/m (12.0 W/foot)// //32.8 W/m (10.0 W/foot)// //39.4 W/m (12.0 W/foot)//. 2. Pipe Diameter: //INSERT Nominal Pipe Size VALUE//. 3. Number of parallel cables: //INSERT VALUE//. 4. Spiral wrap pitch: //INSERT VALUE//. 5. Volts: //INSERT VALUE//. 6. Phase: //INSERT VALUE//. 7. Hertz: //INSERT VALUE//. 8. Full load amps: //INSERT VALUE//. 9. Minimum circuit ampacity: //INSERT VALUE//. 10. Maximum over current Protection: //INSERT VALUE//. 2.4 CONTROLS A. Pipe mounting thermostats for Freeze protection shall have be a remote bulb unit with adjustable temperature range from minus 1 to 10 degrees C (34 to 50 degrees F). The thermostat shall be snap action, open-onrise, single pole switch with minimum current rating adequate for the connected cable. The thermostat shall be remote bulb on capillary, resistance temperature device, or thermistor for direct sensing of pipe wall temperature. The control enclosure shall be corrosion resistant and waterproof. B. The precipitation and temperature sensor for snow melting on roofs and in gutters shall be //automatic// //microprocessor// based control with manual on, automatic, and standby/reset switches. The precipitation and temperature sensors shall sense the surface conditions of roof and/or gutters and shall be programmed to energize the cable as follows: 1. Temperature span between 1 to 7 degrees C (34 to 44 degrees F). 2. Adjustable delay off span between 30 and 90 minutes. 3. Following a two minute delay, the cables shall be energized if ambient temperature is below set-point and precipitation is detected. 22 05 33-6

4. The cables shall be de-energized upon detection of a dry surface plus a time delay of 15 minutes. C. The enclosure shall be the NEMA 4X type. D. A minimum 30 amp contactor shall be provided to energize cable or close other contactors. Provide relay with contacts to indicate operational status, on/off, and for interface with central energy management and control system. 2.5 ACCESSORIES A. Cable Installation Accessories: Fiberglass tape, heat-conductive putty, cable ties, silicone end seals and splice kits, and installation clips all furnished by manufacturer, or as recommended in writing by manufacturer. B. Warning Labels: Shall comply with NFPA 70. C. Warning Tape: Continuously printed "Electrical Tracing"; vinyl, at least 0.08 mm (3 mils) thick, and with pressure-sensitive, permanent, waterproof, self-adhesive back. 1. Width for Markers on Pipes with Outside Dimension, Including Insulation, Less Than 150 mm (6 inches): 19 mm (3/4 inch) minimum. 2. Width for Markers on Pipes with Outside Dimension, Including Insulation, 150 mm (6 inches) or Larger: 38 mm (1-1/2 inches) minimum. PART 3 - EXECUTION 3.1 GENERAL A. Inspect surfaces and substrates of electric heating cables for compliance with requirements of this specification. Ensure surfaces and pipes in contact with electric heating cables are free of burrs and sharp protrusions. B. Notify COR if the existing substrate conditions are unsuitable for application of heating cables in accordance with manufacturer s recommendations. C. If the installation of the heat tracing is unsatisfactory, then the Contractor shall correct the installation at no cost to the Government. 3.2 INSTALLATION SPEC WRITER NOTE: Evaluate the need to place heat tracing cables on emergency power on any service supporting acute patient care. A. Electric heating cable shall be installed for the following applications: 22 05 33-7

1. Snow and ice melting on roofs, in gutters and downspouts, roof drain bodies, and roof drain leaders: //Plastic-insulated seriesresistance// //Self-regulating parallel-resistance// //Constantwattage resistance// heating cable. 2. Freeze protection of plumbing piping: //Plastic-insulated seriesresistance// //Self-regulating parallel-resistance// //Constantwattage resistance// heating cable. B. Electric heating cable shall be installed across expansion, construction, and control joints according to the manufacturer s recommendations using cable protection conduit and slack cable to allow for movement without damage to cable. C. The installation of electric heating cable for snow and ice melting on roofs, gutters and downspouts, and roof drain leaders shall be provided with clips furnished by the manufacturer that are compatible with roof, gutters and downspouts and roof drain leaders. D. Electric heating cable for pipe freeze protection shall be installed according to the following: 1. Electric heating cables shall be installed after piping has been tested and before insulation is installed. 2. Electric heat cables shall be installed according to IEEE 515.1 3. Insulation shall be installed or applied over piping with electric cables. Refer to Section 22 07 11, PLUMBING INSULATION. 4. Warning tape shall be installed on pipe insulation where piping is equipped with electric heating cables. E. Field adjustable switches and circuit breaker trip ranges shall be set. F. Heating cables including leads shall be protected from damage. G. Equipment shall be grounded according to Section 26 05 19, LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES. H. Wiring shall be connected according to Section 26 05 19, LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES. 3.3 TESTS SPEC WRITER NOTE: Coordinate testing and commissioning with Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS and 01 91 00, GENERAL COMMISSIONING REQUIREMENTS. A. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components, assemblies, and equipment installations, including connections. 22 05 33-8

B. Perform the following tests and inspections //with the assistance of a factory-authorized service representative//: 1. Perform tests after cable installation but before application of coverings such as insulation, wall or ceiling construction, or concrete. 2. Test cables for electrical continuity and insulation integrity before energizing. 3. Test cables to verify rating and power input. Energize and measure voltage and current simultaneously. C. Repeat tests for continuity, insulation resistance, and input power after applying thermal insulation on pipe-mounted cables. D. If deficiency is found, Contractor shall correct all deficiencies at no cost to the Government. E. Prepare test and inspection reports. - - - E N D - - - 22 05 33-9