Ⅰ. Introduction of Samcheok Green Power

Similar documents
Samcheok Green Power 4 x 550 MW e Supercritical Circulating Fluidized-Bed Steam Generators in South Korea

Towards New Milestones In CFB Boiler Technology CFB 800MWe

Adoption of USC CFB Technology to Achieving Lower Cost Generation and Environmental Sustainability. Gerd Heiermann & Douglas Spalding

Circulating Fluidized Bed Technology for Large Scale Power Generation Using Coal and Petroleum Coke

State of the art CFB technology for flexible large scale utility power production

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

The Latest CFB Technology Developments for Flexible Large Scale Utility Power Production

COAL WATER SLURRY FUEL Alternate Fuel for Thailand

Circulating Fluidized Bed Technology Towards 800 MWe Scale Lagisza 460 MWe Supercritical CFB Operation Experience

FLEXI BURN CFB WP4: Boiler design and performance

High efficient multi-fuel CYMIC concept for biomass, rejects and coal for Hamburger Hungaria Katriina Jalkanen Valmet Technologies Oy

The Introduction of Foster Wheeler s 660 MWe Supercritical CFBC Technology for the India Market

Worldwide Pollution Control Association. August 3-4, 2010

DEVELOPMENT OF FLEXI-BURN CFB BOILER CONCEPT FOR OXY-CFB-300 COMPOSTILLA PROJECT

Lünen State-of-the-Art 813MW Coal-Fired USC Boiler with High Efficiency and Flexibility

Circulating Fluidised Bed Technology for Indian and other coals Dr John Topper IEA Clean Coal Centre, London

IMPACT OF OPERATING CONDITIONS ON SO 2 CAPTURE IN A SUPERCRITICAL CFB BOILER IN POLAND

Foster Wheeler Energia Oy P.O.BOX 201, FI Varkaus, Finland

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013

J-POWER s CCT Activities

Welcome to. Kendal Power Station

REC weight factor for different renewable energy source REC : Renewable Energy Certificate

Impact of novel PCC solvents on existing and new Australian coal-fired power plants 1 st PCC Conference, Abu-Dhabi

8 th SGC International Seminar on Gasificaton October 15 th -16 th, 2014 Malmö, Sweden

UPDATE ON THE KEMPER COUNTY IGCC PROJECT Gasification Technologies Conference

ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP)

Development of Integrated Flexi-Burn Dual Oxidant CFB Power Plant

Fuel Flexible CFBs are the Future of Solid Fuel Power Generation

Babcock Borsig Steinmüller GmbH. Bełchatów - Retrofitting the EU s Largest Power Plant Site

Development of High Efficiency CFB Technology to Provide Flexible Air/Oxy Operation for Power Plant with CCS FLEXI BURN CFB

Foster Wheeler Advanced Bio CFB Technology for Large Scale Biomass & Peat Firing Power Plants

Clean Energy. from. Renewables Biomass & Waste

WHITE PLUME REMOVAL USING FUEL ADDITIVES IN THERMAL POWER PLANTS

Member State Perspectives PROMOTING HIGH- EFFICIENCY LOW-EMISSION COAL POWER PLANTS JAPAN

Commercial scale gasification to replace fossil fuel in power generation Vaskiluodon Voima140 MW CFB Gasification Project

DEVELOPMENT OF HITACHI OXY-COMBUSTION TECHNOLOGY WITH NEW TYPES OF BURNER AND FLUE GAS RE-CIRCULATION SYSTEM

SCR for NO x Control in Coal-fired Power Plants

CO2 Capture with Foster Wheeler s Flexi-burn TM CFB Technology

Kazushige KUROSAWA*, Zhibao ZHANG**, and Zhengbing WANG** [Delivered Products & Systems] 1. Introduction. 2. Overview of Nanjing

NCCI Conference. Design and Operational Aspects. Hybrid Energy Center. David Leaf Manager Projects

New 790-Megawatt Unit. Council Bluffs Energy Center

MIT Carbon Sequestration Forum VII Pathways to Lower Capture Costs

Experiences from Commissioning and Test Operation of Vattenfall s Oxyfuel Pilot Plant

Kozienice Power Plant - ENEA Group

Development of CFBC concepts and problem solution with the aid of simulation programs

Development of Foster Wheeler s Vision 21 Partial Gasification Module

COAL-FIRED POWER PLANT PLANNING ASSUMPTIONS

Retrofit of Rodenhuize 4 power station: The Max Green and Cold Back-up-projects

Meeting New Environment Norms - Challenges and Possibilities. Presented by: A.K.Sinha General Manager NTPC Limited

Pond Closures: Solving a Complicated Puzzle

Development status of the EAGLE Gasification Pilot Plant

Approach to Overseas EPC Project

A Verification on Design Performance of 300MW Class CFB Boiler

Mercury and SO3 Mitigation Issues for Scrubber Technology

A TECHNICAL AND ECONOMIC ANALYSIS OF LARGE SCALE BIOMASS COMBUSTION

FIRING ESTONIAN OIL SHALE IN CFB BOILERS ASH BALANCE AND BEHAVIOUR OF CARBONATE MINERALS

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM

CFB Technology for Coal, Lignites and Petcokes. PowerGen Asia, Bangkok, Sept 19-21, 2017

What is FGD Gypsum? Presented By E. Cheri Miller Gypsum Parameters, LLC Tennessee Valley Authority (Retired)

- The Osaki CoolGen Project -

Fundación Ciudad de la Energía CIUDEN

Coupling gasification and metallurgical applications

Questionnaire (Conventional Energy)

Fundamental oxy-fuel combustion research carried out within the ENCAP project

Foster Wheeler BFB Boilers Licensee Expertise for Brazilian Markets. October 29, 2014

IEA Clean Coal Centre.

LIMESTONE INJECTION FOR PROTECTION OF SCR CATALYST

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

GE solutions for NOx compliance and increased availability for WtE / Biomass plants

Efficient Combustion of Waste Fuel with Supercritical CFB Technology

Chapter 3 Coal-Based Electricity Generation

Three years operational experiences with the Oxyfuel Pilot Plant of Vattenfall in Schwarze Pumpe

INDUSTRIAL ACCESSORIES COMPANY

Oxyfuel retrofit to coal power plant (Part1) - FS of 500MW class plant

Synthesis Gas Production from Biomass

Thermal Integration of an MEA Post Combustion Carbon Capture System With a Supercritical Coal Fired Power Plant

Results and estimations of the 5,000 Hour Durability Test at the Nakoso Air Blown IGCC plant (including other activities)

40 CFR Part 257. Rollin M. Schahfer Generating Station

Biomass Boiler Emission Abatement Technologies. Simon Wakefield

Clean Coal Technology Roadmap CURC/EPRI/DOE Consensus Roadmap

KEPCO KEPRI Kim eui hwan

Operating Experience of Circulating Fluidized Bed Scrubbing Technology in Utility Size Power Plants

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016

Technology and Prospect of Process Heat Application of HTR(High temperature gas cooled reactor) Applications in Oil Refining Industry

Focus on Gasification in the Western U.S.

Design and Operation of Biomass Circulating Fluidized Bed Boiler with High Steam Parameter

Design, Construction, and Commissioning of a Pilot-Scale Dual Fluidized Bed System for CO 2 Capture

Ventum Series. The new Generation Wood Gasification Boilers. Europe s Fastest Selling Wood Gasification Boiler.

The Progress of Osaki CoolGen Project

Kuyasa mine-mouth coal-fired power project: Evaluation of circulating fluidized-bed technology

Smart CHP from Biomass and Waste

Coal Fired Power Plant Bottom Ash Wet To Dry Conversions / Case Studies. Presented By: Gerald Long

THE NOVELEDGE IGCC REFERENCE PLANT: COST AND EMISSIONS REDUCTION POTENTIAL. Gasification Technologies 2004, Washington, DC, October 6, 2004

Phosphate Plant Yield Comparisons

VESTA a Novel SNG Technology

TruePeak TDLS200. NH 3 Slip Measurement. <Document Number> Copyright Yokogawa Electric Corporation <date/time>

Controlling Ammonia-in-Ash through Direct Measurement of Ammonium Bisulfate

Presentation on Radhe s Advanced Gasification Technologies

COGENERATION PLANT FAQ. What is biomass cogeneration? Cogeneration is the simultaneous production of electricity and heat using a single primary fuel.

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET

Transcription:

Ⅰ. Introduction of Samcheok Green Power

Construction for the Samcheok Green Power Project Name : Samcheok Green Power Unit 1,2 Location : East Coast of Korea Before construction 호산항 작진항 Under construction Area : about 2.6million m 2 (Land 1.6million m 2 + Sea 1million

Construction for the Samcheok Green Power Capacity : 2,000MW (1,000MW 2units) Fuel : Coal (Subbituminous Coal & Biomass co-firing) Generation Quantity : 15,768 GWh/year (at 90% availability) Major Equipment - Main Equipment (The World`s First Supercritical CFBC Boiler & Turbine 2:1 Configuration) CFBC Boiler 500MW CFBC Boiler 500MW Gen. 1,000MW Boiler - B.O.P : Mech. 20 Package + I&C 13 Package : Supercritical, CFBC : Manufacturer - Foster Wheeler Turbine Generator : Tandem Compound, Reheat, Condensing Turbine : Manufacturer Toshiba

Aerial View of Samcheok Green Power Control Room with Stack Unit2 Boiler Biomass Equip. Coal Shed Unit1 Boiler Unit2 Turbine Unit1 Turbine Small Hydro Power Equip. SNG Equip. 3 rd Fuel Unloading Dock Coal Unloading Dock

Construction Milestones 2009. 8 Planning 2011. 1 Start site grading 2012. 5 Constuction Permit 2012. 6 Excavation 2013. 8 Start pressure part installation 2014. 6 Power receiving 2015. 1 Initial firing 2015.12 Unit 1 COD (43 months from excavation) 2016. 6 Unit 2 COD (49 months from excavation)

Ⅱ. Samcheok CFBC Boiler

Samcheok CFBC Boiler Samcheok Green Power Conditions Outlet Steam Condition - Flow ton/h 1,572 / 1,296 - Pressure bar 255.5 / 52.8 - Temperature deg.c 603 / 603 Fuel Range Design Range HHV (af) Kcal/kg 4,250 Min. 3,750 Moisture (af) % 33.5 Min. 43 Ash (ad) % 4.5 1.21~17 Sulfur (ad) % 0.1 Max 1.0

Samcheok CFBC Boiler Configuration of Boiler Benson type Vertical tube furnace 8 Cyclones per boiler INTREX Heat Exchanger - 4ea S/H and 4ea R/H Regenerative air preheater 8 Coal silos and 1 Biomass silo

Samcheok CFBC Boiler Cyclone Arrangement Steam system Steam Cooled type Compact type Refractory 8 Cyclones per boiler Economizer system Evaporator system Superheater system Reheater system

Plant Condition & Fuel Comparison Comparison Table Division PC Power Plant (Example) (500MW) Lagisza Power Plant (460MW) Samcheok Green Power (500MW) Steam Condition <@BMCR> Flow (SH/RH) Pr.(SH/RH) Temp.(SH/RH) 1,605/1,281 t/h 255/53.78 bar 569/596 1,300/1,102 t/h 275/55 bar 560/580 1,572/1,296 t/h 255.5/52.8 bar 603/603 Environment Condition Sox Nox Dust 40 ppm 50 ppm 15 ppm 69.9 ppm 97.3 ppm 30 [mg/nm3] 50 ppm 50 ppm 15 ppm Design Coal Analysis Heating Value Total Moisture Ash Sulfur 6,080 kcal/kg(hhv) 10 %(AF) 15 %(AD) 0.72 %(AR) 5,015 kcal/kg(hhv) 12 %(AF) 26.1 %(AD) 1.2 %(AF) 4,250 kcal/kg(hhv) 33.5 %(AF) 4.5 %(AD) 0.1 %(AF) Biomass Analysis Heating Value Total Moisture Ash N/A 2268.6 kcal/kg(lhv) 45 % 1.3 % 3773.04 kcal/kg(lhv) 5~15 % 0.7~16.2 %

Plant Configuration (2:1) : Overcome the 500MW capacity limitation Unit 1 Unit 2 CFBC Boiler 500MW CFBC Boiler 500MW CFBC Boiler 500MW CFBC Boiler 500MW Generator 1,000MW Generator 1,000MW World s 1 st 2:1 combined Once Through SC CFB power plant 1,000MW Toshiba 48 inch LSB Turbine

Environmental Equipment - Reduction of Foot Print Past Power Plant <Eco. Outlet> SOx : 1,000 ppm NOx : 180 ppm SCR E.P Wet FGD SOx : 40ppm NOx : 50ppm Dust : 15ppm PC Boiler Samcheok Green Power Gypsum Stack <Eco. Outlet> SOx : 50 ppm NOx : 175 ppm SCR E.P SOx : 50ppm NOx : 50ppm Dust : 15ppm FGD removed CFBC Boiler Stack

Ⅲ. Eco-Friendly Power Plant

Not In My Back Yard NIMBY Stack Coal Stock Yard Ash Pond

Eco-Friendly Multi Complex Office Using Stack Viewing Control Restaurant Office Room Deck New Concept

3 No Power Plant No Visible Coal Storage Ash Recycling Waste Water RECYCLE No Outdoor Coal Stock Yard No Discharge No Ash Pond

Plant Site with Non-visible Coal Storage

Plant Site with Non-visible Coal Storage Existing Power Plant Outdoor Conveyer Samcheok Green Power A.B.C(Air-supported B.C.) & Underground Conveyer Complex spider web of conveyors Non-efficient land use Coal is transferred by air slides

No Ash Pond Existing Power Plant Environmentally Unfriendly Disposal of Ash Waste

No Ash Pond Ash handling system 100% recycling - Using bottom ash for light aggregate, fly ash for cement - Remaining ash will be used for mine back fill - No need for an ash pond Mine Back fill CFBC Boiler ESP Stack Cement Material Producing light aggregate -> selling as a construction material Bottom Ash Fly Ash

Abandoned Mine Backfill by Ash Abandoned Mine

Water Supply : A New Idea Existing Samcheok Choice 1. Recirculation of retention basin discharge Plant Water supply Underground Channel Choice 2. Seawater desalination Water pond Intake from new dam or existing dam Desalination Facility Storage Tank Plant New Dam Construction Expensive, Impact on environment and civil issues Sea

Water & Waste Water Treatment : No Waste Water Discharge Existing Plant Samcheok Dam Retention Desalination Rain water Treated Water Waste Water Treated Water Waste Water Dumped into the sea Discharge : about 900 tons/day Zero discharge by closed loop system of water & waste water treatment system

Ⅳ. Clean Energy Production

1. SNG SNG Coal gasification using low grade coal Keep in LNG storage tank & use for CCPP alternative fuel KOSPO operates a number of CCPP Hard to introduce LNG directly Coal gasification as an alternative fuel

2. Small Hydro-power Using discharge Capacity : 5,500 kw (1,375kW x 4 Units) Type : Kaplan

Ⅴ. Status of Construction Work

1. Status of Construction Work Air Photograph of Samcheok Green Power (Sep. 2013) 3 rd Fuel Unloading Dock Sea Water Disch. Carrying Spot #1,2 BLR Carrying Spot EP Stack and Control BLDG. Switch yard Construction Office Air Photograph of Samcheok Green Power (`2013. 7)

1. Status of Construction Work Construction Photographs

1. Status of Construction Work Construction Photographs

1. Status of Construction Work Construction Photographs

Site Formation : Reduction of earthwork volume with a multi-stage site grading plan Existing Plant Flat Ground Elevation 150m Samcheok Multi-stage Ground Elevation 90m [Save $42 million] 60m Reduce earthwork volume 700 million m3 [Save $83 million]

Unloading Dock : Both Side Access Existing [One Side Access : 2 Piers Required] Length of Jetty : 1,4OO m Samcheok [Both Side Access : 1 Pier Required] Length of Jetty : 900 m