Mondéco Earth. Application instructions

Similar documents
Construction. 3-part cement and epoxy combination micro mortar for surface sealing. Product Description 1 1/5. Tests

Sikafloor -161 is an economic, two part, solvent free, low viscosity epoxy resin, suitable for use under hot climate condition.

Construction. 2-part epoxy primer. Product Data

PRODUCT DATA SHEET Sikafloor -378

Part of the Sikaplan WT Membrane System

Liquid applied polyurea hybrid membrane

2-part epoxy primer, levelling mortar and mortar screed

PRODUCT DATA SHEET Sika Level-315 F

Application Guide for MasterSeal Roof 3000

2-part PUR tough-elastic coloured seal coat

Installation Instructions

3-part thixotropic epoxy patching mortar

PRODUCT DATA SHEET Sikafloor -161

weber.floor 4660N Marine Elastic

Construction. 3-part cement and epoxy combination mortar for self-smoothening floor screeds of 1.5 to 3 mm. Product Description 1 1/6

2-part epoxy self-smoothing and broadcast system

Product Data Sheet Sikadur -31 CF Normal Product Description Uses ruction Const Characteristics / Advantages

Make your floor a unique artwork!

Application Guide for. MasterSeal Traffic 1500MD

Sikafloor -375 is a two part, solvent free, low viscosity, tough elastic, crackbridging polyurethane resin coating. CHARACTERISTICS / ADVANTAGES

2-part PUR tough-elastic, low-voc, self-smoothing floor

Construction. High performance joint sealing system. Product Description 1 1/9. Product Data Sheet Edition 29th October 2015

PRODUCT DATA SHEET Sikafloor -381

Flooring and Bedding. RonaFloor SL. Self-smoothing seamless epoxy resin flooring system

Florock Seamless Flooring Systems

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound

Two component solvent-free epoxy system for creation of self-levelling floors. Gloss <4% <70% IR4

Highly Chemical Resistant Laminate System. Sika Asplit VEL is 2 part, glass fabric reinforced, vinyl-ester based coating and lining system.

Installation Instructions

Resin Bound and Bonded Surfacing. RonaDeck UV Rubber Granule Tree Pit Base. Resin bound rubber granule porous tree pit system.

TECHNICAL DATA: Politura Micro Cement

Two component solvent-free epoxy system for creation of self-levelling floors. Gloss >4% <70% 83mg IR4

Construction. 2-part epoxy roller and seal coat. Product Description

CHARACTERISTICS / ADVANTAGES. Yellowish-transparent. PACKAGING 20 kg per pail

2-part Epoxy Self-smoothing and Broadcast System

Construction. Hydrophilic, swellable hose for sealing construction joints in watertight structures. (formerly Sika Injectoflex HPM)

Product Data Sheet SikaFuko Swell-1 Positioning Description Uses Advantages Approval / Standards Construction Product Data Packaging

Con-Spec Industries Ltd.

TECHNICAL DATA SHEET

ARDEX GUIDE SPECIFICATION ARDEX K 521 Self-Leveling Concrete Topping with Aggregate Surface

Isocrete K-Screed Standard and Heavy Duty

2-part epoxy textured roller and seal coat

2-part epoxy primer, levelling mortar, intermediate layer and mortar screed

Construction. Sikafloor N Elastic. 1-part PUR highly elastic coating. Product Data Sheet Version 29/03/2011(Corporate edition 12/08/2010)

3-Part Epoxy Grouting System for Pile Capping

Technical Service. INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS over Gypsum base Products. This document refers to the following products:

Construction. High performance joint sealing system. Product Description. System Data Sheet Edition _1. 1 Sikadur Combiflex SG system 1/8

SikaCor 255 Epoxy-binder for mortars on concrete and steel. Protective Coatings

Approx. 12 m² per litre depending on surface porosity, profile. Application methods

Florock Seamless Flooring Systems

Construction. Sikadur 31, Hi-Mod Gel. Application Instructions. Sika Corporation

Construction. 2-part epoxy impregnation resin. 1 Sikadur /6

TECHNICAL DATA SHEET

TECHNICAL DATA SHEET SIKALEVEL 25 LATEX SELF LEVELLING 25KG

2-part, electrostatic conductive epoxy coating

1-part PUR highly elastic coating

Screedmaster Ultimate

REBOUND ACE AIR CUSHION

Primer and Moisture Control for Wood Floor Bonding with Elastic SikaBond Adhesives on Difficult Substrates

SURFACE PREPARATION INSTRUCTIONS: CONCRETE

Easy to apply Nonflammable Low odor Castable Make excellent materials of construction

CHARACTERISTICS / ADVANTAGES

SECONDARY CONTAINMENT COATING SPECIFICATION

Construction. Sikadur -Combiflex SG System High performance joint sealing system. Positioning. Product Data

1. Rapid Set Cement. 2. Methods of preparation. 3. How to stage a job site. 4. Installation Mix, place, finish. 5. Coloring the TRU.

2-part PUR tough-elastic, low-voc, self smoothing floor

Approved. Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method C VOC-US/Hong Kong. US EPA method 24 (tested)

Epoxy adhesive EN

Caparol System PRO Data sheet

Specifier Notes: Edit the following list as required by the project. List other sections with work directly related to the floor coating.

ISEGA Certificate of Conformity U 09

HYBRID. Pre-Laying Checks

2-part flexible epoxy coating, chemically resistant and electrostatically conductive

ARDEX GUIDE SPECIFICATION

Technical Data Sheet. Techflow Grout GP

Construction. One component cementitious mortar fibre reinforced for flexible waterproofing. Product Description. Product Data. Form.

Construction. 2-part epoxy protective coating. Product Description. Product Data 1 1/5. Test. Form. Storage

ITEM 458 WATERPROOFING FOR STRUCTURES

TECHNICAL BULLETIN TB102

4. Floor Substrate Testing Prior to Floor Paint application

DULUX WEATHERGUARD FINE TEXTURED

DURASHIELD 310 &

Tooling gelcoat MGS F 300

System Recommendation SR0618

Installation Instructions

Resin Bound Installation Guide

STAIR TREAD INSTALLATION

Tactile Pad Installation Guide. All Surfaces.

Construction. Sodium silicate based surface hardener, dustproofer, sealing and curing compound for concrete. Product Description.

Application Instructions for Keystone Kool Deck on Existing Concrete

The American Society of Concrete Contractors Concrete Polishing Council SECTION BONDED ABRASIVE POLISHED CONCRETE FLOORS

RESIN FLOORING. To be read with Preliminaries/ General Conditions TYPE(S) OF FLOORING

GLUE-DOWN INSTALLATION VIRTUO 30 / 55

Construction. Solvent free elastic adhesive for wood flooring. Product Description 1 1/6

1. Division 09 Section "Rough Carpentry."

DULUX INTERIOR LUXURIOUS SILK TECHNICAL DATA SHEET Version SEPTEMBER THIS ISSUE SUPERSEDES ALL PREVIOUS PUBLICATIONS

SECTION RESILIENT SHEET FLOORING

how to easy! TILE A BATHROOM DIY made Scan here to watch the video HOW TO TILE A BATHROOM

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

TECHNICAL BULLETIN TB015

Transcription:

Mondéco Earth Application instructions Preparation/Substrate Surfaces to be coated should be sound and provide adequate strength for the proposed end use. The surface profile and levels should be appropriate for the system to be applied. Substrate humidity must not exceed 100% RH (surface dry). Blasting, scouring or diamond grinding removes laitance. Irregularities, damage and cracks can be filled with epoxy screed (e.g. Flowtex F1 Mortar) or levelled with an epoxy cement scratch-coat (e.g. Flowcem DPM). All mobile joints must pass through the coating and must be sealed tight. Anchor grooves must be cut on both sides of such joints. Welded joints and cracks in the concrete may be coated, but if movement occurs the coating will also crack. All residues must be removed to provide a dry, dust free open textured surface. The surface profile and levels should be appropriate for the system to be applied. Contact us for advice if there are impurities, such as oils etc., in the concrete. Follow our instructions for connections to grid drains, cesspools, pipes and pipe inlets. Sealing of Concrete Surface Prime using Flowprime in order to fully seal the prepared concrete surface. When mixing Flowprime, pour all of the Hardener B into the Base A container. Mix using a slow speed rotary mechanical mixer and helical spinner until a homogenous mixture is obtained. Avoid entraining too much air. Immediately after mixing, pour out all of the resultant mixture onto the floor surface and spread quickly using a double-lipped rubber squeegee and/or roller. Ensure that the primer permeates any surface irregularities. Whilst the primer is still wet scatter the surface with 1.1mm silica quartz. Allow the primer to harden until the surface can be walked on, approximately 15 hours at 20 C. At lower temperatures the hardening time is longer. It is critical there are no dry patches after priming. Sweep and vacuum up all excess unbound silica quartz. Consumption of primer: Consumption of silica quartz approx. 0.3 kg/m 2 (depending on porosity and texture of surface.) approx 0.5kg/m² www.flowcretesa.co.za

Mixing Mondéco Earth Mondéco is supplied in 3 pack format. Base A, Hardener B, Filler C. Check that the batch numbers of the coloured components are the same for the entire surface. Remember, never split batches/components. Incorrect mixing ratios or poor mixing can result in irregular hardening or variations in colour, etc. Stir or shake Base A to re-disperse any settlement during transport or storage. Pour all of the Base A and Hardener B into a clean, dry, suitably sized forced action mixer (e.g. Pan Mixer 30l mix size). Mix for 20-30 seconds until homogenous. Add the Filler C component to the mixer and mix for 3 minutes, ensuring that all fillers and resins are scraped into the mix from the sides of the mixing vessel. The mixing time is critical to ensure that a homogenous mix is obtained. Notes: A larger forced action mixer can be used for mixing multiple units. However, the speed of application must be increased to compensate for the mix quantity and the critical mix times detailed above must be observed. Before the next mix, scrape out any residual material from the mixing vessel and dispose of before starting the next mix; otherwise the working time of the following mix could be reduced. Remember never attempt to proportion the resin and hardener components. Incorrect mixing ratios or poor mixing can result in irregular hardening or variations in the final finish. Application of Mondéco Pour the material into a screed box (laying box) that is set to the correct depth to give the required thickness (confirmed by measuring the coverage rate of one unit). Pull the box slowly (across the width of the area to be applied) allowing the material to flow from the bottom of the box and achieve consistent coverage. The surface can then be compacted and finished with a trowel. Alternatively, the mixed product can be poured out directly to the floor, spread to the desired thickness and finished with a trowel. Maximum application width is determined by material and ambient temperature conditions, which affect the working life of the product and determines the speed of installation/man power. Finishing must be completed as quickly as possible and within 10 minutes after the material has been applied. As a guide (for substrate and material temperatures up to 20 C) a competent team of 4-5 men could lay a maximum bay width of 10m. At higher temperatures the bay width should be reduced by up to a half. The thickness is guaranteed by measuring, and checking how much material has been used (every 50m 2 ). Consumption Mondéco 10mm: 20kg/m 2 Allow the product to harden until the surface can be walked on (approx. 16 hours at 20 C). At lower temperatures the hardening time is longer. The ambient humidity during application and cure must not exceed 85% RH. Mondéco earth can be applied in layers 8-12mm thick.

During prolonged interruptions in work the seam is placed where it is least visible e.g. along drains or door openings etc. Moulding As it is possible to combine different colours or designs on the same floor surface, the boundaries between the colours should be set up using strips. These boundaries can be either permanent (e.g. stainless steel, marine brass, aluminium or plastic) or temporary (e.g. wood). The height of the strips from the sub-floor must correspond to the thickness of the Mondéco before grinding, typically the strip must be 1mm less than the final thickness, because the sub-floor is generally not perfectly flat and the strips sit on small particles when fitted i.e. 5mm strip for a 6mm installed thickness, which is then ground to 4 mm. The moulding should be installed prior to primer application, any primer and 1.1mm scatter sand must be removed from the top of the moulding by wiping. This must be done whilst the material is still wet. Grinding Depending on the temperature in the location, grinding may begin after 48 hours cure/hardening. Grinding should be done using a diamond grinding machine with suitable diamond or abrasive heads. The initial grinding is commonly a dry process and wet for the final stages. The initial grinding process utilises coarse abrasive heads to remove the top surface layer and expose the aggregate. This is followed by successively finer abrasive heads to remove the scratches generated on the first cut. Suggested grinding stages: First Cut Second Cut Third Cut Fine Polish (25/40# diamonds in metal) (60/80# diamonds in metal) (120/140# diamonds in metal) (150# diamonds in metal) Grouting pin holes Thoroughly wash and vacuum clean the surface before applying Grout to seal any holes/pin holes in the screed. Make sure that the coating is dry before commencing grouting and ensure that any pinholes do not contain grinding dust. Grout must be used in the same colour as the Mondéco resin. Grout is supplied in 3 pack format (Coloured Base A, Hardener B and Filler C). Stir Base A using a slow speed drill and helical spinner to re-mix any settlement during transport or storage. Pour all of Base A and Hardener B into a suitably sized mixing vessel. Mix for 30 seconds with said mixer and then add Filler C whilst mixing. Ensure that all fillers and resins are scraped into the mix from the sides of the mixing vessel. Continue mixing until a homogenous mixture is obtained (1-2 minutes). In warmer climates more efficient mixing will result if the Filler C is mixed into the Base A component before mixing in Hardener B. The grout can be applied using a flat edged steel trowel, working back and forth to fill pin-holes and voids. Application should begin immediately after mixing and completed as quickly as possible because of the short working time (especially when the material is used from the bucket rather than spread out onto the floor

area). Leave excess grout on the surface and allow to stand for a few minutes. Remove the excess with the trowel or rubber spatula. Consumption Grout 0.15kg /m 2 /coat Leave to harden for at least 24 hours before final grinding/polishing. In certain instances grouting may have to be conducted in two applications, once the first layer has set, apply a second to fill any micro pores that could have blown through the first application layer. Note: If the grout is over worked with a steel trowel the grout will darken. Polishing Fine grinding segments should be used to polish off the grouted surface and not expose further pin holes. Suggested polishing stage: Fine Polish (500# diamonds in metal) Alternatively use a fast pass with the 300# diamonds in metal before finishing with the 500#. Second Fine Polish (800# diamonds in metal) Clean surface thoroughly with a rotary scrubber and white (non marking) Scotch-Brite pads, then allow the coating to dry. Second Grouting Pinholes Thoroughly wash and vacuum clean the surface before applying Thixogrout to seal any holes/pin holes in the screed. Make sure that the screed is dry before commencing grouting and ensure that any pinholes do not contain grinding dust. Mix grouting materials using a slow speed drill and helical spinner until a homogenous mixture is obtained. Do not entrain too much air. Immediately after mixing, work Thixogrout in using a rubber or steel spatula. Work close to the surface so that no valleys or peaks remain in the material. All excess material must be removed. Note: If the grout is over-worked with a steel trowel, the grout will darken. Grouting should be done in two applications (if necessary); once the first layer has set, apply a second (with a reduced amount if required) to fill any micro-pores that could have blown through the first application layer. Leave to harden for at least 24 hours before grinding/polishing. Final Grind Final grinding segments should be used to polish off the grouted surface and not expose further pin holes. Remove grout residue with a fast pass of 200# resin diamond heads on triple head grinders and followed by: Second Polish Fine Polishing 400# resin diamond heads on triple head grinders 800# resin diamond heads on triple head grinders Clean surface thoroughly with clean water, then allow the screed to dry.

Sealing Before applying the topcoat remove all the loose particles. Carefully vacuum clean and ensure surface is dry. Apply the Flowseal LS by roller with a short pile mohair roller to obtain a smooth surface structure. Do not mix large quantities of topcoat at any one time. If the topcoats start to gel/harden during the application, this will result in an uneven surface finish. Do not mix more than can be consumed within 15 minutes. Allow the sealer to harden until the surface can be walked on, approx. 15 hours at 20 C. At lower temperatures the hardening time is longer. Buffing (Kwikshine) Kwikshine is applied in multiple coats; ensure that the floor is clean and dry before application. Pour the Kwikshine into a bucket or tray, place a clean new mop (high quality micro-fibre flat mop head) or applicator into the polish and lightly squeeze out the surplus (excess polish will leave a grainy finish on the surface). Apply the first coat (thinly and evenly) in one direction (e.g. West to East) over the total area of the floor. Allow to dry for approximately 1 hour. Apply the second coat (thinly and evenly) at right angles to the first (e.g. North to South). Leave a gap of approximately 150cm (6 ) from the skirting board or wall (on this and any further coats of polish) to avoid a build up. Allow to dry for 1 hour and buff using floor polisher using white buffing pad. Note: Always apply polish with a new, clean or specially designated mop or applicator. Do not use a mop which has been used for other purposes such as polish stripping. Any polish left in a bucket or tray should be discarded and not returned to the container, as this will contaminate the remaining polish. Repairs/Restoration In the case of major damage, the entire area to be repaired should be stripped to the concrete substrate and then primed before the application of a fresh Mondéco layer (as described previously). Surfaces that require freshening up (or light surface blemishes) may be repaired by re-grinding, grouting and polishing (there may be a slight colour difference after repair). Note that: Flowcrete products are often multiple-component systems. Poor mixing, or incorrect mixing procedures, can result in irregular and incomplete hardening, which in turn can result in an inferior final result. The temperature should be over 15 C to achieve the best results during application. The temperature of the substrate should be at least 10 C, although a temperature of 15-25 C is recommended. Conditions of high

Humidity combined with sudden falls in temperature should be avoided during the cure period as this can lead to condensation effects and prevent the product from hardening. The temperature of the substrate should exceed the dew point by more than 3 C during application and hardening. The product should be stored in such a way that the temperature is the same as the room temperature where the product is to be applied, i.e. between 15-25 C. This improves the mixing, flow, penetration and hardening of the product. Application temperatures can affect the workability of the product. At temperatures below 15 C, the Filler C component can be reduced by a maximum of 10% by weight to improve the fluidity. It is important that the material is kept warm, to maintain its fluidity. It is also necessary to warm up the filler component; otherwise it will act as a heat sink and cool down the mixture. The surface can normally be walked on after approx. 15 hours at 20-25 C. Complete hardening takes 5-7 days. Grout should not be applied in thicker coats than specified because the cure (hardening) can be impaired. There are often several types of products at a workplace. Sort the products separately to avoid mistakes. Consumption of Materials Flowprime approx. 4m 2 /l Silica Quartz approx. 0.5kg/m 2 Mondéco approx. 20kg/m 2 (for 10mm) Mondéco Grout approx. 0.15kg/m 2 Thixo Grout approx. 0.15kg/m 2 Flowseal LS approx. 0.1kg/m 2 Kwikshine approx. 0.02kg/m 2 Cleaning of tools Clean tools directly after use with soap and water. Any recommendation or suggestion relating to the use of the products made by Flowcrete SA (Pty) Ltd whether in its technical literature, or in response to a specific enquiry, or otherwise, is based upon data believed to be reliable, however the products and information are intended for use by Customers having requisite skill and know-how in the industry and therefore it is for the Customer to satisfy itself of the suitability of the products for its own particular use and it shall be deemed that the Customer has done so at its sole discretion and risk. RSA