LIGHT GAUGE STEEL CPD SEMINAR

Similar documents
Light steel framing.

Steel Framing Systems

External Wall Insulation Systems GUARANTEED TO PERFORM!

Technical Version: 1 December 2009 PERFORMANCE OF STEEL FRAMES IN EARTHQUAKES

CHAPTER 3: Modern Methods of Construction (MMC)

Sustainability and Process Benefits of Modular Construction

The Metal Cladding and Roofing Manufacturers Association (MCRMA) discusses its new, free online learning offering

Building Design Data

The SIPs Process. 1 Why SIPS? What is the typical process for building a home using SIPS Industries? The Factory Process...

A framework guide for Off-Site Construction of New Homes (NH1)

"Turnkey" design & build framing systems

Engineered Timber Systems AN INTRODUCTION. Low Energy Low Carbon Buildings. CI/SfB (2-) Rj7 - Thirteenth Issue September 2017

TECHNICAL SPECIFICATIONS & PROFILES PIR INSULATED EXTERNAL WALL PANEL TECHNICAL GUIDE TO CONQUEROR TM PIR INSULATED EXTERNAL WALL PANEL

Built to Last a Lifetime

PROTAN EXPOSED ROOF SYSTEMS

SIPs Structural Insulated Panels System. The building technology of the future

Renovation of Buildings using Steel Technologies (ROBUST)


Overview. Introduction to Housing Solutions 2-3. Why Modular Housing 4-5. Standarised Designs Apartments Warranties.

ROBERTSON TIMBER ENGINEERING EXCELLENCE IN OFFSITE TIMBER ENGINEERING

Closed-Cell Spray Foam Insulation. Performance in Residential and Commercial Buildings During Adverse Weather

EasylationWall. External Wall Insulation System. bringing european innovation

Taking value to the highest level.

Prospective Construction Systems for Mass Housing

House De Clercq and Cottage, Mount Verde, KZN

February Purlins Framing Engineering Dry Lining Cable Management. voestalpine Metsec plc

THE MODULAR HOUSE - PLOT 15 - SCOTLAND S HOUSING EXPO

Guidance document GD 20 April 2015 amended May 2017 GUIDANCE DOCUMENT ON SERVICEABILITY STATES AND DEFLECTION CRITERIA

Façade excellence for every building. An overview of the alsecco external wall insulation systems

OPITZ Construction Systems Made to Measure

Light Steel Framing ~ From Concept to Completion

SECTION METAL BUILDING SYSTEMS

What is NUFORM HOUSE KIT?

Fire Resistant: Achieves FRL levels of 90/90/90 for load bearing walls.

TCC Systems. Timber-Concrete Composite TIMBER IMAGINEERING INNOVATIVE TIMBER SOLUTIONS

Group 4. Steel Frame ARC-452 DESIGN VI: INTEGRATION A4 BUILDING MATERIALS, ASSEMBLIES, ENVELOPE SYSTEMS BURGENER SIMON YANGCHUAN SUN

Product information Roof terrace GEL + VEA/VEB/VEC

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185

Intro to Structural Cold Formed Steel (CFS)

Delivering Affordable Housing in Rainham. Mark Bradbury Climate Energy Homes. 18 th November Making low carbon living our business

TELLUs FLORIDA USA. Tellus Integrated Panel System

Good ideas. for your new building. BUILDINGS. Ideas become reality

FIVE WAYS YOUR MOVE TO A BIM WORKFLOW PAYS OFF

OUR ESTEEMED CLIENTS 3

60 years. of progressive development

Ridgeguard Roof Guardrail Systems

Insulated Panels. Insulated Roof Systems. Kingspan X-dek. KS1000 XD Longspan Roofpanel. Systems. Insurer Approved

Sports and Leisure Buildings

Kontor. Shade Sails & Tension Membrane Structures STREETSCAPE - PARK & STREET FURNITURE BINS PLANTER BOXES BIKE RACKS FOUNTAINS

The Future has never looked so bright.

EUROHONKA log types. Eurohonka Log Houses - making dreams come true. Eurohonka Log Houses - versatile wood production

BRE Lighthouse. 2. Background and Context:

Definition of Wall. A continuous, vertical structure Thin relatively to its length and height

Project s fiche INOV. Frisomat Case study project's fiche INOV

2018 CE Courses See following pages for course descriptions by topic

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

Construction of Treet - How and Why

Product information Roof balcony CABRIO GDL

STA MEMBER CLIENT ARCHITECT MAIN CONTRACTOR PARTNER TECHNOLOGY

The Role of Cinema in the Leisure Environment

Product information Centre-pivot white-painted roof window GGL

BUILDING TRADES II ALTERNATIVE FRAMING TECHNIQUES TEACHER S GUIDE

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

MID-RISE DESIGN & CONSTRUCTION

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

Product Data Sheet. UltraTemp Insulated Panels for Chilled Storage Applications with a Temperature Range of 0 C to +5 C KS1100 CS

Warmer Roof. Transforming conservatory roofs. WarmerRoof

garages, sheds & carports

EZWall TM REAL BRICK CLADDING SYSTEM. E uroform Products Ltd. Solutions for the building industry

Lamit Industries, Inc. 710 Marion Road Columbus, Ohio P-(614) F-(614)

/BUT BuyLine BUtler roof systems ROOF SYSTEMS DESIGN AND SELECTION GUIDE

ASSEMBLY INSTRUCTION TG 2002

Product information Additional window element GIU

Cross Laminated Timber (CLT)

Building Enclosure Details and Assemblies for Wood-Frame Buildings

Coversys steel tiles for roofing are weatherproof, durable and attractive.

The difference is night & day. Equinox - tiled roof system

Structural Insulated Panels (SIPs) Commercial, Industrial and Residential Applications

Knauf Aquapanel Exterior. Cement board for exterior applications. The ideal render carrier board. Easy to cut and fix. Robust, stable substrate

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

BENCHMARK Evolution Axis

Development of a Frame for Wide Openings in Residential Construction

HADLEY BENEFITS Comprehensive BIM project management approach, working with structural and technical experts

2Beginning with BIM. Axiom Architects

The Merits of Structural Steelwork

lindab rainline the steel rainwater system Lindab Rainline Lindab Roof Drainage System The STEEL rainwater system with the low CO2 footprint

The right solutions. However, it is inevitable that with the introduction of any new construction system the question arises How does it compare?

Insulation. A4/8 KDINT AW2143 Issue 4 Oct An Introduction

Insulation. First Issue December Kingspan Insulation TECHNICAL SERVICES. Low Energy Low Carbon Buildings

Intumescent Fire Protection Solutions for Structural Steel

DRIVE-IN PALLET RACKING

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

Design and Access Statement

EN DK NA:2007

SoftWall Partitions and Curtains


Fire Safety and Performance of Wood in Multi-Residential and Commercial Buildings. Boris Iskra Forest & Wood Products Australia

Transcription:

LIGHT GAUGE STEEL CPD SEMINAR 1

Light Gauge Steel System Attributes: Speed of construction LGS Overview Predictable build time Non-weather dependent Flexibility Low waste 2

ORCA HISTORY IN BRIEF ORCA s team have 20 years of industry leading knowledge and experience in mobile and off site manufacturing and construction The team have built over half a million m 2 of residential units in the Middle East. ORCA, recently launched in UK, has utilised this experience to construct over 50,000m 2. ORCA History in Brief 3

ORCA UK ORCA operates in the following sectors; ORCA UK Residential Leisure and commercial Healthcare Extra care Student Housing Educational 4

ORCA Approach 1. Design led systems 2. Full integration of fabrication software with Revit Autodesk BIM compliant 3. Improved workflow between consultants ORCA Approach 4. Mobile manufacturing 5

ORCA Approach - Differentiating the product Using a simple approach, ORCA, Highly engineered steelwork design minimises the amount of steel, therefore; Reduces material cost Smaller, lighter machines Low fixed overheads as machines and premises reduce space requirement Also allows machines to be moved mobile manufacturing ORCA only manufacture the frames no insulation, no windows fitted, therefore easier to transport to site, need less plant/cranes in factory on site As insulation is fitted post-erection, ORCA are not affected by wind As the insulation is rigid, closed cell, unaffected by rain during construction. ORCA Approach differentiating the product 6

Project 1 Social Housing Installation Time 7 Days Project one 7

Project 1 Social Housing Video Project one 8

Project 2 Residential Installation Time 8 Weeks Project two 9

Project 3 Care home Installation Time 11 Weeks Project three 10

Project 4 Care home Installation Time 14 Weeks Project four 11

Project 5 Holy Trinity School Installation Time 4 Weeks Project five 12

Project 6 Proton Cancer Centre TBC Project six 13

STEEL FRAME CONTSRUCTION - Performance LGS Out performs traditional buildings solutions significantly: Fast construction Typically 50% less than traditional Lightweight - Reduces foundation requirements by up to 50% Predictability Integrated design and manufacturing process Non combustible Low fire risk during construction Light Gauge Steel Construction Accurate to 1mm over 10m Stability no cracking, shrinking, rot or long term movement 14

STEEL FRAME CONTSRUCTION - Performance LGS Out performs traditional buildings solutions significantly: Weather tight shell achieved within 3 days for 2 storey house 100% recyclable higher BREEAM and CSH points Zero waste on site External brickwork/cladding removed from critical path Ability to increase floor space through thinner wall construction Light Gauge Steel Construction 15

DESIGN INTEGRATION ORCA Design and BIM Software Architect s CAD file read, overlaid and formatted by ORCA design team for steel frame coding and manufacture. Structural design is carried out by ORCA s in house team of structural engineers using the latest Eurocodes. Design Integration BIM is integrated using advanced Autodesk Revit software. ORCA use the latest 3D technology to provide clients full visualisation of each project. 16

DESIGN INTEGRATION Design Integration 17

SYSTEM DETAILS and Load-bearing System Details 18

TECHNICAL DETAILS OVERVIEW ORCA STRUCTURAL K-BRACING K-Bracing is used in ORCA LGS framing to remove requirement of timber or CP racking board. Advantages: Decreases wall thickness Allows easier access to follow on trades Reduces installation times Technical Details Overview 19

STABILITY Stability 20

TECHNICAL DETAILS Details consistent with Robust Standard Details for: External wall Party wall Party floor External openings Roof Technical DETAILS 21

CLADDING SOLUTIONS Cladding Solutions 22

LIFESPAN AND WARRANTIES Report carried out by the Steel Construction Institute (SCI) in March 2013 highlighted the predicted lifespan of light gauge steel structural elements. The figures within the table relate to the galvanised coating of the material only, therefore the figures can be seen as minimum lifespan. Lifetime and Warranties In comparison, timber frame is expected to last 60 years due to the natural degradation of the material and likelihood of insect infestation. NHBC, LABC, BLG and Premier all offer warranties as detailed in their structural information packages, with a minimum of 10 years structural guarantee. 23

THE WAY AHEAD The Way Ahead 24