Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Similar documents
Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

Executive Summary. Overview

Florida Department of Transportation

Florida Gas Transmission Section #3 Hydrostatic Test

TRANSPORTATION IMPROVEMENT PROGRAM *

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

Interchange Workshop Report (August 2004)

Final Recommendations Identification of Improvements, Strategies, and Solutions

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Interstate 10 (SR 8)/ SR 200 (US 301) Interchange Interchange Modification Report. APPENDIX E Interchange Concepts Considered

CEI Services Transit Bus Stop Infrastructure

LANE CLOSURE GUIDELINES

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

Value Engineering For Transportation Improvements. Interstate 4 from West of State Road 528 (Beachline) to West of State Road 435 (Kirkman Road)

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

PLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

Appendix B Highway 407 Interchange Review - Cochrane Street Area

US 27 Transportation Alternatives Study

FTBA 2018 Construction Conference Major Projects Update

Woodburn Interchange Project Transportation Technical Report

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

3.6 Construction Methods

II. Approval of June 23, 2015 Meeting Notes. IV. Recap of the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

SCOPE OF SERVICES INTERSTATE 195 CORRIDOR PLANNING STUDY FROM INTERSTATE 95/NW 12 TH AVENUE TO ALTON ROAD

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

Draft Noise Study Report

Progress Report on the Implementation of the Strategic Intermodal System (SIS)

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

CONTRACT No.: E8M79 Date: 06/30/14 Page 1 of 5

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM)

VISION. 4. Vision. 31 Page

Re: PW Appendix 3 - Part 8

Presented by Andrew Velasquez URS Corporation/Florida s Turnpike Enterprise

CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL

State Route 8 Bridge Replacement Project

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Chapter 6: Highways. Existing System. Roadways

Tier 1 Recommendations October 30, 2017

Working with Transportation Concurrency Exception Areas

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

CONSULTANT OF THE YEAR

Miami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1

APPENDIX A TIER 1 ANALYSIS

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

III. Regional TSM&O Overview from the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.)

Chapter 5: Highway Investment Direction and Plan

I-10 KENDALL EXTENSION. Open House

Alico Road. Connector Study. Lee County Department of Transportation. Prepared by. Lee County, Florida

Tech Brief PRECAST CONCRETE PAVEMENT IMPLEMENTATION BY U.S. HIGHWAY AGENCIES

I-10 CONNECT. Public Meeting #1

Table of Contents. I-4 Express Lanes Concept of Operations

Exit 73 I-29 Interchange Modification Justification Study

ES Executive Summary. Introduction. Overview of the Project Area

Modified FY ,100, ,329,791

Sunrise Project South I-205 Corridor Improvement Project

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

on the eastbound side of Route 29). identified in the table.

Stage One Reference Design Enhancements. Date: 2 October Cabinet-in-Confidence

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations

Performance Based Practical Design (PBPD)

Draft Noise Study Report

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

2017 Highway Safety Improvement Program Call

Jacksonville Urban Area Metropolitan Planning Organization LONG RANGE TRANSPORTATION PLAN. Draft

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four

MEMORANDUM. DATE: December 12, Steve Joseph, P.E. J. Philip Cooke, P.E. Monique Durand, P.E. Wastewater Flow Projections

Exposition Light Rail Transit Project

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Standard Performance Attributes for Transportation Projects

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

ENVIRONMENTAL ASSESSMENT INTERSTATE HIGHWAY 35W FROM INTERSTATE HIGHWAY 820 TO INTERSTATE HIGHWAY 30 CITY OF FORT WORTH TARRANT COUNTY, TEXAS

3.6 GROUND TRANSPORTATION

LOCATION AND DESIGN DIVISION

TYPE 2 CATEGORICAL EXCLUSION DETERMINATION FORM

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

Transcription:

DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127 million within Broward, Indian River, Martin, Palm Beach and St. Lucie Counties. Summary of Major Project Funding by Project Type: The table below summarizes the funding programmed for the major Turnpike projects in the Tentative Five-Year Work Program (FY 2015/2016 through FY 2019/2020) that are located in District Four. The project descriptions below this section identify and describe the major projects by county. The following phase abbreviations are used in the project tables: ENV Environmental (Funding Codes: C2, C8) PDE Project Development and Environment (Funding Codes: 21, 22) PE Preliminary Engineering (Funding Codes: 31, 32) DSB Design-Build (Funding Codes: 52, 53, 54, 58, 61, 62) CST Construction (Funding Codes: 52, 53, 54, 58, 61, 62) Work Description Add Lanes & Reconstruction $35,450,000 $0 $170,084,717 $1,000,000 $13,317,000 $219,851,717 Interchange Improvements $11,087,000 $755,000 $9,677,000 $3,623,000 $45,000 $25,187,000 Resurfacing & Other Work $1,811,000 $26,651,000 $16,845,000 $449,000 $0 $45,756,000 PD&E/EMO Study $1,200,000 $0 $0 $0 $0 $1,200,000 All-Electronic Tolling Conversion $0 $0 $38,513,000 $68,565,000 $33,594,000 $140,672,000 Major Projects Total $49,548,000 $27,406,000 $235,119,717 $73,637,000 $46,956,000 $432,666,717 Summary of Major Projects by County: The major Turnpike project expenditures by county in the Tentative Five-Year Work Program are shown in the table below. Please note that the funding for AET 5A ($46,406,000), a major regional project in Broward and Palm Beach Counties and AET 8 ($94,266,000) a major regional project spanning Palm Beach, Martin, St Lucie, and Indian River Counties in District Four, Osceola County in District Five and Okeechobee County in District One is not included these totals and is addressed later in this document. County Broward $22,297,000 $40,000 $170,399,717 $3,367,000 $501,000 $196,604,717 Indian River $456,000 $6,051,000 $153,000 $0 $0 $6,660,000 Palm Beach $26,645,000 $19,930,000 $9,945,000 $1,256,000 $12,861,000 $70,637,000 St. Lucie $150,000 $1,385,000 $16,109,000 $449,000 $0 $18,093,000 Total $49,548,000 $27,406,000 $196,606,717 $5,072,000 $13,362,000 $291,994,717 1 As of January 7, 2015

Broward County Projects: Widen the Turnpike/SR 91 from Sawgrass Expressway/SR 869 (MP 71) to the Palm Beach County Line 73) FPN: 415927-1 (MP This project widens a two-mile segment on the Turnpike/SR 91 from the Sawgrass Expressway Interchange (MP 71) to the Palm Beach County Line (MP 73). This widening will increase the number of travel lanes from six to eight. PE $3,500,000 $0 $0 $0 $0 $3,500,000 Total $3,500,000 $0 $0 $0 $0 $3,500,000 Sample Road Resurfacing and Intersection Improvements FPN: 435614-1,-2 This project resurfaces the Turnpike/SR 91 at Sample Road (MP 69). This project also includes intersection improvements along with guardrail installation, and sigining and pavement marking improvements. CST $1,797,000 $40,000 $0 $0 $0 $1,837,000 Total $1,797,000 $40,000 $0 $0 $0 $1,837,000 Widen the Turnpike/SR 821 from NW 57 th Avenue (MP 43) to Miramar Toll Plaza (MP 47) - FPN: 429328-1,-2 This project adds one lane in both directions on the Turnpike/SR 821 from NW 57th Avenue/Red Road (MP 43) to the Miramar Toll Plaza (MP 47), creating a six-lane section between the interchange and the toll plaza. The project also widens the southbound off-ramp at NW 57th Avenue to two lanes and provides turn-lane improvements on NW 57th Avenue (previously included in FPN 423371-2). This improvement also includes widening the existing bridge structures and facilitating storm-water permitting to accommodate the ultimate eight-laning within the project limits. Improvements to NW 27th Avenue in the area of the Turnpike/SR 821 Interchange are also included. Upon implementation, this project will reduce the potential for bottlenecks along this corridor. PE $0 $0 $490,000 $0 $0 $490,000 DSB $0 $0 $55,189,000 $0 $0 $55,189,000 CST $0 $0 $0 $0 $456,000 $456,000 Total $0 $0 $55,679,000 $0 $456,000 $56,135,000 2 As of January 7, 2015

Improve the Interchange at Sawgrass Expressway/SR 869 and Coral Ridge Drive (MP 14) FPN: 435461-1,-2 This project improves the interchange at Sawgrass Expressway/SR 869 and Coral Ridge Drive (MP 14) by modifying the existing diamond interchange into a diverging diamond interchange. This interchange project improves safety and operations along Coral Ridge Drive by reducing congestion. PE $0 $0 $315,000 $0 $0 $315,000 CST $0 $0 $0 $3,367,000 $45,000 $3,412,000 Total $0 $0 $315,000 $3,367,000 $45,000 $3,727,000 Widen the Sawgrass Expressway/SR 869 from Coral Ridge Drive (MP 14) to State Road 7 (MP 18) - FPN: 435461-3 This project widens a four-mile segment of the Sawgrass Expressway/SR 869 from Coral Ridge Drive (MP 14) to SR 7/US 441 (MP 18). This widening will increase the number of travel lanes from six to eight. PE $3,500,000 $0 $0 $0 $0 $3,500,000 Total $3,500,000 $0 $0 $0 $0 $3,500,000 Project Development and Environment Study for Sawgrass Expressway/SR 869 Widening FPN: 437153-1 This is a Project Development and Environment Study evaluating widening the Sawgrass Expressway/SR 869 from SR 7/US 441 (MP 18) to Powerline Road (MP 22). PDE $1,200,000 $0 $0 $0 $0 $1,200,000 Total $1,200,000 $0 $0 $0 $0 $1,200,000 3 As of January 7, 2015

Widen the Sawgrass Expressway/SR 869 from Sunrise Boulevard (MP 1A) to Coral Ridge Drive (MP 14) FPN: 437155-1 This project widens a 13-mile segment of the Sawgrass Expressway/SR 869 from Sunrise Boulevard (MP 1A) to Coral Ridge Drive (MP 14). This widening will increase the number of travel lanes from six to eight. PE $5,000,000 $0 $702,520 $0 $0 $5,702,520 DSB $0 $0 $113,703,197 $0 $0 $113,703,197 Total $5,000,000 $0 $114,405,717 $0 $0 $119,405,717 Widen the Turnpike/SR 821 from I-75 (MP 39) to NW 57 th Ave (MP 43) FPN: 435546-1 This project widens a four-mile segment of the Turnpike/SR 821 from I-75 (MP 39) to NW 57 th Ave (MP 43). This widening will increase the number of travel lanes from four to six. These new lanes will be express lanes and includes pavement milling and resurfacing and right-of-way costs. The project limits begin in Miami-Dade County and end in Broward County. PE $7,300,000 $0 $0 $0 $0 $7,300,000 Total $7,300,000 $0 $0 $0 $0 $7,300,000 Indian River County Projects: Resurface the Turnpike/SR 91 MP 178.3 to MP 181.1 FPN: 435167-1, -2, -3 This project resurfaces a three-mile segment of the Turnpike/SR 91 from MP 178.3 to MP 181.1. This project also includes guardrail installation, and signing and pavement marking improvements. PE $264,000 $0 $0 $0 $0 $264,000 CST $0 $3,499,000 $94,000 $0 $0 $3,593,000 Total $264,000 $3,499,000 $94,000 $0 $0 $3,857,000 4 As of January 7, 2015

Resurface the Turnpike/SR 91 from MP 188.5 to MP 190.5 FPN: 435168-1, -2, -3 This project resurfaces a two-mile segment of the Turnpike/SR 91 from MP 188.5 to MP 190.5. This project also includes guardrail installation, and signing and pavement marking improvements. PE $192,000 $0 $0 $0 $0 $192,000 CST $0 $2,552,000 $59,000 $0 $0 $2,611,000 Total $192,000 $2,552,000 $59,000 $0 $0 $2,803,000 Palm Beach County Projects: Widen the Turnpike/SR 91 from Lake Worth Road (MP 93) to Okeechobee Boulevard (MP 99) FPN: 406143-1 This project widens a six-mile segment of the Turnpike/SR 91 from Lake Worth Road (MP 93) to Okeechobee Boulevard (MP 99). This widening will increase the number of travel lanes from four to eight. PE $9,650,000 $0 $0 $0 $0 $9,650,000 Total $9,650,000 $0 $0 $0 $0 $9,650,000 Widen the Turnpike/SR 91 from Broward/Palm Beach County Line (MP 73) to Glades Road (MP 75) FPN: 418214-1 This project widens a three-mile segment of the Turnpike/SR 91 from the Broward/Palm Beach County Line (MP 73) to Glades Road (MP 75). This widening will increase the number of travel lanes from six to eight. PE $6,500,000 $0 $0 $0 $0 $6,500,000 Total $6,500,000 $0 $0 $0 $0 $6,500,000 5 As of January 7, 2015

Widen the Turnpike/SR 91 from Okeechobee Boulevard (MP 99) to PGA Boulevard (MP 109) FPN: 415748-1 This project widens a ten-mile segment of the Turnpike/SR 91 from Okeechobee Boulevard (MP 99) to PGA Boulevard (MP 109). This widening will increase the number of travel lanes from four to six. ENV $0 $0 $0 $1,000,000 $0 $1,000,000 PE $0 $0 $0 $0 $9,900,000 $9,900,000 Total $0 $0 $0 $1,000,000 $9,900,000 $10,900,000 Improve the Interchange at Turnpike/SR 91 and PGA Boulevard (MP 109) FPN: 429334-1,-2,-4 This project includes intersection improvements at the Turnpike/SR 91 interchange with PGA Boulevard (MP 109). The improvements include the addition of a second eastbound left-turn lane, second westbound right-turn lane and a second westbound left-turn lane. This additional capacity improves safety and operations at PGA Boulevard by reducing congestion. CST $1,419,000 $17,000 $0 $0 $0 $1,436,000 Total $1,419,000 $17,000 $0 $0 $0 $1,436,000 Widen the Turnpike from the Lantana Toll Plaza (MP 88) to Lake Worth Road (MP 93) FPN: 406144-1 & 429324-1 This project widens the Turnpike/SR 91 from the Lantana Toll Plaza (MP 88) to Lake Worth Road (MP 93). This widening will increase the number of travel lanes from four to eight. PE $0 $0 $0 $0 $2,961,000 $2,961,000 Total $0 $0 $0 $0 $2,961,000 $2,961,000 6 As of January 7, 2015

Improve the Interchange at Turnpike/SR 91 and Glades Road (MP 75) FPN: 435615-1,-2,-4,-5 This project constructs a second lane to the existing northbound off-ramp, providing an additional southbound right-turn lane at the intersection with Glades Road. This project also includes an additional westbound right-turn lane and adjustments to traffic signal timings and offsets at the intersection. ENV $60,000 $0 $0 $0 $0 $60,000 CST $8,081,000 $51,000 $0 $0 $0 $8,132,000 Total $8,141,000 $51,000 $0 $0 $0 $8,192,000 Resurface the Turnpike/SR 91 from MP 92.53 to MP 102.6 (Northbound and Southbound), and from MP 90.1 to MP 90.3 (Northbound) FPN: 435171-1, -2, -3 This project resurfaces a ten-mile segment of the Turnpike/SR 91 from MP 92.53 to MP 102.6 (northbound and southbound), and from MP 90.1 to MP 90.3 (northbound). This project also includes guardrail installation, and signing and pavement marking improvements. PE $1,205,000 $0 $0 $0 $0 $1,205,000 CST $0 $16,031,000 $507,000 $0 $0 $16,538,000 Total $1,205,000 $16,031,000 $507,000 $0 $0 $17,743,000 Resurface the Turnpike/SR 91 from MP 103.7 to MP 106.1 FPN: 435172-1, -2, -3 This project resurfaces a three-mile segment of the Turnpike/SR 91 from MP 103.7 to MP 106.1. This project also includes guardrail installation, and signing and pavement marking improvements. CST $0 $3,184,000 $76,000 $0 $0 $3,260,000 Total $0 $3,184,000 $76,000 $0 $0 $3,260,000 7 As of January 7, 2015

Resurface the Turnpike/SR 91 from MP 106.1 to MP 111.7 FPN: 436521-1, -2, -3 This project resurfaces a five-mile segment of the Turnpike/SR 91 from MP 106.1 to MP 111.7. This project also includes guardrail installation, and signing and pavement marking improvements. PE $0 $647,000 $0 $0 $0 $647,000 CST $0 $0 $9,362,000 $256,000 $0 $9,618,000 Total $0 $647,000 $9,362,000 $256,000 $0 $10,265,000 St. Lucie County Project: Resurface the Turnpike/SR 91 from MP 153.23 to MP 169.32 FPN: 436517-1, -2, -3 This project resurfaces a 16-mile segment of the Turnpike/SR 91 from MP 153.23 to MP 169.32. This project also includes guardrail installation, and signing and pavement marking improvements. PDE $0 $1,385,000 $0 $0 $0 $1,385,000 PE $150,000 $0 $0 $0 $0 $150,000 CST $0 $0 $16,109,000 $449,000 $0 $16,558,000 Total $150,000 $1,385,000 $16,109,000 $449,000 $0 $18,093,000 8 As of January 7, 2015

Regional Projects: Implement All-Electronic Tolling (AET) 5A on the Turnpike/SR 91 FPN: 429339-1,-2 This project implements 5A of an overall program to convert portions of the Turnpike System to a cashless, allelectronic toll collection system. The project limits of 5A begin at the I-595 Interchange (MP 54) on the Turnpike/SR 91 in Broward County and end south of the Lantana Toll Plaza (MP 88) in Palm Beach County. The 5A conversion includes modifications at the Cypress Creek Mainline Toll Plazas and at nine existing interchange ramp toll plazas. CST $0 $0 $36,513,000 $0 $9,893,000 $46,406,000 Total $0 $0 $36,513,000 $0 $9,893,000 $46,406,000 Implement All-Electronic Tolling (AET) 8 on the Turnpike/SR 91 FPN: 431737-1 This project will implement 8 of an overall program to convert portions of the Turnpike System into a cashless, all-electronic toll collection system. The project limits of AET 8 begin at the Lantana Toll Plaza on the Turnpike/SR 91 in Palm Beach County, and extend 148 miles north through Martin, St. Lucie, Indian River, and Okeechobee Counties, to the Three Lakes Toll Plaza on the Turnpike/SR 91 in Osceola County. The 8 AET conversion project includes the removal and replacement of 30 ramp toll plazas and two mainline toll plazas. PE $0 $0 $2,000,000 $390,000 $0 $2,390,000 DSB $0 $0 $0 $68,175,000 $23,701,000 $91,876,000 Total $0 $0 $2,000,000 $68,565,000 $23,701,000 $94,266,000 9 As of January 7, 2015

Summary of Minor Project Funding by Project Type: The table below summarizes the funding programmed for minor projects (signing/pavement markings, landscaping, environmental, bridge paintings, canal revetment and on-going project phases) for Turnpike roadways throughout the District. Work Description Bridge Paintings $0 $168,000 $1,351,000 $0 $0 $1,519,000 Signing/Pavement Markings $8,000 $21,000 $150,000 $0 $0 $179,000 Minor Projects Total $8,000 $189,000 $1,501,000 $0 $0 $1,698,000 Summary of All Project Funding: PROJECTS Minor Projects Total $8,000 $189,000 $1,501,000 $0 $0 $1,698,000 Major Projects Total $49,548,000 $27,406,000 $235,119,717 $73,637,000 $46,956,000 $432,666,717 Total $49,556,000 $27,595,000 $236,620,717 $73,637,000 $46,956,000 $434,364,717 10 As of January 7, 2015

11 As of January 7, 2015