The Gold Standard A/R Smallholder & Microscale Guidelines

Similar documents
Gold Standard Afforestation/Reforestation (A/R) GHG Emissions Reduction & Sequestration Methodology

BCI Criterion 4.2. Smallholders. Conversion Risk Assessment Procedure. Version 0.1

Forest Stewardship Council FSC STANDARD. Requirements for sourcing Controlled Wood FSC-STD V 3-0 EN. Controlled Wood

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SSC A/R (CDM-PoA-DD-SSC-AR) - Version 01. CDM Executive Board Page 1

Agricultural Production Standard (APS) At a Glance

Performance Standard 6 V2

Forest Stewardship Council

by 2010 or beyond and what are the implications for the Convention on Biological Diversity?

FINANCING CLIMATE CHANGE ADAPTATION AND MITIGATION IN THE AGRICULTURE AND FORESTRY SECTORS

Information on LULUCF actions by Sweden. First progress report

2015 SAN/Rainforest Alliance Impacts Report

ROUNDTABLE MEETING ON SUSTAINABLE PALM OIL. RSPO Guidance for the Management and rehabilitation of Riparian Reserves Holly Barclay

SECTION 2. SFI Forest Management Standard

FOREST, WETLANDS AND HABITAT

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS ELEVENTH MEETING

Non-permanence. 3.1 Introduction

Katahdin Forest Management 2016 SFI Summary Audit Report

Appendix1d. Review of the Programme for the Endorsement of Forest Certification schemes

Towards Sustainable Agriculture: the OECD Green Growth Strategy

How Carbon Trading Can Help Preserve Coastal Ecosystems

Introduction to the Methodology for Carbon Accounting of Bamboo. Plantation Projects

REDD+ Safeguards and Safeguard Information Systems

Alien species that threaten ecosystems, habitats or species I. STATUS AND TRENDS

Australian carbon policy: Implications for farm businesses

background info: organic agriculture

FRAMEWORK CONVENTION ON THE PROTECTION AND SUSTAINABLE DEVELOPMENT OF THE CARPATHIANS

4.2.5 Afforestation and Reforestation

Restoration Opportunities Assessment Methodology (ROAM)

Water and Watersheds. Data Maps Action

Manitoba s Submission Guidelines for Peatland Management Plans

Forest certification: the practice of evaluating forest land management against agreed upon standards of. Sustainability:??

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

Appendix 1: Forest Carbon Emission Offset Project Development Guidance

REVISED ANNEX C GUIDANCE ON PROJECT TYPE ELIGIBILITY

Terms and definitions used in FRA 2010

BASELINES, PERMANENCE AND LEAKAGE IN REDD

THE GOLD STANDARD POA RULES AND GUIDANCE ANNEX F (GSV2.2)

Supervisor s Office 5162 Valleypointe Parkway Roanoke, VA

American Carbon Registry

The Alberta Environmental Farm Plan Benchmarking Project

Secretariat of the Convention on Biological Diversity

Sustainable Non-Agriculture Land Management

FCCC/KP/CMP/2012/13/Add.1. Decision 2/CMP.8

CBD. Distr. GENERAL. UNEP/CBD/COP/DEC/X/17 29 October 2010 ORIGINAL: ENGLISH

ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT. Version 3.0

SECTION 4 SFI Standard

Summary - Agri-Commodities Policy

Forest Stewardship Council FSC STANDARD. Forest management requirements for Controlled Wood certification FSC-STD V 3-0 EN.

Combined Safeguards and Sub- on ERDD-plus, Singapore, March Daw Le Le Thein, U Than Naing

A/R Methodological tool. (Version 01)

Ontario Envirothon LEARNING OBJECTIVES. Ontario Envirothon Learning Objectives

the challenge we face

The Project Design Document

Information Leaflet Sustainable Biomass Production. Growers Agricultural Operations

Afforestation Reforestation

Biofuels and Food Security A consultation by the HLPE to set the track of its study.

Concept of Organic Farming S S R A N A S R S C I E N T I S T

Hello my name is Joy Loughry and I am with the groundwater technical unit of the Minnesota department of natural resources. Today I am going to talk

RAINFOREST ALLIANCE CERTIFICATION STANDARDS NON-TIMBER FOREST PRODUCTS ADDENDUM

Dang Thi Tuoi Biodiversity Conservation Agency (BCA) Ministry of Natural Resources and Environment of Vietnam (MONRE)

STANDARD. Document information. Version: v4.8 Dec Date: Dec (c) 2012 European Water Partnership. All rights reserved.

Guideline Establishment of standardized baselines for afforestation and reforestation project activities under the CDM

ARTE RIVER PUGGAREE ROAD

PLANT AND ANIMAL DIVERSITY

Reduced Impact Logging in Sabah

Plan Vivo Carbon management and rural livelihoods

The following contains the 4 key provisions of a coherent package on international forest carbon activities for inclusion in U.S. climate legislation:

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India

approaches for climate change mitigation measures, without pre-empting any future decisions taken under the United Nations Framework Convention on

An overview. May Annelisa Grigg, Director of Corporate Affairs, Fauna & Flora International

Government of Uganda, United Nations Development Programme (UNDP) And World Bank

Joint Framework for Action Ghana

SmartStep Program Participant Fact Sheet

Background. Q1: Why is biodiversity important for sustainable development? KEY MESSAGES (Revised June 11 th, 2013)

Annex 27 GENERAL GUIDELINES FOR SSC CDM METHODOLOGIES. (Version 19.0) CONTENTS

Overview. Study Approach. Impacts

24. Wildlife Habitat on Farmland

The Role of Technology in Enhancing Livelihood Support Options

Palm Oil Innovations Group Charter

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

Swiss agriculture, agricultural policy and biodiversity

FEFAC Soy Sourcing guidelines june 2016 TowardS a mainstream TranSiTion To responsible Soy

Ecosystem-based adaptation options for smallholder coffee farmers in Central America and pastoralists in South Africa

2. Inventory estimates for the Kyoto Protocol (WP 1.2)

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries

PROJECT GREEN YVR CREATING CLIMATE SMART AIRPORT BUSINESSES -VANCOUVER AIRPORT AUTHORITY-

Official Journal of the European Union. (Acts whose publication is obligatory)

FSC STANDARD STANDARD FOR EVALUATION OF FSC CONTROLLED WOOD IN FOREST MANAGEMENT ENTERPRISES. FSC-STD (Version 1-1) EN

CARBON FORESTRY WORKSHOP

Prof. José Antônio Tietzmann E Silva THE NEW FOREST ACT (LAW N /2012) KEYWORDS BRAZIL NEW FOREST LAW MODIFICATION OF LEGAL CONCEPTS

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS NINTH MEETING

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT. on an EU Forest Action Plan

Land Consolidation Practices in Turkey and Some Results

Synergies between National Biodiversity Strategies and Action Plans (NBSAPs) and REDD+

REDD: Cost-Benefit Analysis at the Country Level

REDD-NM-002 / VERSION May Methodology for Estimating Reductions of Greenhouse Gases Emissions from Frontier Deforestation

Ecosystem Services: Provision, Value & Policy. Steve Polasky University of Minnesota & Natural Capital Project

Wildlife Conservation Strategy

Financing Landscape Programs Integrating Different Financing Sources

Transcription:

The Gold Standard A/R Smallholder & Microscale Guidelines Applicable for A/R Requirements Valid since November 2014 Version 1.0 Author The Gold Standard With the support of:

Table of content Background / How to read.................................................................... 2 I. Applicability / Scope....................................................................... 3 1. Definitions.............................................................................. 4 2. Key Project Information................................................................... 7 3. Sustainability............................................................................ 8 4. Additionality............................................................................ 11 5. Methodology........................................................................... 12 7. Project Cycle............................................................................ 14 Background These guidelines are an add- on module for the A/R Requirements - www.goldstandard.org/luf_ar- requirements. They were developed to overcome some of the obstacles smallholder and microscale projects face to access the carbon market. The guidelines simplify the existing requirements and aim to a reduction of transaction costs. For this certain requirements have been modified, simplified or waived. Furthermore, the use of a special class of auditors is possible. If there is no mention of a particular requirement from the A/R Requirements in these guidelines, it implies that the A/R Requirements are unchanged. Please note that the numbering of chapters is not always continuously within this guideline, as some chapters of the A/R Requirements remain unchanged. How to read The following symbols indicate the relevance of requirements for a specific chapter or subchapter: Relevant for smallholder projects Relevant for microscale projects Not relevant for microscale projects 2

I. Applicability / Scope Applicability / Scope To be added as new requirements: 1. This guideline shall be applied in combination with the Gold Standard A/R Requirements v0.9. 2. Smallholders l This guideline can be applied by smallholder projects - project areas that are managed by smallholders. There is NO limit in size for such smallholder projects. Projects that consist of areas, which are managed by a mix of smallholders and non- smallholders ( smallholders as defined in chapter 1. Definitions ) can use this guideline only for the project areas that are managed by smallholders. Combined certifications are possible and economically worthwhile. 3. Mircoscale l This guideline can be applied by microscale projects - projects with a project area of maximum 500ha. In order to avoid undermining the purpose of this guideline, project owner shall not register projects with similar characteristics as separate projects. 4. This guideline aims to simplify the existing A/R Requirements. In case a project intends to use in a particular case the original requirement of the A/R Requirements instead of the adapted version by this guideline, it may do so. 3

1. Definitions The A/R Smallholder & Microscale Guidelines modify some of the existing definitions of the A/R Requirements. Thus the A/R Requirements shall be interpreted accordingly. When the project owner is uncertain about a particular interpretation, he shall contact the Land Use & Forest team of the Gold Standard Secretariat. * All definitions with a red start might be subject to adaption due to the streamlining process with the Gold Standard Agriculture Requirements. These are currently in the developing phase and will be published by the end of 2014. Meanwhile the definitions in this guideline are valid. Governance To be added to the definition 6. Auditor : (c) Auditors are individuals that have successfully completed the Gold Standard training for LUF Auditors. These trainings are still to be developed in 2015. Until than regular company auditors shall be used. These individual auditors are limited to audit projects as New Area Certification as Performance Certification (except for the first Performance Certification) The cumulative amount of CO2- certificates issued through one or several certifications executed by 'individual auditors' cannot exceed 100 000. Beyond this threshold a Performance Certification by a 'company auditor' can reinstate a project's eligibility for subsequent cumulative 100 000 CO2- certificates - again issued through one or several certifications executed by 'individual auditors'. Project Actors The term 11. Worker is adapted to: 11. Workers* l (adapted from Fairtrade and FSC) Workers are all persons that are employed by a written or verbal agreement. This includes permanent, migrant, part- time and seasonal employees, of all ranks and categories, including field workers, artisans, labourers, administrators, supervisors, executives, contractor employees as well as self employed contractors and sub- contractors. Excepted from the definition above are: (a) workers employed by a verbal agreement on smallholder farms for less than 3 months per year, AND (b) smallholder farmers themselves, AND (c) family members of the smallholder farmer Smallholder* l Smallholders are farmers that have more than 50% of farm work done by family members, cooperative members or neighbours. 4

Areas The term project area replaces/merges the definitions of 14. Project area, 15. Planting area and 16. Eligible Planting Area : Project area* l (Source: adapted from FSC, where the relevant term is Management Unit ) The project area is a spatial area submitted for certification, managed to a set of explicit long- term management objectives. For the efficient calculation of the amount of CO2- certificates or other accounted ecosystem services (e.g. carbon reduction, removal and avoidance, biodiversity enhancement, water supply) under The Gold Standard, the project area is divided into the sub- unit of Modelling Units (MUs). New project areas can be added and removed to an existing project area after its Initial Certification (see Procedures, 3. New Area Certification ). To be added as new definition: Project activity* l Project activities are activities (planning, implementation and management) undertaken with the objective to certify one or several ecosystem services (e.g. emission reduction, removal and avoidance, biodiversity enhancement, water supply). The term 7. Project is adapted to: Project* l A project is the realization of project activities. The term 18. Modelling Unit (MU) is adapted to: Modelling Unit (MU)* l A Modelling Unit (MU) represents an area with homogeneous characteristics to predict (model) and verify a certain ecosystem service. A/R projects For A/R projects these homogeneous characteristics are usually defined by the age cohorts, AND (mix of) tree species, AND silvicultural treatment, AND agro- ecological conditions (e.g. elevation, precipitation, soil type, etc.). 5

Certificates The term 21. Crediting period is adapted to: Crediting period* l The crediting period is the time span in which the reduction, removal and avoidance of CO2 can be accounted for and is subject to monitoring. Smallholder projects* Smallholders join and exit projects more frequently than participants in regular projects. Although a project always has only one crediting period, smallholders of a project can have different commitment periods to a project. Overall, it is in the responsibility of the project owner to deliver the estimated CO2- certificates within its crediting period, as outlined during the Initial Certification. Smallholder and microscale A/R projects For smallholder and microscale projects the crediting period shall be minimum 30 years and maximum 50 years. The project owner selects the crediting period based on the characteristics of the project during the Initial Certification. The crediting period starts with the planting start. An adaptation of the crediting period after the Initial Certification is possible, as long as it stays within the timeframe of 30-50 years. For the procedures, please contact the Gold Standard secretariat. 6

Requirement 1 is adapted to: 2. Key Project Information (b) (c) (d) (e) (p) Organisations involved in the project (including legal details of the project owner and its relationship to the local communities of the project) Target smallholder groups that will be invited to participate Location of the project area Size of the project area Distribution of revenues (between the project owner and the smallholders) The requirement 3 is adapted to: 3. The project owner shall have a digital map with the location of all project areas. These maps shall contain for every participating smallholder (a) one GPS point, OR (b) one polygon (reflecting the boundaries of the individual area). 4. Each smallholder participating in the project shall (a) know during any field visit what area of his land is part of the project activity (project area), AND (b) have a hand- drawn (or digital) map of this area that contains the size of his land and/or the number of trees. 7

3. Sustainability 3.1 Do- No- Harm Assessment Social Note that the requirements for Working Conditions (6-12) and for Occupational Health & Safety (15-18) are limited to workers of the project. The workers definition excludes temporary workers on smallholder farms who are verbally self- employed for less than 3 months per year on an irregular basis... see chapter 1. Definition term 11.* The requirement 10 is adapted to: 10.* There shall be no child labour. Excepted are children for work on their families property as long as: (a) their compulsory schooling (minimum of 6 schooling years) is not hindered, AND (b) the tasks they perform do not harm their physical and mental development. To be added as new requirements: Safeguarding Food security 18.2* Food security and human health of local communities surrounding the project, including project participants, shall not be negatively affected by the project activities. Women 18.3* The project shall meet minimum two from the following four domains to improve the women s (a) income or assets (material goods, monetary resources, land, livestock, etc.), (b) discretionary or socialising time, (c) skills, education or knowledge, (d) role for decision making. The domains are based on the W+ Standard 1. The W+ Standard is a certification label developed by the Women Organizing for Change in Agriculture Network (WOCAN) that endorses projects that create increased social and economic benefits for women participating in economic development or environment projects, including those that provide renewable energy technologies, time and labor saving devices, forest and agriculture activities, and employment opportunities. 1 W+ Standard www.wplus.org 8

Environmental The requirements 21, 23 and 34 are removed: 21. Through a smart mosaic of the planting areas, buffer zones and infrastructure habitat connectivity for flora and fauna should be enhanced. 23. Minimum 10% of the project area shall be identified and managed to protect or enhance the biological diversity 2 of native ecosystems 3. For this, the HCV 4 approach should be followed. 34. On both sides of permanent or temporary water bodies (lakes, streams, rivers, wetlands, etc.) riparian buffer zones of 15 meters shall be implemented on each site. In these riparian buffer zones: (a) only native tree species 5 may be planted, AND (b) invasive species 6 shall be removed, AND (c) all existing vegetation shall be kept, AND (d) no timber harvesting activities shall take place, AND (e) no use of fertilizer or chemical pesticides. Requirement 24 and 31 is adapted to: 24.* (a) Existing patches of trees or single solitary stems with a high degree of biological diversity 2, AND (b) habitats of endangered species 7 shall always be identified and managed to protect or enhance the biological diversity 2. 31.* Workers shall transport, store, handle and apply chemical pesticides in a safe way. 2 Biological diversity (Source: FSC) The variability among living organisms from all sources including, inter alia, terrestrial, marine and other aquatic ecosystems and the ecological complexes of which they are a part; this includes diversity within species, between species and of ecosystems. 3 Native ecosystem (Adapted from FSC) Sites to favour or restore native species and associations of native species that are typical of the locality, and for managing these associations and other environmental values so that they form ecosystems typical of the locality. 4 HCV High Conservation Value - www.hcvnetwork.org 5 Native tree species (Source: FSC) Species, subspecies, or lower taxon, occurring within its natural range (past or present) and dispersal potential (that is, within the range it occupies naturally or could occupy without direct or indirect introduction or care by humans). 6 Invasive species (Source: FSC) Species that are rapidly expanding outside of their native range. Invasive species can alter ecological relationships among native species and can affect ecosystem function and human health. 7 Endangered species All endangered and critically endangered species as defined by the IUCN Red List - www.iucnredlist.org 9

3.2 Local Stakeholder Consultation (LSC) The requirements 9. 10. and 11. are removed. According to the Guidelines - LSC, which needs to be applied by all projects, all requirements of the chapter 3.1 Do- No- Harm Assessment are subject to discussion during the local stakeholder consultations - and need to be monitored in case any risk of future non- compliance is identified. 3.5 Legal Rights The requirement 2 is adapted to: 2. Each smallholder shall sign an agreement with the project owner which confirms that (a) the smallholder holds the CO2 user rights from the trees that are planted due to the project and passed these rights on to the project owner, AND (b) the smallholder holds all necessary rights to implement the project (e.g. planting permits, right to harvest). Such agreements shall include the (d) contact details of the smallholder, AND (e) contact details of the land owner (if differing), AND (f) length of lease contract (if applicable), AND (g) a confirmation that the land tenure on which the trees are planted is uncontested, AND (h) the liabilities and benefits for the smallholder. An example agreement is provided by the Smallholder agreement template. This template is still to be developed in 2015. Agreements with comparable meaning may be used. If a smallholder does not meet requirements 2(a) and 2(b), the person or legal entity that does meet those respective requirements shall endorse the participation of the smallholder in a written form. 2.1 All paragraphs within the agreement shall be explained and discussed with the smallholders in meetings. If helpful, the agreement should be translated to the local language and/or in an oral way. 2.2 The project owner shall have a list with all (a) names and contact details from the participating smallholders, AND (b) the locations (GPS points) and area (ha) of their project areas, AND (c) the end dates of the lease contracts and frequency of renewal (if applicable), AND (d) the start and end dates of the smallholders participating in the project. 10

4. Additionality 4.1 Additionality Please note that the A/R Requirements contain two options for the proof of additonality. Though, the adaptations made by this guideline only refer to Option 2, Option 1 can also be applied by the project owner. To be added to the Process for New Area Certification : Process for New Area Certification Option 2: The project owner may use the UNDP Human Development Indicator of the Initial Certification. The requirement 4 is adapted to: 5. The project area shall not have been forest 8 for at least 10 years prior to the planting start. In case the project area has been deforested during the last 10 years, evidence shall be given that the deforestation activity has not taken place with the intention to reforest the area and generate CO2- certificates. 8 Forest A forest is defined by the Designated National Authority (DNA) of the project s host- country: http://cdm.unfccc.int/dna/index.html 11

5. Methodology Practical Approach Many projects take place in countries where little scientific information is available for trees species, biomass in general and other land use related activities. To provide cost- efficient estimations for the parameters Baseline, Leakage and CO2- Fixation it is thus recommended for the project owner not to execute expensive field research, but to use wherever possible existing national or international default values. 5.5 Baseline To be added as new requirement: 0. Applicability conditions for each Baseline scenario shall be set. The process for New Area Certification is adapted to: Process for New Area Certification For the New Area Certification the project owner shall provide justification that the new areas meet the applicability conditions (see new requirement 0 above) that were set during the Initial Certification. In case new Leakage scenarios are created the process for Initial Certification shall be followed. The resulting figures of the Baseline template shall be used to update the projects Modelling Units Report. This can be a self- made spreadsheet by the project or a generated PDF- spreadsheet by the ClimateProjects software. 5.6 Leakage To be added as new requirement: 0. Applicability conditions for each Leakage scenario shall be set. The process for New Area Certification is adapted to: Process for New Area Certification For the New Area Certification the project owner shall provide justification that the new areas meet the applicability conditions (see new requirement 0 above) that were set during the Initial Certification. In case new Leakage scenarios are created the process for Initial Certification shall be followed. The resulting figures of the Leakage template shall be used to update the projects Modelling Units Report. This can a self- made spreadsheet by the project or a generated PDF- spreadsheet by the ClimateProjects software. 12

5.7 CO2- Fixation To be added as new requirement: 0. Applicability conditions for each MU growth- model shall be set. The process for New Area Certification is adapted to: Process for New Area Certification For the New Area Certification the project owner shall provide justification that the new areas meet the applicability conditions (see new requirement 0 above) that were set during the Initial Certification. In case new MU growth- models are created the process for Initial Certification shall be followed. The resulting figures of the CO2- Fixation template shall be used to update the projects Modelling Units Report. This can a self- made spreadsheet by the project or a generated PDF- spreadsheet by the ClimateProjects software. Forest Inventory The requirement 2 is adapted to: 2. For forest inventories the Guidelines - Forest Inventory should be followed. This template is still to be developed by the end of 2014. The requirement 5 is adapted to: 5. The forest inventory shall be sufficient to meet a MU precision with a maximum error of ±20% at a 90% confidence interval. Where the error is above 20%, the additional difference shall be deducted. 13

7. Project Cycle 7.3 New Area Certification To be added as information: New Area Certification can also be executed by 'LUF auditors' as defined in the chapter 1. Definition. The requirement 1 is adapted to: 1. The process for New Area Certification shall be followed, as outlined in the individual chapters. 14