GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY

Similar documents
Guidance on the Standards for Storage and Treatment of End-of-life vehicles

LICENCE REG NO. W HAS BEEN TRANSFERED

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Compliance Assessment Scheme Public consultation

State of the Nation Report

Environmental Conditions Laboratories (for commercial use) Group

The following documentation was tabled:

Interim Guidance on the Regulation of In-situ Disposals of Radioactive Waste and Residual Radioactive Contamination on Nuclear Authorised Premises

Standard rules SR2012 No10

FEEDLOT DESIGN AND CONSTRUCTION. 39. Agricultural and veterinary chemical storage. AUTHORS: Orla Keane and Peter Watts

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

9.3.9 Industry uses code

WASTE LICENCE. Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland. Licence Register Number: 208-1

Initial Construction Costs For Various Pavement and Drainage Options

Ensure your own actions reduce risks to health and safety

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Construction Environment Management Plan

VIRIDOR WASTE MANAGEMENT LIMITED. Lostock Waste Treatment Plant. Airborne Pollutant Management Plan. November 2009

Environmental Guidelines for Preparation of an Environmental Management Plan

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS

CONTROL OF POLLUTION ACT 1974 (PART 1)

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION

Application Pack 5. How to apply for a Connection to a Public Sewer/Lateral Drain

A positive, collaborative airport-wide approach is essential to minimise pollution. Heathrow Pollution Prevention Code of Practice

ATTACHMENT J ACCIDENT PREVENTION & EMERGENCY RESPONSE

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations

Water Pollution Control for Work in Sensitive Areas

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

(1) Site Suitability PURPOSE

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

End-of-Life Vehicle Waste Disposal Site EASR. Ontario Ministry of the Environment and Climate Change Regulation Overview

6.1 Introduction to Wastewater Issues

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

UNDERGROUND STORAGE TANKS FOR LIQUID HYDROCARBONS. Code of Practice for Installers, Owners and Operators of Underground Storage Tanks (& Pipelines)

RESTAURANTS AND FOOD OUTLETS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

Environment Protection Licence

Environment Protection Licence

OELG Event Categories

SECONDARY CONTAINMENT RAINWATER MANAGEMENT

CORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 7 APR09

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Highways Maintenance (Construction)

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

Hazardous Waste Management

GUIDELINES FOR SANITARY DESIGN AND CONSTRUCTION OF MILK PRODUCTS PLANTS (rev )

Procedure and Specification for the Construction of Vehicle Access Crossings over Footways and Verges April 2016

Code of Construction Practice Part B: Site Specific Requirements

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018

VIENNA JUNE 2017

Greater Dublin Drainage Project

PLANNING DECISION NOTICE

ACCIDENT PREVENTION & EMERGENCY RESPONSE

Pollution Prevention Technical Information note

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

Impact of work activities on the environment

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

Kurnell Refinery Conversion Project

Pollution Prevention Technical Information note

SEPARATORS A RANGE OF FUEL/OIL SEPARATORS FOR PEACE OF MIND

Development on Peatland Guidance Waste. Objective

The Pipelines Regulations, 2000

Dangerous Goods Safety Management Regulation 2001

Facility Runoff Control Plan FRCP. City of Papillion Public Works Facility

Ordinance No Lot Surface Drainage

11.0 HANDLING AND STORING AGRICULTURAL INPUTS

Pollution Incident Response Management Plan. Newell Highway Trewilga Realignment

CORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES COLINDALE, MICAWBER STREET & WOOLWICH VERSION 9 APR09

Loy Yang B Environment Improvement Plan

Our ref: XLET7 Confirmation of Registration. Your ref: Date: 07/05/2014

Parking Area Maintenance

Draft Policy Review. Use of Shipping Containers

Leasing of Railway Land

Erosion & Sedimentation Control Policy

OIL RECORD BOOK INSTRUCTIONS

Examples of Hazardous Wastes produced by the University include:

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P

Annex F Scoping Checklist

Storm Water Pollution Prevention Plan. Wastewater Treatment Facility and Streets & Parks Facility. Village of Fox River Grove, Illinois

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

CDM (Set Construction) Information Sheet and Template Introduction

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY

NUCLEAR SAFETY REQUIREMENTS BSR

GLASGOW AIRPORT RAIL LINK BILL NETWORK RAIL OBJECTION. 1. Introduction

Builder s enviro guide

Building Consent Process

The overall objectives for the waste management assessment are summarised below:

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:

Revision date: 13/03/2015 Revision: 2 Supersedes date: 03/07/2012

Spill Response Procedures

This unofficial translation of. Ministerial Decision No 421/1998. was downloaded from METS is not the copyright owner.

DRAFT FOR CONSULTATION

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

Whitewater River Region SWMP. APPENDIX L BMPs for Fire Fighting Agency Activities

Transcription:

GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY A working plan is an essential document and consists of a written statement accompanied by plans, drawings and specifications detailing how the site is to be designed, engineered, operated, monitored and restored. The working plan is referred to in waste management licence conditions and the licence holder may only vary it by notification to, and in some respects with the prior consent of, SEPA. SEPA s Guide to Waste Management Licensing gives further guidance on waste management licensing and working plans. It is essential that applicants discuss the need for site engineering and development works with SEPA at an early stage of preparing a licence application. The site will require engineered design features such as gates, fences, drainage and concrete hardstanding. An indication of the engineering works that will be required is given in this Guidance Note. The application of Quality Assurance and Quality Control procedures form an important part of any waste management practice and applicants should bear this in mind when preparing their working plan. This is particularly applicable to the installation of site infrastructure such as concrete surfacing and site drainage. The Working Plan is likely to require amendment as the site develops, it will therefore be helpful to write the statement in sections with numbered paragraphs and pages, submitted in loose leaf form so that subsequent approved changes are easier to incorporate. The information which must be included in the working plan is as follows, and should correlate with plans as listed in paragraphs 2.1-2.3 below: SEPA suggests that the Working Plan follows the format outlined below. 1. WRITTEN STATEMENT The written statement forms an important part of the working plan. It must describe clearly and unambiguously all aspects of the operation of the site. A correctly written statement should contain sufficient information to enable anyone unconnected with the site to understand how it will be operated. 1.1 General Considerations General details of the site should include; a) A brief history of the site giving its previous uses, including any previous waste management activities. b) The proposed operating hours at the site including the proposals for Bank Holiday and other public holiday working, for accepting, treating and removing waste and the maintenance of plant, buildings and equipment. c) The types of waste that will be accepted and the maximum quantity of each type of waste that will be accepted, stored and treated (as appropriate) each day. A throughput rate for wastes should also be indicated. WML-G-SCRAP revision 2 October 2011 Page 1 of 6

d) The number of staff to be employed on the site and the minimum number of people required to operate the site. Details should be provided of how the technically competent management will control the site including detail on those involved and a copy of the relevant certification / references. 1.2 Site Infrastructure The standard and location of the following infrastructure should be detailed: Fencing The license holder should provide perimeter fencing or some other means of preventing unauthorised or accidental access. Surfaces To prevent the pollution of water, areas used for the storage of contaminated materials including undrained vehicles, dismantled engines and transmissions, the processing of contaminated materials, the draining of vehicles and vehicle dismantling must take place on an impermeable pavement, i.e. concrete. Specifications of thickness, quality and falls to the drainage system must be given. To avoid liquids escaping from the perimeter of the concrete, raised kerbs may be required to bund the areas for complete containment. Internal concreted areas may require sealing at doorways by small barriers, if the fall directs liquids to the doorway. Hardcore areas can be utilised to store fully depolluted vehicles. Drainage To prevent the pollution of water, concreted surfaces which are not under cover must be drained to a sump or to an oil/water interceptor with final discharge to a sewer, soakaway or watercourse under consent from SEPA or Scottish Water, as appropriate. Other Infrastructure Where appropriate, the standard and location of the following infrastructure should be detailed; a) Site roads b) Weighbridge c) wheel cleaning facilities d) fuel and waste storage tanks and associated bunds e) waste storage areas f) services (water, electricity, telephone etc.) g) lighting. If it is considered more convenient, buildings and other infrastructure can be detailed as annotations on the site plan(s). The working plan should make it clear whether the waste storage area is in the open air, covered, enclosed, or in a building, with details of any structure. WML-G-SCRAP revision 2 October 2011 Page 2 of 6

1.3 Waste Reception Detailed explanations are required for the procedures for accepting materials, for the safe handling of materials and for dealing with incidents regarding unauthorised wastes, plant breakdown, accidents, spillages, and fire. A visual check on incoming materials must be undertaken and recorded with details of quantity, nature and origin to ensure the types and quantities of waste as well as the storage capacity of the site are in accordance with licence conditions. For fine materials (residues and oily swarf) acceptance may require further analysis. Any unsuitable materials, accepted by mistake, must be segregated, securely stored and removed as soon as practicable. On removal the quantity, nature, process and destination must be recorded. A summary of all materials accepted and removed will be required to be sent to SEPA at a frequency and format specified in the licence. The Working Plan must give a full description of how the above requirements will be met. 1.4 Site Operations The working Plan should provide information on the day-to-day operations of the site, including: a) The types of treatment processes to be carried out and the location at which they will be undertaken. b) The maximum time that waste will be stored at the facility. The working plan must specify how wastes are to be removed from the site within an acceptable timescale. c) The type, location and size of any waste handling machinery and details of how it is to be used. d) The arrangements for the storage, handling and disposal of any residues or by-products produced at the site. Particular consideration should be given to the following issues: Storage Height To prevent detriment to the amenities of the locality and safe working conditions the height of stacked materials should follow planning permission restrictions or Health and Safety Executive guidelines and should be no higher then the boundary fence. Purpose built stacking frames may allow higher stacking with safe access. Storage of Contaminated Materials To prevent pollution of the environment batteries and oily materials (swarf containing soluble oils) must be stored in covered leakproof containers sited on concrete or in a concrete bunded area with a sump completely isolated from any interceptor draining to sewer or soakaway. Batteries must not be drained on site unless specifically permitted to do so. Storage of Liquids To prevent the pollution of the environment from spillages, liquids should be stored in labelled containers sited on impervious bases and surrounded by impervious bund walls with a capacity. of 110% of the volume of the largest tank. Off loading valves and ventpipes must be sited within the bunded area. The capacity of the bund must be maintained with any liquids being removed from a sump at the lowest point. WML-G-SCRAP revision 2 October 2011 Page 3 of 6

The operator must make adequate provisions for the maintenance and upkeep of the site and all plant and equipment. The working plan must provide full and precise details of such maintenance provisions to satisfy SEPA of their suitability. Details of inspections of infrastructure and storage areas should also be stated. 1.5 Pollution Control This section should detail the measures to be taken to monitor and/or control the following; a) Vermin b) Insects c) Noise d) Dust e) Spillages f) Odours g) Mud h) Litter i) Fires 1.6 Site Completion The proposals for restoring the site after operations have been concluded should be included, where applicable. 1.7 Monitoring This section should include details of any monitoring it is proposed to carry out, including the location and frequency of monitoring and the methodology of sampling and analysis. 1.8 Records This section should include details of the manner in which records relating to the site activities will be kept. In particular the system for recording the types and quantities of waste received, processed and removed from the site should be detailed. 2. PLANS Where indicated the scales suggested for the following sections are strongly recommended, although in some circumstances alternative scales may be more appropriate. Applicants should discuss alternative plans or scales with SEPA prior to the submission of the application. All plans should bear a unique identification number. The plans required for the Working Plan are as follows: 2.1 Site Location Plan A plan to identify the site in comparison to the surrounding area. This should be A4 in size and usually at a scale of 1:1250. It must show the area around the site to a distance of at least 250 m and include all roads, buildings and other developments. WML-G-SCRAP revision 2 October 2011 Page 4 of 6

A red line should be placed around the whole area to be licensed, and a blue line placed around any other areas of land owned or occupied by the applicant. The area to be licensed must be identical to, or fall within the boundaries of the area that has been granted, or applied for, in the planning permission, application or equivalent authorisation. 2.2 Site Operational Plan(s) Suitable scales for this plan would be between 1:100 and 1:500 depending on the size of the facility and will show the site prior to preparation. Details that should be included are existing features and additional works to be undertaken and include such things as: a) existing drainage and outfalls. b) the location of any watercourses including any springs, seepages or wells. c) public services, and any other features of the site. d) location of discharge consents. e) hardstandings - locations and specification. f) Impermeable pavements - locations and specification. g) gates and boundary fencing. h) access and position of notice board. i) reception facilities, location of storage areas and bays, location of processing areas, site control office and other buildings, other fixed equipment on site such as wheel cleaner, weighbridge and secure area for gas bottles. j) location of all tanks and associated bunds. k) existing drainage layout including any interceptors and any proposals for improvement. l) landscaping and screening works. m) type of surfacing of the storage, access and operational areas. In the interests of clarity it may be appropriate to detail the information on a series of plans. A red line should be placed around the whole area to be licensed, and a blue line placed around any other areas of land owned or occupied by the applicant. Please check that the area outlined in red is that covered by the relevant planning permission. 2.3 Engineering Plans & Details These give scaled details of construction and engineering features on the site. Examples of works which may require these details are: a) the form and construction of bunds including those for fuel, oil storage and other fluids. b) details of surface water drainage. c) form and construction of site roads. d) wheel wash and weighbridge facilities. NOTE TO APPLICANTS SEPA will usually discuss with the applicant any details in the submitted working plan which it considers to be unacceptable. If SEPA cannot be satisfied with any of the WML-G-SCRAP revision 2 October 2011 Page 5 of 6

contents of the working plan it will incorporate conditions within the waste management licence which will override the working plan in respect to those points. License Holder s Responsibilities Notwithstanding any requirements of SEPA for site engineering, the applicant should be aware of his responsibility for ensuring the integrity of such works. Compliance with SEPA s minimum standards does not remove the liability of the licence holder for any water pollution or other environmental damage which may result from the activities on site. WML-G-SCRAP revision 2 October 2011 Page 6 of 6