DIRECT, SUSTAINED ACTION

Similar documents
SUSTAINABLE DEVELOPMENT ACTION PLAN

HYDRO-QUÉBEC ELECTRICITY: CLEAN, RENEWABLE AND RELIABLE. November 2015

Sustainable Development Action Plan Sustainability, a Corporate Culture

WATER AND WIND QUÉBEC S CLEAN, RENEWABLE ENERGY RESOURCES

May 17, The important role that Canadian hydropower plays in the U.S.

LONG-TERM SOLUTIONS FOR NEW YORK S CLEAN ENERGY FUTURE

SUSTAINABLE DEVELOPMENT Highlights

sustainability report 2010

Atlantic Link: An Update. June 6, 2017

Sectoral Profile. Forestry and logging NAICS 113. Quebec

National Energy Board. Reasons for Decision. Hydro-Québec EH November For Exports to Citizens Utilities Company

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

TABLE OF CONTENTS Highlights... 2 Quebec market trends... 5 Detailed results... 13

Washington Conservation and Respect Report 2016

Coal Closure In Ontario

International Workshop on Energy Statistics and Energy Balances

Strategic Plan generation transmission distribution construction. Adjusted Version

NEW BRUNSWICK AND CLIMATE CHANGE

GUIDELINES OF THE MINISTÈRE DE L ÉNERGIE ET DES RESSOURCES NATURELLES IN THE AREA OF SOCIAL ACCEPTABILITY

Renewable Portfolio Standard Analysis for the State of North Carolina

SECTOR ASSESSMENT (SUMMARY): ENERGY

Recognizing the Value of Existing Hydropower June 25, 2009

Renewable Energy in Sweden an Overview

1. Survey of the Wild Blueberry Industry in Québec

4. In 1992 the Canadian government shut down fisheries due to over fishing.

QUÉBEC CONTROL AREA 2004 INTERIM REVIEW RESOURCE ADEQUACY

Renewable energy (RE) is any energy source that naturally replenishes and cannot be exhausted. Renewable energies include:

Croatia Energy efficiency report

Hydro Power Generation and Climate Change Research As good as it gets?

Renewable energy potential and utilization in Turkey

Utility Details. Annual Revenues of $14 million. Capital Assets of $21 million. Sales growth 15-20% per annum. 30 Employees

Electricity and Petroleum Industries:

The New England Clean Power Link A powerful wind and hydro partnership for Massachusetts

Information Supplementary to the Sustainability Report / 2015

Environmental Impact: Nuclear Energy in Comparison with other Alternatives. Eric D. Graham

Japan s National Greenhouse Gas Emissions in Fiscal Year 2013 (Final Figures 1 ) <Executive Summary>

Carbon footprint of electricity generation. Stephanie Baldwin POST

TABLE OF CONTENTS Integrated Resource Plan

The Hydro Province. *Manitoba Hydro is the licensee of the Trademark and Official Mark.

CITIZEN CONSULTATIONS ON THE TERRITORIAL REORGANIZATION OF CERTAIN MUNICIPALITIES

1 All global wind energy statistics are from the Global Wind Energy Outlook 2016.

MATERIAL SUBJECT #5: ENERGY AND CLIMATE CHANGE

Response to: Notice of Application Maritime Link Proposal (M05419)

Disclaimer. Confidential. Property of GNL Québec Inc All rights reserved.

Catalogue no X. Electric Power Generation, Transmission and Distribution

Renewable Energy Trends in Finland. Update 20 November 2014

VETERANS INDEPENDENCE PROGRAM - NATIONAL RATE TABLE HOUSEKEEPING AND GROUNDS MAINTENANCE SERVICES

Housekeeping Chimney Rate (per. Rate (per

The Project and Your Community

A POWERFUL HYDRO PARTNERSHIP FOR MASSACHUSETTS

The Electric Power System

Hydro-Québec Utility update

NOVEMBER 5, International Conference on Ocean Energy

LNG. Liquefied Natural Gas A Strategy for B.C. s Newest Industry

Published on Market Research Reports Inc. (

1999 Speech/Source /Date. Statement. November 25, Speech/Source /Date Budget Papers May 10, Speech/Source /Date.

Alberta s Climate Leadership Plan December 7, 2016

Ukraine Sustainable Energy Lending Facility (USELF) Strategic Environmental Review (SER) Ecoline EA Centre

New 790-Megawatt Unit. Council Bluffs Energy Center

NALCOR ENERGY. Comments on Draft Request for Proposals for Clean Energy and Transmission

Background to Corporate Welfare Goes Green in Ontario

CITIZEN CONSULTATIONS ON THE TERRITORIAL REORGANIZATION OF CERTAIN MUNICIPALITIES

Published on Market Research Reports Inc. (

EA July 11, 2017

Curriculum Connections for re- energy.ca

Russell Energy Corporation

Vietnam Renewable Energy development project to 2030 with outlook to 2050

EPRI Welcome and Introduction

NEW BRUNSWICK ENERGY COMMISSION

HYDRO ENERGY AND ENVIRONMENTAL POLICIES IN TURKEY

ARBEC, BOIS D ŒUVRE INC.

Power Sector Transition: GHG Policy and Other Key Drivers

Belgium Energy efficiency report

FutureMetrics LLC 8 Airport Road Bethel, ME 04217, USA

Greenhouse Gas Emission Factors Info Sheet

Northwest Hydropower and Columbia Basin River Benefits Fast Facts

Power Development and Planning in China

CANADIAN HYDROPOWER AND THE CLEAN POWER PLAN

The Decarbonized Electrification Pathway: Taking Stock of Canada s Electricity Mix and Greenhouse Gas Emissions to 2030.

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 8

Energy sector in Mongolia. Contents Brief of energy sector Energy sector policy Future trend

Results from Canada s Energy Utilities

Energy - New York State

MINISTÈRE DES RESSOURCES NATURELLES ET DE LA FAUNE AND M. JEAN-FRANÇOIS CÔTÉ

THE PROSPECTS FOR RENEWABLES IN THE EU

ECONOMIC TRENDS OF ITALIAN ELECTRICITY SECTOR SHORT TERMS STATISTICS

Utah Conservation and Respect Report 2014

Development of Renewable Energies in Tunisia

Tin Zaw Myint Energy Planning Department (EPD), Ministry of Energy (MOE), Myanmar.

An Energy Bill Proposal for the State of Colorado. BGE Consulting Angela Cook Erica Johnson Nick Goldstein Chris Bunch Jake Walter Kindra Priest

Cement Plant Development Project in the Territory of Port-Daniel-Gascons

Luxembourg Energy efficiency report

FRANCE S LONG TERM ENERGY STRATEGY AND THE IMPORTANCE OF CARBON PRICING

Electricity Generation and Greenhouse Gas Emissions

CLEAN ENERGY CAREERS An Overview

2.ENERGY AND OIL #INVESTINGUATEMALA. Industry in Guatemala

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard

Strategic Plan

Published on Market Research Reports Inc. (

Energy modelling in GaBi 2017 edition. Oliver Schuller (Dr.-Ing.) Principal Consultant and Team Lead Oil & Gas and Energy & Utilities

Transcription:

SUMMARY 2012 SUSTAINABILITY DIRECT, SUSTAINED ACTION

ENERGY AND THE ENVIRONMENT Promoting Green Energies By opting for hydroelectricity and other renewable energies, Hydro- Québec contributes to the fight against climate change throughout North America. Our electricity exports in 2012 to neighboring systems in Canada and the U.S. helped avoid 16 million tonnes of CO₂ emissions. That s nearly the equivalent of annual emissions from all the cars and light trucks on Québec roads. We use water to generate 98% of our electricity. Factoring in our electricity purchases, water accounts for 96% of our energy portfolio. As a result of its output of clean, renewable energy, Québec has the smallest carbon footprint in Canada. In 2012, greenhouse gas emissions from our thermal power generation amounted to 215,325 tonnes. Hydropower 96.06% Hydro-Québec output 78.45% Purchases from Churchill Falls 14.42% Various purchases inside and outside Québec 3.19% Other 1.78% Biogas 0.06% Biomass 0.51% Waste reclamation 0.01% Wind 1.20% Nuclear 2.06% Thermal 0.10% Coal 0.01% Oil 0.01% Gas 0.08% The La Grande-3 hydroelectric development: The result of an enlightened choice of clean, renewable energy, supported by vast hydropower resources. HYDRO-QUÉBEC S ATMOSPHERIC EMISSIONS COMPARED TO THE REGIONAL AVERAGE (t/twh) CO 2 Carbon dioxide SO 2 Sulfur dioxide NO x Nitrogen oxides 419,690 414 509 866 Purchased: 831 (96%) Generated: 35 (4%) 3 Purchased: 3 (100%) Generated: 0 8 Purchased: 7.9 (99%) Generated: 0.1 (1%) Hydro-Québec Regional average Regional average for electric utilities in the six New England states and New York State (2009), Ontario (2011) and New Brunswick (2011 2012). Sources: Emissions & Generation Resource Integrated Database (egrid2012), version 1.0, May 2012, U.S. EPA; 2011 Sustainable Development Report, Ontario Power Generation; NB Power 2011/12 Annual Report.

1 We are working to meet today s energy needs, without overlooking the needs of the future. That is the rationale behind our hydroelectric development projects. Every project Hydro-Québec undertakes, such as a generating station or substation, must be cost-effective, environmentally acceptable and favorably received by local communities. 2 The development of the Romaine complex is the second-largest infrastructure project under way in Canada in 2013. It was preceded by an environmental impact assessment that lasted more than four years and yielded a 2,500-page statement, along with 50 background reports. The environmental follow-up will continue until 2040. Romaine-1 jobsite. 3 ROMAINE PROJECT Romaine-4 Romaine-3 Cost: $6.5 billion Total economic spinoffs: Region: Côte-Nord $3.5 billion for Québec as a whole, Construction: 2009 2020 including $1.3 billion for Côte-Nord Installed capacity: 1,550 MW Unit cost: 6.4 /kwh Planned annual output: 8.0 TWh (including transmission system costs) Romaine-1 Romaine-2 Environmental follow-up 1 In 2012, a second inventory of forest-dwelling caribou was compiled and telemetric monitoring of 25 females continued. The objective: evaluate the effects that the construction and operation of the Romaine complex will have on these animals. Mitigation measures 2 Under an agreement with the Havre-Saint-Pierre hunting and fishing association, we will build a snowmobile bridge. 3 We take Innu cultural heritage into consideration. Innu women are encouraged to harvest medicinal plants in the area of the future Romaine 1 reservoir. Once the plants have been processed, they will be added to the community pharmacy.

COLLECTIVE CHOICES Concrete Results The actions we take have major impacts on Québec as a whole. 3,000 2,500 2,000 1,500 1,000 500 Affordable rates Hydro-Québec s electricity rates are among the lowest in North America. INFLATION AND TRENDS IN ENERGY PRICES IN QUÉBEC 1963 2013 Significant energy savings Under our ongoing Energy Efficiency Plan, participating customers helped us achieve 1,007 GWh in annual savings in 2012. That represents the annual energy consumption of 37,000 Québec households that use electricity to heat their homes. At Hydro-Québec s stand at the National Home Show, residential customers can learn about the Dare to Compare service, which lets them compare their electricity consumption against households with a similar profile. Lasting gestures Business and recycling training centres (CFER) recycle used Hydro-Québec work clothes. This gives young people an opportunity to train for jobs while contributing to the cause of sustainability. 0 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 Oil Gas Electricity Consumer Price Index (CPI) Index (1963 = 100) Sources: Hydro-Québec, Ministère des Ressources naturelles du Québec and Statistics Canada. Concerted decisions Hydro-Québec consults the public about its projects, then a team of specialists makes the changes resulting from this process. For its planned 735-kV line connecting Chamouchouane substation (Saguenay Lac-Saint-Jean) and Bout-de-l Île substation (Montréal), over 45 meetings were organized for some 4,500 property owners, vacation leaseholders and citizens. Spinoffs for all Quebecers in 2012 Dividend $645 million Public utilities tax $252 million Water-power royalties $617 million Procurement of goods and services $3,011 million Procurement from Québec-based companies 94% Direct jobs sustained by procurement 12,900 person-years Community investments $29 million

INNOVATION Innovation: The Way of the Future Hydro-Québec is the only power utility in North America to have a high-calibre research centre like IREQ. At IREQ, technician Jean-Philippe Charest-Fournier adjusts the rotor of a model generator used in the AUPALE numerical modeling project. The project is designed to increase generator capacity without compromising service life. We tested this model at Rapides-des-Quinze and Rapide-2 generating stations, in Abitibi-Témiscamingue, and assessed aspects such as potential capacity gain. An initial series of public charging stations was installed in the parking lots of founding partners of the Electric Circuit. By the end of the year, the Electric Circuit had nearly 150 charging stations and 20 new partners. Hydro-Québec Affaires corporatives et secrétariat général Reproduction authorized with reference to source Legal deposit 2nd quarter 2013 Bibliothèque et Archives nationales du Québec ISBN 978-2-550-66869-5 ISBN 978-2-550-66870-1 (PDF) On the cover The beauty of Chutes à Charlie will be preserved after the Rivière Romaine has been developed. To maintain quality of life for the Atlantic salmon that spawn nearby, we are conducting extensive environmental studies. 2013G020A