Towards a Light Handed Regulatory System for Promoting Grid and Off Grid Small Power Producers (SPP): An Update on the Tanzania SPP program

Similar documents
Brief Overview of Renewable Energy Regulation in Tanzania

Over-View of Electricity Regulation in Tanzania

ELECTRICITY PRICING IN TANZANIA

Policy, PPA Framework and Need for Reliable Off-Takers in Tanzania

Rules on Initiation of Power Procurement and Review of Power Purchase Agreements. Eng. Anastas Mbawala, EWURA

Thailand Solar Energy Overview

Country Action Plan-Proposed Outline

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia

Renewable Energy Projects in Thailand

Thailand s Solar Energy Policy and New Alternative Energy Development Plan ( )

Member State Perspectives

Comm/CP/NCE/Tariff/28362 Date: COMMERCIAL CIRCULAR No. 228

Bringing electricity to the rural areas: Designing Laws and Policies that work

Legal Framework enabling PV Iran. Mohammad H. Ghafouri Esmaeil Vasaf. Teheran, Dec. 21th, 2015

Renewable energy: Investing in Africa

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

Renewable Energy Development in Cambodia. Institute of Technology of Cambodia

Mini-Grids: The Five Big Regulatory/Policy Decisions. Dr Bernard Tenenbaum Upscaling Mini-Grids Workshop Naypyidaw, Myanmar February 2017

Technical and Economic Study for Development of Small Scale Grid Connected Renewable Energy in Kenya

- Solar Corridor Support Programme -

Vietnam Renewable Energy development project to 2030 with outlook to 2050

Non Registered Embedded Generation Information Pack

Experience of DEDE s ESCO Fund in financing RE projects in Thailand

RATE 665 RENEWABLE FEED-IN TARIFF

Renewable Energy and Poverty Reduction, Tanzania Case

SECTOR ASSESSMENT (SUMMARY): ENERGY

Guidance Note for CLA members

AORC Technical meeting 2014

Renewables in Vietnam OPPORTUNITIES FOR INVESTMENT

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems

Democratic Socialist Republic of Sri Lanka Commercial Capital: Colombo Administrative Capital: Sri Jayawardenapura Kotte

Renewable Portfolio Standards

แผนพ ฒนาพล งงานทดแทนและพล งงานทางเล อก พ.ศ Alternative Energy Development Plan: AEDP2015

THE ASSESSMENT OF RENEWABLE ENERGY SCENARIOS FOR NAN, RAYONG, AND PHUKET

Incentives to Increase Renewable Energy. Linda M. Wagner Senior Legal and Policy Advisor Illinois Commerce Commission

Comparison of Renewable Portfolio Standards (RPS) Programs in PJM States

Workshop on photovoltaics, grid Integration and funding of the next wave of PV expansion in Cyprus, 13 December 2016.

Rural Electrification by Renewable Energy in Cambodia

OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY

Promoting Renewable Energy Development: An Introductory Workshop for Energy Regulators. Kenyan Country Report

Financing Renewable Energy Projects. Part I: Government Subsidies

Country Overview Sri Lanka

ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES

Independent Power Production Policy

Renewable Energy Development in Sri Lanka Opportunities and Challenges. Ministry of Power and Energy Sri Lanka 01/12/2014 1

Independent Power Producers (IPPs)

CK Power Public Company Limited (CKP) Stable Income, Diversified Portfolio and High Growth Company

Grid Integration in Sri Lanka

Water and Energy Resource Potential of Ethiopia Status of Development and Investment Opportunities. Ethiopian Investment Forum 07 June, 2011

Renewable Energy Plan in Thailand Karnnalin Theerarattananoon

Uruguayan Energy matrix change Wind & PV development. Stuttgart - Germany June, 2013

RURAL ELECTRIFICATION WITH PV - MARKET POTENTIAL IN CAMBODIA

Thailand s Past Success and Future outlook of its Solar Energy Policy. Mr. Phongkarn Piamsuttitam 15 th June 2015

Development and Financing of Renewable Energy Projects in India

OPERATION ANALYSIS OF LARGE SCALE SOLAR POWER GENERATION IN THAILAND

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

Green Electricity in Austria - Summary 2010

SPP at a Glance. Located in Little Rock. Approximately 600 employees

Working With Cost Reflective Tariffs-The Kenyan Experience

Country Summary Sheet Guatemala

PG&E s Role in California s Clean Energy Future. Emma Wendt Pacific Gas and Electric Company January 25, 2011

Oregon Renewable Energy Resources

Tanzania s Wind Energy Market

1. AFREPREN/FWD. & AFREPREN/FWD

ENERGY AND WATER STATISTICS 2016

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard

Schedule 2 TECHNICAL INFORMATION

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF ENERGY AND MINERALS. Energy Subsidy Policy

Sustainable energy solutions for South African local government. A practical guide

Renewable Energy Policies Case Study For Jordan

Success Factors for the Implementation of Mini Grids. Michael Franz, Project Manager, GIZ

Eugene Water & Electric Board. The Future of Utilities in the Pacific Northwest

State Agency on Energy Efficiency and Energy Saving of Ukraine. State policy on renewable energy in Ukraine

Yaowateera Achawangkul, Ph.D.

IEA-DSM Task XVII: Country Report Austria

The value of storage. Chris Elliott Senior Hydropower Engineer. 8 th November 2016

ROMANIAN GREEN CERTIFICATES SYSTEM

MONGOLIA COUNTRY PROFILE 88

CE/Comm/CP/NCE/Tariff/6699 Date: COMMERCIAL CIRCULAR No. 260

THE LESOTHO ELECTRICITY AUTHORITY. Presentation by the LEA Chief Executive on the occasion of the Launch 04 May 2006

SuryaC n HYDERABAD WITH SPECIAL FOCUS ON ROOFTOP SOLAR, SOLAR PARKS, UTILITY SCALE PROJECTS & PV MANUFACTURING

Acreage Needed in 2050 for Renewable Generation to Meet California s GHG Emission Reduction Goals California Energy Commission May 9, 2011

2.ENERGY AND OIL #INVESTINGUATEMALA. Industry in Guatemala

Content Sri Lanka At a Glance Energy reserves Current Energy Policy and Measures Past Energy Demand and Supply Outlook of energy Demand and Supply Ene

Innovative Approaches of Partnership

Renewable Energy Trends in Finland. Update 20 November 2014

Best Practices for Developing the Green Energy Smart Farm in the APEC Region

Indonesia's Energy Transit: Struggle to Realize Renewable Potential

NATIONAL ENERGY POLICY, 2015

Issarachai Ngamroo. King Mongkut s Institute of Technology Ladkrabang (KMITL) Bangkok, Thailand

Renewable Power and Energy Efficiency: Policies in Iowa and Other States

Cost of Service and Public Policy. Ted Kury Director of Energy Studies, PURC

Chapter 4. Introduction to the Toolkit

THE SMALL HYDRO PLANTS IN LATIN AMERICA AND THE CARIBBEAN

Renewable energy (RE) is any energy source that naturally replenishes and cannot be exhausted. Renewable energies include:

VIETNAM GUIDE ON RENEWABLE ENERGY

POSSIBILITIES AND BARRIERS FOR INCREASING RENEWABLE POWER GENERATION IN KENYA AND TANZANIA

Auctions preparation, course, wins. Katarzyna Szwed Lipińska, counsellor at law Director, Department of Support Systems Energy Regulatory Office

TasNetworks Transformation Roadmap 2025

ENERGY EFFICIENCY PROGRAMS IN MALAYSIA

Transcription:

Towards a Light Handed Regulatory System for Promoting Grid and Off Grid Small Power Producers (SPP): An Update on the Tanzania SPP program AFTEG and the African Electrification Initiative (AEI) Room J 4-044 World Bank Washington, D.C. 19 November 2010 Anastas Mbawala, Director Electricity, Energy and Water Utilities Regulatory Authority (EWURA), Tanzania Chris Greacen, Consultant, AFTEG, World Bank

Outline Small Power Producer (SPP) project examples Overview of Tanzania SPP regulations Tanzania Legislative Framework Goals, definitions Table of SPP documents Tariffs for different SPP cases Main grid, mini grid, wholesale and retail sales Required permissions and approvals, procedures for application; process rules Current situation: challenges and successes PPAs, generators in the pipeline Challenges Thai/Tanzania technical assistance

Pilot Sisal Biogas Plant 150 kw HALE -TANGA - TANZANIA

Processing of Sisal Leaves Fibre 4% Sisal waste 96% Production of 1 ton of dry fibre generates about 24 tons of sisal waste

5

Micro hydropower 40 kw Mae Kam Pong, Chiang Mai, Thailand

Rice husk-fired power plant 9.8 MW Roi Et, Thailand

Biomass (wood chips) 1 MW Landhanavi, Sri Lanka Wood is grown specifically for electricity production 8

Wind 9

1 MW Chachensao, Thailand Solar Photovoltaic (PV)

Tanzania SPP Legislative Framework National Energy Policy, 2003 Rural electrification policy statement Energy and Water Utilities Regulatory Authority Act Establishing EWURA Rural Energy Act (2005) Establishing REA & REF The Electricity Act, 2008

Legislative Framework, cont Energy Policy Statement No. 36 Establish norms, codes of practice, guidelines and standards for renewable energy technologies, to facilitate the creation of an enabling environment for sustainable development of renewable energy sources

Legislative Framework, cont The Electricity Act (2008) provides for SPPA and SPPT Definitions Standardized Small Power Purchase Agreement (SPPA): Means agreement between utility entity and a developer entered for pursposes of selling power to the grid not exceeding 10 MW but not less than 100 kw. Standardized Small Power Purchase Tariff (SPPT): Means the tariff agreed on in the SPPA License exemption for projects less than 1 MW (generation or distribution)

A goal: Light-handed regulation 1. Minimize amount of information that is required. 2. Minimize the number of separate regulatory requirements and decisions. 3. Use standardized documents, and make use of documents used by other agencies, to the maximum extent possible (reduce need for caseby-case negotiation)

Table of SPP documents Process Guidelines (roadmap) Process rules Interconnection Guidelines Interconnection rules Standardized PPA Tariff methodology Tariff calculations for year 2009 Main grid Mini-grid Guidelines for Developers of Small Power Projects (SPP) in Tanzania Rules for Developers of Small Power Projects (SPP) in Tanzania Guidelines for Grid Interconnection of Small Power Projects in Tanzania (Parts A, B, C) Guidelines for Grid Interconnection of Small Power Projects Standardized Power Purchase Agreement for Purchase of Grid- Connected Capacity and Associated Electric Energy Between Buyer and a Small Power Project Standardized Tariff Methodology for the sale of Electricity to the Main Grid in Tanzania Under the Standardized Small Power Purchase Agreements. Detailed Tariff Calculations under the SPPA for the Main Grid for year 2010 Standardized Power Purchase Agreement for Purchase of Off-Grid Capacity and Associated Electric Energy Between Buyer and a Small Power Project Standardized Tariff Methodology for the Sale of Electricity to the Mini-grids Under the Standardized Small Power Purchase Agreements Detailed Tariff Calculations under the SPPA for the Mini-grids for year 2010 = Approved and available at: www.ewura.go.tz/sppselectricity.html = Awaiting final approval and gazetting (public consultation completed)

Tariffs determined by SPP type Connected to main grid Connected to isolated mini-grid Selling wholesale (to DNO*) Selling retail (directly to final customers) Case 1 Case 2 Case 3 Case 4 * DNO: Distribution Network Operator (currently TANESCO) 16

Tariff Case 1: Selling Wholesale to Main grid C case1 C lrmc 2 C srmc Where Clrmc is the long run marginal cost as defined by Tanesco s long-term power plan; and Csrmc is the budgeted cost of thermal generation in the next year. Note: the actual calculations are somewhat more complicated, taking into account: Transmission losses Seasonality Price floor & cap They are available in: Standardized Tariff Methodology Under the Standardized Small Power Purchase Agreements available from EWURA. Order 08-015 on Dec 30.2008 Tariff case 1: Main Grid Tariff 2009 (TZS/kWh Tariff 2010 (TZS/kWh) Annual Average 85.49 110.30 Dry season (Aug Nov) 102.58 132.36 Wet season (Jan-Jul and Dec) 75.94 99.27 17 Note: $1 US = 1497 TZS (November 2010)

Tariff Case 2: selling wholesale to a minigrid C case2 C LmrcGrid 2 C AveMini Mini-grid SPP receives the average of Tanesco s main grid and mini-grid avoided costs. CLmrcGrid = long run marginal cost for grid-power (adjusted for losses) CAveMini = average incremental cost of mini-grid power (levelized cost of electricity from a new mini-grid diesel generator). Tariff case 2 (2009) Tariff 2009 (TZS/kWh) Tariff (no seasonal variations) Note: $1 US = 1497 TZS (November 2010) Tariff 2010 (TZS/kWh) 334.83 368.87 18

Tariff Cases 3 (isolated) and 4 (main grid): selling at retail to end use customers Tariff is proposed by SPP generator, subject to EWURA review Less oversight demanded in cases in which community is in agreement with proposed tariff Where possible, EWURA draws on financial analysis submitted to REA for rural electrification subsidy 19

Necessary permits, clearances and procedures for application Land title or lease Resource Rights (e.g. water rights from River Basin Water Office) Letter of Intent (LOI) Business license, tax registration, etc. Building Permit Sequence is important to avoid competing claims on project sites Environmental and Social Clearance (NEMC) Power Purchase Agreement (PPA) EWURA license 20

Completed Where we are now All documents passed public review and most are approved for use. Several PPAs signed with TANESCO and licenses applied 21

SPPs In Operation Project MW Type of Resource Status ACRA Tanzania 0.3 Hydro In Operation / Community based TANWAT 2.34 Biomass -wood Selling 1 MW (2010) TPC Co-Generation 15 Bagasse Selling 10 MWe to TANESCO (2010) Katani Power Plant 0.3 Biomass - Waste Operation - Pilot

SPPs in Preparation Project MW Type of Resource Sao Hill Energy 15 Biomass - wood Chipole Own use & sell to the grid Status Applied Licence 0.4 Hydro In operation additional 3MW planned Mwenga 3.36 Hydro PPA Signed with TANESCO Ngombeni Mafia 1.4 Biomass PPA Signed with TANESCO. Under construction Kilombero Sugar Co. 10.6 Bagasse Applied Licence Tanzania Sisal Board 0.5 Biogas Applied License Kitonga Mini Hydro 10 Hydro Applied License Andoya Hydro Electric Co. 0.5 Hydro Business plan Kilocha Hydro 12 Hydro In discussion with REA Kilombero Mngeta 3 Hydro In discussion with REA

Completed Where we are now All documents passed public review and most are approved for use. Several PPAs signed with TANESCO and licenses applied Ongoing TANESCO in process of establishing SPP cell 24

South-south policy/technology transfer: Technical Visits of Delegations from the Tanzania to Sri Lanka and Thailand

Completed Where we are now All documents passed public review and most are approved for use. Several PPAs signed with TANESCO and licenses applied Ongoing TANESCO in process of establishing SPP cell SPP Working Group composition and function Discussions between EWURA and REA on how to coordinate better, done, but may be refined further. Determine tariff review methodology for projects selling electricity at retail 29

www.pea.co.th call center 1129 การไฟฟ าส วนภ ม ภาค PROVINCIAL ELECTRICITY AUTHORITY 5. Challenges / Opportunities การไฟฟ าส วนภ ม ภาค 30 30

Challenges Challenge Inadequate financial resources to support the initiative Inadequate private sector participation in investment High interest rates loans from commercial banks Land ownership and water rights for SPPs projects especially wind farms & mini-hydro plants Low Tariff and non-cost reflective Response WB has established a facility, engage interest of other financial institutions Conducive Environment, rules and publicize Promote other sources mix grant and loans Include land ownership & water rights in RE Policy Adapt policy in future?

Challenges..cont. 2 Challenge Lack of experience of key project promoters with skills in project management Lack of Renewable Energy Policy Lack of interest on the part of potential Offtakers (TANESCO) Response Capacity building (REA) Government needs to set policy targets, etc. Improving through regular discussions with utility

Reflections Renewable Small Power Projects can enhance efforts towards electrification of Rural areas Though generally expensive SPPs can be developed much faster hence increase capacity Private investments can be quickly organised and also benefit local entrepreneurs Light handed regulation will reduce regulatory burden hence benefit both investors and the country Good Policy, Cost reflective Tariff and well designed FiT can attract foreign and local investors 33

Thank you For more information, please contact mbawala@ewura.go.tz chrisgreacen@gmail.com SPP regulations available at: www.ewura.go.tz/sppselectricity.html

What are the Guidelines for Developers of Small Power Projects in Tanzania? Audiences: SPP developers, EWURA, Tanesco, REA, bankers Purpose: Guide to steps necessary to acquire necessary permits and clearances to develop and operate a SPP Selling electricity to the DNO (Tanesco) main grid Selling to an isolated mini-grid and/or Selling directly to retail customers (main grid-connected & isolated SPPs) Guidelines: roadmap to rules. There will be a separate rules document.

Contents of Guidelines for Developers of Small Power Projects in Tanzania

Definitions DNO: the licensee responsible for the operation of a distribution network in Tanzania. (Currently Tanesco) SPP: a power plant using a renewable energy source or waste heat, or cogeneration of heat and electricity, with an export capacity of up to ten (10) MW Embedded Generator: a single generator or a group of generating plant of total export capacity between 100 kw and 10 MW, connected to a Distribution Network in Tanzania, at 33 kv or below. 37

Proposed rules regarding LOI process: response times, cost estimates Acknowledgement of receipt: The rules require that within seven days of receiving the LOI request, the DNO will acknowledge receipt of the request. Notice of decision: Within 30 days of receiving the complete LOI request, the DNO will send the project developer notice of its decision. Reasons for disapproval by DNO stated: If DNO disapproves of the project, the reasons for disapproval must be clearly stated in writing. Reservation of Network Capacity: The LOI in the case of sites operating on hydroelectric or wind power, or any other primary source of energy which is site-specific by way of its availability, will also imply the exclusivity of the interconnection to the Developer, within the period of validity of the LOI. Estimate of interconnection costs: Within 30 days of sending the LOI, the DNO shall send the Seller a rough initial estimate of the interconnection costs. 38

www.pea.co.th call center 1129 การไฟฟ าส วนภ ม ภาค PROVINCIAL ELECTRICITY AUTHORITY VSPP project sequence Document check Identify circuit connection System study PPA Check Line connecting construction Meter installation license check All test All license check Meter reading Meter reading Billing Submitted Proposals Acceptance Letter PPA signed First synch. COD Every 1 ft VSPP will get first settlement within 3 month after COD. การไฟฟ าส วนภ ม ภาค 39

www.pea.co.th call center 1129 การไฟฟ าส วนภ ม ภาค PROVINCIAL ELECTRICITY AUTHORITY Coordination among PEA divisions Research Div. PQ test Relay Div. Switchgear & Relay test Meter Div. Meter installation Legal Div. PPA check System Operation Div. First synch. test DG office Technical & System Analysis Document Coordinator Tariff Div. Billing System Operation Area Office 1-12 Identify circuit connection Control & Operation Communication Area Office 1-12 & Local Office Line connecting construction Meter reading Finance Dep. Settlement การไฟฟ าส วนภ ม ภาค 40

Land title or lease Resource Rights (e.g. water rights from River Basin Water Office) LOI with DNO (Tanesco) Business license, tax registration, etc. Building Permit Environmental and Social Clearance (NEMC) LOI request to TANESCO PPA EWURA license 1. Name and Address 2. Locations 3. Fuel type (hydro, biomass, wind, gas, etc.) 4. Power capacity (MW), planned power export (MW), annual energy generation (GWh). 5. Copy of deed of title or lease agreement 6. Rights to resource 41

Land title or lease Resource Rights (e.g. water rights from River Basin Water Office) LOI with DNO (Tanesco) Business license, tax registration, etc. Building Permit Environmental and Social Clearance (NEMC) PPA EWURA license Standardized Power Purchase Agreement (PPA) To initiate the PPA agreement process, the Seller completes and submits to TANESCO an Application for Interconnection and Sale of Electricity technical engineering information (one-line diagrams, specifications of key equipment) that DNO needs in order to determine if the proposed project is in compliance with the Interconnection Rules and Guidelines 42

Granting/rejecting a PPA based solely on technical considerations The rules specify that the DNO s decision to sign or reject the standardized PPA is based solely on its evaluation of whether the design of the Seller s facility is in compliance with the Guide for Grid Interconnection of Embedded Generators to the Main Grid and Isolated Mini-Grids in Tanzania. 43

Land title or lease Resource Rights (e.g. water rights from River Basin Water Office) LOI with DNO (Tanesco) Business license, tax registration, etc. Building Permit Environmental and Social Clearance (NEMC) PPA EWURA license EWURA license SPPs up to 1 MW are exempt from EWURA s licensure requirements Must submit completed registration form Location, business registration, capacity of facility, GWh/yr, date of planned construction Non-exempt (>1 MW) Submit license application Same as registration, plus Section on managerial competence Feasibility study Business plan Permits and clearances (NEMC, water rights, etc.) Where possible, EWURA draws on financial analysis submitted to REA for rural electrification subsidy 44