SECTION CLAY BARREL TILE ROOFING Removals Flashing and Sheet Metal.

Similar documents
SECTION CLAY BARREL TILE ROOFING. A. American Society for Testing and Materials (ASTM):

TECHNICAL INFORMATION

SPECIFICATION GUIDELINE

ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

SPECIFICATION GUIDELINE

Pacific Tile Counter Batten and Batten

HALIFAX HUMANE SOCIETY BOARDING AND GROOMING FACILITY SECTION STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS

SECTION CONCRETE ROOF TILE

SECTION CO-POLYMER ELASTOMERIC COOL-ROOF COATING

SECTION MODIFIED BITUMINOUS SHEET WATERPROOFING

1.1 SECTION INCLUDES Verify Scope, including identification of plies and type of coating.

ROOFING APPLICATION STANDARD (RAS) No. 120 MORTAR AND ADHESIVE SET TILE APPLICATION

City of Republic Community Development Department. Residential Roofs REVISION DATE: JANUARY 2017

ALLMET CONTINENTAL INSTALLATION GUIDE

INSTALLATION GUIDE.

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

SECTION 07530CP EPDM MEMBRANE ROOFING

SECTION ROOF SPECIALTIES

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

1. Rubberized asphalt waterproofing membrane, reinforced. 2. Molded sheet drainage panels. 3. Insulation. 4. Plaza deck pavers.

UFGS (June 2005) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SLATE ROOFING INSTALLATION PROPOSAL [Last updated 10/08/2017]

SECTION MANUFACTURED ROOF EXPANSION JOINTS

EVALUATION REPORT Tarco Roofing One Information Way, Suite 225 Little Rock, AR DESCRIPTION: Tarco Roof Underlayments

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET

ACFoam-II HCFC Free "Green" Polyiso Specification

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

SECTION TURBINE VENTILATORS

SECTION STEEL DECKING

1.2 DEFINITIONS, REFERENCES, AND OVERALL STANDARDS Follow 07500

FLUID APPLIED WATERPROOFING

Lightweight Insulating Concrete Roof Decks

OREGON ROOF CONSULTING - ROOF INSPECTION FORM

SAM HOUSTON STATE UNIVERSITY DIVISION 07 THERMAL & MOISTURE PROTECTION SECTION ROOFING SYSTEMS DESIGN AND CONSTRUCTION STANDARDS February 2016

CS-100 Guide Specifications

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

Brava Spanish Tile. Installation Manual. Brava Roof Tile Phone: Fax:

SECTION mil thickness COLD FLUID-APPLIED WATERPROOFING

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

DIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories

SHEET METAL ROOF TEST REPORT

DUKE UNIVERSITY CONSTRUCTION STANDARDS

ITEM 458 WATERPROOFING FOR STRUCTURES

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE RUBBER SHAKES REPORT HOLDER: DAVINCI ROOFSCAPES, LLC

Steep Slope Roofing Section includes various finished roofing materials (shingles, slate, metal) & accompanying materials.

EVALUATION REPORT Boral Roofing 7575 Irvine Center Drive Suite 100 Irvine, CA

1 Exam Prep Roofing Practice Exam 12

2018 British Columbia Building Code Public Review of Proposed Changes

B.U.R., Modified & Shingle. Roofing Systems. Section 3 - Low Slope Roofing Installation Instructions

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: MODIFIED BITUMINOUS SHEET ROOFING REPORT HOLDER:

Scope. Definitions. For definitions of terms used in this application standard, refer to ASTM 1079 and the Florida Building Code, Building.

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

RESIDENTIAL ROOFING PRODUCT GUIDE

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FACED PANELS REPORT HOLDER: MEXALIT INDUSTRIAL, S.A. DE C.V.

MANUFACTURER S SPECIFICATION

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

Pressure-Sensitive Adhesives in Roofing

ICC-ES Report OR-4, AND MOISTURE DIVISION: SECTION: SECTION: Reissued 11/2017 This. Report Holder:

SECTION G RELIEF VENTS A-0

ROOF SUBSTRATE PREP MANUAL

SECTION STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM

SECTION METAL ROOF PANELS

DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING

(Project Location) (your firm's name)

GE SCM3500 High Solids Silicone Roof Coating

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

REPORT HOLDER: RARE MANUFACTURING INC A AVENUE SURREY, BRITISH COLUMBIA V4N 4P2 CANADA EVALUATION SUBJECT: IRONWOOD SHAKE

Weatherproofing & Sealing Systems

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

SECTION BRICK MASONRY ASSEMBLIES

1. Clean the existing totally adhered or mechanically attached roof membrane: TPO, EPDM, Hyplon,

A. Submit product data sheets and literature verifying physical properties of materials.

1 Exam Prep. Roofing Practice Exam 9

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECTION COMPOSITE ROOF TILE SYSTEMS

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

SECTION STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING

1. Division 09 Section "Rough Carpentry."

ThermaCal Nail Base Roof Insulation Panels (all versions) Installation Instructions

ROOFING APPLICATION STANDARD (RAS) No. 111 STANDARD REQUIREMENTS FOR ATTACHMENT OF PERIMETER WOODBLOCKING AND METAL FLASHING

J41 Reinforced bitumen membrane roof coverings

LOW SLOPE ROOFING INSTALLATION

Stonecraft Industies 8300 County Road Holmesville, OH

SECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING

TEST PROCEDURE FOR AIR PERMEABILITY TESTING OF RIGID, DISCONTINUOUS ROOF SYSTEMS

DURRELL DESIGN GROUP, PLLC ROOF REPLACEMENT BARR ELEMENTARY SCHOOL JACKSON PUBLIC SCHOOL DISTRICT JACKSON, MISSISSIPPI.


LEGACY REPORT DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FLUID APPLIED ROOFING REPORT HOLDER: METACRYLICS

MULE-HIDE PRODUCTS CO., INC. MULE-HIDE SELF-ADHERING TPO ROOFING SYSTEM

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION GUTTERS AND DOWNSPOUTS

Firestone Polyiso Boards

SECTION SBS-MODIFIED BITUMEN MEMBRANE ROOFING HEAT-WELDED

ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95

MANUFACTURER S (SHORT FORM) SPECIFICATION / SECTION

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

Transcription:

SECTION 07320 CLAY BARREL TILE ROOFING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02072 - Removals. 2. 07600 - Flashing and Sheet Metal. 1.02 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C91-95c Specification for Masonry Cement. 2. C144-93 Specification for Aggregate for Masonry Mortar. 3. C150-96 Specification for Portland Cement. 4. C270-96a Specification for Mortar for Unit Masonry. 5. D41-94 Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing. 6. D249-89(96) Specification for Asphalt Roll Roofing (Organic Felt) Surfaced with Mineral Granules. 7. D312-95a Specification for Asphalt Used In Roofing. 8. D2626-95 Specification for Asphalt-Saturated and Coated Organic Felt Base Sheet Used in Roofing. 9. D4586-93 Specification for Asphalt Roof Cement, Asbestos-Free. B. National Roofing Contractors Association, latest edition. C. Sheet Metal and Air Conditioning Contractors' National Association (SMACNA): Architectural Sheet Metal Manual, latest edition. 1.03 SUBMITTALS A. Submit copies of manufacturer's published material, handling, and application instructions for barrel tile roofing including mortar and sub-roofing data before starting work. 1.04 QUALITY ASSURANCE A. Qualifications of Roofing Applicator: Before starting work, Project No. SPECIFICATION GUIDELINES 07320-1

submit a list of a minimum of 3 satisfactory roofing installations performed by applicator using materials and methods similar to as specified. B. Reference Specifications and Codes: 1. Florida Department of Education, Office of Educational Facilities - State Requirements for Educational Facilities - 1999 (SREF). 2. South Florida Building Code - Chapter 34 Roof Covering and Application. 3. Underwriters Laboratories UL 790 and ASTM E108 requirements for Class "A" fire rating for roof coverings. 4. Uplift requirements based on the basic wind velocity pressures for the project according to the most stringent applicable requirements among the following: a. M-DCPS Design Standards. b. SREF. c. American Society of Civil Engineers (ASCE) 7-98. 1) Use ASCE 7-98 Exposure Category "C" for wind design at M-DCPS additions and new construction, except when required by a coastal building zone location to use Exposure Category "D". 2) Use map wind speed of +150 mph. 3) Wind load importance factor for educational buildings shall be 1.15. ****** ***** **** *** ** * ** *** **** ***** ****** NOTE TO SPECIFIER: Insert required FM wind uplift classification, in the following paragraph 5, as determined by ASCE 7-98 for "C" or "D" exposure category based on location and with a wind importance factor for educational buildings of 1.15. ****** ***** **** *** ** * ** *** **** ***** ****** 5. Factory Mutual requirements for Class I rated assembly and FM 1- uplift classifications as determined by ASCE 7-98. 6. Roofing manufacturer's specifications. C. Submit tile sample panel demonstrating quality of construction. 1.05 ENVIRONMENTAL REQUIREMENTS A. Do not apply roofing when precipitation is occurring or when frost, water, or dampness is visible on roof decks. Project No. SPECIFICATION GUIDELINES 07320-2

B. Do not apply roofing when ambient temperature is less than 40 degrees F. C. Maintain rolls of felt at a temperature of at least 60 degrees F. for not less than 24 hours before laying. 1.06 WARRANTY A. Contractor shall furnish the Board a 5 year written warranty, beginning at Substantial Completion, signed by Roofing applicator, covering materials and quality of work for entire "Roofing System", including repair and replacement of flashing and other roofing components deemed faulty or in disrepair by A/E during warranty period. This warranty shall include all other work performed by the contractor described in other sections, including but not limited to, caulking and sealants, sheet metal, insulation, and roofing accessories. 1. Such items deemed faulty or in disrepair shall be repaired at no cost to the Board. 2. No dollar limit on warranty. 3. Single source responsibility. 4. Definition of faulty components or roofing in disrepair includes but is not limited to: a. Defects in the quality of work or materials. b. Leaks of any kind. B. Manufacturer shall furnish the Board a 20 year written warranty, beginning at Substantial Completion, signed by manufacturers authorized representative for repair and replacement period and terms: 1. No dollar limit on warranty. 2. Single source responsibility. 3. Definition of faulty components or roofing in disrepair includes but is not limited to: a. Defects in the quality of work or materials. b. Leaks of any kind. PART 2 PRODUCTS 2.01 MANUFACTURERS A. Clay Barrel Tile Roofing: 1. Gladding McBean, Lincoln, CA. Project No. SPECIFICATION GUIDELINES 07320-3

2. Ludowici Celadon, New Lexington, OH. 3. MCA Clay Roofing Tile, Corona, CA. 4. Mediterranean Clay Corp., Medley, FL. 5. Palm Beach Clay Tile Co., Palm Beach, FL. 2.02 MATERIALS A. Clay Barrel Tile: 1. Natural clay tile having authentic barrel configuration as accepted by A/E. 2. Colors: As selected by A/E from manufacturer's standards to match existing. B. Mortar Materials: 1. 2. Portland cement: ASTM C150, Type 1, domestic. Masonry cement: ASTM C91, domestic. 3. Sand: ASTM C144. 4. Water: Portable. C. Roofing Membrane Materials: 1. Asphalt Primer: ASTM D41. 2. Asphalt ASTM D312, Type III or IV according to code. 3. Asphalt Roof Cement: ASTM D4586. 4. Asphalt #30 Coated Base Sheet Roofing Felt: ASTM D2626, Type 1. 5. Asphalt #90 Mineral Surface Roll Roofing: ASTM D249. 6. Sheathing Paper: Rosin sized sheathing paper. 7. Fastening for Roofing Felt to Concrete Deck Surface: Galvanized concrete nails of length conforming to Fed. Spec. FF-N-105B, Type 11, Style 11. 8. Tin Caps: 1-5/8" diameter, 32 gage. D. Foam Attachment: According to South Florida Building Code - Chapter 34 Roof Covering and Application. E. Mortar Mix (used for appearance only): 1. ASTM C270, Type S, 1,800 psi or stronger. a. Mix accurately in following proportions by volume: TYPE S 1 part masonry cement 1/2 part Portland cement 4 parts sand maximum PART 3 EXECUTION Project No. SPECIFICATION GUIDELINES 07320-4

3.01 APPLICATION A. Requirements: 1. Coordinate removal of existing roofing with reroofing work so building interior is not exposed to water damage. a. Provide sufficient crew and overtime work as required to weatherproof each roof deck area worked on before end of each day's work or before rainfall, if rain is imminent. b. Extend roofing plies up abutting vertical surfaces and seal with bituminous cement. c. Seal pipe and conduit penetrations with bituminous plastic cement. 2. Heat Type III or IV asphalt, as required by slope and code, to maximum 450 degrees F. and do not keep heated overnight. 3. Apply asphalt at minimum 350 degrees F. a. Use thermometers to check temperature of asphalt during heating and applications. b. Assign personnel to oversee heating operation at all times to prevent exceeding maximum specified temperatures. 4. Apply roofing felts without wrinkles or buckles while asphalt is hot. Broom, press, or roll felts in. a. Apply asphalt adhered felts in solid mopping so felts do not touch felts, at rate of 25 pounds of asphalt per square. 5. Follow manufacturer's published instructions relating to handling and use of materials except as specified. B. Application of Roofing Felts over Concrete Decks: 1. Apply rosin paper and base sheet, lapping each sheet over preceding felt, turning up at vertical surfaces as shown on drawings. a. Type and number of plies shall be according to code application and uplift requirements. b. Tin cap nail 12 inches on center both ways. 2. Apply one ply of #90 mineral surfaced felt shingled in over base sheet in solid mopping of hot steep asphalt, Project No. SPECIFICATION GUIDELINES 07320-5

lapping each sheet 2 inches minimum over preceding felt and turning up at vertical surfaces as shown on drawings. a. Stagger end laps 12 inches minimum. b. Back nail top edge of felt 18 inches on center. C. Application of Barrel Tile: 1. Sample Panel: a. Before proceeding with tile work, provide approximately 4 foot by 3 foot sample panel of work for A/E's approval. 1) Remainder of work shall have quality of construction that matches approved sample. 2. Mark off roof at 11-1/4" spacing, right to left, after position of first line is determined and horizontal lines to insure proper alignment and consistent headlap. 3. Allowing for overhang, set first line 16 inches from eave and then each line at 15 inches. 4. Tile Head Lap: Not less than 2 inches. 5. Tile Side Laps: Not less than 1-1/2". 6. Do not wet tile before laying. 7. Extend roof tiles beyond roof sheathing at eaves, not less than 3/4" nor more than 2 inches. 8. Lay each pan tile and cover tile with specified foam as required. 9. Miter tile for proper fit at hips and where tile abuts vertical surfaces. 10. Provide cover tile for hips and ridges properly mortared in. 11. Fill opening at eaves ends of tile smoothly with mortar and provide 1/4" diameter weep holes at each tile for adequate drainage. 12. Remove excess mortar from tile while mortar is still moist. Clean smears from exposed surfaces with moist cloth as required. D. Repair of Existing Concrete Roof Deck: 1. Removal of existing clay barrel tile and roofing membrane may reveal areas of existing concrete deck deteriorated to the point of requiring patching or repair. a. Patch or repair such areas with matching material Project No. SPECIFICATION GUIDELINES 07320-6

as directed by A/E before proceeding with application of roofing membrane materials. E. Application of Sheet Metal Work: 1. Provide new sheet metal drip strips to match existing. a. Secure in place over tin capped base sheet and cover by mineral surfaces felt ply. 2. Provide new sanitary vent stack flashings and other penetration flashings, set in place in bituminous plastic cement and secure. a. After mineral surface felt ply is applied, seal around penetration with bituminous plastic cement. END OF SECTION Project No. SPECIFICATION GUIDELINES 07320-7