Building Consistency Meeting

Similar documents
Advanced Ventilation for Residential applications FBC Res 2010.

Inspection of New One- and Two- Family Dwellings

ORDINANCE. APPROVED EMERGENCY: (Yes) (No) VETOED: Date

General Residential Code Requirements

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

1. When using the REScheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

Residential Building Inspections

Administrative Changes

2010 National Building Code Adoption and Associated Process Changes

E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e

Hardin County Planning and Development Commission

One and Two Family Additions

The Inspection Process. Waxhaw N.C.

Feature Zone IECC 2009 IECC

Chapter 2: Foundation

IRC 2012 Key Changes

Building Codes and Ordinances ARC 227

2003 International Residential Building Code

The Homeowner s Building Application Checklist for Constructing a Residential Addition

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

CHECKLIST Inspecting a Garage

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

City of Donnelly. Permit Application Information and Instructions

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

SECTION : FIRE WALL AND FIRE SUPPRESSION REGULATIONS FOR R1-Z, R-2, R-3 ZONING AND PDD CATEGORIES

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and

District of Barriere A GUIDE TO BUILDING PERMITS

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

Detached Garages and Building Permits. 1 and 2 Family Dwellings

BUILDING PERMIT APPLICATION

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

RESIDENTIAL BUILDING REQUIREMENTS

Commercial Remodel Permit

THE GEORGIA ENERGY CODE: 2009 IECC + AMENDMENTS

Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program

Training Certification Categories

Oregon Mechanical Officials Association

r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r

2006 INTERNATIONAL ENERGY CONSERVATION CODE

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

General Commercial Energy Provisions

FS , 712, 713, 714

Inspection Report. 1 of 8

Detached Garage Construction Information

SIDING BUILDING PERMIT APPLICATION

Applying for Permits to build a new house in Linn County

Protecting Penetrations in Fire Rated Construction

Instructions for the Residential Building Data Collection Checklist 2009 International Energy Conservation Code with 2011 Georgia Amendments

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Plan Check & Field Inspection Guide

HPW Protocol Reference Manual

CHAPTER 29 PLUMBING SYSTEMS

Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11

Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.

The permit holder is ultimately responsible for compliance with all aspects of the building code.

WILDLAND URBAN INTERFACE (WUI) PRODUCTS

CHAPTER 26 PLASTIC SECTION 2601 SECTION 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

Questar ThermWise Duct Technical Specifications

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard.

Application for Commercial Plan Review and Building Permit. Address:

INTERIOR ENVIRONMENT

A homeowners/applicants guide to understanding and making application for a building permit.

INTERIOR ENVIRONMENT

Michigan Energy Code Training and Implementation Program

2012 IECC Residential with State Adopted Changes

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

fort collins building & zoning

Excerpts from: International Residential Code 2009

FENCE & RETAINING WALL PERMIT CHECKLIST

Pella 250 Series. Wood Frame Construction with Vinyl Siding... V250-ID-888 Wood Frame Construction with Brick Veneer...

Radon Control Methods for Existing and New Residential Structures

CONTACT INFORMATION. PV System will require a separate Electrical Permit.

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

Applying the Building Code During Design

Plainfield Township Building and Zoning Department P.O. Box 247 Hale, MI PH(989) FX(989) Authority: P.A. 230 of 1972 As Amended

INTERIOR FINISHES CHAPTER 8

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

(Project Location) (your firm's name)

3.1 Noise Overlay District

INC. VILLAGE OF COVE NECK OFFICE: (516) FAX: (516)

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Michigan Energy Code Training and Implementation Program

BUILDER S CONSTRUCTION SUPPLIES (Temporary in permanent position) REQUIREMENTS. March 2014

The better way to build TM

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.

Foundation/Site Work Code Requirements

Moisture Considerations for Insulated Building Assemblies

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

Basement Renovation Guide For Residential Dwellings

Transcription:

Staff present: On File Public present: Brandon Burgin; Brian Hall; Scott McCracken 1) Approved plans on site- clear and legible, no inspection There will be no inspection 2) PTAC units and sunrooms (is it conditioned space, when is mechanical permit required?) For heated space need mechanical permit. 3) Accessibility requirements for townhouses including elevator units (R320 & NC property lines/structurally independent) No it does not need to meet requirement. 4) Underfloor access and ventilation on suspended porch slabs (R408.1.5) No it does not need to vented but needs access. R408 Wall Vented Crawl Spaces R408.1.5 Space separation. Wall vented crawl spaces shall be separated from adjoining basements, porches and garages by permanent solid wall surfaces with all utility penetrations thru the separating wall sealed. Latched, weather-stripped doors or access panels shall provide access between the crawl space and such adjoining spaces. R408.8 Access. A minimum access opening measuring 18 inches by 24 inches (457 mm by 610 mm) shall be provided to the crawl space. See the North Carolina Mechanical Code for access requirements where mechanical equipment is located under floors.

SECTION R409 CLOSED CRAWL SPACES R409.1.2 Access panel/door. A minimum access opening measuring 18 inches by 24 inches (457 mm by 610 mm) shall be provided to the crawl space. See the North Carolina Mechanical Code for access requirements where mechanical equipment is located under floors. To minimize air entry, provide a tight fitting access panel/door with a latch mechanism. Access panels or doors shall be insulated to a minimum of R-2. 5) Mono slab (full of water?) Turn it down need to remove water. If you see concrete being poured need to tell them to clean it out. 6) Minimum depth of a mono slab? (16,18 or 20 ) Depends on the situation they will all work. 7) House wrap used as an air barrier? (Air Barrier ASTM E 2178 - chapter 2 definitions) Air barrier needs to meet code and ASTM. 8) Sprinkler certification letter (required vs. non-required systems?) Not need for residential 13D. If used in townhouse it would be needed. 9) Bulkhead enclosure meeting R311, steps (Required means of egress?) yes needed to meet the requirements if part of egress.

10) Compaction letter for fill soils (slab compaction)? What about CMU/Brick infill? Need a form for compaction or add to subgrade form. 11) Appendix M corrosion-resistant flashing: http://www.duraflash.net/duraflash_product_info.pdf (R703.8 & ASTME 2112) Need approved brand and check labels and compatible with wood.

12) Townhouse soffit material? (non-combustible, FRT, or protect under vinyl) Use R302.2.5 for installation and R302.2.6. 13) Detached accessory structure exemption See Chapter 1 of the Code for definition. If used in a commercial setting will need permit.

14) Garage habitable space above, what is the required means of egress Will need to have approved means of egress. 15) HB255 legal changes Permitting and Inspections have been changed. 16) Fireblocking (Approved language?) Does not need to meet ASTM E 136. Need to read material used to see if used in proper application - There is a difference fire stopping and fire blocking. Firestop Foam Fireblock Foam

17) New Defect Codes & inspection result alerts (effective 7-1-2015) New list starts 1 JUL 15 and will show in results of the inspection. Address: 1234-F MONFORD DR CHARLOTTE Result: Passed Inspected: FR IN View notes in website. The subject permit has been inspected. See the details below. Date: 30 Apr 1513:56:00 Permit Number: B2778833 Permit Status Issued Project Number: 354189 Project Name: Press Box Renovation Project Address: 1234-F MONFORD DR CHARLOTTE Contractor Name: NVR INC (SOUTH) Contractor Phone: 9806781234 Contractor Email: nvr.inc@bobo.org Result: Passed Task(s) Inspected: FR / IN / Defect Codes: / / / / / / / / / Defect Note: Inspector's Note: WE STRIVE TO PROVIDE EXCELLENT PLAN REVIEW AND INSPECTIONS WITH OUTSTANDING CUSTOMER SERVICE Approved By Lon McSwain Date _07/10/2015