PRESENTATION - COOLSWAY

Similar documents
BUILD-QUICK. Prefab Solutions. Global Leader PRE-FABRICATED STRUCTURES

STERLING. Construction & Development Corporation MODULAR BUILD. Cost Competitive System

Moduline. Acoustic Enclosure System. Rugged Noise Control Structures Using Acoustically Rated & Field Proven Demountable Components

Racking System. " Racking Solutions to meet all your storage needs "

MANUAL SYSTEMS. S t o r a g e S o l v e d.

Utility Cabinet System (UCS)

H i g h - D e n s i t y M o b i l e S t o r a g e MANUAL SYSTEMS. S t o r a g e S o l v e d

A. Access doors and frames are part of an access door and frame allowance.

MECHANICAL ASSIST SYSTEMS. S t o r a g e S o l v e d.

Director General Yamuna Group of Institutions, Gadholi, Yamuna Nagar

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

We manufacture durable Pre-Fabricated Structures, Roofing & Cladding Sheets Id Storage Door, EPS Sheets, Telecom Shelters and EPS Pellets.

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

The SIPs Process. 1 Why SIPS? What is the typical process for building a home using SIPS Industries? The Factory Process...

Innovation in Steel Collar Fastening Technology - Connecting Steel

EFFICIENT AND SAFE GOODS FLOW FOR COMMERCIAL ENVIRONMENTS

Stiles doors save lives. Stiles is a national leader in fire ratings and maintains a vast portfolio of options to the architect and builder.

Mechanical Loading Dock Levelers

Automated Construction Equipment Panelization Made Simple for the 21st Century. Mobile Factory.

The Merits of Structural Steelwork

PROJECT PROFILE FOR MANUFACTURE OF AGRICULTURAL IMPLEMENTS

HAMBRO COMPOSITE FLOOR SYSTEM

Comparative Study of R.C.C and Steel Concrete Composite Structures

COMPLETE REVISION November Process Industry Practices Architectural. PIP ARS08111 Standard Steel Doors and Frames Supplier Specification

architectural wall portfolio

Industry Standard Terms & Definitions Of The Steel Deck Institute

Insulated Panels. Insulated Roof Systems. Kingspan X-dek. KS1000 XD Longspan Roofpanel. Systems. Insurer Approved

Architectural Details. Walls. Including PVC cove, UL Listed Raceway, & Integration to Flooring. AES Pharma Wall & Walk-On Ceiling Cleanroom System

THERMALLY BROKEN ALUMINUM SERIES

Technical specifications Prefab Steel Canopy

Light steel framing.

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:

SECTION HANGERS AND SUPPORTS FOR PLUMBING

Maximum thermal performance ISOLEREN INSULATED METAL PANELS INSTALLATION GUIDE

TRANSMISSION LINE TOWERS

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

BEARING METAL STUD FRAMING

FLEXING THE BOUNDARIES OF TEMPORARY SPACE

PROJECT REPORT 5MT COOL CHAMBER

TECHNICAL FURNITURE INDUSTRIES L.L.C. Ideal fit outs for great experiments.

ALL STEEL SHED FRAMES

GERI INDUSTRIAL ESTATE. T: , F: E:

Dyno Test Rooms Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market

OMKAR PUF INSULATION PVT. LTD. RIGID

SLIDING PATIO DOOR DESIGNS REHAU SYSTEM Construction Automotive Industry

Doors and Frames in Stainless Steel Aesthetics and function for the highest demands

The SlottedWeb Steel Moment Connection

Specifying metal studs for interior and exterior walls can be simple.

Insulated Composite Panels

Signature Series 5 Lap SECTION ALUMINUM WINDOWS

JORACK. Storage Solutions from Design to Installations.

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

PLASTIC DOORS INTRODUCTION

TA 201-MmE PROJECT REPORT. Cantilever Bridge

CANTILEVER SHELVING SYSTEMS

Hollow Core Slabs Applications

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

Durakit Instant Houses

No # Specifications Rate To Be Quoted. Unit Qty (in figures) (in words) Total Amount

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

Flood Mitigation Solutions

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

BAY POLES FOR LOAD BEARING WINDOWS

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS

THERMOHALL Insulated Buildings

ECO-THERM. MOBILE FACTORY Technical information on innovative construction methods

BUILDING AND RENOVATING WITH DRYVIT PREFABRICATED PANELS

Built to Order. Stile. Frames. Section Contents. Profiles. Elevations. Double Egress Frames Pocket Frames

Solutions in Steel Innovative Technologies for Smart Solutions

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Structural Facilities

SECTION GYPSUM BOARD ASSEMBLIES

CONTEC SCREW CONVEYOR

Comparison of Design Procedures for Pre Engineering Buildings (PEB): A Case Study

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SL175 Panel Technical Data Guide

HOME APPLIANCES START WITH SMART SOLUTIONS

AND ACCESSORIES FOR DRYWALL CONSTRUCTION

Professional Grade Racking

Now our house. saves soooo. much energy! T h e N e w G e n e r a t i o n Energy Saving. S y s t e m. The Quality Profile

B. Modular House. Feature: Installation Procedure:

adaptable 2014 CONCEPT MODULAR PREFAB - MODULI ABITATIVI PREFABBRICATI

SIPs Structural Insulated Panels System. The building technology of the future

Passivhaus certified housing project with G-Brick SIP panels by Garnica

CS SERIES. Access Flooring Made Affordable.

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

LONG-SPAN MEZZANINE FLOORS GL8

Analysis and design of cantilever falsework for high rise building. Kartikkumar Prajapati1, Roshni John2

Pipe Pile. New Jersey Department of Transportation, Brielle, NJ. Route 70 Bridge over the Manasquan River, Brielle, NJ. USACE, Santa Maria, CA

MANUFACTURING SOLUTIONS FOR FORMING, JOINING AND ASSEMBLY AEROSPACE APPLIANCE AVIATION AUTOMOTIVE BEVERAGE DEFENSE ENERGY HEAVY EQUIPMENT

AMBICO Limited Section and RFI\EMI SHEILDED STEEL DOOR AND FRAME ASSEMBLIES Page 1

OVERKOTE E-100 Epoxy Floor Coating Technical Data

INTRODUCTION. We feel pleasure to introduce ourselves as manufacturers and suppliers of multifarious industrial storage systems and cable tray.

Real Stone Cladding mm sandstone ashlar. Thin Sandstone Ashlar Catalogue

S h e l v i n g CANTILEVER S H E L V I N G S Y S T E M S S t o r a g e S o l v e d

PUFFED RICE Introduction Market Packaging Production capacity 5. Sales revenue 6. Production process outline.

Transcription:

PRESENTATION - COOLSWAY partner in freshness COOLSWAY a brand promoted by TNS 1

INTRODUCTION COOLSWAY, a brand promoted by TNS. TNS engaged in structure manufacturing and serv ices, cold storage solutions and telecom infrastructure turn key solutions. TNS is run by professionals in the field of structures, cold chain and telecom. A fast growing company expected turn over of 240 crores closing year 09-10. Company having competent work force of 1100 in its roll having manufacturing unit for structures at Sikandrabad (UP) and PUF based panels unit at Gaziabad (UP) COOLSWAY stands for COOL: the technology, S: storage for freshness and WAY: solutions it provides to supply and build cold chains with complete prefabricated infrastructure and PUF based panels and ot her various product s i.e. PUF based doors, insulat ed medical vans, telecom shelt ers etc.

WHY COOLSWAY for COLD CHAIN? Single window solution for cold chain by providing: Pre Fab structure and RCC structure engineering Design and draw ing of cold rooms Heat and Energy calculations and consult ancy Consultancy on machines and plant Supply and services of Pre Fab structure from TNS Structure Unit Supply and services of PUF based panels from TNS PUF Panel Unit Commissioning of Cold Storage Plant

COOLSWAY BENEFITS Single Window for solutions, supply and services Cost effective solutions Competent and professional service Own manufacturing of prefab structure and PUF Panels Emphasis on energy saving solutions Fast implementation

AREAs OF OPERATION Medical Insulated Van Cold Storage

AREAs OF OPERATION Cold Room Telecom Shelter

AREAs OF OPERATION Pre Engineered PUF Insulated Shed Pre Fab Housing

COMPARISION PREFAB V/S CONVENTIONAL PEB Buildings Aesthetically appealing appearance Reduced time because of international design standards & codes using standard sections and connections Higher resistance to seismic forces due to low weight flexible frames 30% less PEB steel structures weight through efficient use of steel Factory controlled quality Lower initial cost of PEB steel buildings (cost per square meter about 30% less than the conventional) and faster delivery Simple Foundation, easy to construct and light weight of PEB structures Average delivery time 6-8 weeks Conventional Building Special aesthetic design required Increased design time due to scratch and availability of less design aids Rigid heavy weight structures not suitable for seismic zones High weight due to excessive safety factor and the usage of heavier steel sections Every project to be fabricated at site Special design and features developed for each project at higher costs Extensive heavy foundation Average delivery time 22-28 weeks 8

WHY PREFAB SOLUTIONS? Such buildings are detailed and designed in advance and manufactured in a quality controlled environment. Every manufacturing operation is carried out through advanced technologies such as sophisticated welding techniques, standardization of components, etc. Pre engineered construction system also facilitates mass production. The construction is faster than the conventional method. India has tropical climate that provides good insulation effects - a suitable one for PEB. It is ideal for construction in remote and hilly areas. Such buildings are detailed and designed in advance and manufactured in a quality controlled environment. 9

ADVANTAGE PREFAB Short project times Large clear spans Reduced construction cost and time Faster delivery and installation Factory controlled quality Aesthetically Appealing Virtually maintenance free 10

OUR FACILITIES COOLSWAY is supported by TNS manufacturing facilities of Pre Fab Structures and PUF panels. Monthly capacity of galvanized fabricated steel structure is 1500 MT Monthly capacity of PUF panels of various sizes is approximately 30000 Sq M Structure facility at Sikendarabad near Gaziabad (UP) plot area - 20000 SqM, covered area - 5000 SqM, warehousing - 9000 SqM PUF Panel manufacturing facility at Gaziabad (UP) plot area - 3000 SqM, covered area - 2500 SqM, warehousing - 1000 SqM Plants are equipped with well developed testing labs, internal transport facilities, state of art machines and back up power Well regulated ERP system is working for tracking and report generation

OUR FACILITIES PUF PANELS

OUR FACILITIES PUF PANELS Raw Materials Check Sheet Thickness, Chemical quality, Marine Board, thickness Anti Static Sheet thickness, Accessories make and quality. In Process Check- Sheet Cutting, Shearing, Bending as per drawing. PUF Thickness and Density as per specifications, Floor loading structure as per specification etc. Finished Good Inspection - Panel has no bends, Cam Locks are properly positioned, panel is clean and no scratches visible, Panels are packed properly.

OUR FACILITIES PRE FAB STRUCTURES

ENERGY SAVING BENEFITS Assuming a conventional cold storage unit is consuming 200 KW per hour A well design infrastructure with technology may save 5% of energy Saving per hour 5% of 200 KWHr i.e.10 Units Cost of 1 unit is Rs. 5.00 Saving per Hour in Rs is 5.00 x 10 = 50.00 Saving in a day 24 x 50 = 1200.00 Saving in a month = 36000.00 Saving in a year = 432000.00

THANKS!!!