Impact of Septic Tank Contamination at Te Puna

Similar documents
E5. On-site and small scale wastewater treatment and disposal

How to safely spread sludge from your septic tank

Data analysis and interpretation

Appendix 1. Schedules 5, 6, 7 and 8

Clackamas County Septic Systems 101. Brannon Lamp, REHS

GUIDELINES FOR SEPTIC SYSTEM DESIGN

SepticDesign.ca Gunnell Engineering Ltd.

Recreational Waters Surveillance Report

Lake Okareka Hornwort Management Plan 2013

On-Site Sewage Disposal Systems. Santa Barbara County Environmental Health Services

P U B L I C H E A L T H P R O T E C T I O N. Ministry of Health and Ministry Responsible for Seniors

Information guide for Stormwater Discharges in Southland

REGISTRATION EXAMINATION, NOVEMBER 2012 LICENSED DRAINLAYER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Lake Okareka Catchment Management Action Plan

Contents LM Land Management... 1

and the term landfill generically refers to all landfills, including the above types, unless specified otherwise.

On-site Wastewater Groundwater Quality Risk. July 2013

SpencerHolmes engineers - surveyors - planners

ROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT#

GRAY WATER RECYCLING SYSTEMS

Content Copy Of Original

SCOPE OF WORK (Last amendment 9/18/08) Update: Signed agreement in hand Work to proceed March 15, 2009 June 30, 2010

Northeast 19 percentage of households have an onsite septic system. Vermont >55% New Hampshire > 49% Maine > 51% Massachusetts < 27%

Review of the Regional Plan for Tarawera River Catchment

13 Section 32 Summary for the Residential Chapter

New Zealand Transport Agency: Christchurch Southern Motorway Proposal. Notices of requirement and resource consent applications

E36. Natural hazards and flooding

E36. Natural hazards and flooding

Septic Tank Enforcement Project

Town of Sewall s Point Septic Tank to Sanitary Sewer. History

Septic System Basics. Today s Presentation:

Producer Statement. Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2012)

Basic Septic And Plumbing Maintenance. By: All-Clear Septic & Wastewater Services

On-Site Sewage Systems Maintenance Inspections

WATERSHED. Maitland Valley. Report Card 201

Contents GR Geothermal Resources... 1

DEVELOPMENT CONTROL PLAN BUILDING LINE

INSTALLING A SEPTIC SYSTEM IN LIVINGSTON COUNTY LIVINGSTON COUNTY PUBLIC HEALTH DEPARTMENT 310 TORRANCE AVENUE PONTIAC, IL /

CLALLAM PIC UPDATE. PIC Open House

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

Property Owner's Name: Telephone #: Mailing Address: System Address (if different): Directions to location of installation:

SEPTIC TANKS. Let us help! FOR THE COLLECTION SETTLEMENT OF DOMESTIC SEWAGE

Producer Statement. Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2000)

Education on Common Household Sewage Treatment Systems Found In Allen County, OH

Appendix A Literature Review - Septic System Performance Criteria, Technologies, and Cost Factors

MURPHY DRAIN CATCHMENT

Public Health STARK COUNTY HEALTH DEPARTMENT

Existing System Evaluation Report for Onsite Wastewater Systems

WaStop Check Valve System

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

APPLICATION FOR PERMIT TO CONSTRUCT A PRIVATE SEWAGE DISPOSAL SYSTEM. 1. Name (Owner): Phone # ( )

UPPER MAKEFIELD TOWNSHIP

Rural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies...

Non-point source pollution now accounts for over 75% of Pennsylvania s total water pollution

Recreational Waters Surveillance Report 2014/15

SEPTIC SYSTEM EVALUATION AND CERTIFICATION FORM

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

ONSITE SEWAGE SYSTEMS*

Shellfish Sanitation and Recreational Water Quality Section. N.C. Division of Marine Fisheries Dept. of Environment and Natural Resources

On-site Household Sanitation Guidelines for Fiji #3 SEPTIC TANK CONSTRUCTION USING CONCRETE BLOCKS

A Homeowner s Guide to Evaluating Service Contracts

GUIDELINES FOR SUBMISSION OF AN APPLICATION FOR A SEWAGE SYSTEM PERMIT

Pollution Control. Klargester Off-mains. Market Leading Off-mains Sewage Solutions. klargester.com

National Environmental Standards for Sources of Human Drinking Water

Tackling Non-point Source Water Pollution in British Columbia

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

A.B.A. Well and Septic Services Inc. P.O. Box 35 Ivor, VA (757) A Homeowner s Guide to Septic Systems

Northfield Township WWTP Capacity Evaluation Report

LDRP 509 Knights Drain Investigation Stormwater Management Options Assessment Christchurch City Council. 12 May 2017 Revision: 2 Reference:

Lakes Facts. Algae in the Rotorua Lakes. Rotorua lakes 1

Regulation of Sewage Disposal Systems to Protect Surface Waters and Pond Water Quality

INTRODUCTION TO HOBBY FARMING AND WATER QUALITY

Tweed Shire Demand Management Strategy & Water Supply Augmentation Options Study A Brief Technical Review

GULF OF MEXICO - SEGMENT 2501

West Virginia Department of Health & Human Resources Department of Health

Living With a Septic System A homeowner s guide to basic septic system operation and maintenance

Infiltration Guidelines

West Hernando County Sewer Master Plan SECTION 7.0 RECLAIMED WATER

How to Care for Your Septic System

MONTHLY ENVIRONMENTAL MONITORING REPORT PORT BOTANY REDEVELOPMENT PATRICK STEVEDORES

Q&A Guidance for Implementing Revised COMAR ; Best Available Technology for Removal of Nitrogen (BAT)

Commonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments

SEPTIC TANK CONSTRUCTION GUIDELINES

Validity of the application of open dug well sanitary survey methodology in the development of a water safety plan in the Maldives islands

Ministry of the Environment and Climate Change. Transfer of Review. Presentation for Wastewater Practitioners Group.

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area

Building a Regional Partnership to Address Septic System Impacts to Lake Michigan

Otter Tail Water Management District Septic System Use and Maintenance Evaluation October 23, 2017

4.1 This directive is issued under the authority of the Assistant Deputy Minister, Socio-Economic Policy and Programming and Program Re-design.

Bacon Creek Septic System Replacement Best Management Practices. Implementation Plan

Grand Calumet. River Revitalized

CHAPTER 110 SEWAGE DISPOSAL

EVALUATION OF GRAVELLESS PIPE SYSTEMS FOR ONSITE WASTEWATER TREATMENT ACROSS MINNESOTA

OPERATION AND MAINTENANCE MANUAL FOR SEWAGE TREATMENT PLANT

New Illicit Discharge Detection and Elimination (IDDE) and Monitoring Requirements. COST Stormwater Management Conference

c: Don Labossiere, Director, Environmental Compliance and Enforcement Public Registries

STORMWATER HARVESTING, AN INNOVATIVE WAY OF MEETING THE CATCHMENT WIDE NEEDS OF THE BUILT AND SOCIAL ENVIRONMENTS

6. Pollutant Sources in

Peninsula Harbour. Area of Concern Status of Beneficial Use Impairments September 2010

LAWS AND RULES FOR SEWAGE TREATMENT, AND DISPOSAL SYSTEMS

Transcription:

Impact of Septic Tank Contamination at Te Puna Prepared by Paul Futter, Project Implementation Officer Environment Bay of Plenty June 2003 Update 5 Quay Street P O Box 364 Whakatane NEW ZEALAND ISSN 1175-9372 Working with our communities for a better environment

Environment Bay of Plenty Acknowledgement Former Environmental Scientist, John Gibbons-Davies, for sample collection and data analysis Cover photo: One of the drains (No.9) that discharge to Te Puna Estuary

Environment Bay of Plenty Contents Chapter 1: Introduction... 1 Chapter 2: Septic Tank Maintenance Programme... 3 Chapter 3: Environmental Monitoring... 5 Chapter 4: Conclusion... 7 Appendices... 9 Appendix I Environmental Monitoring Data...11

1 Chapter 1: Introduction The On-Site Effluent Treatment Regional Plan became Operative in December 1996. Within the Plan, policies were developed to give guidance for the use of on-site effluent treatment systems. The policies addressed: (a) (b) (c) (d) The issue of contamination through poor maintenance and servicing of systems; The lack of knowledge of what lay below the ground at each household; The need for a maintenance programme to be developed; and The need for continued environmental monitoring. Ian Gunn, an on-site treatment specialist from Auckland Unitec Services, was contracted in 2001 to review the on-site effluent treatment and disposal programme for specific communities, and in his report he recommended increased monitoring of three communities in Tauranga Harbour, one in Opotiki, two on the shores of Lake Rotoiti, and one at Lake Tarawera. Te Puna, one of the communities identified by Ian Gunn as requiring increased monitoring, was not included in the previous on-site effluent monitoring and inspection programme. Environmental Publication 2002/07, Impact of Septic Tank Contamination at Te Puna, reported on the impact of septic tank contamination at Te Puna. This report identified specific areas where highly contaminated discharges were occurring. The Medical Officer of Health, for Pacific Health, was advised of the public health hazard. In December 2002 the Te Puna community agreed to join the maintenance programme of regular cleaning and inspection of their systems. This report discusses the results of the monitoring programme at Te Puna between 8 May 2002 and 26 May 2003, and the results of monitoring of septic tank systems up to June 2003.

3 Chapter 2: Septic Tank Maintenance Programme In December 2002 the Te Puna community started a voluntary maintenance programme. The area covered by the programme covers 136 properties, including seven empty sections. Some sections may have more than one dwelling on them. At the start of June 2003, 52 inspection forms had been received. There is also one system for which Environment Bay of Plenty is not expecting an inspection as a new system was installed under resource consent 61569 in 2002. About 55% of systems reported so far have failed. As expected there is a predominance of failures around the Waitui Reserve but not an absence of failures elsewhere. Pass/failure rates for reports received by June 2003 are shown in Figure 1. A gross failure was reported for a property in Fairlie Grove where a pumice concrete tank had deteriorated to the point it no longer contained any effluent and was positioned directly over a pipe believed to be a stormwater drain. The owner of this property had a new system installed by the time Environment Bay of Plenty received the report and therefore for the purposes of the analysis of causes for failure has been ignored. Table 1: Summarises the various causes for failure. Problem Number for Te Puna Percentage of Te Puna systems Percentage in total database Tank size between 2000 litres and 2700 17 32% 37% litres Tank size below 2000 litres 3 6% 24% Failure of soakage field/soak hole 11 20% 6% Groundwater clearance too low 6 12% <1% Groundwater clearance marginal 2 4% 3% Physical barrier within 5 metres causing 3 6% 2% problem Physical barrier within 5 metres no obvious 5 10% 4% problem Access for regular maintenance 5 10% 1% Condition of Tank 0 0% 7% Those in italics do not score enough points by themselves to cause failure of inspection. The systems at seven properties have multiple causes for failure. Approximately 20% of the systems have a failed soakage field/soak hole. This compares to only 6% of all systems in the entire database failed for this characteristic. Additionally 70% of systems in Te Puna are served by soak holes (of those communities on the maintenance programme only Woodlands has a higher percentage), which will be affording little treatment of the effluent discharged from the septic tanks. In total 80% of systems at Te Puna are served by a failed soakage system or a soak hole or both.

4 The number of systems with low groundwater clearance and close proximity to a physical barrier to horizontal soakage such as a cutting or retaining wall is also higher than in many other areas but not in league of some communities e.g. Hinehopu >50% groundwater clearance issues. The median section size at Te Puna is just over 1000m 2 with the most common section size being just under 1000m 2. Therefore depending on soil types and how much of sections are developed there may be reasonable potential for upgrade of the treatment, post the septic tanks. Only 40% of systems have been reported so far and therefore the above analysis needs to be treated with some caution. At this stage it is too early to decide whether Environment Bay of Plenty should be advising property owners to remedy any minor causes for failure within a defined time period and advising other solutions such as sewage reticulation. However, for those property owners whose systems failed because of the disposal field then there is a need to take action in the shorter term. Similarly, if any more systems like the one in Fairlie Grove described above are revealed then urgent action would be required. Based on the information to date, the practicality and effectiveness of replacing all soak holes with effluent trenches and installing raised beds for the Waitui Reserve area may need to be considered. However, it is important that Environment Bay of Plenty wait till the remaining properties are inspected to confirm these are correct options to pursue.

5 Chapter 3: Environmental Monitoring The Waitui Reserve and the Lindoch Ave drains were first sampled in 1997. Since then there has been a dramatic increase in the enterococci and faecal coliforms found in the discharge from the Waitui Reserve drain with the counts being consistently in the tens of thousands and occasionally in the hundreds of thousands. The Lindoch Ave drain has also been consistently higher although the numbers are an order of magnitude lower than the Waitui Reserve drain. The median enterococci numbers for each sample point during the period covered by this report compared with Recreational Water Quality guidelines are shown in Figure 1. A dramatic increase in the bacterial number was observed in the discharges from the drains entering the estuary around the community, and in particular the discharge from the Waitui Drain, in May 2002. The results for the following 12 months indicate that there has been little change to the bacterial numbers since then. There was an initial decline in bacteria counts in January, February and March of this year, but this may be due the dry weather experienced over those months. The higher counts since then may be a result of increased rainfall events. It can be seen from the tables of results (Appendix 1) that there has been no pattern of decreasing bacteria numbers since the voluntary inspections started in December 2002. Those drains that exhibited high numbers in the past continue to do so.

6 Environment Bay of Plenty

7 Chapter 4: Conclusion Drains entering Tauranga Harbour around Te Puna area continue to show elevated bacterial level septic tank contamination. This bacterial contamination presents a significant health hazard for the community when using the estuary for recreational purposes. Only 40% of systems have been cleaned, inspected and reported on so far. This is too few to enable Environment Bay of Plenty to fully assess the problem. However, early indications are that a high percentage of soak holes and failed soakage systems, along with poor groundwater clearance around the Waitui Reserve may be key factors. Of the systems reported so far there is a predominance of failures around the Waitui Reserve but not an absence of failures elsewhere. Environment Bay of Plenty needs to continue to encourage the remainder of the Te Puna community to have their septic tank systems cleaned and inspected voluntarily, while proceeding with a change to the On-Site Effluent Treatment Regional Plan to formally include Te Puna in the compulsory Maintenance Programme.

9 Appendices Appendix I Environmental Monitoring Data

Environment Bay of Plenty 11 Appendix I Environmental Monitoring Data Sample Location Date Sample ph Enterococci/ 100ml Faecal Coliforms/100ml Waitui Reserve 08/05/02 022243 9.59 8000 5000000 13/05/02 022312 700 19000 23/05/02 022495 7.3 22000 370000 06/06/02 022619 7.7 1900 730 19/06/02 022818 7.1 4700 36000 04/07/02 022977 6.97 590 21000 08/07/02 023007 130 19000 04/11/02 024426 7.39 13 600000 17/11/02 024601 7.72 2000 82000 02/12/02 024807 7.6 4700 97000 16/12/02 025142 7.6 700 4700 13/01/02 030136 7.1 39000 220000 29/01/03 030607 7.1 1230 80000 14/02/03 030953 7.5 2100 59000 12/03/03 031493 6.9 6700 14000 01/04/03 031877 7 1000 360000 01/05/03 032392 7.2 9100 340000 26/05/03 032776 190000 1400000 Lindoch Ave. 04/07/02 022978 6.93 80 660 08/07/02 023008 140 230 04/11/02 024429 7.23 2400 57 17/11/02 024599 7.33 2000 160 02/12/02 024810 7.7 80 6200 16/12/02 025143 7.2 3100 2700 13/01/02 030141 6.9 120 970 29/01/03 030610 6.7 17 40 14/02/03 030954 7.4 1200 4100 12/03/03 031499 6.9 210 3900 01/04/03 031881 6.9 7 20 01/05/03 032388 7.1 220 390 26/05/03 032782 100 190 Drain #4 04/07/02 022979 6.81 170 6600 08/07/02 023012 820 24000 04/11/02 024424 7.4 59 7800 17/11/02 024596 7.53 1600 510000 02/12/02 024805 7.5 34 47 16/12/02 025139 7.4 290 3000 13/01/02 030133 7 1600 4100 29/01/03 030605 7.6 100 1900 14/02/03 030952 7.8 1900 3200 12/03/03 031489 6.7 1300 5200 01/04/03 031873 6.8 1000 6600 01/05/03 032384 7.7 420 220000 26/05/03 032773 90 2700 Drain #1 04/07/02 022980 6.89 1100 23000 08/07/02 023009 1100 3200

12 Sample Location Date Sample ph Enterococci/ 100ml Faecal Coliforms/100ml 04/11/02 024425 7.28 80 89000 17/11/02 024597 7.64 5200 740000 16/12/02 025141 7.7 2400 3400 13/01/02 030135 6.9 640 20000 12/03/03 031492 6.6 650 6900 01/04/03 031876 6.8 190 100 01/05/03 032385 7 190 1400 26/05/03 032771 630 3700 Drain #2 04/07/02 022981 7.69 3600 170 08/07/02 023010 6100 1200 12/03/03 031491 7.3 130 7100 01/04/03 031875 7.7 340 410 26/05/03 032772 110 410 Drain #3 04/07/02 022982 7.1 640 940000 08/07/02 023011 50 7100 02/12/02 024806 7.6 270 74000 16/12/02 025140 7.7 160 2100 13/01/02 030134 7 410 41000 12/03/03 031490 6.7 570 97000 01/04/03 031874 7 40 890000 26/05/03 032786 60 410 Drain #5 04/07/02 022983 7.36 57 280 08/07/02 023013 12 370 12/03/03 031495 7.4 900 5800 Fairlie Grove Drain 04/07/02 022984 6.52 540 800 12/03/03 031497 7.6 1600 4200 01/04/03 031879 7.6 270 330 01/05/03 032386 7.6 310 470 26/05/03 032778 100 410 Drain #6 08/07/02 023014 20 150 13/01/02 030138 7.6 1700 1300 12/03/03 031496 7.3 1600 310 Drain #7 08/07/02 023015 1400 26000 13/01/ 02 030132 7.5 20 150 12/03/03 031488 7 50 140 01/04/03 031872 7.6 5 9 01/05/03 032383 6.9 14 200 Drain #9 08/07/02 023016 77 570 02/12/02 024808 7.5 200 1200 13/01/02 030137 7.2 5700 29000 12/03/03 031494 7.3 1600 1300 01/04/03 031878 7.5 2600 67 26/05/03 032775 1900 13 Drain #8 08/07/02 023017 140 3300 04/11/02 024427 90 90 17/11/02 024602 7.69 730 160 02/12/02 024809 220 1200 13/01/02 030139 240 130 29/01/03 030608 7 33300 8000 01/05/03 032393 6.2 390 1000 Seepage #1 08/07/02 023018 73 40 04/11/02 024428 6.95 190 37

Environment Bay of Plenty 13 Sample Location Date Sample ph Enterococci/ 100ml Faecal Coliforms/100ml 17/11/02 024598 7.42 73 120 13/01/02 030140 7.1 90 60 29/01/03 030609 7.4 120 800 12/03/03 031498 6.8 170 160 01/04/03 031880 6.8 70 1 01/05/03 032387 6.8 180 90 26/05/03 032779 600 100 Drain #10 08/07/02 023019 10 43 Drain # 11 04/11/02 024430 7.68 27 2400 17/11/02 024600 8.11 5 20 26/05/03 032774 23 47 Drain # 12 04/11/02 024431 6.79 37 170 17/11/02 024603 7 140 490 02/12/02 024811 6.7 1700 240 16/12/02 025144 7.2 470 900 13/01/02 030142 6.7 310 430 29/01/03 030611 7.4 1200 4000 14/02/03 030955 7.1 300 2700 12/03/03 031500 400 2000 01/04/03 031882 6.8 230 90 01/05/03 032389 6.8 37 130 26/05/03 032781 87 13 Spring Drain 12/12/02 025062 6.32 130 900 Drain #13 13/01/02 030143 7.5 40 70 Seepage #2 13/01/02 030144 7 53 40 01/05/03 032391 6.9 31 12 26/05/03 032780 30 3 Drain #14 12/03/03 031501 7.4 160 170 01/05/03 032390 7.1 160 80 26/05/03 032777 23 270 Drain #16 26/05/03 032785 40 120 Drain #15 No data for this reporting period. Te Puna 22 July 2003

Environment Bay of Plenty 14