Glen Briar Condominium Association Additions and Alterations Guidelines and Application

Similar documents
WINDMILL CROSSING HOMEOWNERS ASSOCIATION, INC. Architectural Committee Guidelines For Townhomes

Marbella Isles Homeowners Association, Inc.

Springtree Property Owners Association, Inc. (POA)

GREEN PASTURES - RESIDENTIAL ARCHITECTURAL REVIEW GUIDELINES

Whispering Woods Community Association Architectural Rules and Regulations

Fieldstone Ranch Homeowners Association, Inc.

ARCHITECTURAL REVIEW COMMITTEE (ARC) GUIDELINES

These Standards and Guidelines supersede any previous versions.

EAGLE BLUFF HOMEOWNERS ASSOCIATION P.O. Box Chattanooga, TN

Amelia Park Neighborhood Association, Inc.

REQUEST FOR ARCHITECTURAL REVIEW AND HOA APPROVAL - PHEASANT WALK HOMEOWNERS ASSOCIATION, INC.

Legacy Existing Homes Design Guidelines and Submittal Requirements

ARCHITECTURAL GUIDELINES HOLLYBROOK COVES HOA

FENCE PERMIT APPLICATION

Rules and Regulations

Hunter s Gate at Landen Homeowners Association

BAYARD DESIGN GUIDELINES

Architectural Review Board Application Information & Criteria

ARCHITECTURE IMPROVEMENT APPLICATION

ARCHITECTURAL REVIEW CRANBERRY WOODS

VAB Home Owners Association

Vantage Pointe Homeowner s Association Architectural Guidelines and Application Procedures

Architectural Guidelines

BUCKHAVEN VILLAGE HOMEOWNERS ASSOCIATION

ARCHITECTURAL GUIDELINES, RULES AND REGULATIONS

City of Port Huron Michigan. Historic District Guidelines and Application

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

Subdivision Plat Review Application

VILLEURBANNE MASTER ASSOCIATION

ARTICLE VIII. (SF-A, SF-TH) SINGLE-FAMILY ATTACHED AND TOWNHOUSE RESIDENTIAL DISTRICTS

CLIPPER ESTATES HOMEOWNER S ASSOCIATION DESIGN GUIDELINES

Architectural Standards

AMENDED AND RESTATED RESIDENTIAL IMPROVEMENT GUIDELINES FOR PLUM CREEK MASTER HOMEOWNERS ASSOCIATION, INC.

Miramar Village Homeowners Association Architectural Review Standards and Guidelines I. Purpose II. Architectural Review Objectives

Fence and Wall Requirements

Summary of Common Design Guidelines

Design Guidelines for Construction and Renovation in the Longmeadow Historic District

CARTER S COVE HOMEOWNERS ASSOCIATION RULES, REGULATIONS AND GUIDELINES ADDITIONS AND ALTERATIONS In addition to the Declaration of Covenants,

WHITNEY OAKS COMMUNITY ASSOCIATION P.O. Box 1459, Folsom, CA (916) (916)

Henderson Village Property Owners Association Architectural Design Standards

SECTION 5 EXCEPTIONS AND MODIFICATIONS

MILLER'S CROSSING PROPERTY OWNERS ASSOCIATION ARCHITECTURAL CONTROL COMMITEE GUIDELINES AND PROCEDURES (Effective 27 November 2007)

ARCHITECTURAL GUIDELINES HAVASU SHORES RV RESORT

Windsor Hills Community Association. Architectural Review Committee Handbook

Pecan Grove Plantation Homeowners Association, Inc.

INSPECTION TYPE EIFS system, Visual, Tramex & Delmhorst probe moisture readings

ADMINISTRATIVE SITE PLAN REVIEW FOR SINGLE- AND TWO-FAMILY DWELLINGS AND MULTIPLE-FAMILY DWELLINGS HAVING THREE OR FOUR DWELLING UNITS

3275 & 3275U, 3285 & 3285U Vertical Sliding, Double-Hung Windows

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

Façade Improvement Specifications: 221 S. Lafayette, Greenville, MI. General Section:

Residential Design Standards Draft 9 August 2013

Seal Harbor Development 1 Nagog Park Acton, MA 01720

Architectural Review Committee Standards

ARCHITECTURAL DESIGN & REVIEW MANUAL

QUAIL CROSSING TOWNHOMES ASSOCIATION, INC.

REQUEST FOR ARC APPROVAL

Casement Windows Montecito New Construction Window

RIVERS EDGE CONDOMINIUM ASSOCIATION MAINTENANCE RESPONSIBILITIES

Architectural Standards Guide. Compiled by the Architectural Standards Committee (ASC) Published:4/26/17 Version: 1.0

CORPORATE CERTIFICATE 177 LAKE ESTATES HOMEOWNERS ASSOCIATION


ARCHITECTURAL STANDARDS & PROCEDURES KEENE MILL VILLAGE IV (KMV IV) HOMEOWNERS ASSOCIATION (HOA)

Talavera Community Association Design and Architectural Guidelines Introduction

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

SITE AND HOME DESIGN AND CONSTRUCTION GUIDELINES

Reems Creek Homeowners Association, Inc. P.O. Box 1546, Weaverville, NC

JETTON COVE COMMUNITY ASSOCIATION, INC. NEW CONSTRUCTION ARCHITECTURAL GUIDELINES

Home Building Planner

Exterior Architectural Guidelines and Restrictions (EAG&R)

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

Introduction. Massing and Overall Form. Catalina. Catalina is a 111 lot, single-family home community by Costain Arizona, Inc.

Winding Brook Condominium Unit Owners Association. Architectural and Ground Rules. Revised Version of the

ARCHITECTURAL AND LANDSCAPING GUIDELINES

Holdener Farm Area P.U.D. Enumclaw,Washington DESIGN STANDARDS PHASE ONE

Slayton Ranch Estates

Application for Commercial Plan Review and Building Permit. Address:

BUILDING PERMIT APPLICATION

Basic Service. This Section provides information regarding a. Introduction

ARCHITECTURAL STANDARDS POLICY FOR THE HEIGHTS COMMUNITY OF THE STEDWICK HOMES CORPORATION

THE PRESERVE ARCHITECTURAL DESIGN GUIDELINES

Awning Windows Montecito New Construction Window

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

Application for a Residential Building Permit

STATE PREFERENTIAL PROPERTY TAX ASSESSMENT PROGRAM

FENCE & RETAINING WALL PERMIT CHECKLIST

NEW CONSTRUCTION ADDENDUM TO COA APPLICATION

Pueblo Estrella Homeowners Association Architectural Guidelines

Section , Article 4 of the Zoning Ordinance December 14, 2012 Page 1 of 8

Checklist for ACC Requests

Architectural Review Board Guidelines

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

Wheel Chair Ramp Ministry

DESIGN GUIDELINES Version 1.04 Effective

Tehaleh Owners Association Architectural Modification Design Manual

WIND ENERGY CONVERSION SYSTEMS APPLICATION

RESIDENTIAL BLOCK WALL/ FENCE APPLICATION

Village of Arlington Heights. Sewer Back-up Rebate Program

BEACON HILL COMMUNITY ASSOCIATION, INC. COMMUNITY CODE NO. 2 DESIGN GUIDELINES

Arcada Community Association. Architectural Policies

Transcription:

REVISED: September 1, 2008 Glen Briar Condominium Association Additions and Alterations Guidelines and Application A completed application must be sent to Glen Briar s management company for review/approval by the Board of Directors for all exterior modifications to homes or lots. These modifications include: addition of patios and decks; alterations to the exterior of the units; installation of windows, doors, dryer vents, furnace vents, roof vents, satellite dishes, flagstones and timbers; planting or removal of shrubs and trees; and any other alterations specified in the By-Laws. Please see attached guidelines for the following additions and alterations: Satellite Dishes Windows Doors (entry doors and storm doors) If you have questions about other additions and alterations, please contact Glen Briar s management Company, IKO Real Estate (see contact information on page 2). Applications are usually reviewed at Glen Briar Board meetings on the 4 th Monday of alternate months (January, March, May, etc.) and should be received by IKO prior to the meeting. Timesensitive applications can be reviewed by the Board between scheduled meetings. Incomplete applications cannot be reviewed and will be returned. Review period begins on the date that a complete application and supporting documents are received. The Board cannot approve materials or uses prohibited by the Declaration of Covenants, Conditions, Restrictions and Easements. 1. Date 2. Applicant's Name (Glen Briar Unit Owner) Address Home Phone Work Phone 3. Description of Addition or Alteration 4. Name of Contractor (Company name, city, state) 5. Attach the following to this application: Detailed scaled drawing showing proposed addition or alteration in red, including size, location, dimensions, design, color, finish and materials for proposed addition or alteration. Glen Briar Additions and Alterations Guidelines and Application 1

Please note the following: 1) Construction must commence within six (6) months and be completed within one (1) year from the date of this approval. 2) All construction work MUST be done by a licensed, bonded contractor. 3) Any damage to nearby common or private areas must be corrected within fifteen (15) days of completion of construction. 4) The homeowner is responsible for obtaining any applicable Montgomery County Building Permits. 5) The homeowner is responsible for contacting "Miss Utility at 1-800-257-7777 at least 48 hours prior to any digging. 6) Any changes in drainage due to construction are the applicant's responsibility. 7) All front and rear yard lot lines must be strictly adhered to. 8) If disapproved, this application can be appealed to the Glen Briar Board of Directors and the Montgomery County Office of Common Ownership Applicant Authentication The applicant listed on page 1 of this application acknowledges that: he/she is the owner of the specified unit; he/she has reviewed and understands these Guidelines and Application. the information he/she has provided on this Application is correct. Signature of Unit Owner Date Glen Briar Board Use: Date Received: By: Glen Briar Board Action Taken: Your request for approval of (a) Action: Approved: Disapproved: Approved as noted: (b) Glen Briar Board Representative Signature: Signature Date Send completed application and all attachments to: Glen Briar Condominium Association c/o IKO Real Estate, Inc. 3416 Olandwood Court, Suite 210 Olney, MD 20832 301-924-3050 Fax 301-924-9389 rcaudle@ikorealestate.com Glen Briar Additions and Alterations Guidelines and Application 2

Glen Briar Condominium Association Guidelines for Installation of Satellite Dishes This document is a summary of the Federal Communications Commissions (FCC) guidelines on the installation of satellite dishes. This information is provided for information purposes; it does not constitute a legal document or a commitment. The FCC guidelines are available at http://www.fcc.gov/mb/facts/otard.html. The document is called Over-the-Air Reception Devices Rule Preemption of Restrictions on Placement of Direct Broadcast Satellite, Multichannel Multipoint Distribution Service, and Television Broadcast Antennas. Owners must submit an Architectural Change Request Form for all exterior modifications, including installation of satellite dishes. The FCC rule applies to satellite dishes that are one meter (39.37 inches) or less in diameter Satellite dishes may not be installed on or attached to the chimney, roof, or the exterior of any Glen Briar building. Satellite dishes may not be installed on a walkway. An acceptable location for a satellite dish at Glen Briar is directly in front of or behind one s unit or at the side of an end unit on the ground, close to the building, and preferably shielded by a bush. In the event that the above satellite dish location precludes reception of an acceptable quality signal, the property owner shall have the antenna installer so certify and request an alternative location where the satellite dish would be the least obtrusive to aesthetic considerations and still receive an acceptable quality signal. The FCC rule does not grant permission to drill a hole on the exterior of a Glen Briar building for a satellite dish cable or attach a cable to the exterior of a building. Glen Briar homeowners may request permission to do this as part of their architectural change application. Revised: May 6, 2003 Glen Briar Additions and Alterations Guidelines and Application 3

Glen Briar Condominium Association Standards for Replacement of Windows Owners must submit an Architectural Change Request Form for all exterior modifications, including replacement of windows. 1) All window replacements on individual Glen Briar units are at the owner s expense. 2) Owners may want to contact the local utilities to determine whether energy credits are available for replacement of windows. 3) Windows must be white vinyl casement. 4) The size, shape and configuration of each window must match original Glen Briar windows; the mutin or grill bars must match original Glen Briar windows. 5) Exterior of windows must be capped with white aluminum. 6) All of the unit s windows must be replaced. 7) Contractor must complete work in a timely and neat manner, and haul all old windows off site. 8) Provide a picture or drawing and/or model number of the new windows. Glen Briar Additions and Alterations Guidelines and Application 4

Glen Briar Condominium Association Standards for Replacement of Front and Back Entry Doors and Front and Back Storm Doors All Door Replacements All door replacements on individual Glen Briar units are at the owner s expense. Owners must submit an Architectural Change Request Form for all exterior modifications, including replacement of front and back entry doors and storm doors. Owners may want to contact the local utilities to determine whether energy credits are available for replacement of doors. Front Entry Door Replacement door must be Therma-Tru brand fiberglass door (3086 S296), or equivalent brand of fiberglass door. Replacement door must match the current configuration of 2 clear glass windows (lites) at the top and four vertical panels below. Replacement door must include mail slot in the same location. Style and finish of knobs or handles and locks are at the owners discretion. Peep holes and door knockers are optional at the owner s discretion. Exterior of door must be painted to match the current color. (IKO Management can provide paint color and type.) Rear Entry Door Replacement door must be Therma-Tru brand fiberglass door (3068 S2150), or equivalent brand of fiberglass door. Door must be 9-lite (9 clear glass window panels in top half of door) with two vertical panels in lower portion of door. Style and finish of knobs or handles and locks are at the owners discretion. Exterior of door must be painted to match the current color. (IKO Management can provide paint color and type.) House numbers should not be replaced on the door. (They won t be visible behind the storm door due to the dimension of the window.) Front Storm Door Door must be white aluminum. Door can be high-view or full-view. (Mid-view door is not permitted.) Door must have clear glass (no etching or frosting). Lower portion (of high-view door) must be two vertical panels (not crossbuck). Rear Storm Door Door must be white aluminum. Door must be high-view. (Full-view or mid-view door is not permitted.) Door must have clear glass (no etching or frosting). Lower portion of door must be two vertical panels (not crossbuck). See photos of doors on the following pages. Glen Briar Additions and Alterations Guidelines and Application 5

Front Entry Door Rear Entry Door Glen Briar Additions and Alterations Guidelines and Application 6

Full-View Storm Door High-View Storm Door Front Storm Door Option 1 Front Storm Door Option 2 Rear Storm Door Glen Briar Additions and Alterations Guidelines and Application 7

Mid-View Storm Door Not permitted Glen Briar Additions and Alterations Guidelines and Application 8