BRIEFING NOTES ON TAZAMA OPERATIONS

Similar documents
Zamanco Minerals Limited. Serenje Ferromanganese Project, Zambia Update October

ENERGY STATISTICS IN ZAMBIA. Harriet Zulu Principal Energy Officer DEPARTMENT OF ENERGY

GUIDELINES FOR APPLICATION FOR TANZANIAN LOCAL SUPPLIERS AND SERVICE PROVIDERS IN THE PETROLEUM SUBSECTOR

Preamble. Mindful of: Noting

FACTS ABOUT THE AUSTRALIAN WHOLESALE FUELS MARKET & PRICES

Charter for the South African Petroleum and Liquid Fuels Industry

Cotton and Cotton By-products Country Survey Report for Tanzania November, 2017

INVESTING IN AFRICA. Company Profile

Management Trust on the Establishment of a Centre. Memorandum of Understanding between the Eastern and Southern African Management

COTTON DEVELOPMENT TRUST

Infrastructure and Multi-Modal Transport

Growth. Network grew steadily until early 1980s. Pipeline diameter increased. Increase in volume and amount of volume

NAMIBIA: LOGISTICS HUB FOR SOUTHERN AFRICA CAPE TOWN, SOUTH AFRICA 17 NOVEMBER 14 (& BEYOND)

i -Terminals Wipro Thought Leadership

Lipow Oil Associates, LLC. January 3, Energy Independence: Can We Really Do It?

Transmission Pipeline Opportunities. Advancing Project Development in India through Public Private Partnerships

Certificate in Global Downstream Oil & Gas Operations

6. Africa. 6.1 Overview

PETROLEUM SECTOR. Crude Oil

The Pilot Programme for Climate Resilient (PPCR)

UNITED REPUBLIC OF TANZANIA MINISTRY OF WATER AND IRRIGATION (MoWI) NATIONAL IRRIGATION COMMISSION (NIC) KILIMANJARO ZONE

DOWNSTREAM PETROLEUM 2017 DOWNSTREAM PETROLEUM

Rule Business Function Retention Rule Title Retention Period Description

ABOUT COMPANY. Per Association of Ship Brokers

EVALUATION ON POLICY FORUM S COMMUNITY RADIO PROGRAMMES ON EXTRACTIVE AND ACCONTABILITY 2017

ACCESS MULTI-MODAL LOGISTICS IMPALA IN COLOMBIA

Dar es Salaam Regional PPP Risk Allocation Workshop

Suez Canal. The Suez Canal Zone represents a new chapter in the economic development of

Conventional Energies (Oil & Gas)

COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM PIPELINE AND A STORAGE FACILITY.

«Economic instruments and transition pathways to a low carbon economy in the industrial sectors» Claudio Spinaci Unione Petrolifera President

TRI-M Mecano Metal de Moçambique

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

THE USE OF OUTSIDE CONTRACTORS FOR PORT MAINTENANCE. John R. Lethbridge

Opportunities and Challenges in the Energy Infrastructure Industry. Louisiana State University Energy Summit

Navios South American Logistics Inc. Company Presentation

Western Power Company Ltd. Ngonye Falls Hydroelectric Project October 2014

The report covers supply and demand trends for sugar in South Africa

Crude scheduling in refinery operations

Energy sector in Mongolia. Contents Brief of energy sector Energy sector policy Future trend

INFRASTRUCTURE. US$2.27 billion 17% MW

Geothermal Hot Water Supply of Saburtalo District in Tbilisi, Georgia

GAS-TO-LIQUIDS - «GTL»

35-years of Pipeline Incidents Statistics Lessons learned Jean-François Larivé Technical Coordinator, CONCAWE

STRATEGIC CONTEXT FOR ENERGY PLANNING CHAPTER 2

Current Issues and Empirical Evidence from Malawi, Zambia, and Kenya. Isaac Minde, T.S. Jayne, Joshua Ariga, Jones Govereh, and Eric Crawford

Janice T. DeVelasco, P.E.

Navios South American Logistics Inc. Company Presentation

Korea Hydro & Nuclear Power: Improving Productivity by 60% with the SAP NetWeaver Technology Platform

FT-GTL UNLOCKS VALUE FROM NATURAL GAS

TTICUS RESOURCES LIMITED ABN

Industry and infrastructure can contribute substantially to African economic growth

Brent Gloy, April

PRE-FEASIBILITY REPORT

WHITEPAPER. Unlocking Your ATM Big Data : Understanding the power of real-time transaction monitoring and analytics.

FACTS ABOUT THE AUSTRALIAN RETAIL FUELS MARKET & PRICES

PBF Energy. State College, PA. North East Association of Rail Shippers Fall Conference. October 1, 2014

Stratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL

The Complete Guide to Subscription Billing

Provisional results for the year ended 30 June Thursday, 31 August 2006

Tank Farm Operations and Performance Nov May Nov 2017 Dubai, United Arab Emirates

WATER UTILITIES PERFORMANCE REVIEW REPORT 2012/2013 REGIONAL WATER UTILITIES & DAWASCO

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary:

AN EMPIRICAL ANALYSIS OF INVENTORY EFFICIENCY OF MAJOR REFINERIES IN INDIA

POLICY REFORMS AND PROGRAMMES IN TRANSPORT AND SECTOR - UNITED REPUBLIC OF TANZANIA

Oil and Gas. Chapter Three

THE LOCAL AND REGIONAL ECONOMIC IMPACTS OF THE US DEEPWATER PORT SYSTEM, 2007 PREPARED FOR: AMERICAN ASSOCIATION OF PORT AUTHORITIES JUNE 6, 2008

Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan

TABORA INVESTMENT FORUM 19 th JULY 2013 AT SERENA HOTEL DAR ES SALAAM

Waste-to-Energy Projects on the Maldives Analysis of the Financial Feasibility

Australian and Canadian Imports and Exports: Trade and Transportation by

CHALLENGES FOR AFRICA IN AN AGE OF GLOBAL EMPLOYMENT DEINDUSTRIALIZATION: IMPLICATIONS FOR TANZANIA

Chapter 4. Introduction to the Toolkit

Second Pillar: Energy

COTTON DEVELOPMENT AUTHORITY

INDEPENDENT REVIEW OF THE REFINING NZ PROCESSING AGREEMENT. Prepared for REFINING NZ

Summary of PTTGC Oil Spill Incident and Execution

US Hydrocarbon Exports Presented by

CENSUS OF INDUSTRIAL PRODUCTION

Jeddah water & wastewater management contract

For personal use only

IRANIAN. Petrochemical industry 2017

Energy Sector March 2016, Maseru, Lesotho Pavel Shermanau, IPCC TFI TSU

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Whiting Business Unit

Electricity Slide Index Slide 2: Generating Electricity Slide 3: SA Power Grid

Economic Impacts of the. Torrance Refinery. August Torrance Refining Company LLC. Prepared For:

Gorgon Project Update: Selected Images

Mine Power: Partnering to Upgrade Energy Infrastructure in the DRC

The African Smallholder Farmer s Perspective. Silas D. Hungwe President, Zimbabwe Farmers Union

Analyst: Meilin C. Pierce Spring Recommendation: Hold Target Stock Price (12/31/2016): $120

TasNetworks Transformation Roadmap 2025

North South Corridor. TradeMark Southern Africa. Delivering an integrated and sustainable transport network Regional Transport Roundtable

URANIUM MINING IN MALAWI BY PATRICK MEDIUS NYIRENDA ENVIRONMENTAL AFFAIRS DEPARTMENT, MINISTRY OF NATURAL RESOURCES, ENERGY AND MINING, MALAWI

4. PROFILE ON GRANITE CUTTING

Guangdong Provincial Green Freight Demonstration Project by Grant of GEF

STRENGTHENING YOUR PORT S FINANCIAL STABILITY THROUGH DIVERSIFICATION

ZAMBIA SUGAR SITE VISIT. October 2015

Transcription:

BRIEFING NOTES ON TAZAMA OPERATIONS Page 1

1.0 BACKGROUND TAZAMA Pipelines was incorporated in 1968 and is owned by the government of the Republic of Zambia, with two thirds of the share capital and the government of the United Republic of Tanzania which holds one third of the share capital. The two owner governments formed TAZAMA Pipelines Limited as a private company for the purpose of transporting crude oil or its petroleum products cheaply from the port of Dar-es-salaam into land locked Zambia. The main purpose of forming the company was to ensure that the people of Zambia and their economy did not endure high fuel prices as a consequence of Zambia being land locked. To this effect the two governments negotiated between them a pipeline convention which to this day still regulates on operations of the pipeline including such matters as tax status, way leave easements and ownership, shareholding, market share and many other rights and privileges. 2.0 PROFILE ON COMPANY OPERATIONS TAZAMA Pipelines Limited owns and operates a Petroleum Crude Oil Pipeline, that runs from Dar-es-salaam in Tanzania to the INDENI Refinery at Ndola in Zambia. The pipeline runs for a distance of 1710 kilometers and comprises 954 kilometers of 8 inch diameter pipelines and 798 kilometers of 12 inch diameter pipelines and has an installed annual transportation capacity of 1.1 million metric tons. From the port of Dar-es-Salaam the pipeline follows the highway to Zambia and passes through the Mikumi National Park, then up the escarpments of Iringa and Mbeya before crossing into Zambia at Nakonde. In Zambia it continues through the plateaus of Chinsali and Serenje and then onwards through Mkushi before finally Page 2

reaching the INDENI Refinery in Ndola. Currently the optimum operating capacity is 700,000 metric tons per annum. The pipeline has been de-rated pending completion of the Rehabilitation programme. The programme was halted in the year 2000 as a result of the withdrawal of financiers, the World Bank. The company also operates a tank farm facility situated at Kigamboni in Dar-es-salaam comprising six tanks with a holding capacity of 231,000 cubic meters (190,000 metric tons). Pumping is achieved through seven pumping stations, five of which are in Tanzania and two in Zambia. In order to further explain the situation in the company historical and current trends are given here: 2.1 Historical Trends For a long time since the company s inception in 1968, the pumping fees paid for services rendered had been kept low in line with the pipeline convention in order to keep petroleum products affordable to the Zambian consumers. As a consequence, the revenues the company received remained too low to fully support the requisite preventive maintenance programs needed to keep the pipeline at internationally acceptable standards of operational condition. As a result of this, the first pipeline leak occurred hardly five years after pipeline inception (in 1973) and by 1983 over 100 leaks were being recorded and repaired annually. Other support equipment including crude oil storage tanks, pumps, telecommunications etc. faired equally badly and consequently need arose for a comprehensive rehabilitation program to bring the pipeline to internationally acceptable standards of operation. The rehabilitation program started in 1986 and in view of the huge capital requirement it was Page 3

carried out in four phases. Although the last phase was not completed due to cancellation of the credit by the World Bank, the program was generally successful as a big part of the infrastructure was renewed. In the meantime operations had remained smooth until May 1999 when the INDENI Refinery was gutted by fire. 2.2 Current Status In recent years the company had enjoyed profitability, after resumption of operations at the Refinery and stabilization of arrangements for feedstock supply. Further, government appointed TAZAMA as their agent in the coordination of crude oil movement from load port to Dar-es- Salaam Port, refining and sale of products to Oil marketing Companies at the Ndola Fuel Terminal. The Agency Fee (though recently reduced from US$15.00 to US$5.00 per MT) has helped a lot in improving the financial situation of the company. Currently, the National fuel demand is estimated at 1,200,000 metric tons and is growing rapidly as new mines are established in the country. As a consequence, the pipeline throughput is expected to rise to over 1.1 million metric tons per year. Such an increase will impact favourably on the financial standing of the company while taxing the ability of the equipment to cope with such demand. The pipeline has been de-rated and its optimum capacity capped at 700,000 metric tons per annum. This available capacity is falling behind the National demand and projected export potential. In terms of capacity, last financial year ending 31 st December 2015, the pipeline delivered 613,074 metric tons of feedstock to the Refinery and the balance on Page 4

the demand of 600,000 MT of products was met through imports The intelligent pigging exercise of the pipeline carried out in 2013 exposed weaknesses in the pipeline. These have all been repaired, and the exercise has greatly reduced the number of leaks along the pipeline. Meanwhile, a fully rehabilitated pipeline remains the most viable and cost effective means of transporting petroleum feedstock and/or products into Zambia. In terms of costs, the pipeline charges US$54 per metric ton delivered into Zambia and this is far less compared to over US$150 per metric ton charged by road transporters and US$100 per metric ton charged by rail transportation. As for road transportation the charge does not include the serious damage to the road network caused by the huge trucks involved in the exercise. 2.3 Current Bottlenecks As at present, the company is facing the following problems which need to be solved: 2.3.1 Reliability of INDENI Operations For some time, INDENI Refinery had experienced constant breakdowns which forced TAZAMA to go on long shutdowns as well, though the situation has slightly improved of late. 2.3.2 Long Term Loans The company has long term loans with the World Bank, the European Bank and the African Page 5

Development Bank. The Government has since moved to convert these to equity. What remains is for Cabinet to adopt the recommendations. 2.3.3 Pipeline Vandalism 3.0 REHABILITATION PROJECTS Tazama has experienced several incidences of vandalism on it infrastructure. All the vandalism on the pipeline has been occurring on Tanzania side. Management has engaged the authorities in Tanzania for assistance to curb the situation. The Government of Tanzania has taken very radical steps to curb this vice and consequently vandalism on the pipeline has completely stopped. 3.1 Main Engines Replacement Project: The pumping units used to pump crude oil to Zambia are the same ones installed at the company s inception in 1968. They are now too old to continue providing a reliable service coupled with the fact that their spares have become very difficult to find. In view of this, management has embarked on an exercise to replace all the 28 units (4 per station). The project is being phased to tackle one station at a time in view of the high costs involved. (US$5.5 million per station). Two pump stations (Kigamboni and Elphons Pass in Tanzania) has been completed and work on the third station (Chinsali in Zambia) is in progress. Page 6

3.2 Pipeline Repairs: Management is carrying out phased pipeline repairs in order to enhance the integrity of the pipeline as well as improve the capacity. The intelligent pigging exercise was carried out in 2013 in order to establish the extent of corrosion in the pipeline which has lead to define a scope of work needed to be done on the pipeline to enhance reliability and reduce losses due to leaks. Based on the intelligent pigging results all weak areas which metal losses is above 60% have been sleeved and replaced. These repair works have greatly reduce losses due to leakages and improved our pumping rate from 100m³/hr to 115m³/hr i.e 800,00 MT per year. 3.3 Tank Repairs In order to ensure that there is always enough storage capacity at the Tank Farm, tanks are routinely rehabilitated and maintained. Management recently completed repairs on Tank 4 which had leaks on both roof and bottom plates at a cost of USD 2,995,515.90. 3.4 Dar es Salaam Port Facilities 3.4.1 Single Point Mooring This facility belongs to Tanzania Ports Authority (TPA) and is used for offloading vessels of 60,000 to 120,000MT capacity. The facility has recently been upgraded and is operating well. Page 7

3.4.2 Kurasini Oil Jet This facility also belongs to Tanzania Ports Authority (TPA) and is operational. 4.0 Management of the Strategic Fuel Depots Government appointed TAZAMA Pipeline Limited management to take over the management of the Ndola Fuel Terminal with effect from 1 st January 2007. This was done and to date operations of the Terminal are going on smoothly. Government has extended this appointment to the management of Lusaka Fuel Depot, Mpika Fuel Depot, Solwezi Fuel Depot and Mongu Fuel Depot. 5.0 Manpower and Training Currently the company has 392 employees out of whom 181 are Zambians and 211 are Tanzanians. The approved establishment stands at 410. In addition, the company employs 303 staff at the Ndola Fuel Terminal, Lusaka, Mpika, Solwezi and Mongu Fuel Depots bringing the overall manpower strength to 695. The company continues to enjoy cordial industrial relations with the two unions representing the workers in the two countries. Currently, with slightly improved cash flows management is working out a vigorous training Schedule to train personnel in key departments of the Company in line with the existing Training Policy. Page 8

6.0 AREAS OF FURTHER COOPERATION 6.1 New Petroleum Products Pipeline The consumption of Petroleum products in the Southern part of Tanzania has increased tremendously. The main consumption center of Morogoro, Iringa, Makambako, Songea, Mbeya and Sumbawanga are all supplied by road Tankers. Malawi is also supplied through Mbeya. A products pipeline with depots at Morogoro, Makambako and Mbeya would greatly reduce the number of road tankers and save the road infrastructure while providing a cheaper and more efficient transportation means of the Petroleum products. This pipeline can also be extended to the existing Mpika depot and Ndola fuel Terminal. All this can be done using the existing Right of Way and the Legal mandate of Tazama. This will lower the landed cost of petroleum products at these centers. The new pipeline will supply products, Diesel and Petrol especially, to Southern Tanzania, Malawi, Zambia and Congo. This will make the project technically feasible and financially viable. 6.2 Natural Gas Pipeline Tanzania has discovered huge deposits of Natural Gas off its coast. Zambia can use this Gas for Power Generation, Fertilizer Production and other industries. The Tazama proposal is the setting up of a Combined Cycle Gas Fired Power Plant at Chinsali, the provincial headquarters of Muchinga province. With the discoveries of huge reserves of Gas off the coast of Tanzania, supply of Gas is guaranteed. Page 9

The Power Generation plant will be supplied with Natural Gas from the Port of Dar es Salaam via a 36 pipeline. This pipeline will be laid alongside the crude oil pipeline in the existing Tazama wayleave. The Natural Gas pipeline will be within the existing Tazama Legal mandate to transport the gas to main consumption centers between Dar Es Salaam and Ndola. The length of the Line will be 1100km and maybe branched off at some points to supply other needy centers such as Morogoro, Iringa and Mbeya Domestic consumption can be encouraged to reduce usage of Charcaol. This project will generate jobs during construction and during operation. Further jobs will be generated in the offshoot industries such as fertilizer, petrochemical and plastic manufacturing. Management is in the process of obtaining a unified Government position on the two projects through the Board. As soon as the necessary approvals are obtained, Feasibility Studies will be conducted to ascertain their financial viability. ********** Page 10