Best Management Practice (BMP) Guidance Manual

Similar documents
Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

The Good, The Bad, and The Ugly

City of Bozeman. Construction Site Management Program

PART 1 GENERAL REQUIREMENTS

APPENDIX C DURING CONSTRUCTION BMP TABLES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Storm Drain Inlet Protection

Diversion Dikes. Fe=0.95

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

SECTION 903 EROSION CONTROL

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

SECTION EROSION AND SEDIMENTATION CONTROLS

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Erosion Control State Standards Sampling of Material Innovations

CITY OF FARGO SPECIFICATIONS EROSION AND SEDIMENT CONTROL

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Planning & Building Department. Requirements for Erosion and Sediment Control

Block or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff.

CITY UTILITIES DESIGN STANDARDS MANUAL

Kristin Kerr EOA, Inc. Construction Inspection Workshop February 1, 2017

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

KDOT TEMPORARY EROSION - CONTROL MANUAL

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Erosion & Sedimentation Control Policy

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

CCI107 ONLINE PROGRAM. Stormwater Management. Stormwater Management for Construction Activities Alberta. Market Type: Construction Level: 1

Storm Drain Inlet Protection for Construction Sites (1060)

Construction Inspection Checklists

C. This project shall be designed to meet LEED Silver design criteria. Construction activity pollution prevention is a mandatory requirement.

Modular Sediment Barriers (Instream)

CITY OF RAPID CITY STORMWATER QUALITY MANUAL 2009 EDITION

Section Soil Erosion Protection Tender No. [ ] Page 1

Alternative BMPs for Erosion Prevention & Sediment Control

Town of Fortville Utility Street Standards

Installation and Maintenance of Erosion Control BMPs

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

SITE DESIGN ENGINEER'S STATEMENT:

Stormwater Management and Sediment and Erosion Control Plan Review Checklist for Design Professionals

Standard Erosion Control Plan

Erosion Control for Home Builders

TEMPORARY SEDIMENT TRAP CODE

Chapter 12 Erosion and Sediment Control

Richland County Department of Public Works Engineering (Land Development) Division

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

SECTION EROSION AND SEDIMENTATION CONTROL

Design and Implementing Temporary Erosion Prevention BMPs

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

Erosion and Sediment Control Plan for a Timber Harvesting Operation

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Filter Tube Barriers (Instream)

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

The Next Generation of Storm Water Treatment Technology

General Permit No.: OHR Page 53 of 146

Constructing a Better Future for Kentucky s Environment AND SEDIMENT CONTROL EROSION PREVENTION KENTUCKY. Field Guide

Builder s enviro guide

EROSION AND SEDIMENT CONTROL

Constructed Wetland Use in Nonpoint Source Control

Water Pollution Control for Work in Sensitive Areas

Nevada Contractors Field Guide for Construction Site BMPs

CONSTRUCTION EROSION AND SEDIMENT CONTROL PLAN APPLICANT PACKAGE

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

Erosion and Sediment Control

BMP 6.4.4: Infiltration Trench

SECTION 806 WATER COURSE AND SLOPE EROSION PROTECTION

At least 2 feet above the seasonal high water table Overflow path or structure provided

Homeowners Guide for Flood, Debris, and Erosion Control after Fires

GRASS-LINED CHANNEL (acre) CODE 840

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS

Concrete Waste Management

STREAM STABILIZATION PLAN

4.8. Subsurface Infiltration

BMP #: Infiltration Basin

APPENDIX H. Stabilization Measure Fact Sheets

EROSION AND SEDIMENT CONTROL PLAN (ESCP) FOR PROJECT TITLE

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

11 Ways to Avoid Storm Water Fines. No Exceptions!

SECTION STORM WATER MANAGEMENT CONSTRUCTION STANDARD PART 1: GENERAL Scope of Standard

JEFFERSON COUNTY STORM WATER MANAGEMENT

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

16.0 Water Quality Management Criteria for Developed Land

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL South Terminal C Phase 1 (WS110) Item P-156

WYOMING DEPARTMENT OF TRANSPORTATION. Pollution Controls and Best Management Practices for Storm Water During Construction FIELD GUIDE

4.8. Subsurface Infiltration

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 836 SEEDING AND EROSION CONTROL WITH TURF REINFORCING MAT January 18, 2013

Training on Roads for Water and Resilience

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

1.1.2 NOI & NOT Notice of Intent and Notice of Termination for TPDES permits TPDES Texas Pollutant Discharge Elimination System

CITY OF MIDDLETOWN, OHIO EROSION AND SEDIMENT CONTROL RULES & REGULATIONS

EROSION PREVENTION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL

Chapter 5 Hydraulic Structures

Temporary Watercourse Crossing: Culverts

Transcription:

Best Management Practice (BMP) Guidance Manual INTRODUCTION BMP examples in this guide provide ways to meet erosion and sediment control requirements. Best Management Practices are not limited to these examples; many other BMPs are acceptable. Reference tools at the end of the guide and manufacturer information to ensure BMPs are selected and installed properly. Sediment Control BMPs SILT FENCE Silt fence is generally used as perimeter control to keep sediment on site. A silt fence slows runoff allowing water to flow through while filtering out sediment. Silt fence is made of geotextile fabric and is machine sliced or trenched into the ground 8 to 12 inches, leaving 2 feet of fabric above ground. The trench is filled and soil compacted next to the fabric. Steel or wooden posts are attached to the fabric located on the downstream side of water flow. Posts must be at least 5 feet long, embedded 2 feet into the ground, and secured with three zip ties in the upper 8 inches of fabric. STRAW BIOROLL (Straw Wattle) Straw biorolls can be used for perimeter control, ditch checks, and inlet protections. Straw biorolls slow runoff velocities allowing sediment to settle out and remain on site. The straw is encased in a netting with a minimum 6 inch diameter. The bioroll must be slightly trenched into the ground and secured by wood stakes. The stakes should be driven through the back half of the log at a 45 degree angle with the top of the stake pointing upstream. Stakes are spaced one foot apart. When more than one log is used, overlap the ends 6 inches. The end sections of the log should be curled upslope or J-hooked to keep sediment on site. 1

WOOD FIBER BIOROLL Wood fiber biorolls can be used for perimeter control, ditch checks and inlet protections. They slow runoff velocities to filter sediment, and are more effective filters in high flow areas than straw. The wood fibers are encased in a netting with a minimum 6 inch diameter. The bioroll binds to flat soil and may not have to be trenched in. Wood stakes shall be driven through the back half of the log at a 45 degree angle with the top of the stake pointing upstream. Stakes are placed every foot. When more than one log is used, overlap ends about 6. The end sections of the log should be curled upslope or J hooked to keep sediment on site. COMPOST LOG Compost logs can be used for perimeter control, ditch checks, and inlet protections. Compost logs slow water velocity and filter runoff. The logs are made from a geotextile tube filled with shredded mulch or woodchips. They are easy to install and multiple logs should overlap about 6 inches so there are no gaps; no stakes are required. These logs are easily reused. Logs should form a smile shape to keep sediment on site. ROCK LOG Rock logs can be used for perimeter control, ditch checks, and inlet protections. Rock logs slow water velocity and filter sediment. Typically used on paved surfaces, rock logs are installed by overlapping edges about 6 creating a smile shape. Due to their weight, rock logs are more difficult handle. However, if not damaged they can be reused multiple times. BERMS Berms are an effective perimeter control device as an alternative to other practices and a good reusable option. They are often used as a secondary BMP. Berms slow water velocity and allow for sediments to settle out on site. Berms can also be used to redirect water. Berms can be made from shredded wood mulch, rock or compacted stabilized soil. To be effective, berms must be at least 1 foot tall and 2.5 feet wide. Berm material must be maintained and reapplied as necessary. 2

INLET PROTECTIONS maintenance ease, safety, and effectiveness. Inlet protections protect storm drain inlets by filtering out sediment while allowing water to pass through. Some sit on top of the inlet or surround the inlet, while others are inside the inlet. Inlet protections come in many varieties such as prefabricated protections, various logs, and bags. When choosing your inlet protection, it is important to know one size does not fit all. Different protections are designed for different inlets. When choosing your inlet protection c o n s i d e r i n s t a l l a t i o n a n d Install inlet protections to specifications provided and be sure there are no gaps, rips, or holes allowing water to be unfiltered. Inlet protections must be cleaned when 1/2 full of sediment. They must have an emergency overflow. ENTRANCE BMPS Entrance BMPs are used to limit the tracking of sediment from vehicle and equipment traffic onto paved surfaces and can act as perimeter controls. The most common is a rock entrance. Rock entrances must be at least 50 feet long, 20 feet wide, have a filter fabric underliner, and be 6 inches thick with 1.5 to 3 inches of clean rock. Other prefabricated BMPs exist such as tracking pads and mats. Other BMPs like mulch or different aggregates may be used. Be creative and reuse products available (e.g. slash mulch from clearing & grubbing). Maintenance must occur as the BMP becomes ineffective or full of sediment. BUFFERS Grass buffers or existing vegetation around the perimeter and throughout the site can provide effective, inexpensive sediment control. Buffers should always be left when possible and utilized in conjunction with other sediment control BMPs. 3

Erosion Control BMPs MULCH Straw mulch is primarily used as temporary stabilization. It can also be used to establish permanent vegetation after seeding occurs. Mulch holds soil in place to reduce erosion. Temporary mulch can be placed on soils not ready for permanent seeding, and on exposed soils outside of seeding dates to meet temporary stabilization requirements. There are two main types of mulch products: 1) straw or hay material; 2) wood material. Straw mulch should be applied evenly with 90% coverage (about 2 tons/ acre). Disc anchoring straw mulch will help hold it in place. Wood mulch can be produced on site from clearing and grubbing material and used to cover soils. EROSION CONTROL BLANKETS Erosion control blankets are commonly used where mulch is not appropriate including steeper slopes, and concentrated flow areas like ditch bottoms and narrow areas. Blanket can be used as a stand alone product to hold soil in place temporarily. It is most commonly used to reduce erosion until vegetation is established. Erosion blankets can be made of straw, wood, or coconut fibers held together by netting or net less. There are many categories of blankets, each corresponding to different site conditions. Slope, length of time in place, and flow velocity dictate what type is used. When installing blanket, the underlying soil should be smooth so the blanket can lay flat. Blanket should be laid parallel to the direction of water flow with the netting on top. Blanket must be stapled down appropriately with adjacent blankets overlapping at least 4 inches. Following the manufacturer s recommendations is critical. HYDRAULIC SOIL STABILIZERS Hydraulic soil stabilizers are hydraulically applied tackifiers (glues), or mulch material with a tackifier. These products are used for temporary soil stabilization or for erosion control to establish permanent vegetation. Typical uses are in areas with limited access, steep slopes, and stockpiles; not to be used in concentrated flow areas. There are three types of tackifiers and five types of hydraulic matrix, all can be used with or without seed: 1) Natural tackifier; 2) Synthetic tackifier; 3)Polyacrylamide; 4)Hydraulic compost; 5) Hydraulic mulch; 6) Stabilized Fiber matrix; 7) Bonded Fiber matrix; 8)Fiber Reinforced matrix. Refer to the pocketbook guide listed on page 8 for more details on these products. 4

TEMPORARY COVERING Temporary cover BMPs are used to meet stockpile or slope stabilization requirements. Instead of using silt fence, mulch, or vegetation, a tarp can be pulled over a stockpile and anchored down. Geotextile or burlap are also great materials for temporary stabilization on slopes or piles. Temporary covering is also a great BMP for challenging slopes until they are ready for final stabilization. DITCH CHECKS Ditch checks are used to slow water runoff velocities in a ditch or on steep slopes for reducing erosion. Ditch checks also trap sediment reducing stress on the final sediment BMP. Common ditch checks are similar to sediment control products and installed in a similar manner: 1) silt fence; 2) straw bioroll; 3) wood bioroll; 4) compost & rock logs; 5) rock check dams. TEMPORARY DIVERSIONS Diversion BMPs such as extenders can direct runoff from roof gutters to paved or grassed areas until vegetation is established, reducing erosion potential. Temporary down drains can also be used to carry water down an unvegetated slope. EROSION STABILIZATION MATS (Turf Reinforcement Mats) These mats are designed to reinforce vegetation, withstanding higher velocity flows than erosion control blankets. They can be used as an alternative to riprap. There are 5 classes of mats based on strength. Mats are composed of non-degradable synthetic fibers, filaments, netting, and wire mesh. 5

Other Important BMPs CONCRETE/WASTE WASHOUT Concrete and other waste materials must be disposed of in compliance with MN Pollution Control Agency regulations. These wastes must not cause contamination of the ground or surface waters prior to disposal. Liquids and slurry can be contained using compacted impermeable soils, impermeable plastics, or containers. Washout areas must be marked with a sign and should be located on flat surfaces, away from waterways and stormdrains, not in boulevards, and not on paved surfaces. DEWATERING TECHNIQUES Pumping and discharging water is a common occurrence during construction projects. Sediment is the main concern when dewatering, however, if other pollutants exist, alternative BMPs must be applied. Discharge water must not cause a nuisance in the receiving water and cannot create erosion. BMPs to consider include: 1)Temporary pond; 2) Grass buffer; 3)Filtering with rock or wood chips; 4)Dewatering dumpster; 5)Floating pumps; 6) Dewatering bag; 7) Flocculent - material used to bind and settle out sediment. Multiple treatment methods may be needed depending on dirtiness & amount of water, and where it is being discharged. Discharges must be monitored to ensure BMPs are working properly. General rule: If you cannot see your hand through a clear sample bottle with the water inside, additional treatment is required. More BMP Examples Rock sediment traps used to capture sediment and debris prior to the inlet protection. Stockpile hydro mulched with rock log protecting it Temporary sediment basin with rock berm and grass buffer. Used to capture sediment and filter runoff prior to discharging to a wetland during a mass grading project. 6

Wood mulch used as erosion control BMP on a haul road with a rock ditch check; geotextile slope BMP. Rock used as entrance BMP, perimeter control and sediment trap all in one. Small scale concrete washout BMP; a small depression with plastic liner. Must make sure not to overflow. Spill kit must be readily available on-site Bioroll used as ditch check with blanket for erosion control until vegetation is established; silt fence perimeter BMP. Inlet protection with sediment trap Plastic swimming pool used as secondary containment. One strip of blanket used on flat slope as perimeter control until vegetation establishes. 7

Winter BMPs Erosion and sediment control BMPs are required during winter construction; snowmelt is considered stormwater runoff and is required to be treated. To prevent pollutants from leaving the construction site during the winter season, it is recommended that the following are considered: Stop land disturbing activities until warm weather returns. Sequence work so land disturbing activities occur prior to freeze. Stabilize all exposed soil surfaces with vegetation, mulch, blankets, or other BMPs before the ground freezes. Remember, the City requires that all soils be stabilized if no land disturbing activity has occurred for 14 days, this includes the winter. Maintain construction entrance BMPs to limit tracking during snow melts. If new land disturbing activities occur, proper BMPs must be installed. See the Erosion and Sediment Control Pocket Guidebook for details on installing winter BMPs. Inlet protections may be removed after freeze as appropriate because they can pose problems in the winter (flooding, damage by plows). These BMPs must be installed prior to runoff and melting events. They may need to be installed/ removed daily, depending on the weather. Perimeter control devices may need to be moved or enhanced to avoid winter damage. Links For Additional Information Erosion and Sediment Control Pocketbook Guide (2013) - This is a useful reference about BMP types and installation. It can be downloaded or purchased.* www.erosion.umn.edu/ Mn/DOT Standard Specifications for Construction - Sections 3835-3973 contain most of the erosion/ sediment control and stormwater information, will assist with understanding products and installation www.dot.state.mn.us/pre-letting/spec/ Mn/DOT Approved/Qualified Product list - Erosion Control and Landscaping section provides quality BMP product examples. www.dot.state.mn.us/products/index.html# MN Pollution Control Agency - Construction Stormwater - Lots of good BMP guidance and information. www.pca.state.mn.us/water/stormwater/stormwater-c.html City of St. Cloud - Construction Stormwater - More BMP guidance, City ordinance and permit information. www.ci.stcloud.mn.us/index.aspx?nid=339 * Source used as a reference for this guide 8