The Capacity Development Project for Non Revenue Water Reduction in Jordan Summary Sheet for Result of Evaluation Study after the Project

Similar documents
Summary of Evaluation Results

Summary of Terminal Evaluation Results

Summary of the Mid-term Review

Summary of Terminal Evaluation

JICA s Cooperation for Water Sector in Jordan

1. Project Description

I. Project Outline. Background. Objectives of the Project. Activities of the project

Ex-Ante Evaluation (for Japanese ODA Loan)

Malaysia Needs of Industries in Malaysia. I. Project Outline

Summary Sheet for Terminal Evaluation

1. Outline of the Project Country:Ethiopia. Project title:the Capacity Development Issue/Sector:Transport. Project on Bridge Management (R/D):

Water loss in Mafraq Governorate, Jordan

Overview of Terminal Evaluation Study Results

Summary of the Joint Terminal Evaluation

Cattle Improvement Project Fields: Agricultural/Rural development- Agricultural Development

Experience and Strategy of the City of Yokohama Capabilities & Achievements of Yokohama Waterworks Bureau

Hitachi Research Institute Report Work Style Innovation Improving Added Value Hisato Kessoku, Associate Senior Researcher, 2nd Research Department

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

(1) Current State and Issues of the Electricity Sector in Indonesia

Water, Wastewater and Stormwater 2017 Budget 2018 Plan

The Evaluation Study on the Japan Overseas Cooperation Volunteers (JOCV) Program. Final Report (Summary)

TECHNICAL REPORT. Training Course on. Climate-smart Rainfed Agriculture for Dry Areas

Summary of Terminal Evaluation

Recommendation concerning Human Resources Development: Education, Training and Lifelong Learning

Policy and Strategy for Capacity Development in the Water Sector

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary:

Fujitsu Group s Green Logistics

JICA s Mid-term Plan/Annual Plan for Fiscal 2013

South Korea s 10th Long-term Natural Gas Supply/Demand Plan (Summary)

Provision of Excellent Water and High-Quality Service

1. Project Description. Wells Pump Stations along the Tora River

Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi

Japanese ODA Loan. Ex-Ante Evaluation

Chapter II. Statistical Organization

National Energy Efficiency Strategy

Palestinian Central Bureau of Statistics

Current Status of Economic Statistics in Cambodia

External Monitoring Consultant: Eiko Nakamoto / Toyo Tanaka, Nakamoto&Associates Co., Ltd. Irrigation Water Reservoir (Fernana)

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Thailand Greenhouse Gas Management Organization (TGO) Under the Ministry of Natural Resources and Environment the Royal Thai Government

Summary of Terminal Evaluation

National Water Demand Management Policy

JICA s Experience of Technology Transfer

JICA s Mid-term Plan/Annual Plan

Ex-Ante Evaluation (for Japanese ODA Loan)

CONSULTING SERVICES : SEWERAGE SYSTEM IMPROVEMENT FOR GREATER TIRANA. 6/8/2012 Address: Rruga Dora D Istria 2/1, Apt 4/13, Tirane, Albania

VACANCY ANNOUNCEMENT

World Bank Group Directive

Human Resources Development and Training

Ex-Ante Evaluation (for Japanese ODA Loan)

Ivanka Mihailova -National ECVET team Coordinator, HRDC Evgenia Pekaj - National ECVET Expert, Managing Partner, "Epsilon HR Penka Nikolova -

Case Study for the 2006 HDR PRIVATE VERSUS PUBLIC IN WATER PROVISION: ENCOURAGING CASE OF SRI LANKA

PwC Consulting Co., Ltd.

ZENDESK, INC. COMPENSATION COMMITTEE CHARTER. Effective August 1, 2017

Reform in China s Electric Power Industry. - A Case Study of East China s Wholesale Electric Power Market -

Ex-ante Evaluation - 1 -

CEEP OPINION ON GENDER EQUALITY PROGRESSING TO 2020

TOTAL COMPENSATION POLICY STATEMENT APPLICABILITY GENERAL PROVISION

Census of Economic Establishments in Ethiopia

Telecommunication Expansion Project (II)

Japan with colleague. Upon successful completion, following outputs are expected; (1) To understand the purification plants and purified water process

Ministry of Regional Development and Infrastructure of Georgia United Water Supply Company of Georgia

Ex-Ante Evaluation (for Japanese ODA Loan)

Survey of Big Data Use and Innovation in Japanese Manufacturing Firms

FY2015 Ex-Post Evaluation of Technical Cooperation Project The Project of the African Institute for Capacity Development Phase II and Phase III

Ex-ante Project Evaluation

JAPAN. 1. Research organisations

[6] Human Resources Development

Working Together for a

14. Sewerage / Urban Drainage Sub-sector. Guideline:

Seminar on Evaluation Study of Japanese ODA for Vietnam. Report March. Commissioned by the Ministry of Foreign Affairs of Japan

Experiences and lessons learned from JICA s activities to support mitigation actions in developing countries

1. Project Description. 1.1 Background

Ex-Post Monitoring for Completed ODA Loan Projects

Payroll Policy. Purpose of Policy. The policy is to cover the administration of the payroll service. Overview

Ex-Post Evaluation of Japanese Grant Aid Project Project for Rehabilitation of Gresik Steam Power Plant Units 3 and 4

Capacity Assessment and Monitoring in CD Support Projects in Solid Waste Management Sector

Consultancy Opportunity Training Module Development Location: Kathmandu, Nepal preferred; Alternative locations considered for working remotely

OA PERFORMANCE ASSESSMENT QUESTIONS

6. Vision 3: Leading the Japanese economy forward as a high value-added industry"

Informal Apprenticeship Training in Ghana

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

PPP IN INFRASTRUCTURE RESOURCE CENTER

Minipe and Nagadeepa Irrigation Rehabilitation Project

EMPLOYMENT EQUITY POLICY REGULATIONS

PL Control of Seveso II accidents

WAC Programme Key Areas

Audit of the Office of the Correctional Investigator. A report by the Public Service Commission of Canada

Public Sector Executive Compensation Report School District No. (36)

Organizational Assessment Guide Appendix A Model Text: Terms of Reference

Key Design Principles for Community Water and Sanitation Services

COVENANT OF MAYORS WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS WHEREAS WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS, WHEREAS WHEREAS,

Introduction of Water Quality Control Department

RULES OF THE DEPARTMENT OF MANAGEMENT SERVICES PERSONNEL MANAGEMENT SYSTEM CHAPTER 60L-33 APPOINTMENTS AND STATUS

Section III. Employment

Palestinian Water Sector Capacity Building

Bottleneck Vacancies in Germany

Japanese ODA Loan. Ex-Ante evaluation

Human Oriented Productivity Program (HOPP) in Poland : The Meaningful First Five Years of

INTUIT INC. CORPORATE GOVERNANCE PRINCIPLES FOR THE BOARD OF DIRECTORS as amended July 20, 2017

Transcription:

The Capacity Development Project for Non Revenue Water Reduction in Jordan Summary Sheet for Result of Evaluation Study after the Project I. Outline of the Project Country: The Hashemite Kingdom of Jordan Issue/Sector: Water and sewage Division in charge: Water Resources Management Team 2, Group 3, Global Environment Department Project title: The Capacity Development Project for Non-Revenue Water Reduction in Jordan Cooperation scheme: Technical cooperation Total cost (including the cost up to the project termination estimated at the time of evaluation): 480M yen Period of Cooperation (R/D): 2005/06/15 2005/08/01-2008/07/31 Partner Country s Implementing Organization: Project Management Organization: Ministry of Water and Irrigation (MoWI) Project Implementation Organization: Water Authority of Jordan (WAJ) Cooperation Organization in Japan: Ministry of Health, Labour and Welfare Related Cooperation Project: Individual Project (Long-term Experts) Water Resource Advisor 1-1. Background of the Project The annual precipitation in the Hashemite Kingdom of Jordan (hereinafter called Jordan) is less than 100 mm in over 80% of its land and the population has been increasing every year (increased by 500,000 from 2004 to 2005). To address the issues of water shortage and increasing water demand, the country has adopted water rationing. Despite such situation, the rate of Non-Revenue Water (NRW) of the Water Authority of Jordan (WAJ) is over 50% as of 2002 and its accumulated deficit has reached 723.98 million JD (as of 2003), which is as much as 10% of the country s GDP. Realizing the importance of the problem, WAJ tried to take necessary measures but was not able to take adequate measures due to the insufficient number and low technical level of the personnel who were addressing the issue of non-revenue water. Considering the urgency of the problem and the increasing importance of the human resource development to address the problem, the government of Jordan requested a comprehensive technical cooperation project from JICA, who had been supporting the country in dealing with the issue of non-revenue water through technical transfer from long-term experts. In response to the request, the Project was started in August 2005 and midterm evaluation was carried out in January 2007. Terminal evaluation was conducted 6 months before the planned termination of the Project. 1-2. Project Overview

(1) Overall Goal NRW of WAJ is reduced (2) Project Purpose Capacity Development of WAJ on NRW reduction measures. (3) Outputs 1. The Preparation for the formulation of the Project is completed 2. WAJ Engineers and Technicians acquire essential concept and technology for NRW reduction 3. WAJ senior personnel and Engineers acquire the implementation capacity of internal training courses on NRW reduction. 4. WAJ Engineers and Technicians acquire the practical technology on NRW reduction through field work in pilot areas. 5. WAJ strengthens public awareness activity on NRW countermeasures. (4) Inputs Japanese side: Short-term Expert 8 persons, 74.19 man-months Equipment 54,338 (thousand) Yen Trainees received 24 persons Local cost 35,887 (thousand) Yen Jordan s Side: Counterpart: 19 persons Land and Facilities: Local Cost: 160, 223 Jordanian Dinar (about 26,710K yen) II. Evaluation Team Members of (Job title: Name, Occupation) Evaluation Leader of Japanese Team: Mr. Kazuo Sudo Team Senior Advisor, Global Environment Department, Japan International Cooperation Agency Non-Revenue Water Reduction: Mr. Shozo Yamazaki Advisor, Ductile Iron Pipe Division, Kubota Co, Ltd. Cooperation Planning: Mr. Terumasa Matsuzaki Water Resources Management Team 2, Group 3, Global Environment Department, Japan International Cooperation Agency Evaluation and Analysis: Ms. Yoshie Yamamoto Researcher, Social Development Department, Global Link Management Period of 2008/01/12-2008/02/01 Type of Evaluation: Terminal Evaluation

III. Results of Evaluation 3-1. Project Performance (1) Project Purpose Overall Evaluation: A It is confirmed that budget for NRW reduction measures will increase, starting with allocation of budget for NRW reduction measures to 5 Governorates in 2009. Reference values for project operation indicators will be set by the end of January 2008. Improvement of the organizational capability is confirmed based on the followings. a) Each governorate is now able to conduct issue analysis and formulate an action plan and budget. b) Roles of the NRW department of each governorate have expanded and necessary human resources have been assigned. c) Engineers and technicians have been trained to have essential technologies concerning NRW. d) Training materials for NRW measures have been developed and training of trainers has been conducted. As a result, their capability to conduct internal training has improved. (2) Outputs Output 1 Overall Evaluation: A Output 1 is about formulation of PO and other documents, which was carried out before other Outputs. Output 2 Overall Evaluation: B The numbers of engineers and technicians who have mastered essential technologies are 11 and 27 respectively, exceeding the targeted numbers of 10 and 25. 90% of the engineers who have accomplished training have become trainers and the percentage also greatly exceeded the target value of 50%. On the other hand, the implementation of the final achievement test for technicians is delayed although the outline and the contents have been prepared. The operation and management system (proposal) has not been clearly defined. It has just started and is expected to be completed by the time of the project termination. Output 3 Overall Evaluation: A 6 people have been qualified as trainers as planned. Development of training materials has also been almost completed. The curriculum for the basic level has been completed and implemented. Output 4 Overall Evaluation: A Although there were delays in budget formulation and facility construction in some areas, the amount of NRW has reduced to half in 7 areas. Water distribution control area maps in non-pilot areas have been developed in all 9 areas of 5 governorates except Ma an governorate, where the position of the engineer is vacant. Output 5 Overall Evaluation: A Despite low experts input, significant results have been achieved through public awareness activities

because they are easily accepted in the local areas with the use of a local NGO, the Jordan Aqua Conservation Association (JACA). 3-2. Summary of Evaluation Results (1) Relevance Overall Evaluation: A Considering the fact that the country is suffering from water shortage, there is no doubt that NRW reduction is an urgent task, as the National Agenda 2006-2015 states that the country will reduce the rate of NRW from the current 46% to 30% by 2012 and 20% by 2017. The target group is WAJ personnel. The Project met the needs to improve the technical level of WAJ engineers and technicians engaged in the improvement and dissemination of NRW measures. The Project is relevant to one of the development issues in the priority fields for JICA s cooperation activities in Jordan; Effective Use of Limited Water Resources and Capacity Development for Environmental Management, in the field of 1) Improvement of Infrastructure for Self-Reliant and Sustainable Economic Growth. (2) Effectiveness Overall Evaluation: A The Project purpose has been mostly achieved. Synergetic effects have been confirmed, e.g., all the 5 outputs contributed to the achievement of the purpose. The contributing factors are the above-stated synergetic effect and the improvement of learning effect generated through the combination of lectures and practical training. There were no special adverse factors. (3) Efficiency Overall Evaluation: B Although the Jordan side made efforts, there was a significant delay in inputs. The assignment of counterpart personnel was conducted as planned. However, in Ma an governorate, the position of the engineer has been vacant since the resignation of the former engineer for career change. Although a technician has been acting as an engineer, there is still the sense of stagnation. Although the inputs from the Japanese side have been generally appropriate, it was pointed out that the timing of expert dispatch could be improved. Compared with the summer months when water shortage is more severe, the months from February to May are more suitable for NRW activities as the water volume is more stable. However, as it is the time of contract renewal in Japan, there is no expert dispatch and local operation cost cannot be paid.

(4) Impact Overall Evaluation: B The following unexpected impacts have been confirmed. Third country training and technology exchange have been positively accepted and the training materials developed by the Project have been utilized and improved. The GIS introduced for the support to GTZ was made more elaborative in the Project and then utilized by another aid organization for water system improvement. Thus synergetic effect on cooperation is confirmed. Engineers of different governorate branches have developed a sense of unity and started exchanging information at their own initiative. Governorate branches have also developed a sense of rivalry, which has made the activities even more active. WAJ personnel have become more motivated and developed cooperation with the Ministry of Education, town assemblies, etc. through activities to raise awareness among residents. (5) Sustainability Overall Evaluation: B (Political aspect) As the direction is relevant and the commitment level is high, there is no doubt that political support will continue. (Financial aspect) The water rates have to be raised to the appropriate level to reduce the accumulated deficit, but the rates have not been revised since 1998 as it requires political decisions. As a result, they have been dependent on loans and technical support from overseas. Large reduction of WAJ's regular budget has been suggested. However, as MoWI and WAJ are highly concerned with the problem, it seems very likely that the budget for activities to maintain and expand the impacts of the Project will be secured. (Organizational aspect) The Programme Management Unit (PMU) was established within WAJ with the support from EC and the NRW manager and the engineer are employed under contract with EC. EC s support will be terminated at the end of 2009, and it has to be ensured that they will not leave the positions due to organizational change in the NRW department or decline in salary level. On the other hand, the 6 governorate branches that cover pilot areas are developing capacities to plan and implement NRW measures and will be able to continue activities on their own. (Technical aspect) Although the system to conduct NRW measure training at the basic and intermediate levels has been established, technical support from JICA and other external personnel is still required for the implementation of the advanced course. The technical level of each governorate is likely to be maintained as NRW measures have started in other areas than the original pilot areas. As for the public awareness

activities, although the importance and methodology are understood to some extent, they will still have to be led by MoWI and the NRW department of WAJ main office because governorates do not have enough knowhow to carry out activities on their own. 3-2. Factors that Promoted Realization of Effects Interconnection of outputs has generated synergetic effects. It was also good that practical training followed lectures. 3-3. Factors that Impeded Realization of Effects N/A 3-4. Conclusion As stated above, the achievement level in the 5 categories, purpose and outputs is high. Therefore, we propose that the Project should be terminated in August 2008 as planned. However, in order to reduce the rate of NRW as much as possible, efforts will still have to be made to 1) improve the water distribution system to solve the high pressure issue that increases water leakage, and 2) improve technologies for piping and water supply works. The NRW measure training and budget system also need to be mainstreamed. 3-5. Lessons Learned (1) Period till the Project Termination (i) Each governorate should establish a collaborative structure with related departments including GIS department, O&M department and customer information management department as well as the departments for fieldwork. (ii) In Ma an governorate, the position of the engineer has been vacant after the resignation of the former engineer. The successor needs to be appointed as soon as possible. (2) Period after the Project Termination (i) In order for the NRW measure activities in the areas designated by each governorate as equivalent to pilot areas to be successful, appropriate amount of budget needs to be allocated to each governorate exclusively for NRW measures. (ii) If the activities spread to the whole governorate, the current organizational structure of each governorate will not be sufficient. It is necessary to conduct cost benefit analysis based on the data from the pilot areas, formulate a NRW measure plan for the whole governorate and allocate human resources, equipment and budget accordingly. (iii) Meter accuracy can be improved and error can be reduced by replacing customer meters at 2,000 m 3 or 5 years of age.

(iv) (v) (vi) To further reduce NRW, tools for water pressure adjustment, zoning, etc. are necessary. Personnel at the level of technician and below tend to have low morale because the promotion opportunities are limited due to their academic qualifications and their technical level varies. Establishment of a certification system and raising salary for those with good skills will improve their morale. For further NRW reduction, it is desirable to measure MNF on a daily bases in small plots (less than 300 households).