The University of Arkansas at Monticello

Similar documents
Opening: Facilities Technician Department: Maintenance

COMMODITY BUYER EXT APPLIANCES BELL ROBINS ARCHITECTURAL SERVICES RAMONA REID ARMORED CAR SERVICES BELL ROBINS 55108

OPERATION SERVICES DIVISION. Supporting the Journey

CITY OF BELLINGHAM, WASHINGTON Purchasing-Vendor Guide

Scripps Ranch High School

LOVEJOY Independent School District

Facility Specialist (Tom O Leary Golf Course/VFW Sports Center) Bismarck Parks and Recreation District

Substitute Custodian Day/Night

INDIANA STATE UNIVERSITY TASK FORCE ON AFFORDABILITY FACILITIES SUBCOMMITTEE RECOMMENDATIONS

Getting Facility & Engineering Support and Maintenance Facilities & Engineering Department

EASTLAKE WOODLANDS CONTROLLED ACCESS PATROL POST ORDERS

General Operating Fund Budget Reduction Scenario Narrative Business & Finance

RDV STAFFING, INC POSITION DESCRIPTION PROPERTY MANAGER

Zion-Benton Public Library District Job Description - Security Supervisor

Associate Vice President of Facilities Management

Southeast Technical Institute JOB DESCRIPTION. Custodial, Facilities and Grounds Manager

PUBLIC WORKS DEPARTMENT HIGHWAY AND MAINTENANCE SUPERVISOR

Transportation Service Summary Report on Providing Transportation Services To the West Lafayette Campus

Metro s Guide to Accessibility and Independence

Office of Internal Audit and Compliance

FACILITIES MAINTENANCE WORKER

Job Advertisement - Facility Maintenance Technician

nmqwertyuiopasdfghjklzxcvbnmqwer tyuiopasdfghjklzxcvbnmqwertyuiopas dfghjklzxcvbnmqwertyuiopasdfghjklzx cvbnmqwertyuiopasdfghjklzxcvbnmq

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

MADISON HIGH SCHOOL // Executive Summary

CITY OF NORTH RICHLAND HILLS

VENDOR GUIDE DOING BUSINESS WITH THE SCHOOL BOARD OF POLK COUNTY

Operational Services Facility Innovation & Readiness Stakeholder Team

A Guide to Building Permits for Home Owners / Renovators

KENTUCKY STATE UNIVERSITY

2016 FEES, CHARGES AND UTILITY RATES

JOB DESCRIPTION. Head of Operations. Transport Manager

CONSTRUCTION UPDATE JUNE 2015 THIS IS AUBURN.

Manager, Facilities Operations

UCLA Procedure 615.1: Employee Driving Records

BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION

Gwinnett County Public Schools. Jim Steele Chief Operations Officer

California State Polytechnic University. Department Safety Coordinator Manual

Section 27 Schedule of Uses by District

*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.

MaBSTOA. Notice of Examination

Police Services Representative

Texas A&M University Employee Services USAC Forum Minutes Important Issues to Discuss

DISTRICT SCHOOL BOARD OF PUTNAM COUNTY BIDDERS MAILING LIST APPLICATION

CITY OF NEW LONDON Fair Labor Standards Act (FLSA) Overtime Compensation Policy

Commercial Vehicle Drivers Hours of Service Module 24 Daily Log Audits

AGENDA. I. Certification of notice posted for the meeting Dr. Wright Lassiter

The University of Connecticut Climate Action Plan:

Carpenter (Journeyman) (Existing position)

Yale University Environmental Health and Safety

Total FY 2011 Budgetary Resources (planned obligations) $24.3B

Leased Space Environmental and Energy Efficiency Attributes Tenant Instructions

ARCHIVED. Identification and Suitability Assessment of Sites for Primary Schools. Technical Guidance Document TGD-025

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************

Yale University Art Gallery Sustainability Action Plan

From: Art Farley, Chair of the Environmental Issues Committee (EIC)

Transit Operator Recruitment Information Guide

MUNICIPALITY OF WEST PERTH JOB DESCRIPTION Facilities and Recreation Manager

CLASS SPECIFICATION SENIOR STOREKEEPER, 1837

Essential Duties and Responsibilities include the following. Other duties may be assigned as dictated by operational necessity.

CONSTRUCTION UPDATE SEPTEMBER 2015 THIS IS AUBURN.

CITY OF CALERA BUSINESS LICENSE FEE CODE SCHEDULE **All licenses issued are required to pay a $10.00 issuance fee in addition to their license fee**

TERMS OF AGREEMENT AND TERMINATION. This agreement is made between and MILO TRANSPORTATION INC (MTI) on day of, 20.

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC

THE UNIVERSITY OF TEXAS AT EL PASO

Occupational Safety & Health Environmental Health Laboratory Safety Industrial Hygiene Radiation Safety Hazardous Waste Pollution Prevention

JAN-JUN 2014 SURVEY RESULTS

Cornell University ILR School. Retail and Education Collective Bargaining Agreements - U.S. Department of Labor

HOME OUR SERVICES COMPANY POLICIES PROGRAMS TECHNOLOGY LICENSING & SAFETY PROCEDURES

University of New Mexico Environmental Services Design & Development Standard Requirements

Greenhouse Gas Reduction Initiative. Air Quality Program Supervisor January 8, 2010

SUSTAINABILITY ACTION PLAN

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Revised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi

Safer Alternative Products

Weekly Job Postings & Internship Opportunities. Updated on December 4, 2013

FACILITIES I MAINTENANCE SERVICES

Maintenance Mission Statement

Recycl RECYCL CAMPUSES: IN ADDITION UNIVERSITY AND THE

Transit, Intercity Bus, Taxi 8-1

University of Virginia Facilities Management Services Guide

Redwood Coast Regional Center Respecting Choice in the Redwood Community

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Facilities Master Plan State University of New York College of Technology at Delhi

FINANCIAL MANAGEMENT FOR GEORGIA LOCAL UNITS OF ADMINISTRATION

2018 Employment Agreement for New Teachers in the New York City / Long Island / New Brunswick Region. I. Terms of Employment

Communication & Marketing Approved By: Richard R. Rush Effective Date: 3/28/11 President Page 1 of 6. Policy on Postings and Signage.

Corporate asset management strategy: 2016 UPDATE

Tree Protection Policy

6.1 Introduction to Wastewater Issues

WASTEWATER TREATMENT FACILITY SUPERVISOR

WKU Building Services. Service Level Agreement Craig Alumni Center

Preventive Maintenance Policies and Plan for Vehicles and Facilities Northeastern Connecticut Transit District

Florida Institute of Technology Guidelines for Work Orders: Policy, Procedures & Account Categories Revised: May 12, 2014

TRANSIT SERVICES Business Plan

Salt Lake County Onboarding Packet - Intern

SANDUSKY COUNTY An Equal Opportunity Employer POSITION DESCRIPTION

OVERVIEW OF BUDGET RESPONSE TEAM IMPLEMENTATION STR ATEGIES REV. OCTOBER 17, 2017

McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007

2017 Employment Agreement for New Teachers in California. I. Terms of Employment. II. Workload and Schedule

Transcription:

The University of Arkansas at Monticello Physical Plant Department Service Guide Assistant Vice Chancellor Finance & Administration Director of Physical Plant Administrative Secretary Associate Central Supply Director Director Supervisor Building Maintenance Grounds Maintenance Custodial Services Recycling Central Warehouse Motor Pool Telephone number for Physical Plant 460-1018

Introduction The University of Arkansas at Monticello Physical Plant Department is responsible for the day-to-day care of all Educational and General facilities, Auxiliary facilities and Research facilities. In addition, the Physical Plant maintains approximately 200 acres of grounds, provides a fleet of 42 vehicles for short and long-term lease, and supervises the Central Supply Warehouse located on the campus. Each building has a Building Administrator responsible for requesting physical plant service for the facility. All work requests (other than emergencies or work requested by the Physical Plant) must be initiated through the Building Administrator s office. Physical Plant Mission Statement The University of Arkansas at Monticello Physical Plant Department is a professional organization responsible for service to the university through the efficient operation and maintenance of the campus facilities. Its objective is to provide for a safe and comfortable environment for learning, working, and teaching. The Physical Plant is committed to the highest level of service possible while complying with all safety and accessibility guidelines through education, training and competent performance of duties. Services Provided Each building has an appointed Building Administrator responsible for requesting physical plant service for that facility. All work requests (other than emergencies or those issued by the Physical Plant) must be initiated through the Building Administrator s office. UAM Physical Plant services are as follows (not all-inclusive): Maintenance of structures and attached systems Maintenance of streets, sidewalks and grounds Basic Housekeeping services Minor moving tasks, and relocation of equipment Paper recycling Trash and litter removal Pest control Set-ups for Commencement exercises, Homecoming exercises Motor Pool operations Central Supply (Warehouse) As time, manpower and resources allow, the Physical Plant provides limited services directed toward demolition and construction projects on a small scale. These projects are not included in the annual budget of the Physical Plant and are charged back to departmental budgets. All modifications to UAM buildings and grounds must be performed or coordinated by the Physical Plant. Examples of limited services are as follows: Alterations, renovations or remodeling of facilities Purchase or installation of special equipment such as window treatments, special lighting, bulletin boards, pictures, plaques, shelving, casework, etc. Painting other than on regular schedule Charges are made for time (in some cases) and material used. A work order requesting these or any services must include an appropriate departmental account number, Chancellor, or V/C approval and a complete description of the work requested.

Building Maintenance UAM Maintenance Department consists of an Electrical, Carpentry, Paint, and Plumbing shop. These shops work under the general title of Crafts. Supervisors handle daily service calls and assign priorities for service. Emergency call-out service (after hours, weekends and holidays) should be reported to UAM Public Safety. Emergencies are considered to be health or life threatening situations. A member of the maintenance staff is on-call 24 hours per day. Work orders initiated by the Building Administrator should be completely filled out. Those having insufficient information will be returned to the source of the request. Crafts should not be combined on work orders (i.e., plumbing needs should not be listed on a work order requesting painting). Work orders are assigned to a craftsman who will complete the work that is within his craft area. Work orders listing the crafts separately will be assigned to more than one craftsman at a time facilitating quicker completion. Renovations, Remodeling and Modifications All modifications to UAM physical facilities must be performed or coordinated by the Physical Plant. Requests must be made through work orders. The work order should have a valid account number and account name with the proper signatures authorizing the work. Moving Services/Transfers of Equipment The UAM Maintenance Department provides BASIC moving services to the campus. Request for Transfer of Equipment forms must be processed before any move will be made. Transfers are required for any move from room-to-room, room to another building, building-to-building, and department-to-department. Pest Control UAM Maintenance Department provides pest and rodent control to most buildings on the campus. Reporting a pest or rodent problem can be initiated by calling the Building Administrator s office and in turn directed to the Physical Plant office. Grounds Maintenance UAM Grounds Maintenance Department is responsible for the maintenance of approximately 200 acres. Some services provided are: Mowing & trimming of lawns Shrubbery and plant bed maintenance Leaf removal Ice and snow removal Irrigation systems Greenhouse & planting beds Fire Ant control Street cleaning Street drains Trash collection Planting of trees, or shrubbery by anyone other than Grounds Maintenance employees must be coordinated through the Physical plant. Trash Collection UAM Grounds Department is responsible for the removal of trash from the entire campus. The trash is collected each day in all E & G buildings by custodians and placed in a designated area for removal. Residents of apartments and houses are required to place trash in designated areas for pick-up by 9:00 a.m.

Custodial Services UAM Custodial Services Department provides BASIC custodial service. Emphasis is placed on safe, sanitary conditions to all buildings on the UAM campus (approximately 850,000 sq. ft.). Routine cleaning is performed during a day shift with staggered start times. Cleaning begins in certain areas at 4:00 a.m. Other areas start at 5:00 and 6:00 a.m. Cleaning is prioritized in the following order: restrooms and showers, classrooms, high traffic and offices. Special cleaning is scheduled during summer months when student population is at its lowest. Building Administrators will be notified in advance of special cleaning projects. Basic custodial services will be affected during these projects. Recycling UAM Recycling Program was established in 1992. Mandated by Act 749 of 1991, all state and local agencies are required to implement recycling programs designed to capture the recyclables generated as a result of agency operations. Mission To develop a waste management program promoting source reduction, reuse, recycling, with emphasis on the procurement of products containing post consumer recycled materials, in an effort to make land-filling the last option for the University's waste. Faculty and staff are asked to separate white office paper, envelopes and computer paper from the regular waste stream. Large recycling containers are located in each building. Smaller office containers can be requested and placed next to the regular wastebasket. Central Supply (Warehouse) UAM Central Supply is located at 135 Forestry Park Drive. The Warehouse stocks over 2,500 different items. These items are available to departments for purchase. The Warehouse is also the central location for shipping and receiving. The following categories are maintained: Air Filters Automotive Items Building Material Electrical Supplies Glass Hardware Janitorial Light Bulbs Miscellaneous Nails Office Supplies (State Contract items only) Paint Supplies Plumbing Supplies The Warehouse stocks minimal quantities. Some items may be temporarily out of stock. Motor Pool UAM Motor Pool Department maintains forty-two (42) vehicles for short and long-term lease. Nineteen (19) vehicles (sedans, mini-vans, 15-passenger vans, a jeep and buses) are available for department rental. Rental vehicles can be secured by submitting a completed Motor Pool Trip Ticket. Read all instructions, and supply the requested information. Forms with insufficient information will be returned to the requesting department. Requests for vehicles are scheduled by availability and on a first come, first serve basis. Requests should be made as early as possible. Upon receipt of the form in the Motor Pool office, the vehicle will be scheduled if available. The designated driver will need to obtain vehicle keys and gasoline credit cards if necessary. Proof of current drivers license is required each time a vehicle is issued. Please note on the request if the vehicle will need to be picked up prior to 8:00 a.m. or after 4:30 p.m. The vehicle will be

Return the vehicle to the parking lot of the Motor Pool at the completion of the trip. Lock the vehicle and leave the keys, credit cards and credit card receipts in the car. Motor Pool Vehicles The following shows the current inventory of vehicles and current rates. Selection Quantity Daily Rate Mileage Rate Sedan 2 $12.00.38 per mile Mid-size Sedan 1 $12.00.47 per mile Mini-Van 3 $12.00.44 per mile 10-Passenger Van 8 $15.00.54per mile 25-Passenger Bus 2 $20.00 1.03 per mile Selections and rates are correct at time of printing. All are subject to change. Call 460-1159 for current information.

to Bowser Road University of Arkansas at Monticello Campus 34 to Old Warren Road 23 13 Legend 40 0 125 250 500 750 1,000 Feet 32 40 16 10 19 21 25 7 41 17 30 26 18 6 20 44 39 9 22 8 3 43 33 2 37 35 27 29 42 11 28 24 12 1 4 38 Weevil Pond 36 14 15 Drew Central Schools Campus 31 5 to US 425 N 1 Administration Building 2 Agriculture Building 3 Babin Business Center 4 Baseball Field 5 Bankston Hall 6 Baptist Collegiate Ministries 7 Book Store 8 Central Heating Plant 9 Central Warehouse 10 Chancellor's Home 11 Athletic Facilities 12 Cotton Bowl Stadium 13 Faculty / Staff Housing 14 Fine Arts Center 15 Football Practice Field 16 Gibson University Center 17 Graphic Design and Copy Center 18 Harris Hall 19 H. H. Chamberlin Forest Resources Complex 20 Horsfall Hall 21 Jeter Hall 22 Library 23 Married Housing 24 Math & Science Center 25 Maxwell Hall 26 Memorial Classroom Building 27 Missionary Baptist Student Fellowship 28 Music Building 29 Natural history Museum 30 Post Office 31 Public Safety 32 Recycling Center 33 Red Barn 34 Rodeo Team Facilities 35 Royer Hall 36 Softball Field 37 Sorrells Hall 38 Steelman Fieldhouse 39 Tennis Courts 40 University Apartments 41 Visual & Performance Arts Center 42 Wells Hall 43 Wesley Foundation 44 Willard Hall