Substitute 1 to Ordinance

Similar documents
THERFORE, the Board of Supervisors hereby adopts the following amendments to the Zoning Ordinance by adding the following:

Addition to Section 4 - Special Use Regulations

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS

MEETING DATE: ADOPTED ON EARTH DAY: APRIL 22, 2008 AGENDA ITEM COMMENTARY

RECOMMENDATION REPORT

Franklin County Communique to the Planning Board

HAMILTON TWP S SOLAR SITING ORDINANCE. David Peifer ANJEC Environmental Congress October 19, 2013 Middlesex County College, Edison NJ

WIND ENERGY CONVERSION SYSTEMS APPLICATION

WIND ENERGY CONVERSION SYSTEMS

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY

In-Depth Policy Workshop: Zoning for Solar Energy. Presented by the NY-Sun PV Trainers Network

Fence, Wall & Column Information Packet

Commercial Tax Abatement

SOLAR ENERGY CONVERSION FACILITIES. Carroll County Code of Public Local Laws & Ordinances As of December 1, 2015

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

ORDINANCE NO. BE IT ORDAINED by the City Council of the City of Waukee:

ORDINANCE #16- PROPOSED ORDINANCE #16-14

ARTICLE VIII. (SF-A, SF-TH) SINGLE-FAMILY ATTACHED AND TOWNHOUSE RESIDENTIAL DISTRICTS

a. Structures subject to section Architectural & Site Design Standards must comply with the following additional fencing standards:

H 6062 S T A T E O F R H O D E I S L A N D

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

PART R3-L ZONE, LOW DENSITY MULTIPLE DWELLING DISTRICT

ARTICLE 4 SUPPLEMENTARY PROVISIONS

COUNTY OF CAPE MAY STATE OF NEW JERSEY ORDINANCE NO ESTABLISHING REGULATIONS FOR SMALL WIND ENERGY SYSTEMS AND SOLAR ENERGY SYSTEMS

Zoning Ordinance Chapter 7

SECTION 832 "C-P" - ADMINISTRATIVE AND PROFESSIONAL OFFICE DISTRICT

HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS

Ottawa County Farmland Preservation Program Scoring Criteria

SECTION 25: RENEWABLE ENERGY ORDINANCE

ARTICLE X TRANSMISSION TOWER REGULATIONS

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

CHAPTER 10: AGRICULTURAL USE DEVELOPMENT STANDARDS

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

ZONING RESOLUTION OF KNOX COUNTY APPENDIX C SOLAR ENERGY SYSTEM ORDINANCE

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems:

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

LAND USE INFORMATION SHEET

SCHEDULE B RESIDENTIAL BUILDING FEES

Adopted January 15, 1996 Hood River County Ordinance #201

Construction Application for Permit (CAP) Instructions

INTENT OBJECTIVES HISTORIC DESIGNATIONS

The following is required for a complete permit submittal for each unit.

A. Provide for the appropriate location and development of antennas and towers within the city;

ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85

Review Zone Application for D&R Canal Commission Decision

AN ORDINANCE ADOPTING A SOLAR ENERGY SYSTEM ORDINANCE FOR DEKALB COUNTY

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Staff Report. Staff believes that this second meeting provides that opportunity.

NOBLESVILLE PLAN COMMISSION STAFF REPORT DECEMBER 16, 2013

CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS)

Environmental Information Form

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND * * * * * * * * * * * * *

RESIDENTIAL BUILDING PERMIT PROCEDURES

CEMENTITIOUS SIDING NORMAN BRICK VENEER SET AT 1/3 COURSING CEMENTITIOUS LAP SIDING (PAINT TO MATCH BRICK COLOR) CEMENTITIOUS SIDING ALUMINUM CANOPY

ORDINANCE # AN ORDINANCE ESTABLISHING REGULATIONS FOR SMALL WIND ENERGY SYSTEMS AND SOLAR ENERGY SYSTEMS

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

SECTION 5 EXCEPTIONS AND MODIFICATIONS

8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

Ordinance. No

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING

Fence and Wall Requirements

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS

GOAL 13 ENERGY CONSERVATION

City of Santa Monica s Solar Santa Monica Program and Solar Energy System Design Standards

Title 15 BUILDINGS AND CONSTRUCTION

Light Industrial (I)

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND

Fieldstone Ranch Homeowners Association, Inc.

Chapter 22A. Forest Conservation - Trees.

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

GWINNETT COUNTY DEPARTMENT OF PLANNING AND DEVELOPMENT

# Mercyhealth Hospital Project Review for Planning and Zoning Commission

CHAPTER 5: RESIDENTIAL USE DEVELOPMENT STANDARDS

Application for Gas Exploration and Production

SOLAR ENERGY SYSTEMS APPLICATION

ARTICLE III: LAND USE DISTRICTS EXCLUSIVE FOREST AND CONSERVATION DISTRICT (EFC)

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

RESIDENTIAL FIRE SERVICE METERS Addendum #1

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

C O M M E R C I A L W I N D E N E R G Y R E G U L A T I O N S - R E V I S E D : 3 / 3 0 / 1 6

BLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house):

ARTICLE VI - RESIDENTIAL DISTRICT R-1. be for one or more of the following uses:

CITY OF MERCER ISLAND

Definitions. The following words and phrases, when used in this article, shall have the following meanings respectively ascribed to them:

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING

REVISIONS RECOMMENDED by the SMITHFIELD PLANNING BOARD ON PROPOSED SOLAR ENERGY SYSTEMS ORDINANCE ARTICLE 5.11

THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES

DOUGLAS COUNTY BUILDING PERMIT APPLICATION

CASE NUMBER: 17SN0500 APPLICANTS: Marjorie S. Elliott and Michael B. Elliott

SUMMARY STAFF REPORT. Initiation

Wetland Permit Application

CMPA Campus Wide Solar Array Installation 2 of 4

Transcription:

Substitute 1 to Ordinance 17-044 Solar Energy Systems - new to our code Minor and Major Utilities - amended Revised: NCC Land Use 09/28/17

Page 1 - SES - SOLAR ENERGY SYSTEM Per State Code, renewable energy sources should be encouraged A Solar Energy company is interested in locating in New Castle County No provisions exist in our Code for large Solar Energy Systems (SES).

Page 2 - SES - ZONING Under this Ordinance a large scale Solar Energy System (SES) would be allowed in zoning categories MM, ON, CR, BP, I, D, HI, S and SR as a Limited Use site plan with the approval decision for development being made by the Land Use Department. In S and SR zones only 85% of a parcel can be converted. Out of the 14,000 acres of SR zoning the aggregate acreage that can be converted is 1000 acres. An SES is not allowed in ST, TN, CN, SE, NC or EX. SES is not allowed on land that is in a Conservation Easement or in a Farm Preservation Program

Page 3 SES -Land Development If it is expected that proposed solar for a site produces over 110% of the electrical consumption on that parcel a site plan must be filed.

Page 4 - SES - OPACITY AND BORDERS An SES cannot be closer than 50 from a property line An SES cannot be closer than 150 from an existing dwelling unit. It must be enclosed with a barrier fence on which contact information is stated as well as any other information required by state or federal law Landscaping must contain at least 5 plant units (more than 1 plant per unit) per 100 linear feet. Must be a 4 season screening.

Page 5 - SES - BOND AND ABANDONMENT Prior to construction a Bond, surety letter or other financial assurance needs to be received by NCC to cover 100% of the cost of the removal, NCC must be notified if the SES is not in use for 6 months. An SES not in use for 1 year is considered abandoned.. If the SES is not reactivated the equipment needs to be removed and the property is to be restored,within 6 months, to the predevelopment condition.

Page 6 - SES DEVELOPMENT RIGHTS The acreage dedicated for the SES shall be subtracted from the base site area prior to conducting site capacity and concurrency analysis for any other proposed development of the property.

Page 7 SES - Accessory uses Residential use only Ground mounted - must be 6 feet from any side or rear lot line. Roof top - Shall not extend more than 5 feet above the surface of the roof. Will be calculated when evaluating maximum building height and if there is a ground component it will be located behind the principle structure and a minimum of 6 feet from any side or rear lot line. Non Residential: the only new section added is: Rooftop SES shall be considered when evaluating maximum building height.

What is the reason to update our code on Utilities? Because the Federal Energy Regulatory Commision has ordered the construction of a power line that crosses the Delaware River linking Artificial Island Nuclear Plant in Salem NJ to the Red Lion substation near Delaware. FERC has determined that there is a need for reliability through an upgraded power line that will increase the nuclear plant s capacity to reduce the length of power outages. The public first became aware of this in April 2014 through a NJ story. Because of the FERC decision and its impact on DE, the Dept of Land Use has decided to upgrade our utility Code.

Page 1 -- Minor Utility - New definition Any facility or structure for the local generation, transmission, distribution, treatment, disposal, regulation or storage of power, natural gas water, sanitary sewer or waste management that provides service solely within NCC. Any underground, surface or overhead structure or facility or an area of land used to generate, store, transmit, distribute or regulate electricity of no more than 230 kilovolts. Between 139 to 230 KV Excludes any SES

Page 2 - Minor Utility-land development plan Any new Minor Utility, which is a new utility substation that is used to transmit or distribute more than 139 KV of electricity will require a Minor land development plan to be submitted. This was previously a site plan submission. Elevated storage tanks and standpipe currently require an exploratory submission and will go before the Planning Board. Minor Utilities will be a Limited Use except for those in HI and EX where they are permitted by code.

Page 3 - Minor Utility - Opacity and Borders Any New substation over 139 Kv standards will have: 0.3% opacity increase in buffer yard, (from 0.3 to 0.6), with the exception that state and federal vegetation clearance distance requirements shall apply A barrier suitable to prevent unauthorized access. It must meet any applicable state or federal rules or standards. And the utility installation will be no closer than 50 feet from a property line and 150 feet from an existing dwelling unit.

Page 1 - Major Utility - Amended definition Any facility or structure for the regional generation, transmission, distribution, treatment, disposal, regulation, or storage of power, natural gas, water, sanitary sewer or waste management. Any underground, surface or overhead facility or structure or an area of land used to generate, store, transmit, distribute or regulate electricity in excess of 230 KV. Excludes SES

Page 2 - Major Utility - land development plan New Major Utility development will be required to follow the code for a Major Land Development plans/process if they are a power generating facility. All other major utility actions will use a minor land development plan. Table 40.03.110 allows for Special Use review in all categories except for HI and I where it is classified as Limited review.

Page 3 - Major Utility - Opacity and Borders There will now be a 0.3% increase in opacity buffering (increasing the opacity to 0.6%) with the exception that state and federal vegetation clearance distance requirements shall apply. Must be enclosed by a barrier suitable to prevent unauthorized access. It must meet any applicable state or federal rules or standards. The utility installation cannot be closer than 50 feet from a property line or 150 feet from an existing dwelling unit. A Major Electric power generating site is a Limited Use in I and HI zoning districts only.