AMERICAN ELECTRIC POWER (SWEPCO)

Similar documents
Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2016 Annual Dam and Dike Inspection Report

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

DTE Energy St. Clair Power Plant

CLOSURE PLAN. CFR (b) Document No. GERS Stingy Run Flyash Pond. Gavin Plant Cheshire, Ohio. October, 2016

CCR Annual Inspection (b) for the Ash Pond at the San Miguel Plant. Revision 0

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016

2016 ANNUAL DAM AND DIKE INSPECTION REPORT

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

CCR Certification: Initial Structural Stability Assessment (d)

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

TVA Colbert Fossil Facility Ash Disposal Pond 4

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

CHOLLA POWER PLANT BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_Inflowflood_003_

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

Closure Plan Ash Disposal Area PGE Boardman Power Plant

CLOSURE PLAN. CFR (b) Fly Ash Reservoir 1 Landfill Cardinal Plant Brilliant, Ohio. September, 2016

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011

Dam Safety Inspection Checklist

Types of Inspections. Prior to Inspection. Types of Inspections. Typical Inspection Equipment. Embankment Dams

Coal Combustion Facility Assessment Report. October 20, 2010

Visual Inspection Checklist

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Annual Inspection Report

Annual Inspection Report Lawrence Energy Center

ENVIRONMENTAL ENGINEERING LAND SURVEYING

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI

CHOLLA POWER PLANT FLY ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN CH_InflowFlood_002_

Final Summary Report Structural Integrity Assessment Bottom Ash Pond Cholla Power Plant Joseph City, Arizona

DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

Sediment Basin. Fe= (Depends on soil type)

III. INVENTORY OF EXISTING FACILITIES

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY

CCR Certification: Initial Inflow Design Flood Control System Plan for the

Stantec Consulting Services Inc Lebanon Road, Cincinnati, OH 45241

David Miller, P.E.- Atlanta. The New Coal Ash Regulations Wednesday, May 6, 2015

Diversion Dikes. Fe=0.95

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

Final Summary Report Structural Integrity Assessment Combined Waste Treatment Pond Four Corners Power Plant Fruitland, New Mexico

1. Regulation Requirements

2017 Annual Inspection Report

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

Inflow Design Flood Control System Plan

INFLOW DESIGN FLOOD CONTROL PLAN

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS

Modular Sediment Barriers (Instream)

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

HISTORY OF CONSTRUCTION

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Evaluation of Drainage Layer Alternatives for Proposed Landfill Liner at the E.W. Brown Generating Station

PHASE I ERNEST MINE COMPLEX. The objective of the project was to develop an economically feasible, safe

HAZARD POTENTIAL CLASSIFICATION REPORT

Inflow Design Flood Control System Plan

Geosynthetics Cost/Benefit Analysis for the Development of a Landfill Expansion Module in Monterey, California

North Umpqua Hydroelectric Project (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form

Inflow Design Flood Control System Plan

INITIAL INSPECTION REPORT ASH LANDFILL AREA SPRINGERVILLE GENERATING STATION SPRINGERVILLE, ARIZONA

Filter Tube Barriers (Instream)

ENVIRONMENTAL ENGINEERING LAND SURVEYING

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

Lansing Generating Station Project No Closure Plan for Existing CCR Revision: 1 TABLE OF CONTENTS

Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps. Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band

Closure Plan Brame Fly Ash Pond

NAUGHTON POWER PLANT NORTH ASH POND INITIAL CLOSURE PLAN

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company

# of Pages Purpose of Calculation 1

BMP #: Infiltration Basin

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1

LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO S3N AFIN:

Constructed Wetland Pond T-8

Mill Pond Dam Modifications Feasibility Study

Stormwater Local Design Manual For Houston County, Georgia

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

AEP s CCR Impoundment Closure Projects - Lessons Learned, Insights & Exemplary Practices

MODEL Stormwater Local Design Manual. City of Centerville

Factors affecting health of Ash Dyke and Preventive Measures. Kukreti RC Chowdhury Ujjwal Naresh D N

NIPSCO MICHIGAN CITY GENERATING STATION, MICHIGAN CITY, LA PORTE COUNTY, INDIANA PRIMARY 2 HISTORY OF CONSTRUCTION

Annex I Lyons Ferry Hatchery Modification Plan

Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017

MSHA s Review of Impoundment Plans

Written Post-Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado

Unit(s): Units Issued for Information RSG/ JAL/ JCP/

PAPERWORK REDUCTION ACT A. GENERAL

V. DRAINAGE IMPROVEMENTS

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements:

Geoenvironmental impact assessment of a landfill for solid chemical wastes

North Domingo Baca Extension at Barstow

Transcription:

2015 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-15-034 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO December 2015

ANNUAL DAM AND DIKE INSPECTION REPORT WELSH POWER PLANT ASH STORAGE PONDS YEAR 2015 GERS-15-034 INTRODUCTION... 1 1. Background Information... 1 1.1 Facility Location Description... 1 1.2 Description of Primary Ash Pond CCR Unit... 1 1.2.1 Embankment Configuration... 1 1.2.2 Area and Volume Data... 2 1.2.3 Construction and Operational History... 2 1.2.4 Surface Water Control... 2 2. Background Information... 3 2.1 Facility Location Description... 3 2.2 Description of Bottom Ash Storage Pond CCR Unit... 3 2.2.1 Embankment Configuration... 3 2.2.2 Area/Volume... 3 2.2.3 Construction and Operational History... 4 2.2.4 Surface Water Control... 4 SUMMARY OF VISUAL OBSERVATIONS... 5 Primary Ash Pond... 5 Active Bottom Ash Storage Pond... 6 ASSESSMENT OF RECENT INSTRUMENTATION DATA... 6 CONCLUSIONS... 6 RECOMMENDATIONS... 7 REMEDIAL ACTIONS... 7 GENERAL MAINTENANCE AND MONITORING... 7 APPENDIX A: APPENDIX B: VICINITY MAP AND PLAN VIEW INSPECTION PHOTOGRAPHS

INTRODUCTION AEPSC (American Electric Power Service Corporation) Civil Engineering manages the Dam Inspection and Maintenance Program (DIMP) at AEP facilities. As part of the DIMP, staff from the Geotechnical Engineering Section conducts dam and dike inspections annually. The 2015 inspection of Designated CCR Surface Impoundments at the Welsh Power Plant were performed by Mr. Brett A. Dreger, P.E. and Mr. William G. Carter, P.E. This report was prepared by Mr. Brett A. Dreger, P.E. and serves as a summary of the inspection and an assessment of the general conditions of the facility. Mr. William G. Carter, P.E. of AEP Plant Engineering Region 5, was the facility contact for the inspection. The inspection was performed on October 28, 2015. Weather conditions were mostly sunny, with temperatures ranging from 70 F in the morning to 84 F in the afternoon. General Information: 1. Background Information The following section provides background information for the AEP J. Robert Welsh Generating Plant primary ash pond. 1.1 Facility Location Description The AEP J. Robert Welsh Plant is located in southern Titus County, approximately 8 miles northeast of Pittsburg, Texas, and approximately two miles northwest of Cason, Texas. The primary ash pond CCR unit is located southwest of the Plant and directly west of the Welsh Reservoir (Figures 1 and 2). 1.2 Description of Primary Ash Pond CCR Unit The following section will discuss the embankment configuration, area, volume, construction and operational history, and surface water control associated with the primary ash pond. 1.2.1 Embankment Configuration The primary ash pond was placed into operation in 1977, and is located in a topographically low area that had been an unnamed intermittent tributary of Swauano Creek prior to development of the Site. The primary ash pond is bounded by natural ground surface (topographically higher areas) to the north and west, and embankment dikes to the south and east. The elevation at the top of embankment along the crest area is approximately 340.0 feet above msl. These dikes are predominately constructed of compacted sandy clay and clayey sand. The embankment dike south of the primary ash pond includes a drainage canal that receives overflow (clear) water from the primary ash pond. The water level in the Page 1 of 8

primary ash pond is controlled by a weir box which discharges into the drainage canal. The clear water in the drainage canal flows east and discharges into the clear water pond. The primary ash pond embankment is approximately 40 feet in height. Discussions of embankment configuration and timeline, including cross sections through the dikes, was provided in a previous report prepared by ETTL Engineers & Consultants Inc. in 2010 (ETTL, 2010). 1.2.2 Area and Volume Data Per the Hydraulic Analysis of Welsh Power Plant Ash Ponds Report, dated December 2010 (Freese and Nichols, 2010), the bottom elevation of the Primary Ash Pond is 300 feet above mean sea level (above msl), the high level overflow weir box bottom elevation is 325 feet above msl, and the storage capacity of the primary ash pond at elevation 325 feet above msl is 304.2 acre-ft. 1.2.3 Construction and Operational History The AEP J. Robert Welsh Plant began operations in 1977 with three coal-fired generating units (Units 1, 2, and 3). Throughout the life of the generating plant, CCR materials (fly ash, bottom ash, economizer ash) have been generated. All of these byproducts were stored in either the primary ash pond or in the adjacent landfill that was constructed about 1977. In 2000, the 22-acre bottom ash storage pond was installed south of the landfill. The bottom ash storage pond was constructed with a 60-millimeter (mil) high-density polyethylene (HDPE) liner, and receives bottom ash and economizer ash dredged and sluiced from the primary ash pond. Presently, economizer ash from the generating plant is sluiced to the primary ash pond. On occasion, bottom ash is sluiced to the primary ash pond. Solids settle as the clear liquids flow through a drainage canal into the clear water pond (a non-ccr Unit).Water in the clear water pond discharges through a weir box into a 36-inch-diameter pipe, and then into the Welsh Reservoir under Texas Pollutant Discharge Elimination System (TPDES) Permit No. WQ00018111000. 1.2.4 Surface Water Control Surface water flow within the primary ash pond complex is controlled by a weir and emergency spillway located on the south side of the pond below the embankments. The pond elevation is maintained so that surface water flows through the weir box which has a bottom elevation of 325 feet above msl. The emergency spillway is 90 feet wide with a crest elevation of 334 feet above msl. Clear water flows through the weir (and occasionally the emergency spillway during heavy precipitation events) into a drainage canal along the south side of the pond. The drainage canal discharges into the clear water pond located directly southeast of the primary ash pond. Page 2 of 8

The perimeter embankments on the south and east sides of the primary ash pond are located at an approximate elevation of 340 feet above msl. Therefore the perimeter embankments have approximately six feet of freeboard above the emergency spillway. 2. Background Information The following section provides background information for the AEP J. Robert Welsh Generating Plant Bottom Ash Storage Pond. 2.1 Facility Location Description The AEP J. Robert Welsh Plant is located in southern Titus County, approximately 8 miles northeast of Pittsburg, Texas, and approximately two miles northwest of Cason, Texas. The Bottom Ash Storage Pond CCR unit is located at the south end of the Plant and approximately 1,000 feet west of the Welsh Reservoir (Figures 1 and 2). 2.2 Description of Bottom Ash Storage Pond CCR Unit The following section will discuss the embankment configuration, area, volume, construction and operational history, and surface water control associated with the Bottom Ash Storage Pond. 2.2.1 Embankment Configuration The Bottom Ash Storage Pond was placed into operation in 2000, and is located in a topographically high area of the Plant. The Bottom Ash Storage Pond embankments are approximately 20 feet in height and are constructed of compacted clay on a 3:1 slope (3 feet horizontal, 1 foot vertical). The elevation at the base of the embankment is approximately 340 feet above msl, and the elevation at the top of the embankment around the perimeter of the Bottom Ash Storage Pond is approximately 360 feet above msl (Southwestern Electric Power Company, 2000). 2.2.2 Area/Volume The Bottom Ash Storage Pond is 22 acres in size. Per the Hydraulic Analysis of Welsh Power Plant Ash Ponds Report, dated December 2010 (Freese and Nichols, 2010), the principal spillway for the Bottom Ash Storage Pond is located near the southeast corner of the pond and consists primarily of an 18 inch drain at elevation 350.5 feet above msl and also of a 40-foot-long broad-crested weir with a crest elevation of 355 feet above msl. The emergency spillway is an 8-foot-wide weir with a rock rip-rap discharge chute located along the southern embankment at an elevation of 358 feet above msl. The storage capacity of the Bottom Ash Storage Pond at elevation 358 feet above msl is 86.50 acre-ft (Freese and Nichols, 2010). Page 3 of 8

2.2.3 Construction and Operational History The AEP J. Robert Welsh Plant began operations in approximately 1977 with three coalfired generating units (Units 1, 2, and 3). Throughout the life of the generating plant, CCR materials (fly ash, bottom ash, economizer ash) have been generated. All of these byproducts were stored either in the primary ash pond or in the adjacent landfill that was constructed in the late 1970 s. In 2000, the 22-acre Bottom Ash Storage Pond was installed south of the landfill. The Bottom Ash Storage Pond receives bottom ash and economizer ash dredged and sluiced from the primary ash pond. The Bottom Ash Storage Pond contains a 60-millimeter (mil) high-density polyethylene (HDPE) liner. The liner is located at the base of the Bottom Ash Storage Pond at an elevation of 340 feet above msl. The liner also extends along the base of the Bottom Ash Storage Pond sidewalls and is keyed into the top of the Bottom Ash Storage Pond earthen embankment at an elevation of 360 feet above msl (Southwestern Electric Power Company, 2000). The southeast corner of the Bottom Ash Storage Pond contains an approximate ¼-acre clear water pond with a base elevation of 347 feet above msl. The clear water pond receives clear water primarily through an 18 inch drain and then through an overflow structure from the main part of the Bottom Ash Storage Pond through the 40-foot-long broad-crested weir discussed above in Section 2.2.2. Water in the ¼-acre clear water pond at the southeast corner of the Bottom Ash Storage Pond discharges through a 30-inch-diameter pipe into the primary ash pond system. 2.2.4 Surface Water Control Surface water flow within the Bottom Ash Storage Pond is primarily controlled by an 18 inch drain and then by a weir located on the southeast side of the pond below the embankments. The pond elevation is maintained so that surface water flows through the drain pipe at invert elevation 350.5 feet above msl or weir which has a crest elevation of 355 feet above msl. Clear water flows through the weir into the ¼-acre clear water pond at the southeast corner of the Bottom Ash Storage Pond, then discharges through a 30-inchdiameter pipe into the primary ash pond. The emergency spillway for the Bottom Ash Storage Pond is located along the southern embankment, and is 8 feet wide with a crest elevation of 358 feet above msl. The perimeter embankments of the Bottom Ash Storage Pond are located at an elevation of 360 feet above msl. Therefore the perimeter embankments have approximately five feet of freeboard above the clear water discharge weir, and approximately two feet of freeboard above the emergency spillway. Page 4 of 8

SUMMARY OF VISUAL OBSERVATIONS The summary of the visual observations presented herein uses terms to describe the general appearance or condition of an observed item, activity or structure. Their meaning is understood as follows: Good: Fair or satisfactory: Poor: Minor: Significant: Excessive: A condition or activity that is generally better or slightly better than what is minimally expected or anticipated from a design or maintenance point of view. A condition or activity that generally meets what is minimally expected or anticipated from a design or maintenance point of view. A condition or activity that is generally below what is minimally expected or anticipated from a design or maintenance point of view. A reference to an observed item (e.g., erosion, seepage, vegetation, cracks, concrete surface etc.) where the current maintenance condition is below what is normal or desired, but which is not currently causing concern from a structure safety or stability point of view. A reference to an observed item (e.g. erosion, seepage, vegetation, cracks, concrete surface etc.) where the current maintenance program has neglected to improve the condition. Usually, conditions that have been identified in previous inspections, but have not been corrected. A reference to an observed item (e.g., erosion, seepage, vegetation, cracks, concrete surface etc.) where the current maintenance condition is above or worse than what is normal or desired, and which may have affected the ability of the observer to properly evaluate the structure or particular area being observed or which may be a concern from a structure safety or stability point of view. Results of the visual inspection performed on October 28, 2015 are summarized below. Pond water elevation is presented in the instrumentation data section of this report. Primary Ash Pond At the time of inspection the primary ash pond was in service and the current pool elevation was approximately 333.0 feet above msl. The dikes of the primary ash pond are generally in fair condition, with the only observed deficiency being overgrown vegetation on the downstream side and an abundance of woody vegetation on the inside slopes. The vegetation was so thick on the interior slope, that it was difficult to access and visually inspect. There were no observed signs of slope displacement, erosion, or seepage. The crest was in good condition with no observed cracking, misalignment, or unusual deformation Page 5 of 8

(Photographs Nos. 1, 2, and No. 3). The emergency spillway area for the primary pond was in fair and functional condition, but also displayed overgrown vegetation (Photograph No. 4). Active Bottom Ash Storage Pond At the time of inspection the active bottom ash storage pond was in service and the current pool elevation is approximately 350.0 feet above msl. The Active Bottom Ash Storage Pond exterior slopes were satisfactory condition with no observed sign of slope displacement, erosion or seepage. The slopes were well maintained with vegetation; however, there were a few isolated areas with signs of animal borrow (Photograph No. 5, 6, 7, 8 and No. 10). The emergency spillway section of the pond appeared to be fair and functional condition (Photograph No. 9). The interior area of the pond is lined with white HDPE geomembrane, and there were no observed issues with the crest or interior slopes (Photograph No. 11 and No. 12). ASSESSMENT OF RECENT INSTRUMENTATION DATA The monitoring instrumentation for the Primary Ash Pond of the following: one (1) active piezometer located through the main embankment area. Monitoring instrumentation data is collected as part of the annual inspection program for the Primary Ash Pond. The piezometer level measured during the inspection is provided below. Pond Crest Elevation Boring/Piezometer Water Level Name msl 10/26/2015 msl Primary Ash Pond 340.0 B2 324.0 A review of the active piezometer readings indicates that the static water level readings are consistent from month to month. CONCLUSIONS Based on the visual inspection, the overall condition of the dams and levees of the Ash Pond Complex is poor to fair. Inspection and monitoring activities being performed by the Plant and AEPSC Civil Engineering & Geotechnical Services should continue. Specific conclusions related to this inspection include: There is no evidence of distress that would indicate the possibility of immediate sliding, slope instability, settlement, misalignment or cracking of the bottom ash pond embankments. As such it is concluded that the dam and dikes are performing as designed. Page 6 of 8

Overall, the slope conditions of the dam and levees are generally fair with the exception of animal burrow activity on the bottom ash storage pond. These areas overtime can lead to significant erosion and stability problems. Vegetation management for the facilities is considered poor. Most areas are overgrown and should be managed accordingly, however, there are a few areas that have sparse vegetation. RECOMMENDATIONS Following are remedial actions, general maintenance items and monitoring requirements that are recommended as a result of the inspection. Assistance or guidance with the implementation of these items can be provided by AEPSC Civil Engineering & Geotechnical Services: REMEDIAL ACTIONS Overgrown areas need to be mowed on a regular basis and areas of sparse vegetation need to be reseeded and fertilized in order to establish adequate cover on both the interior and the exterior side slopes. Areas of overgrown vegetation should be well maintained and under control. GENERAL MAINTENANCE AND MONITORING Any erosion gullies, slough areas (shallow slides), and gopher disturbed areas that are encountered should be stabilized as soon as possible. Erosion gullies and slough areas may be stabilized by redressing the slope and placing rip rap or re-vegetating, depending on the slope gradients and propensity for concentrated water flow. Gopher damaged areas should be redressed in the same fashion; A maintenance program of seeding, fertilizing and mulching the slopes of the dam and levees should be implemented. Establishing local grass varieties will prevent erosion and could improve stability of slopes. The local U. S. Dept. of Agriculture Natural Resource Conservation Service (NRCS) office can provide suitable seed mix design for the local climate and soils; Page 7 of 8

The slopes of the ash pond dikes should be maintained free of brush and woody vegetation; Monitoring procedures and maintenance activities should be implemented in coordination with AEP Geotechnical Group; Continue Plant inspections of the facility in accordance with the Circular Letter and CCR Rules. Based on the inspection and review of relevant documents, AEPSC Civil Engineering believes that the Welsh Primary Ash Pond and the Bottom Ash Storage Area have a general satisfactory appearance and are in fair condition. Inspections and monitoring should continue. If you have any questions with regard to this report, please do not hesitate to contact Brett A. Dreger at (614) 716-2258 (Audinet 200-2258). Page 8 of 8

APPENDIX A VICINITY MAP AND PLAN VIEW

APPENDIX B INSPECTION PHOTOGRAPHS

October 28, 2015 Welsh Power Plant Dam and Dike Inspections Page 1 Photo # 1 Typical view of primary ash pond upstream slope and interior conditions. Photo # 2 Typical view of primary ash pond downstream slope. Photo # 3 Typical crest area of primary ash pond.

October 28, 2015 Welsh Power Plant Dam and Dike Inspections Page 2 Photo # 4 Emergency spillway channel of primary ash pond. Photo # 5 Active ash storage area (Winston Pond) downstream slope southeast area. Photo # 6 Active ash storage area (Winston Pond) downstream slope southeast area.

October 28, 2015 Welsh Power Plant Dam and Dike Inspections Page 3 Photo # 7 Active ash storage area (Winston Pond) downstream slope south area. Photo # 8 Active ash storage area (Winston Pond) downstream slope west area. Photo # 9 Active ash storage area (Winston Pond) downstream slope looking at emergency spillway channel.

October 28, 2015 Welsh Power Plant Dam and Dike Inspections Page 4 Photo # 10 Animal activity/burrow on exterior slope area (Winston Pond). Photo # 11 Active ash storage area (Winston Pond) looking at typical interior conditions. Photo # 12 Active ash storage area (Winston Pond) interior slopes looking north.