Construction of Bison Containment Game Fence Grasslands National Park - Parks Canada Agency

Similar documents
ITT# 5P /A Page 1 of 6 Bison Paddock Fence Removal & Replacement. Statement of Work

Special Provision No. 540S01 March OPSS 540, Construction Specification for Highway Fence, is deleted and replaced with the following:

Keefer Pasture Drift Fence Project. Challis-Yankee Fork Ranger District Salmon-Challis National Forest

Section 2 Specification 2.12 Fencing TABLE OF CONTENTS

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION 1043 FENCE MATERIAL

REQUEST FOR QUOTATION

PART 1 GENERAL REQUIREMENTS

CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction

CHAIN LINK FENCES AND GATES

SECTION CHAIN LINK FENCES AND GATES (PARK)

Environmental Assessment Matrix

MERCHANTS METALS. A. ASTM F552 Standard Terminology Relating to Chain Link Fencing

A. Product Data shall be provided for each type of product indicated.

RECLAMATION REGULATIONS

ENVIRONMENTAL SCREENING REPORT

SECTION UNCLASSIFIED EXCAVATION AND GRADING

Bi-Directional Static Load Testing of Drilled Shafts

PROJECT INFORMATION AMEREN POWERLINE RECONSTRUCTION PROJECT April 2014

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE

Alberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects

Canadian Solar Developers Ltd.

WOOD POLE SPAN WIRE SIGNAL SYSTEMS

Best Management Practice (BMP) Guidance Manual

SECTION CHAIN-LINK FENCES AND GATES 02821/1

Douglas County Traffic Signal Installation Guidelines (January 2013)

SPECIFICATIONS SCOPE OF WORK

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

STATEMENT OF WORK. Deer Fencing - Installation (Forest Districts 8,9,10,13,14, & 15 ) (Group 1)

8 ENVIRONMENTAL MANAGEMENT PROGRAMME (PROJECT ENVIRONMENTAL SPECIFICATION)

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

SECTION WATERTIGHT GATES & BARRIERS FOR FLOOD & SPILL CONTROL

SYNTHETIC GRASS INDOOR SURFACE SPECIFICATIONS: K9GRASS LITE

Reclamation Monitoring. Rachel Mealor Extension Range Specialist Department of Renewable Resources

Flygt Advanced Low Pressure Sewer System Package

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division

DynoRaxx EVOLUTION PR Guide to Code Compliant Installation

Chapter 13 Management and Implementation

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POLES

PROPOSED ACTION Cooperative Horse Removal with Fort McDermitt Paiute-Shoshone Tribe

SUPPLEMENTAL TECHNICAL SPECIFICATION

SECTION CHAIN LINK FENCES AND GATES

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

Tree Protection Policy

Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING

Chapter 3 Affected Environment and Environmental Consequences

Fencing Systems for Pasture Management

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION

Builder Agreement. Access to build in Mountainside Village constitutes agreement to abide by the following:

SECTION A1 EXCAVATION AND BACKFILL GENERAL

Mechanical Site Preparation

Small NEPA Scoping Letter April 2017 Fremont - Winema National Forest

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

Environmental Management Plan (EMP)

ROOF MOUNT KIT OWNERS MANUAL

STANFORD UNIVERSITY UNIVERSITY ARCHITECT / CAMPUS PLANNING AND DESIGN

C&B Alberta Solar Development ULC

Nancy L. Young, Forester USAID/USDA Natural Resources Conservation Service

C&B Alberta Solar Development ULC

Commercial Medical Marijuana Operation Design Guidelines

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

American Metal Specialties, Inc.

New York Community Solar Facility Decommissioning Plan

BRIEL FARM SOLAR PERMIT-BY-RULE APPLICATION DOCUMENTS

TRENCH SAFETY TRAINING

2015 Georgia Grazing School: Choosing the right fence, fence charger, and wire or tape for your grazing system

B. The purpose of the meeting shall be to establish the conditions of all existing trees upon receipt of the Project site by the Contractor. Failure t

Galiuro Exploration Drilling Project

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $

80M 4-Square. An antenna project to obtain a bigger signal on the 80 Meter (3.5 to 3.8 MHz) amateur radio band. Bruce Whitney W8RA

Factor Potential Effects Mitigation Measures

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Safe Operating Procedure

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

Is silvopasture for you?

BNSF RAILWAY COMPANY

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Northwest Trek Core Area Fence Upgrade SWR BID NO. T Request for Bids

Water Pollution Control for Work in Sensitive Areas

ENVIRONMENT INDUCTION. Section 5

Installation Guide. PrivacyShield Outdoor Enclosure

A Landscape Perspective on Pheasant Biology and Habitat Needs

WALL MOUNTED ARTICULATING JIB CRANE

Important: Before You Start

C&B Alberta Solar Development ULC

LAND CLEARING CONTENTS VARIABLES AFFECTING CLEARING OPERATIONS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

A-Series Aluminum Gantry Crane

Application for resource consent Form B Damming and diversion of water

Developing forestry practices. Managing for Timber and Wildlife Diversity NATIONAL WILD TURKEY FEDERATION PRE-HARVEST PLANNING:

Transcription:

Construction of Bison Containment Game Fence Grasslands National Park - Parks Canada Agency General Specifications: 1.0 General These specifications address the construction of fences to be built along permanent boundaries and or Bison paddock fences of Grasslands National Park (GNP). Such fences will be built on Parks Canada land, owned and maintained by Parks Canada, and be built between park-owned lands and: private landowners, provincial pastures and, along the United States/Canada International Boundary. In addition GNP will require the construction of a game containment fence near the bison handling facility (Approximately 7.5 miles) As part Grasslands National Park s commitment to the environment integrity of the park and surrounding area, new fences will be built in such a manner as to facilitate wildlife movements, while addressing the containment considerations associated with grazing management and the re-introduce the plains bison. Specific environmental protection issues associated with the construction of fences on Parks Canada lands are addressed in the attached, generic environmental assessment (Annex I). Site specific amendments may be made to the environmental assessment to ensure protection of cultural and natural resource. Mitigations identified in the environmental assessment must be adhered to, or other measures employed after consultation with the Parks Canada project officer. 2.0 Scope of Work 2.1 Location The location of the fence to be salvaged and new fence constructed. See Appendix 1 for land descriptions, locations and maps. 2.2 Optional Site Visit As identified in the Tender Package documents an optional site visit for is available for prospective bidders in order to submit a bid. Parks Canada staff will have met with landowners adjacent to the park to discuss: fence construction; construction time table; access; storing and staging of materials/equipment, and any special considerations that might arise. 2.3 Salvage

Contractor will be responsible for the salvaging of the existing fence. Disposal of the salvaged materials are the responsibility of the contractor. All materials must be removed from Parks Canada property. 2.4 - Survey Fence line demarcation. Contactor will be responsible for boundary surveying and demarcation. The fence line shall be surveyed inside GNP boundary by 0.3 to 1 meter. In the event the line is beside a road allowance, the road allowance will be left with the neighbouring property and the line shall be demarked 0.3 to 1 meter inside GNP property. Rough terrain may warrant constructing the fence outside of the designated line. This would only be done in consultation with the GNP Representative. 2.5 Fence Construction - General The work is to drill and set or pound posts, affix wire and install gates as per approved specifications outlined in the following details, using the listed materials provided by the contractor and in accordance with attached Annex II VII. 3.0 Materials Materials used for construction of fence to be supplied by the contractor include: 8' pressure treated, square/diamond sharpened posts, 5-7" in diameter (for use as anchor, brace and gate posts) 7' pressure treated, square/diamond sharpened posts, 4-5" in diameter (for use as fence posts) four point 12.5 gauge double strand barbed wire (950 lb. breaking strength) barbless double strand wire (950 lb breaking strength) 9 gauge smooth wire gate slats metal gate closing levers 16' metal swing gates and mounting hardware (if requested in advance) 2" barbed staples wire splicers anchor wire-hooks spikes 4.0 Construction 4.1 Posts 4.1.1 Anchor Posts and Brace Posts Anchor and brace post sets shall be used approximately every 1320 feet (ie. one wire length), at all changes in direction, corners and at all gates. Posts for anchors shall be a minimum of 5" in diameter.

Like line posts, anchor and brace posts shall be placed into the soil to a depth which leaves 58" above the ground. Cross bracing shall be used between all anchor and brace posts. Cross braces shall be cut to fit from 7' cull posts and cross wired with barbed wire. 4.1.2 Line Posts Spacing for line posts shall be 16' 6". Where obstacles (ie. rock piles) interfere with these spacing, posts may be situated closer or farther apart. The posts shall be placed into the soil to a depth which leaves between 58" above the ground. 4.2 Gates 4.2.1 Wire Gates All wire gates shall be constructed using 6 wires of double strand barbed wire and independently mounted with gate fasteners. There will be one wire gate constructed per half mile of fence. The location will be predetermined and marked by GNP 4.2.2 Metal Gates There may be metal gates required by GNP. Contractors will determine a price for metal gates and place them where designated by GNP. There is not expected to be many metal gates 4.3 Wire 4.3.1 Spacing The 5 wires shall be spaced at 18" from the ground, then every 9". This will result in wires at 18", 27", 36", 45" and 54" above the ground. The top two wires are to be smooth barbless as well as the bottom wire. 4.3.2 Attachment to Posts The wire is to be attached to the posts with 2" barbed staples. The staples shall be securely driven into the posts across the grain of the post at an angle of approximately 45 degrees (from vertical) to a depth which will allow free movement of the wire within the staple. Each wire at all anchor post locations shall be wrapped around the post at least once and tied off. Wire is to be stapled to Canada s side of the posts. 4.3.3 Wire Tension Wire tension shall be such as to allow for a maximum of 3" side pull deflection.

Double strand wire is required to be over tightened initially, before stapling, in order to remove a portion of the natural stretch of the wire. 4.4 Screw/Bin Anchors Screw or bin anchors shall be installed where the topography dictates they would be beneficial to the long term integrity of the fence (ie. where tight wire may lift posts out of the ground). This includes places where: anchor/brace posts are situated, corners, at fence ends/gates, one or more posts are lower than on those either side, where brace posts are situated in lower spots, or where the angle of a fence changes 10 degrees or more.

Annex I - Generic Environmental Assessment for Fence Construction PROJECT DESCRIPTION Fences that restrict movement of livestock between national park lands and adjacent properties are needed to allow for park management. These fences may be built between GNP and provincial pasture, private lands (leased and/or deeded), and where GNP lands are adjacent to the International Border with the USA. Fence will be constructed to allow for possible future grazing (bison and other livestock) on GNP side. For detailed project location and design see Appendices II - VIII in this document. Equipment used will be tractors, post-pounders, augers, pick-up trucks and all terrain vehicles. Standard Operating Procedures will be followed. DESCRIPTION OF ENVIRONMENT GNP is situated in SW Saskatchewan, a semi-arid area dominated by mixed grass species of vegetation. Coulee slopes often are shrub dominated and wetter coulee bottoms infrequently have aspen stands. Coulees can be quite steep and non-stabilized by any sort of vegetation. Rivers and ephemeral creeks are usually bordered by flood plains. Wildlife is abundant and includes several ungulate species, small to medium sized predators, migrant and seasonal birds, amphibians/reptiles, and a very diverse invertebrate complex. GNP provides habitat for a number of species listed in the Species At Risk Act. NATURE AND EXTENT OF ENVIRONMENTAL EFFECTS, INCLUDING CUMULATIVE EFFECTS 1) Construction of fence, operation and transport of equipment -noise, fuel and oil spillage -disturbance of wildlife -damage to vegetation -introduction of exotic species

-soil compaction -disturbance of archaeological resources 2) Selection and disposal of construction material -treated posts (environmental contamination) MITIGATION MEASURES 1) Equipment -equipment must be in good running order -vehicles must not have any fuel or oil leaks -equipment must be cleaned, tires washed and radiators thoroughly cleaned to prevent the introduction of exotic species -designated areas, away from water courses and dugouts, will be marked for refuelling, and spill containment kits will be on site -ground must be dry/solid enough to minimize vegetation destruction and soil compaction 2) Disposal of solid waste -collection of shavings and waste -only in approved landfill. 3) Selection of construction material -only approved pressure treated wood 4) Employee/contractor safety -Standard Operating Procedures shall be read, understand and implemented for all procedures -personal protective equipment will be used as required -first aid equipment will be available on all work sites

-all close-calls, accidents and injuries will be properly documented and reported 5) Fence Design -consideration in design will enable the travel of wildlife 6) Construction -scheduling avoid disturbance of nesting birds to the greatest extent possible -fence placement will be moved to avoid crossing or passing through sensitive wildlife habitat or travel corridors -known cultural resources will be considered during the development of the location plan - if during any excavation, hole drilling or surface surveys previously unknown archaeological artefacts are discovered, the work will immediately be suspended at that site until Parks Canada staff can assess the resources

Annex II - General Fence Specifications

Annex III - Anchor and Brace Post Specifications

Annex IV - Corner Post Specifications (Side View)

Annex V - Corner Post Specifications (Top View)

Annex VI - End of Fence at Wire Gate

Annex VII - End of Fence at Metal Gate