QUALIFICATION MATRIX ADDENDUM:

Similar documents
Owner s Representative SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

Document B252TM 2007

SECTION 6.2: CONTRACT MANAGER

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101

CONSTRUCTION MANAGEMENT AGREEMENT

Kirk W Buffington, CPFIM, CPPO, C.P.M.,

RESIDENT ENGINEER S MANUAL

NC State University OESAD GUIDELINES Contract Year

PLANNING AND EVALUATION PRELIMINARY DESIGN

Choosing Delivery Method

REQUEST FOR PROPOSALS

EJCDC Contract Documents for America s Infrastructure Buy online at

Connoisseur Solutions Project Procurement Management

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

CONTRACT SERVICES PHASE 1: PRE-CONSTRUCTION

ConsensusDocs. Catalog. Updated Docs Inside

SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT PROCEDURES

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

Managing Fraud Risks. Procurement & Contacting. John J. Hall, CPA (970)

ASA PM WORKSHOP PROJECT MANAGEMENT

Facilities Planning and Construction (FP&C)

Forward Pricing Proposal- Labor Categories. Next Slide

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K

A , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE

Document B101 TM. Standard Form of Agreement Between Owner and Architect

POSITION DESCRIPTION September 2017

REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX

CIC Guidelines Construction Administration and Observation

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

Construction Family of Documents

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

Version 1.0. The Contract Management Standard Final Edition. Version 1.0

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

Construction Management Plan

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:

Addendum Number 1. August 31, Colcock Hall Windows. Owner Project Number: Prepared by:

SPROUTS Training Session: Procurement-Goods and Services Overview Reference Guide Date: June 23, 2015

Project Management Information System

Professional Practice 544

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

CONSTRUCTION MANAGEMENT

REQUEST FOR PROPOSAL FOR. CONSTRUCTION MANAGER and DESIGN TEAM FOR. Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH

Design and Construction: CIP Project Management Review. Hampton Roads Sanitation District

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

Managing Schedule Change

JOB ORDER CONTRACTING (JOC)

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th

Elgin/Lake Huron SCADA Upgrades SCADA Standards Section 300 Detailed Design and Construction

Commissioning Guide. Transportation and Works Building Design and Construction Division

KPMG s Major Projects Advisory Project Leadership Series: Stakeholder Management and Communication

Construction Contract Basics

EXHIBIT F POSITION DESCRIPTIONS

Facilities Management Project Delivery Model - Process Map - v

PROJECT CHECKLIST Links to Relevant Links to Relevant Responsible Suggested Red Folder

ISO 9001:2008 Quality Management System QMS Manual

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

EXHIBIT A INDEX TO TECHNICAL SPECIFICATIONS DOCUMENT FOLLOWS

Role of Procurement / Purchasing Within the Authority

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

REQUEST FOR QUALIFICATIONS AND PROPOSAL FOR OWNER S REPRESENTATIVE March 21, 2014

TxDOT Internal Audit Travel Division Operations Audit (1405-1) Department-wide Report

Managing an Effective Procurement Process at the State Level

PROJECT PROCUREMENT MANAGEMENT. 1 Powered by POeT Solvers Limited

jmt.com PROJECT CONTROLS Part of a diversified family of solutions

INFRASTRUCTURE ONTARIO VENDOR PERFORMANCE PROGRAM

LEVEL I PREQUALIFICATION DOCUMENTS

Science Technology Engineering and Mathematics (STEM) Initiative

Manage Deliverables - Construction Step 6 February 2015

SECTION QUALITY REQUIREMENTS

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

CASE STUDY GOVERNMENT. Metropolitan Council. Managing Project Risks through the Establishment of Effective Project Controls. e-builder.

The Brickfields Trust. Procurement and Tendering Policy and Procedures

Selection of Contractor Step 5. June 2013

CAPE FEAR COMMUNITY COLLEGE VICE PRESIDENT OF BUSINESS SERVICES

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard.

Template for ToR for Transaction Advisory Services

ROUND LAKE AREA SCHOOLS DISTRICT 116: LIMITED COMMISSIONING GUIDELINES INTRODUCTION

Urzgan Rural Access Program

Revision 3. Construction Management Plan. Rebuilding Today for a Better Tomorrow

SSM Project: Centennial School District Issued for Bid AC Unit Replacements 05/16/2014 Klinger and Log College Middle Schools

Request for Proposal For: 2018 American Bar Association Temporary Services

INTERNAL AUDIT OF PROCUREMENT AND CONTRACTING

Human Resources & Risk Manager Class Specification

REPORT 2014/010 INTERNAL AUDIT DIVISION. Audit of contract administration at the United Nations Office at Geneva

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

DRAFT RESEARCH SUPPORT BUILDING AND INFRASTRUCTURE MODERNIZATION WORK BREAKDOWN STRUCTURE DICTIONARY. April 2009 SLAC I

Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan.

Schedule Guidance Document

Review of FMMIS and DSS Assessment Project Procurement Divisions of Operations and Medicaid

Request for Qualifications. Career Pathways for English Language Learners. April 21, 2014

ROLE DESCRIPTION. Strategic Procurement Manager

PERSONNEL COMMISSION. Class Code: 5128 Salary Range: 34 (C1) PURCHASING AGENT JOB SUMMARY

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Internal Communications: MMU Board of Commissioners, General Manager, department managers, department supervisors, utility staff

Transcription:

QUALIFICATION MATRIX ADDENDUM: The following are just some examples of typical Responsible-in-Charge (RIC) functions for each of the fifteen specific areas identified in the experience matrix, Section II above. We realize that there are other possible RIC functions which could result from regional differences and the specific project involved. As you fill out the form, you should use the examples below as a guide and complement it with your good judgment as you answer Yes or No to the question, Did the decisions that the applicant was empowered to make directly impact the successful completion of the project and was the applicant directly responsible in charge of construction management services? PRE-DESIGN PHASE Assist owner in deciding project delivery method. Review/Approve or recommend approval of Feasibility Study for accuracy and applicability; Review the Environmental Impact Report; Select/Assist owner in selecting the Design Consultant; Establish the initial Project Organization; Prepare/Approve the Responsibility Matrix; Prepare/Approve the Construction Management Plan; Prepare/Approve the Project Procedures Manual; Chair the Pre-design Project Conference; Establish the Management Information Systems; Participate in the Site Reconnaissance Committee meetings and decisions; Identify and Coordinate with the stakeholders of the project; Have initial meetings with the pertinent Regulatory Agencies/Offices. Prepare a Risk Register and Risk Management Plan.

DESIGN PHASE Chair Design Review meetings; Approve or recommend approval of design contracts, subcontracts and amendments; Coordinate preparation and approval of General and Special Conditions in the contract documents; Approve or recommend the approval of the Public Relations Plan; Approve project funding allocations; Organize and Chair meetings; Establish cost controls; Approve design schedules; Brief stakeholders on the design status and on-going actions; Develop Risk Management Register; Develop the Quality Control/Quality Assurance program; Develop Project Reporting Requirements; Lead the Constructability Review; Participate in or evaluate Value Engineering studies; Prepare or review the Engineer s Construction Cost Estimates and Compare with Budget. Perform contractor/vendor/supplier/labor market study. Implement and Update the Risk Management Plan. Chair regularly scheduled meetings to review the Design Progress; Approve or recommend approval of designer invoices; Review project estimates; Reconcile Estimates against Project Budget; Evaluate potential Value Engineering savings; Review and approve cash flow diagrams; Manage project funding and costs; Approve the cost loaded design schedule; Identify Cost Saving options; Review and Comment on completeness, accuracy, and the effect on schedule and cost of the Plans & Specs, at the various submittal stages. Time Management: Chair the Design Coordination meetings; Develop Project Milestones; Manage/Approve the master schedule; Engage Stakeholders to provide input on the master schedule; Manage/Approve the design schedule; Manage/Approve the milestone schedule; Establish/Approve the preliminary construction schedule; Ensure that Long Lead Items are identified and entered into the schedule; Ensure that Environmental considerations are identified and thoroughly addressed during design; Identify and contact potential equipment and material suppliers to validate schedule assumptions. 5. Quality Management: Review Design Quality Control procedures; Conduct Constructability Reviews and submit to designer for incorporation; Manage the Document Control function, Review design submittals, Design criteria changes, Quality Control and Quality Assurance efforts; Review and Approve project estimates; Reconcile Estimates, and evaluate the quality implications of Value

Engineering recommendations; Verify construction duration; Approve Construction/Material testing requirements; Approve Quality Management plan; Manage the implementation of Quality Control/Quality Assurance requirements during construction; Manage the project review meetings, the public relations program and reports. PROCUREMENT PHASE Identify Long Lead Items; Recommend materials for pre-purchase; Check with the local labor market to evaluate the trade worker capacity; Confirm with Counsel or Procurement department on the ability to sole source items; Manage Bidder pre-qualification; Develop bidders list; Manage Bidders interest campaign; Publish Notices/Advertisements; Manage delivery of bid documents, Information for Bidders, Conduct Pre-bid Conferences and meetings, Bid openings and evaluation, and conduct Post bid interviews; Issue Addenda; Negotiate with Trades; Prepare Construction contracts; Issue Notice(s) to Proceed; Prepare Schedule Maintenance reports, Project Cost reports and Cash Flow reports. Manage the bidder pre-qualification criteria; conduct the Pre-Bid conference; Evaluate Bids and make recommendation for award. Prepare construction contract. Manage the Risk Management Plan. Manage and resolve any bid protests. CONSTRUCTION PHASE Manage/Chair the Preconstruction Conference; Chair the regularly scheduled Construction Progress meeting; Oversee construction planning and execution; Identify potential construction issues and facilitate developing alternative solutions; Serve as liaison among the owner, designer, general contractor, the regulators, etc; Expedite/reinforce areas needing assistance; Facilitate communications among project team members; Ensure Requests For Information (RFIs) are answered on time. Implement and Update the Risk Management Plan. Review, if necessary, Negotiate Revisions to and Approve the general contractor s Schedule of Values; Manage the change orders and potential change orders; Evaluate potential claims; Approve cost estimates for negotiations and negotiate on behalf of the owner; Recommend change order settlement amounts to owner; Review weekly the expenditures and budget status; Manage the contingency; Submit a cost trending report.

Time Management: Continually monitor the construction schedule; Review the near term look ahead schedule and direct recovery action if appropriate; Review the near term (typically weekly) construction plan (and the look ahead schedule), compare them to the actual progress and overall schedule and take action to keep the construction on track, including recommendations for schedule recovery, if appropriate); Anticipate delays and take proactive action to prevent them; Prepare Time Impact Analysis of proposed and actual changes. Quality Management: Manage the assigned QC/QA duties ; Review QA tests at an appropriate frequency; Verify that there is appropriate evidence that factory tests were performed on equipment/materials used; Review and Accept field test reports prior to startup of facility; Visit the construction site routinely and review daily logs; Issue or confirm that the responsible party issues Noncompliance reports for defective work and review/approve proposed Corrective Action Plans; Verify that Record Drawings are kept current. Plan and conduct the Preconstruction Conference; Assign responsibility for the owner-purchased materials and equipment; Verify that necessary permits, insurance, bonds, and labor affidavits are in place; Review systematically all contract and construction documentation/site records (e.g. field reports, QA reports, Nonconforming Work reports, Accident Reports, Proposed and actual Change Orders, Force Account (T&M) work, budget projections, Progress payments, Claims, RFIs,) so that procedures are being followed and to identify any areas that need attention or correction. Safety Management: Review/comment on the Job Hazard analysis; review/comment on the Safety Management Plan; Review all Accident Reports and confirm that appropriate remedial action is taken; Review Safety Audits; Attend the general contractor s weekly tailgate/toolbox safety meeting; Manage the Safety Committee; Manage the Owner Controlled Insurance Program ( OCIP ).

POST CONSTRUCTION PHASE: Quality Management: Review and cause Submittal of complete Record Drawings and Operation and Maintenance manuals; Ensure that the owner s Operations and Maintenance staff are given training, spare parts, test reports, such that they are trained to can operate and maintain the facility; Manage issues that may arise during the Warranty Period. Prepare a Project Closeout Log to track outstanding items necessary to make the final payment to the GC including release of final retention, release of liens, receipt of spare parts; Negotiate the final close out change order, including settlement of all claims; Prepare list of Lessons Learned. Conduct Lessons learned meeting.