Joint Expeditionary Collective Protection

Similar documents
Joint Expeditionary Collective Protection (JECP)

Joint Expeditionary Collective Protection (JECP) Family of Systems (FoS)

DoD Template for Application of TLCSM and PBL In the Weapon System Life Cycle

Mission-Level Systems Engineering

Shelter Technology, Engineering, Fabrication Directorate. Fabric Structures Team Technology Update

Direct Reporting Program Manager Positioning, Navigation, and Timing

CRS(I) Program Update NDIA GRCC June Louis Anulare PM Force Projection

TECHNICAL REVIEWS AND AUDITS

Engineering and Manufacturing Development YOU ARE HERE. As homework, you read the SPAW MS B TEMP and wrote down any mistakes you noticed.

Given design trade studies, interpret the results to recommend the most cost-effective concept for development.

Course Title: Progressive Concepts in Program Management Course #: 6894 Duration: 4 days Delivery Method: Instructor-led live classroom

Aeronautical Systems Center

Report of the Reliability Improvement Working Group Table of Contents

Headquarters U. S. Air Force

Model Driven Systems Engineering: Linking the Vee

CORROSION PREVENTION AND CONTROL PLANNING GUIDEBOOK

Incorporating Test and Evaluation into Department of Defense Acquisition Contracts

Robotics & Autonomous Systems Ground Interoperability Profile (RAS-G IOP) NDIA GRCCE 2016

TECHNOLOGY DEVELOPMENT STRATEGY [or] ACQUISITION STRATEGY FOR [PROGRAM NAME]

Overcoming Obsolescence and Upgrading Integrated Small Arms Abstract May 2012

Implementation of the Reliability & Maintainability (R&M) Engineering Body of Knowledge (BoK)

Independent Logistics Assessments

Evolving Maintenance Metrics. Acquisition Plans and Strategies. Jim Farmer ODASD Materiel Readiness November 13, 2012

Selected Acquisition Report (SAR)

the USMC Expeditionary Fighting g Vehicle

DATA ITEM DESCRIPTION TITLE: TRAINING SITUATION DOCUMENT Number: DI-SESS-81517C Approval Date:

Integrated Product Support Procedures

Implementing the Materiel Availability KPP in DoD Acquisition Programs Balancing Life Cycle Costs with Warfighter Needs

Statement of Work For PMA-205 TRAINING SYSTEMS Training Ranges Integrated Product Team. 9 July 2009

Analysis of Alternatives (AoA) Handbook

Best practices for highly effective test design; Part 1 Beginners guide to mapping the T&E strategy

Alan F. Estevez. Principal Deputy Assistant Secretary of Defense for Logistics and Materiel Readiness

The DCARC UNCLASSIFIED UNCLASSIFIED. DCARC Helpdesk Jen Horner (253) x1. Software and Web Development

Unmanned Maritime Systems Current Status

COMMITMENT. S&T Needs & Gaps How Better to Communicate. & SOLUTIONS Act like someone s life depends on what we do. 27 Apr Mr.

NUWC Division Newport Undersea Collaboration & Technology Outreach Center (UCTOC) March 9, 2017 SSIC: 4200

CORROSION PREVENTION AND CONTROL PLANNING GUIDEBOOK SPIRAL 3 September 2007

Selected Acquisition Report (SAR)

Selected Acquisition Report (SAR)

Selected Acquisition Report (SAR)

Report Documentation Page

DATA ITEM DESCRIPTION

Required Navigation Performance Area Navigation (RNP RNAV) Flight Management File (FMF) Application Development

Development, Validation and Implementation Considerations of a Decision Support System for Unmanned & Autonomous System of Systems Test & Evaluation

DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT

Operational Requirements Document (ORD)

CONTENT GUIDE FOR THE NET-READY KPP. a. Usage. All IS will follow the NR KPP development process in accordance with this guide and reference jjjj.

Application of the Integrated Product Support Elements

DLA s Counterfeit Protection Program

NDIA Systems Engineering Conference 2013 M&S Applied to Improved Test Planning & Analysis Methods in the DT & OT Execution Phase

2009 DoD Weapon System Product Support Assessment

GAIA. GAIA Software Product Assurance Requirements for Subcontractors. Name and Function Date Signature 15/09/05 15/09/05 15/09/05 15/09/05 15/09/05

Selected Acquisition Report (SAR)

Downloaded from Integrated Master Plan and Integrated Master Schedule Preparation and Use Guide

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #62

Proven Solutions for the Most Challenging Wastewaters

Selected Acquisition Report (SAR)

HUMAN SYSTEMS INTEGRATION: DEFINING AND VALIDATING A FRAMEWORK FOR ENHANCED SYSTEMS DEVELOPMENT

Containerized Ice Making System Innovation New Product Development Decemebr, 2015

Agenda Framing Assumptions (FAs) Lunch and Learn, March 8, Presenter: Brian Schultz. Moderator: Lt Col Doherty

Transportation Security Equipment Qualification Process

EcoDomus, Inc

Department of Defense MANUAL

The Produce/Deploy/Support Phase. The Produce/Deploy/Support Phase. Long Description

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Energy Efficiency Initiatives

Selected Acquisition Report (SAR)

Latest Reliability Growth Policies, Practices, and Theories for Improved Execution

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

PRACTICE NO. PD-ED RELIABILITY February 1996 PRACTICES PAGE 1 OF 7 COMMON REVIEW METHODS FOR ENGINEERING PRODUCTS

Selected Acquisition Report (SAR)

OUTLINE. Collective Protection Conference

Selected Acquisition Report (SAR)

System Safety in Systems Engineering V-Charts

Selected Acquisition Report (SAR)

Integrated T&E throughout the Systems Engineering Life-Cycle

Selected Acquisition Report (SAR)

Performance Based Life Cycle Product Support

Joint Urban Test Capability. Industry Forum Brief. Mike Landers Project Director

Common Tactical Controller

SYSTEMS ENGINEERING REQUIREMENTS AND PRODUCTS

U.S. Army Evaluation Center. Mission Based T&E. NDIA 26 th T&E Conference. 4 March 10

Selected Acquisition Report (SAR)

H-1 Weapons System Support Activity (WSSA) Continuing the Journey. H-1 WSSA Overview. o Established in o Located at NAWS China Lake, CA

Experiences with the construction of EPR at Flamanville and Taishan

Request for Proposals

Selected Acquisition Report (SAR)

Program Management. PREFERRED: o Level II or III Certification in a second DAWIA career field.

objective: to ensure our nation can afford the systems it acquires.

A Turning Point in Naval Ship Design

Intermediate Systems Acquisitions Course. Commercial and Non-Developmental Items

Integrated Logistics Support. What is Integrated Logistics Support?

Guidance for the Tailoring of R&M Engineering Data

Section 6.3 PEO LS S&T Focus Area MODELING AND SIMULATION

Report of the Reliability Improvement Working Group (RIWG) Volume II - Appendices

WEAPON SYSTEM PERFORMANCE INDICATORS - OSD SUSTAINMENT KPPs. 29 Oct 2008 Roy E. Rice, Ph.D., P.E. Chief Technologist, Teledyne Brown Engineering

Information Exchange Energy Security Topics

Florida PALM Quarterly Project Oversight Report: Comprehensive Review For April - June 2015

SUBJECT: Better Buying Power 2.0: Continuing the Pursuit for Greater Efficiency and Productivity in Defense Spending

Transcription:

Joint Expeditionary Collective Protection Date: 23 Oct 07 Michael Boruch JECP Acquisition PM NSWC Dahlgren Division Joint CBR Protection Branch 540-653-3817 DSN 249-3817 michael.boruch@navy.mil DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE

2 Program Objective Design, develop, integrate, test, procure and field a Family of Systems that will provide a collective protection capability to the Joint Expeditionary Forces

Increment 1 Program Overview Includes the entire Family of Systems Tent kit Structure kit Standalone configurations Man-portable Small Medium Large Supports Command & Control (C2), Medical, & Rest and Relief (R2) missions Focus for increment 1 is: Full range of protection against traditional CB agents & select TIMs Easily transportable Quick erect and strike Minimal logistics footprint 3

4 Family of Systems (FoS) CP Tent Kit A lightweight, easily maintained, assembled and disassembled CP capability added to selected fielded tents CP Structure Kit One or more approaches to render an enclosed space of opportunity collectively protected Standalone Shelter System Collectively Protected shelter system which is self contained, lightweight, easily transported, erected, and struck.

5 Key Performance Parameters KPP1 CB Protection CB Warfare agents in vapor, aerosol and particulate form Minimum protection time varies by configuration KPP2 Weight/Cube Transportability KPP3 Individual Lift Number of personnel required (Portability) KPP4 Sustainment Materiel Availability

6 Design Goals ColPro should be as transparent as possible to users Minimize or eliminate the need for Military Handling Equipment FoS component & subsystem commonality and interface standardization to the greatest extent possible Minimize application unique designs Modularity, flexibility, affordability, supportability Backward compatibility with selected existing ColPro applications

7 Program Milestone Events MS-A Decision Issue Draft RFP Issue Formal RFP CDD Approved MS-B Decision SDD Contract Award CPD MS-C Decision Completed Completed 1Q08 2Q08 2Q08 2Q08 2Q10 3Q10

8 Technology Demonstrations Whole CP System characterization and user evaluation Weight reduction greater than 31% Cube reduction greater than 15% Set-up and strike time reductions greater than 50%

9 Technology Demonstrations Demonstrate quick erect technologies applied to airlocks Single person set-up and strike time reduction greater than 50% Multi-person set-up and strike time reduction greater than 40%

10 Technology Demonstrations Demonstrate a quick erect liner for use in multiple tents Demonstrated in CPSSS and TEMPER Set-up and strike time reduction greater than 75%

11 Technology Demonstrations User evaluation of passive CBRN protective tents Provided acceptable protection Better than average rating from participating warfighters

Test and Evaluation Parallels the systems engineering process Anomalies and Deficiencies identified early and resolved prior to LRIP Integrated Test and Evaluation Integrated Test Team Charter Coordination of all Gov t DT and OT through a comprehensive Design of Experiment Integrated Test Team: Program Office, Contractor, DT & OT Representatives Common data collection, analysis and reporting Test data will feed a system performance model No Live Fire Testing anticipated System level testing with simulants only 12

13 Integrated Logistics Support Maintainability, Transportability and ease of Erect / Strike early primary considerations Joint Service Supportability WIPT Program Office, Contractor and User membership Joint Supportability Strategy (JSS) Level of repair analysis will determine maintenance philosophy (2 level vs 3 level) Performance Based Logistics and Contractor Logistics Support will be assessed through Business Case Analysis