Monthly Progress Report. June 2017

Similar documents
City of Saint John, New Brunswick. Safe, Clean Drinking Water Project

Raw Water Supply Master Plan Development

The Impacts of Climate Change on Portland s Water Supply

Spring Forecast Based Operations, Folsom Dam, California

Environmental Information Worksheet

2011 ANNUAL WATER REPORT

Submitted to: Mr. Jim Dunn Chesterfield County Economic Development Department 9401 Courthouse Road - Suite B Chesterfield, VA 23830

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

MEMORANDUM. The general findings of the assessment are as follows:

Folsom Dam Water Control Manual Update

Moving Forward Suggestions for Reducing the Destructive Lake Discharges to the Estuaries

Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship

City Council Work Session Handouts. July 21, I. Review and Discuss North Texas Municipal Water District Water Supply Plan and Projects

US Army Corps of Engineers

Schedule Guidance Document

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

Riverbend Water Resources District Phase 3 Report on Water Treatment Plant and Raw Water Intake Site Selection

Granular Activated Carbon System

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Cedar River Watershed Habitat Conservation Plan

Oil and Gas Energy. Transforming Ideas for the Energy We Use. gaiconsultants.com/energy

Montecito Water District Drought and Quarterly Water Supply Update

Annual Report. December 2010 November Bradley Cole 2/7/2012

ATTACHMENT A TO THE AGREEMENT FOR ENGINEERING SERVICES. Project: Chloramine Replacement Alternative Evaluation

Conference for Ecological and Ecosystem Restoration July 30, US Army Corps of Engineers BUILDING STRONG

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017

November 28, Dear Mr. Bechtold:

Final Design Guideline

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

1.0 ABOUT THE NU GUIDELINES

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

Clermont Modernization Project. National Fuel Gas Supply Corporation Sept. 20, 2016

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

The Sustainability of Floods Pond

WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Stormwater Reuse Through Aquifer Storage & Recovery

7/20/2011 TECHNICAL FEEDBACK GROUP OBJECTIVES. Seepage and Conveyance Technical Feedback Group. April 29, H Street Los Banos, CA.

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE

Oshkosh Water Filtration Plant Clearwells Replacement Project. Public Information Meeting October 16, 2017

Business Practice Manual for The Transmission Planning Process

SECTION 6: MITIGATION STRATEGY

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form

FINAL ENGINEERING REPORT

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

North Central Arizona Water Supply Feasibility Study. Interim Report. Coconino Plateau Watershed Partnership February 24, 2017

Annex 5 - Hydropower Model Vakhsh

CHAPTER 4 MINIMUM DESIGN CRITERIA

APPENDIX A. NEPA Assessment Checklist

System Plan Components Inventory

Water Development Plan Template

Colorado River Municipal Water District. WATER CONSERVATION and DROUGHT CONTINGENCY PLAN

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

DEPARTMENT OF THE ARMY NORFOLK DISTRICT CORPS OF ENGINEERS FORT NORFOLK 803 FRONT STREET NORFOLK, VIRGINIA

Regional Habitat Indicators Project. Workshop #1. Nov 9, 2016

Appendix VIII. Hazen and Sawyer Technical Memorandum: Option 4: Permanent Haw River Intake. and. Supporting Tables Showing Results of OWASA Analysis

PROFESSIONAL SERVICES REQUEST FOR PROPOSALS Moffat Collection System Siphon 1 River Crossing

Start-up of a Secondary Water Supply Company. and First Phase Design of a Regional System

ENVIRONMENTAL AUTHORIZATIONS FOR FEDERAL NAVIGATION AND PROJECTS

Improvements to Florida s Rail Network. CSX Transportation, Inc. AMEC Environment & Infrastructure, Inc.

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016

ACHIEVING STAGE 2 DBPR COMPLIANCE THROUGH SYSTEM OPTIMIZATION AND EFFICIENT USE OF POST-FILTRATION GAC: A 5 YEAR CASE STUDY

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA

Missouri River Basin Water Management

PJM Roadmap for edart

REQUEST FOR QUALIFICATIONS (RFQ) For Engineering Services Institute for Marine Mammal Studies (IMMS)

S.O.P. No. HMD

Los Angeles 3 rd Regional

Water/Wastewater System Capital Projects Workshop June 29, 2017

PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

2017 Freight System Plan

US Army Corps of Engineers

Background Information on the. Peace River Basin

Guidelines for Preparing a Compensatory Mitigation Plan

WATER RESOURCES - WATER SUPPLY

Port of Camas/Washougal Levee Recertification and Engineering Analysis Request for Proposal May 3, 2011

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Village of Mamaroneck Flood Mitigation Status Report

DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3

June Lake Public Utility District

Marcellus Shale Advisory Commission Infrastructure Work Group Meeting El Paso Corporation Tennessee Gas Pipeline Company April 11, 2011

Settlement Agreement Report

Recovering a Failed Sand Filter Wastewater Treatment System

Application for Gas Exploration and Production

Aquifer Science Staff, January 2007

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas

STREAMING CURRENT MONITOR FOR COAGULANT OPTIMIZATION IN WATER TREATMENT PLANTS - LAP EXPERIENCE

Northwest State Route 138 Corridor Improvement Project

MODELING PHOSPHORUS LOADING TO THE CANNONSVILLE RESERVOIR USING SWAT

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

Purpose of the Comprehensive Water System Plan

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

In support of an alternative water supply

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County

Transcription:

Monthly Progress Report June 2017

Program Overview 2 Program Administration 6 Intake and Pump Stations 8 Pipeline 12 Terminal Storage 16 Water Treatment Plant 20 Distribution 24 Environmental 28 1

Program Overview Program Overview Summary The City of Enid, Oklahoma (City) has historically enjoyed an adequate supply of water resources to support consumers in Enid and its wholesale customers. However, the City s annual water demand has begun to exceed the annual yield of the existing groundwater supply, which has resulted in depletion of the aquifer system. To address this supply gap, the City initiated a Water Master Plan (by others) that recommended developing a new surface water supply from Kaw Lake to supplement the existing groundwater supply. Key Components Intake and Intermediate Booster Pump Stations The intake and intermediate booster pump station will provide the means to pump water from Kaw Lake to Enid. This will include an intake structure on Kaw Lake and an intake pumping station. An intermediate pump station will be located about two-thirds of the way to Enid along the pipeline and will provide additional pressure necessary to convey the design flow to the treatment plant site. Pipeline The pipeline will convey the raw water from the proposed Kaw Lake intake structure to the proposed water treatment plant along a 70-mile direct corridor. Terminal Storage Reservoirs Terminal storage is employed to provide a constant supply of raw water to the new water treatment plant, and it can also be utilized to minimize costs associated with conveyance of raw water. As such, the main components of the terminal storage assessed for the current project were emergency storage and equalization storage. For this program, the City desires to separate the volume dedicated for equalization storage from the volume for emergency storage. Therefore, the terminal storage is divided into two components: Equalization (TSR EQ) storage used on a routine basis to meet peak demands Emergency (TSR EM) storage used only when raw water conveyance is not in service Water Treatment Plant A new surface water treatment plant will be needed to meet the water quality objectives necessary to provide safe drinking water as well as to meet the aesthetic desires such as taste and odor. These objectives can be met by a combination of conventional treatment to produce safe drinking with the addition of polishing to reduce objectionable tastes and odors. Distribution Distribution system improvements are necessary to blend the existing groundwater with the treated surface water and to connect the blended water into the existing City of Enid water distribution network. 2 3

Program Overview Program Finance - Phase 2 Program Schedule - Phase 2 Kaw Lake Water Supply Program CashFlow Kaw Lake Water Supply Program - May 2017 $1,800,000 $1,600,000 Baseline Monthly Actual Monthly Baseline Accum Actual Accum Forecast Accum $14,100,000 $18,000,000 $16,000,000 100 90 86% 98% 98% 98% 99% 99% 99% 99% 100% 100% 98% 99% 99% 99% 99% 99% 100% 100% 100% 95% 97% 93% 95% 93% 90% 89% 84% $1,400,000 $14,000,000 80 80% 78% 72% $1,200,000 $12,000,000 70 70% 64% MONTHLY SPEND $1,000,000 $800,000 $600,000 $10,000,000 $8,000,000 $6,000,000 ACCUM SPEND 60 50 40 54% 50% 46% 42% 61% Actual Target Enid WSP-Baseline 36% $400,000 $4,000,000 30 32% 26% 5 $200,000 $2,000,000 20 17% 24% 5 16% 7 $0 $- 10 9% 4% 3% 4 8% -Year Jan-17 Feb-17 Mar-17 Apr-17 May- Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May- Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 F 4 5

Program Administration Program Administration Scope of Services Garver is providing project administration controls initiation through Phase 2, including reporting in all aspects of the program management, scheduling and budget status updates, coordination of regulatory and funding agencies, as well as stakeholders and public meetings. Primary deliverables include a Design Consultants Standards Manual and a Program Strategy Manual. In addition, the Garver Technical Review Committee is providing review and oversight of the deliverables produced by the infrastructure teams and other services as requested. Project Update The Program Management Team continues to work on developing all the items in the scope of services. The team has made significant progress in gathering data for use in establishing the Design Consultant Standards Manual. Workshops are being scheduled for discussions on the strategic execution of the program planning. Team assignments have been made for assistance with the creation of the Program Strategy Manual. The Garver Technical Review Committee has been assembled for quality assurance reviews of project deliverables. Completed Reviewed list of standards and specification for implementation into the Design Consultant Standards Manual Design Consultant Standards Manual workshops Update Program Strategy Manual Organization and planning activity on the Program Strategy Manual Define Program Management Information System requirements Schedule and cost updating of the Master Project Schedule City review and approval of CAD Standards Manual Six technical reviews of Draft Preliminary Design Reports and Water Treatment Plant Design Information Memoranda Continue technical reviews of Draft Preliminary Design Reports for individual project disciplines Develop risk management initiative 6 Future Activities 7

Intake and Pump Stations Intake and Pump Stations Scope of Services The scope of services includes surveying, geotechnical investigations, preliminary (30 percent complete) design, investigation of property acquisition and development of design consultant standards for a new raw water intake and pumping station located on Kaw Lake at Intake Site No. 2 and an intermediate booster pump station as identified in Phase 1 of the project. The intake is expected to include a shaft and micro tunnel with vertical turbine pumps in a parallel configuration with a design capacity to meet the targets identified during Phase 1 of the Program. The intermediate booster pump station is expected to consist of parallel horizontal split case pumps housed in an at-grade structure. The intermediate booster pump station is also expected to include approximately 5 million gallons of stored raw water within two ground storage tanks. Project Update On May 9, 2017, the team submitted the Draft Preliminary Design Report to the City for review and comment. This report establishes the pumping design criteria, design concepts, and operations strategies for the intake and intermediate booster pump station. The draft report also included system overview, process and instrumentation diagrams, and equipment data sheets for basis of design. The team is now focused on development of the preliminary design for the intake and intermediate booster pump station. The preliminary design phase submittal will include design drawings and represent approximately 30 percent of final design documents. Completed 8 Continued to coordinate with U.S. Army Corps of Engineers and geotechnical consultant for land and marine borings at intake site Completed draft process and instrumentation diagrams for intake pump station, intermediate booster pump station and ground storage tank Revised Draft Preliminary Design Report based on Technical Review Committee comments. Submitted Draft Preliminary Design Report to City Continued development and revised Draft Transient Analysis Technical Memo Defined preliminary on-line monitoring needs for water quality at intake Future Activities Address comments received from the City on Draft Preliminary Design Report Perform geotechnical borings at intake Submit draft Transient Analysis Technical Memo to Technical Review Committee and the City Develop preliminary (30 percent) design drawings Draft a list of anticipated technical specifications Above and Right: 3D rendering of intake pump station and underwater piping at Kaw Lake 9

Intake and Pump Stations Project Milestones Draft Preliminary Design Report Draft Transient Analysis TM Geotechnical Report - Intake Geotechnical Report - Intermediate Booster Pump Station and Tank Design Consultant Standards Manual Final Preliminary Design Report and 30% Design Draft 30% Design - Intake Draft 30% Design - BPS & Tank Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Q2 2018 Project Schedule Activity ID Activity ID Activity Name Activity Name Orig Dur Finish Orig Dur Finish Phase 2 Kaw Phase Lake 2 Water Kaw Supply Lake Water Program Supply Program 346d 11-May-18 346d 11-May-18 Intake Intake 346d 11-May-18 346d 11-May-18 MS1030 MS1030 Submit Draft Preliminary Submit Design Draft Preliminary Report Design Report 0d 09-May-17 A 0d 09-May-17 A MS1032 MS1032 Submit draft Transient Submit Analysis draft Transient TM to City Analysis - Intake TM to City - Intake 0d 03-Jul-17 0d 03-Jul-17 MS1010 MS1010 Submit Geotechnical Submit Report Geotechnical - Intake Report - Intake 0d 12-Sep-17 0d 12-Sep-17 MS1020 MS1020 Submit Geotechnical Submit Report Geotechnical - Intermediate Report BPS - and Intermediate GS Tank BPS and GS Tank 0d 10-Nov-17 0d 10-Nov-17 MS1035 MS1035 Submit Draft 30% Submit Design Draft - Intake 30% Design - Intake 0d 12-Dec-17 0d 12-Dec-17 MS1040 MS1040 Submit Design Consultants Submit Design Standards Consultants Manual Standards - Intake, Intermediate Manual - Intake, BPS/ GS Intermediate Tank BPS/ GS 0d Tank 04-Jan-18 0d 04-Jan-18 MS1045 MS1045 Submit Draft 30% Submit Design Draft - Intermediate 30% Design BPS - and Intermediate GS Tank BPS and GS Tank 0d 14-Feb-18 0d 14-Feb-18 MS1050 MS1050 Submit Final PDR Submit and 30% Final Design PDR - and Intake, 30% Intermediate Design - Intake, BPS and Intermediate GS Tank BPS and GS Tank0d 11-May-18* 0d 11-May-18* Intake Information Intake Needs Information (COE) Needs (COE) 21d 27-Jun-17 21d 27-Jun-17 PIP.1840 PIP.1840 Site for Intermediate Site BPS for Intermediate BPS 21d 27-Jun-17 21d 27-Jun-17 Project Coordination Project Coordination 231d 29-Nov-17 231d 29-Nov-17 Topo & Property Topo Survey & Property Survey 110d 02-Aug-17 110d 02-Aug-17 Geotechnical Investigations Geotechnical Investigations 181d 10-Nov-17 181d 10-Nov-17 Preliminary Design Preliminary Report Design Report 346d 11-May-18 346d 11-May-18 Conceptual 30% Conceptual Design 30% Design 279d 11-Apr-18 279d 11-Apr-18 Final Design Standards Final Design Development Standards Development 149d 02-Apr-18 149d 02-Apr-18 Property and Easement Property Acquisition and Easement Acquisition 15d 25-Apr-18 15d 25-Apr-18 2017 2018 2019 2020 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Phase 2 Kaw Lake Water Supply Program Intake Submit Draft Preliminary Design Report Submit draft Transient Analysis TM to City - Intake Submit Geotechnical Report - Intake Submit Geotechnical Report - Intermediate BPS and GS Tank Submit Draft 30% Design - Intake Submit Design Consultants Standards Manual - Intake, Intermediate BPS/ GS Tank Submit Draft 30% Design - Intermediate BPS and GS Tank Submit Final PDR and 30% Design - Intake, Intermediate BPS and GS Tank Intake Information Needs (COE) Site for Intermediate BPS Project Coordination Topo & Property Survey Geotechnical Investigations Preliminary Design Report Conceptual 30% Design Final Design Standards Development Property and Easement Acquisition 10 11

Pipeline Pipeline Scope of Services The scope of services includes surveying, geotechnical, alignment analysis, preliminary (30 percent complete) design, investigation of future property acquisition and development of design consultant standards for a new raw water pipeline from Kaw Lake at Intake Site No. 2 to a new water treatment plant as identified in Phase 1 of the project. The pipeline will consist of approximately 70 miles of pipe along the direct corridor with a design capacity to meet the targets identified during Phase 1 of the Program. This task generally consists of providing final pipeline alignment selection within the Direct Corridor and preparation of aerial background plans. Project Update The team received feedback on preliminary pipeline route alternatives analysis criteria and is preparing revised analysis criteria for consideration. A presentation of the revised analysis is expected at the July progress meeting. The team has also developed the web mapping site to allow the City and team members to utilize pipeline route information and updated data, which was demonstrated at the May progress meeting. Pedestrian surveys continued for all three sections of the pipeline, along with coordination with the Environmental Team. The Pipeline Team is heavily involved in coordinating with other project teams on proposed layouts, connections, and various other design criteria, as well as preparing for geotechnical field investigations to begin. The team continued development of pipeline design criteria for the Preliminary Design Report. Completed Continued coordination with major utility owners along proposed route Coordinated geotechnical investigation needs along route Implemented the web mapping tool for the entire pipeline route Pedestrian Surveys Section 1 = 95 percent complete (awaiting Tribal property access) Section 2 = 100 percent complete Future Activities Preliminary Design Report development Continued coordination of geotechnical investigation needs along route Continued evaluation of equipment and material types Further coordination of crossings with utility companies, city, county, and state agencies Continue field reviews along proposed alignment Perform route alternative analysis Section 3 = 100 percent complete Revisions to alignment alternatives based upon pedestrian surveys Above: Installing 60-inch casing Right: Installing 48-inch pipe by bore and jack 12 13

Pipeline Project Milestones Draft Preliminary Design Report Alignment Field Walks Geotechnical Report Design Consultant Standards Manual Geotechnical TM Draft Draft 30% Design Final Preliminary Design Report and 30% Design Geotechnical TM Final Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Q2 2018 Project Schedule Activity Activity ID ID Activity Name Activity Name Orig Dur Finish Orig Dur Finish Phase Phase 2 Kaw 2 Lake Kaw Water Lake Supply Water Supply Program Program 317d 02-Apr-18 317d 02-Apr-18 Pipeline Pipeline 317d 02-Apr-18 317d 02-Apr-18 MS1070 MS1070 Submit draft Submit Preliminary draft Preliminary Design Report Design - PIP Report - PIP 0d 02-Oct-17 0d 02-Oct-17 MS1060 MS1060 Submit Geotechnical Submit Geotechnical Report - PIPReport - PIP 0d 07-Nov-17 0d 07-Nov-17 MS1085 MS1085 Submit Design Submit Consultants Design Consultants Standards Manual Standards - PIP Manual - PIP 0d 28-Dec-17 0d 28-Dec-17 MS1075 MS1075 Submit Geotechnical Submit Geotechnical TM draft - PIP TM draft - PIP 0d 04-Jan-18 0d 04-Jan-18 MS1080 MS1080 Submit draft Submit 30% draft Design 30% - PIPDesign - PIP 0d 04-Jan-18 0d 04-Jan-18 MS1095 MS1095 Submit Geotechnical Submit Geotechnical TM final - PIP TM final - PIP 0d 02-Apr-18 0d 02-Apr-18 MS1090 MS1090 Submit final Submit PDR final and 30% PDR Design and 30% - PIPDesign - PIP 0d 02-Apr-18 0d 02-Apr-18 Pipeline Pipeline Decisions Decisions to Make to (COE) Make (COE) 5d 11-Sep-17 5d 11-Sep-17 PIP.1850 PIP.1850 Proposed Proposed Easement Easement Widths Widths 5d 11-Sep-17 5d 11-Sep-17 Pipeline Pipeline Information Information Needs (COE) Needs (COE) 60d 28-Sep-17 60d 28-Sep-17 PIP.1280 PIP.1280 Choose pipe Choose materials pipe type materials type 60d 28-Sep-17 60d 28-Sep-17 PIP.1300 PIP.1300 Valve manufacturers Valve manufacturers 23d 28-Sep-17 23d 28-Sep-17 Project Project Coordination Coordination 147d 28-Aug-17 147d 28-Aug-17 Geotechnical Geotechnical Investigation Investigation 315d 02-Apr-18 315d 02-Apr-18 Preliminary Preliminary Design Design Report & Report 30% Design & 30% Design 315d 02-Apr-18 315d 02-Apr-18 Final Final Design Design Standards Standards Development Development 251d 28-Dec-17 251d 28-Dec-17 Property Property & Easements & Easements 218d 11-Dec-17 218d 11-Dec-17 2017 2018 2019 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Phase 2 Kaw Lake Water Supply Program Pipeline Submit draft Preliminary Design Report - PIP Submit Geotechnical Report - PIP Submit Design Consultants Standards Manual - PIP Submit Geotechnical TM draft - PIP Submit draft 30% Design - PIP Submit Geotechnical TM final - PIP Submit final PDR and 30% Design - PIP Pipeline Decisions to Make (COE) Proposed Easement Widths Pipeline Information Needs (COE) Choose pipe materials type Valve manufacturers Project Coordination Geotechnical Investigation Preliminary Design Report & 30% Design Final Design Standards Development Property & Easements 14 15

Terminal Storage Terminal Storage Scope of Services The scope of services includes surveying, geotechnical, preliminary (30 percent complete) design, investigation of property acquisition and development of design consultant standards for a new raw water terminal storage in two separate locations: one for emergency storage and one for equalization storage as identified in Phase 1 of the project. Project Update Conceptual layouts of the equalization storage basin continues to evolve as new concepts are explored. These concepts were presented in the Draft Preliminary Design Report for the terminal storage reservoirs last month. The Terminal Storage Team continues to coordinate with the water treatment plant and distribution staff on the conceptual site design, stormwater drainage, process flow, and drying beds. The team has received feedback from the Oklahoma Department of Environmental Quality on the permit requirements for the terminal storage reservoirs. While the general area of the emergency storage basin has been established, the final location has not been determined. The Terminal Storage Reservoir Team will continue to coordinate with the City to determine a final location of the emergency storage reservoir. Civil site design has commenced, including preliminary grading, road locations, and stormwater design. Completed Future Activities Determined design flows Determined potential permit requirement for mid-level berm construction Determine final location of emergency terminal storage Determined final location of equalization terminal storage Terminal storage lining and erosion control selection Stormwater drainage Determined Oklahoma Department of Environmental Quality permit requirements for the terminal storage reservoirs Preliminary site layouts with grading Site access Completed the Draft Preliminary Design Report Process and pipeline layout for site Complete Terminal Storage Technical Memorandum No. 1 Pumping Energy Evaluation Above: Rendering of equalization terminal storage reservoir at water treatment plant Right: Example terminal storage reservoir under construction 16 17

Terminal Storage Project Milestones Equalization Storage Survey Draft Preliminary Design Report Emergency Storage Survey Geotechnical Report Draft 30% Design Design Consultants Standards Manual Final Preliminary Design Report and 30% Design Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Q2 2018 Project Schedule Activity Activity ID ID Activity Name Activity Name Orig Dur Finish Orig Dur Finish Phase Phase 2 Kaw 2 Lake Kaw Water Lake Supply Water Supply Program Program 335d 02-Apr-18 335d 02-Apr-18 Terminal Terminal Storage Storage Reservoir Reservoir 335d 02-Apr-18 335d 02-Apr-18 MS1100 MS1100 Submit draft Submit Preliminary draft Preliminary Design Report Design - TSRReport - TSR 0d 09-May-17 A 0d 09-May-17 A MS1110 MS1110 Submit Geotechnical Submit Geotechnical Report - TSReport - TSR 0d 19-Sep-17 0d 19-Sep-17 MS1130 MS1130 30% Design 30% draft Design - TSRdraft - TSR 0d 04-Jan-18 0d 04-Jan-18 MS1120 MS1120 Submit Design Submit Consultants Design Consultants Standards Manual Standards - TSRManual - TSR 0d 04-Jan-18 0d 04-Jan-18 MS1140 MS1140 Submit Final Submit PDR Final and 30% PDR Design and 30% - TSRDesign - TSR 0d 02-Apr-18 0d 02-Apr-18 TSR Decisions TSR Decisions to Make to (COE) Make (COE) 316d 18-Jan-18 316d 18-Jan-18 TSR.2020 TSR.2020 Selection Selection of TSR EM of site TSR EM site 194d 20-Jul-17 194d 20-Jul-17 TSR.2030 TSR.2030 Lining Type Lining and Erosion Type and Controls Erosion - EQControls - EQ 127d 11-Aug-17 127d 11-Aug-17 TSR.2046 TSR.2046 Bird Deterrents Bird Deterrents 142d 14-Nov-17 142d 14-Nov-17 TSR.2040 TSR.2040 OWRB dam OWRB / level dam implications / level implications - EM - EM 121d 05-Oct-17 121d 05-Oct-17 TSR.2050 TSR.2050 USACE jurisdiction USACE jurisdiction - EQ - EQ 130d 31-May-17 A130d 31-May-17 A TSR.2055 TSR.2055 USACE jurisdiction USACE jurisdiction - EM - EM 95d 18-Jan-18 95d 18-Jan-18 TSR.2032 TSR.2032 Lining Type Lining and Erosion Type and Control Erosion - EMControl - EM 57d 11-Dec-17 57d 11-Dec-17 Project Project Coordination Coordination 201d 19-Sep-17 201d 19-Sep-17 Preliminary Preliminary Design Design Report Report 275d 02-Apr-18 275d 02-Apr-18 Conceptual Conceptual 30% Design 30% Design 170d 04-Jan-18 170d 04-Jan-18 Final Final Design Design Standards Standards Development Development 255d 04-Jan-18 255d 04-Jan-18 Permitting Permitting 92d 10-Aug-17 92d 10-Aug-17 Property Property and Easement and Easement Acquisition Acquisition 26d 25-Aug-17 26d 25-Aug-17 2017 2018 2019 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Phase 2 Kaw Lake Water Supply Program Terminal Storage Reservoir Submit draft Preliminary Design Report - TSR Submit Geotechnical Report - TSR 30% Design draft - TSR Submit Design Consultants Standards Manual - TSR Submit Final PDR and 30% Design - TSR TSR Decisions to Make (COE) Selection of TSR EM site Lining Type and Erosion Controls - EQ Bird Deterrents OWRB dam / level implications - EM USACE jurisdiction - EM Lining Type and Erosion Control - EM Project Coordination Preliminary Design Report Conceptual 30% Design Final Design Standards Development Permitting Property and Easement Acquisition 18 19

Water Treatment Plant Water Treatment Plant Scope of Services The scope of services includes surveying, geotechnical, preliminary (30 percent complete) design, investigation of property acquisition, and development of design consultant standards for a new Enid water treatment plant located adjacent to the City s current water treatment plant No. 2. The planned capital improvements include construction of a new conventional water treatment plant with ozone and granular activated carbon facilities to meet capacity and treatment goals identified during Phase 1 of the Program. Project Update Presented detailed technical discussion for the filter backwash supply system, residuals handling system, granular activated carbon feed pumps, power distribution, standby power, supervisory control and data acquisition system, system-wide operational control strategy, and piping and instrumentation diagrams at the May water treatment plant workshop. Continuing to develop site layout and hydraulic grade concepts. Developing draft versions of residuals handling and intermediate pumping facility technical memoranda for review by the City in June. Continuing work on preliminary process and instrumentation diagrams and facility layouts. Coordinating with ongoing geotechnical investigation at water treatment plant site. Completed Draft Design Information Memoranda: Future Activities Water treatment plant workshop with focus on operations and maintenance facilities and disinfection and chemical storage and feed systems Site visit to tour ozone generation installations, factory, and laboratory Develop Draft Pre-Design Report deliverables for: Ozone and granular activated carbon Rapid mix, flocculation, and sedimentation Filtration and backwash facilities Preliminary process design criteria for: Electrical power distribution and standby electrical power Residuals handling system Supervisory control and data acquisition system and instrumentation Granular activated carbon feed pumps Residuals handling system: gravity thickeners backwash recovery basins, lagoons 20 Updated preliminary process layouts and draft site layout Continue developing process and instrumentation diagrams Granular activated carbon feed pumps Continue development of preliminary layouts for operations and maintenance support facilities Continue development of site layouts Continue development of water treatment plant hydraulic profile Perform geotechnical investigations Round Two of bench scale treatability testing Develop and present scope of study to sample and characterize water at various depths in Kaw Lake Above: Water treatment plant sedimentation basin Right: Process flow diagram for selected alternative 21

Water Treatment Plant Project Milestones Geotechnical Report Draft Preliminary Design Report Draft Engineering Report to ODEQ Draft 30% Design Design Consultants Standards Manual Final Preliminary Design Report and 30% Design Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Q2 2018 Project Schedule Activity Activity ID ID Activity Name Activity Name Orig Dur FinishOrig Dur Finish Phase Phase 2 Kaw 2 Kaw Lake Water Lake Supply Water Supply Program Program 317d 02-Apr-18 317d 02-Apr-18 Water Water Treatment Treatment 317d 02-Apr-18 317d 02-Apr-18 MS1150 MS1150 Submit Geotechnical Submit Geotechnical Report - WTP Report - WTP 0d 01-Aug-17 0d 01-Aug-17 MS1165 MS1165 Submit Draft Submit Preliminary Draft Preliminary Design Report Design - WTPReport - WTP 0d 04-Oct-17 0d 04-Oct-17 MS1160 MS1160 Submit Draft Submit Engineering Draft Engineering Report to ODEQ Report - WTP to ODEQ - WTP 0d 24-Oct-17 0d 24-Oct-17 MS1190 MS1190 Submit Design Submit Consultants Design Consultants Standards Manual Standards - WTPManual - WTP 0d 04-Jan-18 0d 04-Jan-18 MS1180 MS1180 Submit Draft Submit 30% Draft Design 30% - WTP Design - WTP 0d 04-Jan-18 0d 04-Jan-18 MS1200 MS1200 Submit Final Submit PDR Final and 30% PDR Design and 30% - WTP Design - WTP 0d 02-Apr-18 0d 02-Apr-18 WTP WTP Decisions Decisions to Make to (COE) Make (COE) 142d 04-Oct-17 142d 04-Oct-17 WTP.1715 WTP.1715 Drainage Drainage requirements requirements 22d 29-Aug-17 22d 29-Aug-17 WTP.1750 WTP.1750 Treatment Treatment Equipment Equipment type type 44d 29-Aug-17 44d 29-Aug-17 WTP.1730 WTP.1730 Electrical Electrical power supply power ( underground/overhead, supply ( underground/overhead, backup power) backup power) 62d 14-Aug-17 62d 14-Aug-17 WTP.1740 WTP.1740 SCADA / SCADA Controls / type Controls type 22d 23-Aug-17 22d 23-Aug-17 WTP.1720 WTP.1720 Operations Operations Building (architecture, Building (architecture, finishes, LEED finishes, certif., Interior LEED layout) certif., Interior layout) 22d 04-Oct-17 22d 04-Oct-17 Project Project Coordination Coordination 253d 02-Jan-18 253d 02-Jan-18 Engineering Engineering Report Report 169d 24-Oct-17 169d 24-Oct-17 Preliminary Preliminary Design Design Report Report 218d 22-Nov-17 218d 22-Nov-17 Conceptual Conceptual 30% Design 30% Design 212d 04-Jan-18 212d 04-Jan-18 Final Final Design Design Standards Standards Development Development 317d 02-Apr-18 317d 02-Apr-18 2017 2018 2019 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Phase 2 Kaw Lake Water Supply Program Water Treatment Submit Geotechnical Report - WTP Submit Draft Preliminary Design Report - WTP Submit Draft Engineering Report to ODEQ - WTP Submit Design Consultants Standards Manual - WTP Submit Draft 30% Design - WTP Submit Final PDR and 30% Design - WTP WTP Decisions to Make (COE) Drainage requirements Treatment Equipment type Electrical power supply ( underground/overhead, backup power) SCADA / Controls type Operations Building (architecture, finishes, LEED certif., Interior layout) Project Coordination Engineering Report Preliminary Design Report Conceptual 30% Design Final Design Standards Development 22 23

Distribution Distribution Scope of Services Generally, the scope of services includes surveying, geotechnical, preliminary (30 percent complete) design, investigation of property acquisition, and development of design consultant standards for new distribution infrastructure (pumping, storage, and piping) as identified in Phase 1 of the project. The pumping improvements will include the construction of a new high service pump station adjacent to the water treatment plant capable of conveying flow to both pressure planes and the decommissioning of the existing high services pump stations. The storage improvements will consist of adding a new 8 million gallon ground storage tank adjacent to the new high service pump station. The piping improvements will include the piping necessary to blend the groundwater supply with the treated surface water prior to the high service pump station, as well as the piping necessary to convey water to the east pressure plane. Project Update Utilized information from the field investigation for Chestnut corridor to complete a transmission main alignment alternatives evaluation. Updated demand projections over the design horizon based on historical data and available planning documents, and utilized this information for the distribution system optimization. Optimal sizing was determined for major distribution components, specifically the highservice pump station, ground storage, additional elevated storage, and the transmission main to the east pressure plane. Preliminary 30 percent design work continues on design criteria, high-service pump station and clearwell site layout, operational control, facility electrical loads, and geotechnical investigations. Completed Future Activities Completed transmission main alignment alternatives evaluation Review of transmission line alignment alternatives evaluation technical memorandum Continued coordination with Survey and Environmental Teams for their data collection along the transmission main corridor to support alignment selection and conceptual design Review of system optimization technical memorandum Complete transmission line pipe material determination Assessed demands and future growth and updated demand projections for design horizon Select geotechnical boring locations along transmission main alignment Completed initial system optimization for high-service pump station capacity, transmission line size, elevated storage volume, and ground storage volume Continue developing site layout in conjunction with Water Treatment Plant Team Develop electrical one-line diagram 24 Completed preliminary operational controls strategy for blending of treated surface water and groundwater and the high-service pump station Developed process and instrumentation diagrams Presented draft alignment evaluation and system optimization results at distribution workshop Continue Preliminary Design Report draft development of design criteria and design concepts Develop distribution system assessment / design criteria Develop construction sequencing Update demand in hydraulic model Perform computational fluid dynamics modeling to evaluate mixing in clearwell Above: Conceptual layout of high-service (distribution) pump station 25

Distribution Project Milestones Draft 30% Design and Cost-Distribution Interface Design Consultant Geotechnical Report Draft Preliminary Design Report Standards Manual Phasing Plan and Final Cost Final Preliminary Design Report and 30% Design Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Q2 2018 Project Schedule Activity ID Activity Name Orig Dur Phase 2 Kaw Lake Water Supply Program 317d 02-Apr-18 Distribution System 317d 02-Apr-18 MS1210 Submit Geotechnical Report - DIS 0d 19-Sep-17 MS1220 Submit Draft Preliminary Design Report - DIS 0d 06-Dec-17 MS1230 Submit Draft 30% Design and Cost - DIS 0d 03-Jan-18 MS1240 Submit Design Consultants Standards Manual - DIS 0d 04-Jan-18 MS1250 Submit Final PDR and 30% Design - DIS 0d 13-Feb-18 MS1255 Submit Phasing Plan and Final Cost - DIS 0d 02-Apr-18 DIS Information Needs (COE) 10d 29-Jun-17 DIS.2105 Review / Feedback on Flow Testing Plan 10d 29-Jun-17 DIS Decisions to Make (COE) 61d 03-Oct-17 DIS.2165 Comments on Transmission Main alignment evaluation 5d 14-Jul-17 DIS.2144 Comments on Transmission Main size selection 5d 28-Jul-17 DIS.2157 Comments on Elevated Storage Tank style selection 10d 18-Aug-17 DIS.2156 Comments on Transmission Main material selection 10d 03-Oct-17 Project Coordination 182d 19-Sep-17 Preliminary Design Report 254d 03-Jan-18 Conceptual 30% Design 283d 13-Feb-18 Final Design Standards Development 317d 02-Apr-18 Property and Easement Acquisition 72d 14-Feb-18 Finish 2017 2018 2019 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Phase 2 Kaw Lake Water Supply Program Distribution System Submit Geotechnical Report - DIS Submit Draft Preliminary Design Report - DIS Submit Draft 30% Design and Cost - DIS Submit Design Consultants Standards Manual - DIS Submit Final PDR and 30% Design - DIS Submit Phasing Plan and Final Cost - DIS DIS Information Needs (COE) Review / Feedback on Flow Testing Plan DIS Decisions to Make (COE) Comments on Transmission Main alignment evaluation Comments on Transmission Main size selection Comments on Elevated Storage Tank style selection Comments on Transmission Main material selection Project Coordination Preliminary Design Report Conceptual 30% Design Final Design Standards Development Property and Easement Acquisition 26 27

Environmental Environmental Scope of Services This scope of work includes activities to support document preparation as required of the National Environmental Policy Act (NEPA) (42 U.S.C. 4321 et seq.) in accordance with the procedures set forth in Council on Environmental Quality Regulations Implementing the Procedural Provision of NEPA (40 CFR 1500-1508) and in the U.S. Army Corps of Engineers (USACE) Procedures for Implementing NEPA (33 CFR 230). The U.S. Army Corps of Engineers, Tulsa District, will serve as the lead federal agency for the project. It is anticipated that the NEPA Class of Action for this Program will be an Environmental Assessment and will analyze the impacts of a No Build and one Build Alternative (Proposed Action) for each of the project s infrastructure components [intake, pipeline, terminal storage reservoir (emergency and equalization), treatment plant, and distribution system]. Project Update Biological and cultural field studies are complete for the intake, water treatment plant, and distribution. A Cultural Resources Report documenting the findings at the intake site has been submitted to the U.S. Army Corps of Engineers. The Corps initiated consultation with the State Historic Preservation Officer on May 5, 2017 to obtain their concurrence prior to authorizing geotechnical testing. Letters requesting permission to access these properties were mailed certified to 907 tribal owners on April 20, 2017. One hundred and five permission forms have been received, resulting in approval to access six properties. Twenty-four properties still do not have permission to access. A meeting with the Ponca Tribe is scheduled for June 29, 2017 to present the project to tribal members. The cultural resources methodology is in discussion. The team is looking at options to present a methodology to the Corps and the State Archaeologist that will also incorporate the request of the Osage Nation where possible. Discussion with the Tonkawa Tribe has occurred and a meeting is being coordinated. Completed 28 Future Activities Intake, water treatment plant, and distribution biological and cultural resource studies Complete biological studies for remainder of pipeline as alignments are refined Approximately 45 percent of the biological field work along the pipeline corridor Begin cultural resources field work when methodology is resolved Status update meeting with the U.S. Army Corps of Engineers held June 2, 2017 Meet with State Archaeologist and Osage Nation to discuss cultural resources scope Meet with Tonkawa Tribe Community meeting with Ponca Tribe Above: Kaw Lake shoreline 29

Environmental Project Milestones Tribal Notification Private Landowner Notification Submittal of Specialist Reports Draft Environmental Assessment Public Involvement 30 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Q2 2018 Q3 2018 Project Schedule Activity ID Activity ID Activity Name Activity Name Orig Dur Finish Orig Dur Phase 2 Kaw Phase Lake 2 Water Kaw Supply Lake Water Program Supply Program 527d 30-Jan-19 527d 30-Jan-19 Environmental Environmental 527d 30-Jan-19 527d 30-Jan-19 ENV.1010 ENV.1010 NEPA Start NEPA Start 3d 06-Jan-17 A 3d 06-Jan-17 A Private Landowner Private Notification Landowner Notification 118d 23-May-17 A118d 23-May-17 A Tribal Notification Tribal Notification 36d 20-Apr-17 A 36d 20-Apr-17 A Public Involvement Public Involvement 209d 26-May-17 A209d 26-May-17 A Specialist Studies Specialist Studies 244d 16-Apr-18 244d 16-Apr-18 ENV.1213 ENV.1213 Conduct stream and Conduct wetland stream field work and wetland - PIP field work - PIP 60d 25-Aug-17 60d 25-Aug-17 ENV.1217 ENV.1217 Conduct stream and Conduct wetland stream field work and wetland - TSR EMfield work - TSR EM 3d 27-Jul-17 3d 27-Jul-17 ENV.1215 ENV.1215 Cultural Resources Cultural field work Resources - PIP field work - PIP 44d 27-Sep-17 44d 27-Sep-17 ENV.1950A ENV.1950A Wetland and Stream Wetland Delineation and Stream Report Delineation Report 60d 20-Oct-17 60d 20-Oct-17 ENV.1218 ENV.1218 Stream and Wetland Stream preliminary and Wetland results preliminary - TSR EM results - TSR EM 5d 03-Aug-17 5d 03-Aug-17 ENV.1950B ENV.1950B Threatened & Endangered Threatened Species & Endangered Report Species Report 60d 20-Oct-17 60d 20-Oct-17 ENV.1950D ENV.1950D Hazardous Materials Hazardous memo Materials memo 47d 03-Oct-17 47d 03-Oct-17 ENV.1214 ENV.1214 Stream and Wetland Stream preliminary and Wetland results preliminary - PIP results - PIP 22d 27-Sep-17 22d 27-Sep-17 ENV.1219 ENV.1219 Cultural Resources Cultural field work Resources - TSR EMfield work - TSR EM 4d 31-Aug-17 4d 31-Aug-17 ENV.1220 ENV.1220 Cultural Resources Cultural preliminary Resources results preliminary - TSR EM results - TSR EM 5d 08-Sep-17 5d 08-Sep-17 ENV.1216 ENV.1216 Cultural Resources Cultural preliminary Resources results preliminary - PIP results - PIP 22d 27-Oct-17 22d 27-Oct-17 ENV.1950C ENV.1950C Cultural Resources Cultural Report Resources Report 60d 22-Dec-17 60d 22-Dec-17 ENV.1950D.1 ENV.1950D.1 City Review of Hazardous City Review Materials of Hazardous Memo Materials Memo 10d 17-Oct-17 10d 17-Oct-17 ENV.1950A.1 ENV.1950A.1 City Review of Wetland City Review and Stream of Wetland Delineation and Stream Delineation 10d 03-Nov-17 10d 03-Nov-17 ENV.1950B.1 ENV.1950B.1 City Review of T&E City Report Review of T&E Report 10d 03-Nov-17 10d 03-Nov-17 ENV.1950A.2 ENV.1950A.2 Revisions of Wetland Revisions & Stream of Wetland Delineation & Stream Report Delineation Report 5d 10-Nov-17 5d 10-Nov-17 ENV.1950B.2 ENV.1950B.2 Revisions of T&E Revisions Report of T&E Report 5d 10-Nov-17 5d 10-Nov-17 ENV.1100A ENV.1100A USACE Review of USACE Wetland Review & Stream of Wetland Delineation & Stream ReportDelineation Report 42d 15-Jan-18 42d 15-Jan-18 ENV.1100B ENV.1100B USACE Review of USACE T&E Report Review of T&E Report 42d 15-Jan-18 42d 15-Jan-18 ENV.1950C.1 ENV.1950C.1 City Review of Cultural City Review Resources of Cultural ReportResources Report 10d 09-Jan-18 10d 09-Jan-18 ENV.1950C.2 ENV.1950C.2 Revisions of Cultural Revisions Resources of Cultural ReportResources Report 5d 16-Jan-18 5d 16-Jan-18 ENV.1100B.1 ENV.1100B.1 USFWS Review of USFWS T&E Report Review of T&E Report 20d 12-Feb-18 20d 12-Feb-18 ENV.1100C ENV.1100C USACE Review of USACE Cultural Review Resources of Cultural ReportResources Report 44d 19-Mar-18 44d 19-Mar-18 ENV.1100C.1 ENV.1100C.1 SHPO Review of SHPO Cultural Review Resources of Cultural ReportResources Report 20d 16-Apr-18 20d 16-Apr-18 Environmental Environmental Assessment Assessment 204d 01-Nov-18 204d 01-Nov-18 ENV.1120 ENV.1120 Prepare Draft EA Prepare - Introduction Draft and EA - Background Introduction and Background 10d 30-Jan-18 10d 30-Jan-18 ENV.1123 ENV.1123 Prepare Draft EA Prepare - Existing Draft conditions EA - Existing conditions 5d 06-Feb-18 5d 06-Feb-18 ENV.1121 ENV.1121 Prepare Draft EA Prepare - Environmental Draft EA Impacts - Environmental Impacts 22d 01-Mar-18 22d 01-Mar-18 ENV.1122 ENV.1122 Prepare Draft EA Prepare - Public Involvement Draft EA - Public summary Involvement summary 22d 16-May-18 22d 16-May-18 ENV.1124 ENV.1124 Prepare Draft EA Prepare - Summary Draft and EA Commitments - Summary and Commitments 10d 31-May-18 10d 31-May-18 ENV.1125 ENV.1125 Produce and Submit Produce Draft EA and Submit Draft EA 5d 07-Jun-18 5d 07-Jun-18 ENV.1110 ENV.1110 USACE & Cooperting USACE Agency & Cooperting review of EA Agency review of EA 31d 23-Jul-18 31d 23-Jul-18 ENV.1080 ENV.1080 Draft FONSI Draft FONSI 10d 06-Aug-18 10d 06-Aug-18 ENV.1130 ENV.1130 Public Comment Period Public Comment - FONSI Period - FONSI 21d 05-Sep-18 21d 05-Sep-18 ENV.1140 ENV.1140 Review & incorporate Review Public & incorporate Comments Public Comments 21d 04-Oct-18 21d 04-Oct-18 ENV.1150 ENV.1150 FINAL EA Approval FINAL EA Approval 20d 01-Nov-18 20d 01-Nov-18 Section 408 Approval Section 408 Approval 60d 30-Jan-19 60d 30-Jan-19 Section 404 Pre-Coordination Section 404 Pre-Coordination 42d 18-Jan-18 42d 18-Jan-18 Finish 2017 2017 2018 2018 2019 2019 Q1 Q2 Q1 Q3 Q2 Q4 Q3 Q1 Q4 Q2 Q1 Q3 Q2 Q4 Q3Q1 Q4Q2 Q3Q1 Q2 Q3 Phase 2 Kaw Lake WaterPhase 2 Kaw Lake Water Private Landowner Notification Private Landowner Notification Tribal Notification Public Involvement Tribal Notification Public Involvement Specialist Studies Conduct stream and wetland Conduct field stream work - PIPwetland field work - PIP Conduct stream and wetland Conduct field stream work and - TSR wetland EM field work - TSR EM Cultural Resources field Cultural work - PIP Resources field work - PIP Wetland and Stream Delineation Wetland and Report Stream Delineation Report Stream and Wetland preliminary Stream and results Wetland - TSR preliminary EM results - TSR EM Threatened & Endangered Threatened Species & Report Endangered Species Report Hazardous Materials memo Hazardous Materials memo Stream and Wetland preliminary Stream and results Wetland - PIPpreliminary results - PIP Cultural Resources field Cultural work - TSR Resources EM field work - TSR EM Cultural Resources preliminary Cultural Resources results - TSR preliminary EM results - TSR EM Cultural Resources preliminary Cultural Resources results - PIPpreliminary results - PIP Cultural Resources Report Cultural Resources Report City Review of Hazardous City Materials Review of Memo Hazardous Materials Memo City Review of Wetland City and Review Stream of Delineation Wetland and Stream Delineation City Review of T&E Report City Review of T&E Report Environmental Revisions of Wetland & Revisions Stream Delineation of Wetland Report & Stream Delineation Report Revisions of T&E Report Revisions of T&E Report USACE Review of Wetland USACE & Stream Review Delineation of Wetland Report & Stream Delineation Report USACE Review of T&E USACE Report Review of T&E Report City Review of Cultural City Resources Review Report of Cultural Resources Report Revisions of Cultural Resources Revisions Report of Cultural Resources Report USFWS Review of T&E USFWS Report Review of T&E Report USACE Review of Cultural USACE Resources Review Report of Cultural Resources Report SHPO Review of Cultural SHPO Resources Review Report of Cultural Resources Report Environmental Assessment Environmental Assessment Prepare Draft EA - Introduction Prepare and Draft Background EA - Introduction and Background Prepare Draft EA - Existing Prepare conditions Draft EA - Existing conditions Prepare Draft EA - Environmental Prepare Draft Impacts EA - Environmental Impacts Prepare Draft EA - Public Prepare Involvement Draft summary EA - Public Involvement summary Prepare Draft EA - Summary Prepare and Draft Commitments EA - Summary and Commitments Produce and Submit Draft Produce EA and Submit Draft EA USACE & Cooperting Agency USACE review & Cooperting of EA Agency review of EA Draft FONSI Specialist Studies Public Comment Period - Public FONSI Comment Period - FONSI Review & incorporate Public Review Comments & incorporate Public Comments FINAL EA Approval Section 404 Pre-Coordination Section 404 Pre-Coordination Draft FONSI Section 408 Approval FINAL EA Approval Environmental Section 408 Approval 31

Contact Information Program Manager Michael Graves Phone 405-329-2555 Email MJGraves@GarverUSA.com Website GarverUSA.com