An Introduction To BIM INTEGRATED Architectural Specifications

Similar documents
Peter Marchese Microdesk Gilles Letourneau Interspec, Inc.

DYNAMIC PROTOTYPE BIM MANUAL FOR A FITNESS CENTER V1.0 November 21, 2011

Parametric Library Components for BIM-based Curtain Wall Design Automation Module

The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM

Thule Prototype BIM Manual for Dormitories. February 5, 2010

BIM EXECUTION PLAN PROJECT INFORMATION PROJECT NUMBER

Oracle Process Manufacturing Formula Management

WEB BASED BIM FOR MODULAR HOUSE DEVELOPMENT. Query Approach in Consumer Participatory Design

Building Information Modeling to Facilities Information Management and Beyond

Audio Presentation. Session 1 FUNDAMENTALS. Project Delivery Education Program. Construction Document Technology (CDT) Preparatory Course

FIVE WAYS YOUR MOVE TO A BIM WORKFLOW PAYS OFF

Solutions Implementation Guide

IMPLEMENTATION, EVALUATION & MAINTENANCE OF MIS:

E-Procurement Reference Model for Small Government Department

BIM and the Consultant / Client s Quantity Surveyor

The Strategy Alignment Model: Defining Real Estate Strategies in the Context of Organizational Outcomes

Software Processes. Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 4 Slide 1

Indiana University. Vice President for Capital Planning and Facilities

Software Processes. Objectives. Topics covered. The software process. Waterfall model. Generic software process models

Objectives. The software process. Topics covered. Waterfall model. Generic software process models. Software Processes

Next we have checklists, which include concise list of points, timetables and flowcharts you can consult to ensure you have thought of everything.

NBS National BIM Survey 2011

Topics covered. Software process models Process iteration Process activities The Rational Unified Process Computer-aided software engineering

Service Plan Creator. Quick Reference Guide RapidFire Tools, Inc. All rights reserved. V Ver 1I

User Guide. Introduction. What s in this guide

Towards a Unified Laboratory Informatics Platform STARLIMS SCIENTIFIC DATA MANAGEMENT SYSTEM

Introduction and Abstract. Previous Research

SOLUTION BRIEF IDENTITY AND ACCESS GOVERNANCE. Simplify Identity Governance and Reduce Risk With the CA Identity Suite

PDM Made Easy for the Mainstream Enterprise

An Integrated Methodology for Construction BIM & ERP by Using UML Tool

IBM WebSphere Catalog Architect

AIA 2009 BIM AWARDS. Category B: Design/Delivery Process Innovation Using BIM

BIM M Masonry Wall Project and Revit Guide BIM FOR MASONRY MISSION STATEMENT

Advance Concrete. PROFESSIONAL AND EASY-TO-USE 3D STRUCTURAL CONCRETE BIM SOFTWARE THAT AUTOMATES THE PRODUCTION OF DRAWINGS, BOMs AND NC FILES

WORK SMART. Microsoft Dynamics NAV 2009 Simple. Smart. Innovative

Design of Information Systems 1st Lecture

Deswik.MDM Mining Data Management

Siebel CRM On Demand Administrator Rollout Guide

The Impact of Information Technology and Internet in the Construction Industry

The software process

1.0 ABOUT THE NU GUIDELINES

Practice Bulletin No

Oracle Landed Cost Management

Netformx DesignXpert. The global leader in enterprise technology design and proposal generation. Datasheet. The Netformx Discover-to-Sell Solution

What are requirements? Basics of Requirement Engineering. Definition of a Stakeholder. Stated Vs. Real Requirements. Stated Vs.

IBM Rational Systems Developer, Version 7.0

ViziRail Description

LabX Software. Complete Overview, Total Control Smart Laboratory Instrument Software. LabX Software. LabX balance LabX titration LabX connect

How to Design a Successful Data Lake

The content can be provided to ORACLE iprocurement in basically 3 ways:

Simultaneous Product Development: The Move from Serial Collaboration to Parallel Co-Development

Session 7 Part A Revit for Urban Design

Microsoft Dynamics xrm Delivery Mitigation in a Changing Environment. An Oakton Perspective. Consulting Technology. October 2013

MANUFACTURING EXECUTION SYSTEM

Process-driven Architecture for Workflow Automation in a GIS context A Tensing USA, LLC White Paper

Software Life Cycle. Main Topics. Introduction

IT Services Management

BPM Pulse TM Survey Results

E³.series Electrical Wiring, Control Systems and Fluid Engineering Software

TECHNICAL REVIEWS AND AUDITS

data sheet ORACLE ENTERPRISE PLANNING AND BUDGETING 11i

SAP Custom Development. User Guide. Version Status Date. November 19, Customer SAP AG Dietmar-Hopp-Allee 16 D Walldorf

MBA BADM559 Enterprise IT Governance 12/15/2008. Enterprise Architecture is a holistic view of an enterprise s processes, information and

ID-Spec Large 3.0. Software for Electrical Installation Design in Industrial and Tertiary Buildings

AGILE ITIL SOFTWARE. Data Sheet AGILE ITIL SERVICE DESK AND ITSM JUMP START YOUR SERVICE DESK ITIL CERTIFIED PROCESSES WHOSE ITIL?

TRANSPORTATION ASSET MANAGEMENT GAP ANALYSIS TOOL

The Big PowerPoint Study. Where is time wasted and how we can prevent it

NDIA th Annual Systems Engineering Conference. MBSE to Address Logical Text-Based Requirements Issues. Saulius Pavalkis, PhD, No Magic, Inc.

SAS Decision Manager

Efficient Business Service Consumption by Customization with Variability Modelling

Product Documentation SAP Business ByDesign February Business Configuration

A Primer for the Project Management Process by David W. Larsen 1. Table of Contents

Software tool support for software development

Key Benefits. Overview. Field Service empowers companies to improve customer satisfaction, first time fix rates, and resource productivity.

Promoting better business outcomes through the use of BIM and digital technologies.

AGILE TEST MANAGEMENT WITH VISUAL STUDIO

Industry-Leading Recording and Evaluation Solutions for Contact Centers. mercom. Mercom Audiolog Mercom Interaction Quality

BEST PRACTICE COLLABORATION

Solutions for Enterprise Risk Management SAS. Overview. A holistic view of risk of risk and exposures for better risk management SOLUTION OVERVIEW

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

Remedy Change Management 4.0

Product Summary of XLReporter with GE Intelligent Platforms SyTech, Inc.

Intland s Medical IEC & ISO Template

Business Insight and Big Data Maturity in 2014

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Passit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2

This book is divided into three parts. With part 1, my goal is really just to

Industry 4.0 What does it Mean for CAPIEL Manufacturers?

Oracle Fusion Applications Workforce Development Guide. 11g Release 5 (11.1.5) Part Number E

WHITE PAPER: CUSTOMER DATA PLATFORMS FOR BUSINESS-TO-BUSINESS SOFTWARE AS A SERVICE (SAAS) MARKETING

Executive Summary WHO SHOULD READ THIS PAPER?

TIE Aluminum Guide Spec: Thermally Improved Windows & Doors

CASESTUDY: UNITEC s integrated information system

Strategic Revit MEP Object Organization From BIM to Asset Management

White Paper Microsoft SharePoint for Engineering Document Management and Control

Using Vanguard SmartProcedures to Meet the NEI-AP Procedure Process Guideline April 13, 2006

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Construction Contract Basics

Campaign Management Implementation Guide

What s New with the PlantPAx Distributed Control System

Transcription:

An Introduction To BIM INTEGRATED Architectural Specifications

WHAT ARE SPECIFICATIONS? Specifications are documents that accompany and govern the construction of a building. The guiding library of master specifications, from which the project manual will be created, is organized in MasterFormat. MasterFormat was developed and is jointly sponsored by the Construction Specifications Canada and the Construction Specifications Institute. The specifications fall into 50 Divisions, or broad categories of work involved in construction. The Divisions are organized into Sections, each one addressing a narrower scope of construction work. Each Section is subdivided into three distinct Parts: General, Products and Execution. The MasterFormat system can be successfully applied to residential, commercial, civil and industrial construction. The project manual is then a complete legal document that defines the execution of all project requirements, materials, equipment, systems, standards and required workmanship as detailed below. WHEN ARE SPECIFICATIONS DEVELOPED? In early phases of a project called the conceptual or schematic design phase the specifications are comprised of a skeleton list of materials or systems that form the basis of the design. During the design development (DD) phase, specifications form an outline spec. the outline spec can be as brief or as detailed as the project, design and client demand. During the construction documents (CD) phase, the specifications contain multi-page spec sections for each group of materials. The specs must contain all details governing the quality of materials and workmanship required in the finished project.

HOW ARE SPECIFICATIONS DEVELOPED? Starting from scratch Creating every project specification from scratch would clearly be cumbersome, unnecessary and expensive. However, this approach still applies when specifying a new or unusual product, system or process. Adjusting an old project manual Adapting a specification from a previous project is an approach commonly employed by designers. However, this won t provide the updated options, materials or codes required for the new project. According to industry experts, this approach is inherently flawed and should be avoided. Using an office master Most medium-size and larger design practices maintain some form of office master. This generally takes the shape of a catalog of standard sections based on corporate design preferences and lessons learned. Using a master specification library A master specification library is the industry standard for maintaining quality. By accessing a wider range of industry expertise, a master specification library offers accurate updates to codes, materials and workmanship that reflect industry thinking. A master specification library allows spec writers to concentrate on the core task of precisely reflecting and recording project requirements. The most popular master specification libraries include AIA MasterSpec libraries, Canadian masters (CMS and NMS), the U.S. Dept. of Veteran Affairs (VA) master and the DOD s United Facilities Guide Specifications (UFGS) master, among others.

METHODS OF SPECIFYING The Subtractive Method This method allows the spec writer to delete what doesn t apply, using a standard workflow. Generally, projects will also require the addition of project-specific information, making the subtractive method impractical. The Additive Method This method allows the spec writer to select from a standard spec library, adding projectspecific language as necessary. The additive approach allows the spec writer to mix and match from a full database of spec content to accurately reflect a specific project. This produces a truly customized specification. The e-specs Method e-specs is a master specification management system that builds upon the additive method by applying checklist technology to the firm s chosen master specification libraries. The specifier selects only the spec sections needed from the checklist to build the project manual. While working within each section, the spec writer saves time with the e-specs Editor functionality: double click to include or exclude text, insert merge fields for full customization and more. No information is ever deleted, so text can be changed as the project evolves. Combining its patented checklist and editor technology, e-specs enhances the spec writer s ability to produce a wholly customized project manual, while saving them 75% time over other workflows. WHAT ARE BIM INTEGRATED SPECS? e-specs Revit leads the BIM revolution with solutions for integrated design, engineering and fabrication workflows. BIM integrated specifications are specifications automated from the building drawings and models. BIM integrated specs offer the most coordinated, complete project specification

manual. They reduce time and effort, eliminate change orders and ensure the smoothest construction process. Less time spent manually comparing the drawings and specs means more time for design. THE PURPOSE OF SPECIFICATIONS 1. A design record 2. A record of decisions made 3. A record of statutory compliance 4. A cost planning tool 5. A tendering document 6. A contract document 7. A project management aid 8. An on-site manual for construction 9. As evidence in disputes 10. A resource for facilities management & building maintenance THE e-specs BASICS Now in its ninth major release, e-specs is the first application to successfully integrate the construction drawings and specification documents, beginning with a fairly simple interface to AutoCAD over 10 years ago, along with a version for Revit after its acquisition by Autodesk. Based on continuous customer feedback and feature requests, e-specs is a stable, easy to implement, integrated solution that delivers real value to customers. Automation of your project Manual Let s start with a very basic overview of how e-specs works in order to clarify some common misconceptions and define important terminology: e-specs does not magically create specification information using some super sophisticated algorithm based on items it might find in a building model. It is much simpler than that.

e-specs creates and automates project specific specification documents by filtering preconfigured master specification documents to the requirement of the building project based on information it extracts from the Revit models. This is not unlike what most architects, engineers and specifiers do routinely to create the project specification by hand with word processing systems. Starting with a set of master specification documents, they review the project drawings to determine what spec sections are required, and proceed to markup the master specifications library of documents to fit the project specific requirements. HOW DOES IT WORK? e-specs simply automates this process. In doing so, e-specs provides the added benefit of ensuring that the models (and resulting drawings) and the project specifications remain in sync. At the core of the e-specs integration technology is a patented process to simplify the filtering of the specification master documents based on selections in a master checklist. The figure below is a diagram that illustrates relationships known as mappings. If the wood window tag is selected or checked, the relevant wood window section is selected from the master specification documents and the required paragraphs in the section is automatically included in the resulting specification documents. All the other paragraphs that are not related to the wood window are removed.

To see how this actually looks in practice, the Figure below is an illustration of the e-specs specification checklist. If we select double hung wood windows from the checklist options The wood window section will be inserted into the specification manual with the relevant language included and the non-required language removed, as illustrated by the Figure below.

One of the principal components of the e-specs system is the scope and integrity of the specification master database. e-specs is fully integrated with: AIA MasterSpec libraries U.S. Department of Veterans Affairs (VA) master DOD and NASA s Unified Facilities Guide Specifications (UFGS) master Canadian master guide specifications (CMS and NMS) In addition, e-specs is fully configurable so you can easily customize the checklist and master documents around your company s particular requirements adding new sections or integrating your own custom office masters as you desire. BIM INTEGRATED ARCHITECTURAL SPECIFICATIONS Taking automation, a step further, instead of having to make the selections manually by checking the checkboxes in the e-specs checklist, users can realize fully integrated architectural specifications by associating those checkboxes to Revit elements (or assemblies) in the Revit model. When those elements are used in a particular project model, the related specification section is added automatically to the project manual. The diagram below is a graphical representation of this process.

The whole process is quite simple: the elements in the model are associated to specific checklist tags to automatically check the boxes when the item is included in the model. This process of association between an element in the model and the e-specs tags is called a binding. e-specs provides a simple process to manage these associations with the e-specs Binding Manager, which is pictured below. In the Binding Manager you will notice that we have the same simple checklist as before, only now the checkbox items are bound to information accessible in the Revit model. In Revit, the primary integration component is the Assembly Code parameter in the Revit Family Type Properties, as the example below shows. The Revit Assembly codes are defined by the familiar UniFormat classification system.

For those less familiar with it, UniFormat is an industry standard classification system, developed in part by the Construction Specifications Institute (CSI), used primarily as a way of categorizing information about building elements which may contain multiple detailed parts. As defined by the CSI, UniFormat is a method of arranging construction information based on functional elements, or parts of a facility characterized by their functions, and often referred to as systems or assemblies. It is a way to organize information about an entire assembly with multiple detail components. UniFormat provides a consistent way to classify building model components, regardless of the complexities of the assemblies or model elements that they represent. In the wood window example, the entire assembly could consist of a number of component parts, such as the wood frame, glazing, joint sealants, insulation, hardware and so on. In another, an assembly could consist of one simple component, and electrical junction box or a ceiling tile, for instance. THE WAY OF THE FUTURE To bridge the gap between model and specs, e-specs has been patently designed to adhere to industry standards and conventions where applicable. It has been designed to adhere to the conventions of UniFormat when it comes to the model components and to MasterFormat with regards to the specifications. Through its specification management system, e-specs provides a unique and rather simple solution to the reconciliation of these two industry standard classifications systems resulting in an automated, integrated project manual. LEARN MORE ABOUT e-specs Call us at (207)772-6135 Visit www.e-specs.com