Operational Procedures. Conduct one-time pressure test of new/repaired hose assembly at 120% of maximum working pressure.

Similar documents
USDOT/FMCSA HM UPDATE. David W. Ford USDOT/FMCSA

USDOT/FMCSA HM UPDATE. National Propane Gas Association April 2014

Motor Carrier/Shipper Audit

Braemar Technical Services

WATERWORKS SERVICES WORKER I WATERWORKS SERVICES WORKER II WATERWORKS SERVICES WORKER III

11.0 HANDLING AND STORING AGRICULTURAL INPUTS

EMPLOYEE R-T-K, EMPLOYEE TRAINING, AND TRAINING RECORDS

Bulk Bag Unloader Installation, Operation and Maintenance Manual

Lifting Appliances of Ships and Offshore Installations

Eversource Substation Access. Safety First and Always

2015 DW Module 1: General Overview VOLUME III Answer Key

FACILITIES MAINTENANCE WORKER

GUIDELINES FOR INSTALLATION OF ABOVEGROUND DIESEL FUEL TANKS

Public Safety [661] Chapter 226, Liquefied Petroleum Gas, Amended for Application within the State of Iowa

Transportation and Transfer of Ethanol-Blended Fuels

EASTERN MICHIGAN U N I V E R S I T Y SECURITY OF HAZARDOUS MATERIALS IN TRANSPORT

SAA ANHYDROUS AMMONIA CODE

TENTS AND OTHER MEMBRANE STRUCTURES

What is EPA up to? John McKnight, Director EH&S National Marine Manufacturers Association

195LiquidsCatalog.

Part II AUTOMATION AND CONTROL TECHNOLOGIES

DECLARATION OF INSPECTION

Chemigation. in Georgia

TERMS OF AGREEMENT AND TERMINATION. This agreement is made between and MILO TRANSPORTATION INC (MTI) on day of, 20.

Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers

Mason County Fireworks Permit Application

Builders Risk - Water Damage Inspection Checklist

Natural Gas Transmission Line SAFETY BULLETIN

OIL RECORD BOOK INSTRUCTIONS

Water Conservation Update

Oshkosh Water Filtration Plant Clearwells Replacement Project. Public Information Meeting October 16, 2017

REGULATION OF THE MINISTER OF COMMUNITY, ABORIGINAL AND WOMEN S SERVICES. Safety Standards Act M 62

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

Thornton Sewer Plant Operations Manual -DRAFT-

Carolina Freightways, Inc.

Toxic Flammable Gas Release From Rail Car Results in 3 Fatalities

Appendix A Fees, Charges and Rates

DESIGN STANDARD DS 79-03

Water Use In Your Business

Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission:

Figure 1. Report of Inspection Process Flowchart.

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S

Subpart G Emergency Response Information

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

TENTS AND MEMBRANE STRUCTURES

PART 177 CARRIAGE BY PUBLIC HIGHWAY. 49 CFR Ch. I ( Edition)

Forklift Operator Safety Program

Commonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments

Hydrosol System Furnace Cooling Water Cleaning Case Study: North American Stainless

Resolution MEPC.11(18) adopted on 25 March 1983 GUIDELINES FOR SURVEYS UNDER ANNEX I OF THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION

Grade: See Below APPLICATIONS ACCEPTED THROUGH FRIDAY, DECEMBER 15, WE ARE AN EQUAL OPPORTUNITY EMPLOYER.

Forklift Operator Training

Agricultural Pumping Efficiency Program. Flow Meters. Helping California Agriculture...

REPUBLIC OF COSTA RICA CIVIL AVIATION GENERAL DIRECTION Air Navigation Management AIS/MAP P. O BOX SAN JOSE COSTA RICA AGA

EL DORADO IRRIGATION DISTRICT DROUGHT PREPAREDNESS PLAN DROUGHT ACTION PLAN

LAW No. 2003/11 ON THE LAW ON ROADS. The Assembly of Kosovo,

LNG VACUUM INSULATED PIPE SOLUTIONS.

NAVFAC EXWC Tests Feasibility of Smart Water Conservation System

SAMPLE. reviews for HMSP motor carriers with insufficient data to utilize SMS. HMSPs

A. This Section includes exterior piping for vertical, direct-buried, ground-loop, heat-pump systems that operate between 23 and 104 deg F.

Forklift Operator Safety Safe Operation and Pre-Use Inspection

Border & Port of Entry Transit of In-Bond Container Current Operations

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ACCIDENTAL SPILL PREVENTION PLAN EH-009-R03

a difficult challenge when trying to achieve effective coverage within a shallow space. The Model CC1 Combustible

Powered Industrial Trucks Safety Checklist

Installation Instructions EQ-400 Whole House Water Filter

Sprinkler Identification Numbers (SINs)

Bloomington Township Public Water District User Information Packet. Water Service

Storm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015

中国路桥工程有限责任公司. Provide all-round services. Assist and serve passengers, Must be below 30years old, Must be Flexible and a good communicator.

Property is served by unmetered public or private water. Not normally applicable to this item. Page 1 of 5 Supplement to HHE-240 Rev.

Notice of Tariff Change Effective January 1, 2014

Backflow Irrigation Control Station

DRI Procedure for Moving/Transporting Chemicals 1

Hydrogen Workshop for Fleet Operators

Terms and Conditions of Service. Buckeye Intermodal

AAR CIRCULAR LETTER SUMMARY APRIL 2017

ENVOY STATION FUEL SELF AUDIT CHECKLIST

Focus on Hydraulic Fracturing

Transportation. Railroads. Aircraft Homes 8 Containers of Haz Mat (1 of 3)

SANITARY SEWER CHEMICAL GROUTING

JOB OPPORTUNITY SERVICE WORKER CEMETERY (PART-TIME) THE POSITION: QUALIFICATIONS: COMPENSATION & BENEFITS: APPOINTMENT PROCEDURE:

Eurobitume UK. Site Inspection for Delivery of Bitumen

~~~\ VKAN KAN-TN-LI 05

Standard Duty Cantilever Rack Installation and Assembly Guide

Request for Proposals

OMT Asphalt Plant Inspection Checklist

GHG Inventory Report February 2018 KENT COUNTY REGIONAL RESOURCE RECOVERY FACILITY 2017 GREENHOUSE GAS (GHG) EMISSION INVENTORY

recycle water reuse it save up to from showers & baths for flushing toilets 30% of water use

HALIFAX PORT AUTHORITY BERTHAGE AND ANCHORAGE NOTICE SCHEDULE OF RATES. Item Description Rate

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Guangdong Provincial Green Freight Demonstration Project by Grant of GEF

Gas Transmission and Distribution Piping Systems

Peter Juhren Corporate Service Manager Morrow Equipment Co. L.L.C. Salem, OR USA. What s New in Tower Crane Standards?

How are Industry Standards, Engineering Codes, Best Management Practices and Other Measures of Compliance Being Met by Facilities?

CITY OF REDLANDS WATER DISTRIBUTION OPERATOR (WDO I, II, III, IV, V) WELDER

NFPA 30-FLC-SWC Second Revisions Report

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager

CITGO PETROLEUM CORPORATION CORPUS CHRISTI MARINE FACILITY REGULATIONS FOR VESSELS

Transcription:

New DOT Requirements Applicable to Cargo Tank Motor Vehicles <3500 Gallons in Metered Delivery Service (Common Bobtails) Once (after 7/1/00) 180.416(f) Inspect delivery hose assembly Monthly (after 7/1/00) 180.416 (d)(1) Discharge System Inspections fusible elements and components such as bolts, Monthly (after 7/1/00) 180.416(d)(2) Actuate all emergency discharge control devices discharge opening for leakage (dead meter test) Monthly (after 7/1/00) 180.416(d)(4) Operational Procedures Verify each component of discharge system that is readily observable during normal course of unloading is of sound quality, free of leaks and connections are secure after pressure in discharge system has reached equilibrium with pressure in cargo tank. Per Transfer N 177.840(m) Observe both cargo tank and receiving tank at least once every 5 minutes during any delivery taking more than 5 minutes. Remain awake and within 150ft of CT Per Transfer N 177.840(p)(1) and 25 feet of delivery hose throughout unloading operation. For a truck equipped, attendant must possess off-truck remote activation device at all times during the unloading operation. Per Transfer N 177.840(s)

For a truck equipped,check that off-truck remote mechanism in good operating order within 18 hours of the first delivery of each day and from 150ft. from the vehicle. Daily N 177.840(o)

No later than the first scheduled leakage test after No later than the first scheduled leakage test after 1 New Hardware Begin retrofit of trucks with emergency discharge control equipment (off-truck remote) at time of requalification. All retrofits must be complete by July 1, 2006. New vehicles/remounts must be equipped with offtruck remote. Ensure fusible elements (thermal means of closure) installed on cargo tanks at annual leakage test. At time of requalification 180.405(m)(1) Initially 173.315(n)(5) Initially N 180.405(n) Miscellaneous Provisions Non-specification cargo tanks may cross state lines to travel to and from a qualified assembly, repair, or requalification facility. As Needed N 173.315(k)(6) New DOT Requirements Applicable to Cargo Tank Motor Vehicles >3500 Gallons in Metered Delivery Service (Large Bobtails and Metered Transports) Hose Management Program Once (after 7/1/00) 180.416(f) Inspect delivery hose assembly Monthly (after 7/1/00) 180.416 (d)(1) Discharge System Inspections fusible elements and components such as bolts, Monthly (after 7/1/00) 180.416(d)(2) Actuate all emergency discharge control devices discharge opening for leakage (dead meter test) Monthly (after 7/1/00) 180.416(d)(4)

Operational Procedures Verify each component of discharge system that is readily observable during normal course of unloading is of sound quality, free of leaks and connections are secure after pressure in discharge system has reached equilibrium with pressure in cargo tank. Per Transfer N 177.840(m) Observe both cargo tank and receiving tank at least once every 5 minutes during any delivery taking more than 5 minutes. Remain awake and within 150ft of CT Per Transfer N 177.840(p)(2) and 25 feet of delivery hose throughout unloading operation. For a truck equipped, attendant must possess off-truck remote activation device at all times during the Per Transfer N 177.840(s) unloading operation. For a truck equipped,check that off-truck remote mechanism in good operating order within 18 hours of the first delivery of each day and from 150ft. From the vehicle. Daily N 177.840(o) New Hardware No later than the Begin retrofit of trucks with emergency discharge At time of first scheduled control equipment (off-truck remote) at time of requalification leakage test after requalification. All retrofits must be complete by July 1, 2006. 180.405(m)(3) New vehicles/remounts must be equipped with offtruck remote devices (for obstructed view deliveries, must have either (1) passive shut-down capability; or (2) a query system to shut down delivery unless attendant prevents system from doing so at least once every 5 minutes). Initially 177.840(p)(2) and 173.315(n)(3) Miscellaneous Provisions Non-specification cargo tanks may cross state lines to travel to and from a qualified assembly, repair, or requalification facility. As Needed N 173.315(k)(6)

New DOT Requirements Applicable to Cargo Tank Motor Vehicles in Other Than Metered Service (Transports) Hose Management Program Once (after 7/1/00) 180.416(f) Inspect delivery hose assembly Monthly (after 7/1/00) 180.416 (d)(1) Discharge System Inspections/Maintenance fusible elements and components such as bolts, Monthly (after 7/1/00) 180.416(d)(2) actuate all emergency discharge control devices discharge opening for leakage Monthly (after 7/1/00) 180.416(d)(4) Ensure delivery hose assembly and piping system Annual inspected by RI while under leakage test pressure. (after 7/1/00) 180.407(h)(4) Operational Procedures Conduct test of off-truck remote shut-off once Daily equipped N 177.840(o) Emergency discharge control system must Always automatically shut off flow of lading without need for human intervention within 20 seconds of the release caused by complete hose separation. N 173.315(n)(2)