The ITIL Foundation Examination

Similar documents
The ITIL v.3. Foundation Examination

ITIL V3 Foundation (Classified Questions) Page 1 of Which of the following questions does Service Strategy help answer with its guidance?

ITIL Foundation v.3. Number: Passing Score: 800 Time Limit: 120 min File Version: 1.0.

Pass4sure.ITIL-F.347.QA

ITIL Foundation Instructor-led Live Online Training Program

ITIL from brain dump_formatted

EXIN ITIL Exam Questions & Answers

ITIL Foundation Examination

EXIN ITIL. Exam Name: Exin ITIL Foundation

EX0-117 Exin ITIL Certification Exam

ITIL Foundation. Objectives

M.Sc. (I.T.) Sem. IV IT INFRASTRUCTURE MANAGEMENT QUESTION BANK ( )

Problem Management ITIL v3 Problem Management Process

Glossary 1. For a complete glossary of support center terminology, please visit HDI s Web site at HDI Course Glossary

Contents An Introductory Overview of ITIL Service Lifecycle: concept and overview...3 I. Service strategy...6 The 4 P's of ITIL Service

ITIL Sample Papers. The Official ITIL Accreditor Sample Examination Papers. Terms of use

Part 0: Overview and vocabulary

Exin Exam EX0-117 ITIL Foundation (syllabus 2011) Version: 16.0 [ Total Questions: 238 ]

EX0-117V 3.0 with explanations

ITIL Foundation v V1. Module 4: Service Transition. Reader s Note QAI India Ltd. I

EXAM - ITIL. ITILÂ V3 Foundation.

EXIN,Inc. Exam Questions ITILFND. ITIL Foundation (syllabus 2011) Version:Demo. ITILFND Exam Questions Demo

EX0-117V 3.0 with explanations

ITIL Intermediate Lifecycle Stream:

ITIL Intermediate Lifecycle Stream:

PASS4TEST IT 인증시험덤프전문사이트

PASS4TEST. IT Certification Guaranteed, The Easy Way! We offer free update service for one year

General Platform Criterion Assessment Question. SLM-11-G-001 Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 N/A

ITCertMaster. Safe, simple and fast. 100% Pass guarantee! IT Certification Guaranteed, The Easy Way!

ITSM, ITIL & ISO/IEC Implementation Toolkit List of Contents

<< Practice Test Demo - 2PassEasy >> Exam Questions ITIL. ITIL Foundation v.3.

ITSM, ITIL & ISO/IEC Implementation Toolkit List of Contents

itexamdump 최고이자최신인 IT 인증시험덤프 일년무료업데이트서비스제공

HP Service Manager. Software Version: 9.40 For the supported Windows and Unix operating systems. Processes and Best Practices Guide (Classic Mode)

TECHNOLOGY brief: Event Management. Event Management. Nancy Hinich-Gualda

PINK ELEPHANT THOUGHT LEADERSHIP WHITE PAPER. Identifying & Implementing Quick Wins

Release & Deployment Management PinkVERIFY

Information Technology Engineers Examination. Information Technology Service Manager Examination. (Level 4) Syllabus

ITIL Foundations. Introduction. May 14, 2007

ITIL Foundation V3. Walaa Omar

The YaSM Process Map for Microsoft Visio Examples and overview of contents

INTERMEDIATE QUALIFICATION

OPERATIONAL SUPPORT AND ANALYSIS. A guide for ITIL exam candidates Second edition

Exam Questions ex0-100

Incident Management. What is it? Why use it? Who wants it? Cheryl Nickel ITSM Process Specialist MTS Allstream September 22, 2011

Implementing ITIL Best Practices

ITIL: Operational Support & Analysis (OSA) (Revision 1.6)

AGILE ITIL SOFTWARE. Data Sheet AGILE ITIL SERVICE DESK AND ITSM JUMP START YOUR SERVICE DESK ITIL CERTIFIED PROCESSES WHOSE ITIL?

ITIL Intermediate Lifecycle Stream:

ITIL CSI Intermediate. How to pass the exam

Higher National Unit Specification. General information for centres. IT Infrastructure: Service Delivery. Unit code: F0DY 35

The following form is available in the service management application for the Availability Management process:

UCSF ENTERPRISE INCIDENT MANAGEMENT PROCESS

Service Design. ITIL is a registered trade mark of AXELOS Limited. The Swirl logo is a trade mark of AXELOS Limited 1

Service Integration and Management (SIAM ) Foundation Process Guides

The Basics of ITIL Help Desk for SMB s

Micro Focus Service Desk 7.4 System Planning, Deployment, and Best Practices Guide. November 2016

ITIL Intermediate Capability Stream:

SERVICE OPERATION. ITIL - Part 2

ITIL: Planning, Protection & Optimization Course 02 Planning, Protection & Optimization

Why bother with a Service Catalogue?

BMC - Business Service Management Platform

ITSM Process/Change Management

MOF Service Management Function Job Scheduling

Welcome! Process Integration, Metrics and Setting ITSM Academy

How to Drive Business Value with Capacity Management

Operating Level Agreement (OLA) Template

Information Technology. Classification Band 5. Position Objective

Session 205: ITSM Deep Dive: Classification, Prioritization, Escalation & Alerting

IT Service Management

ESKITP7023 IT/Technology Service Help Desk and Incident Management Level 3 Role

Change Management Process

EVM-11-G-001 Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 N/A. Edition workflows and process integrations?

Reduces the risk of downtime caused by infrastructure failure.

1010 La Trobe Street Docklands Victoria

Y AR ISSUE COMPLIMENT

Service Desk Certification YOUR ESSENTIAL HANDBOOK

Carahsoft End-User Computing Solutions Services

ITIL 2011 FOUNDATION STUDY NOTES. Pass your ITIL exam with these comprehensive 2011 Foundation study notes and exam tips! Ver

UCISA ITIL Case Study on the University of Huddersfield

through its operations in various countries and serving its clients for more than 3 decades.

ITIL Intermediate Release, Control, and Validation (RCV) Boot Camp - Syllabus

Incident Management. Process and Procedures Guide

UoD IT Job Description

Internal Audit Report. IT Change Management Review March 2016

Bank of Ireland. Service Integration as a means to govern a multivendor. 11 th October 2013

Practical Stories of ITIL Quick Wins

JOB DESCRIPTION. Manager Service Management Technical Systems & Proposed band. Job family

Expert Reference Series of White Papers. Microsoft Service Manager Simplified

Metrics Workshop 21 June 2017

Information Technology Services Change Control Procedure

ITILSC-OSA Exam. Number: ITILSC-OSA Passing Score: 800 Time Limit: 120 min File Version: 1.0 ITILSC-OSA

Using A Process-Oriented Architecture To Improve IT Service Delivery

Best Practices for IT Service Management in 2017+

An Overview of the AWS Cloud Adoption Framework


Enabling a Successful Multisourcing Model: An NTT DATA Services Insight

Governance in a Multi-Supplier Environment

Customer Support Analyst II

Moogsoft Inc. Support Addendum

Transcription:

The ITIL Foundation Examination Sample Paper B, version 4.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. All answers are to be marked on the answer grid provided. 3. You have 60 minutes to complete this paper. 4. You must achieve 26 or more out of a possible 40 marks (65%) to pass this examination. The Swirl logo is a Trade Mark of the Office of Government Commerce ITIL is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries Page 1

1. Input from which processes could be considered by service level management when negotiating service level agreements (SLA)? a) All other ITIL processes b) Capacity and availability management only c) Incident and problem management only d) Change management, and release and deployment management only 2. Which of the following statements about a standard change is INCORRECT? a) A standard change is one for which the approach is pre-authorized by change management b) Approval or authorization for each instance of a standard change will be granted by the nominated authority for that change c) Standard changes are usually low risk and well-understood d) Standard changes are only raised by incident management 3. Which of these statements about service desk staff is CORRECT? a) The service desk staff require less training than other members of the IT department b) Service desk staff should represent customer views during service level agreement (SLA) negotiations c) Awareness of business priorities is essential for service desk staff to do their job well d) Service desk staff should undertake root cause analysis of all calls they resolve 4. Which of the following statements about demand for IT services is CORRECT? a) It is driven by patterns of business activity b) It is impossible for demand to be predicted c) It is impossible to influence demand patterns d) It is driven by the delivery schedule generated by capacity management 5. Which of the following activities is carried out by facilities management? a) The management of IT services that are viewed as "utilities", such as printers or network access b) Advice and guidance to IT operations on methodology and tools for managing IT services c) The management of the physical IT environment such as a data centre d) The procurement and maintenance of tools that are used by IT operations staff to maintain the infrastructure 6. Which process would assist with the identification and resolution of any incidents and problems associated with service or component performance? a) Capacity management b) Supplier management c) Technology management d) Change management Page 2

7. Which of the following statements about the known error database (KEDB) is MOST correct? a) The KEDB is the same database as the service knowledge management system (SKMS) b) The KEDB should be used during the incident diagnosis phase to try to speed up the resolution process c) Care should be taken to avoid duplication of records in the KEDB. This can be done by giving as many technicians as possible access in order to create new records d) Access to the KEDB should be limited to the service desk 8. Which of these statements about key performance indicators (KPIs) and metrics is/are CORRECT? 1. Service metrics measure the end-to-end service 2. Each KPI should relate to a critical success factor 3. Metrics can be used to identify improvement opportunities 4. KPIs can be both qualitative and quantitative a) 1 only b) 2 and 3 only c) 1, 2 and 4 only d) All of the above 9. Which of the following maintains relationships between all service components? a) The capacity plan b) The definitive media library c) The configuration management system d) A service level agreement 10. Which of the following statements about a definitive media library (DML) are CORRECT? 1. The DML can include a physical store 2. The DML holds definitive hardware spares 3. The DML includes master copies of controlled documentation a) All of the above b) 1 and 2 only c) 2 and 3 only d) 1 and 3 only 11. Which of the following statements is/are CORRECT? 1. Problem management can support the service desk by providing known errors to speed up incident resolution 2. Problem management is the only source of information to service level management about the impact of changes a) 1 only b) 2 only c) Both of the above d) Neither of the above Page 3

12. A failure has occurred on a system and is detected by a monitoring tool. This system supports a live IT service. When should an incident be raised? a) When users notice the failure b) No incident should be raised if the technicians have seen this before and have a workaround c) Only if the failure results in a service level being breached d) Immediately, to limit or prevent impact on users 13. Where would you find the answer to a question about how IT resources and capabilities should be allocated across the service lifecycle? a) Definitive media library b) Service portfolio c) Schedule of change d) Performance review 14. Which activities does service asset and configuration management ensure are performed on configuration items (CIs)? 1. CIs are identified 2. Baselines of configuration are kept 3. Changes to CIs are controlled a) All of the above b) 1 and 2 only c) 1 and 3 only d) 2 and 3 only 15. Which of the following statements about processes is/are CORRECT? 1. All processes must have an owner 2. A process takes one or more inputs and turns them into defined outputs a) 1 only b) 2 only c) Both of the above d) Neither of the above 16. Which of the following statements is CORRECT for ALL processes? a) They define functions as part of their design b) They should deliver value for stakeholders c) They are carried out by an external service provider in support of a customer d) They are units of organizations responsible for specific outcomes Page 4

17. Which process is responsible for packaging, building, testing and deployment of services? a) Incident management b) Release and deployment management c) Service asset and configuration management d) Service catalogue management 18. Which of the following is the BEST example of a workaround? a) A technician installs a script to temporarily divert prints to an alternative printer until a permanent fix is applied b) A technician tries several approaches to solve an incident. One of them works, although the technician does not know why c) After reporting the incident to the service desk, the user works on alternative tasks while the problem is identified and resolved d) A device works intermittently, allowing the user to continue working at degraded levels of performance while the technician diagnoses the incident 19. Which of the following areas would technology help to support? 1. Self-help 2. Reporting 3. Release and deployment 4. Process design a) 1, 2 and 3 only b) 1, 3 and 4 only c) 2, 3 and 4 only d) All of the above 20. What are the four stages of the Deming Cycle? a) Plan, Measure, Monitor, Report b) Plan, Check, React, Implement c) Plan, Do, Act, Audit d) Plan, Do, Check, Act 21. Which two processes will negotiate and agree the necessary contracts for the provision of recovery capability to support all continuity plans? a) Service level management and capacity management b) Supplier management and service level management c) IT service continuity management and service level management d) IT service continuity management and supplier management Page 5

22. Which is the BEST definition of an incident model? a) The template used to define the incident logging form for reporting incidents b) A type of incident involving a standard (or model) type of configuration item (CI) c) A set of pre-defined steps to be followed when dealing with a known type of incident d) An incident that is easy to solve 23. What roles are defined in the RACI model? a) Responsible, Accountable, Consulted, Informed b) Responsible, Achievable, Consulted, Informed c) Realistic, Accountable, Consulted, Informed d) Responsible, Accountable, Corrected, Informed 24. In which phase of the service lifecycle is it decided what services should be offered and to whom they will be offered?? a) Continual service improvement b) Service operation c) Service design d) Service strategy 25. Which of the following does continual service improvement (CSI) provide guidance on? 1. How to improve process efficiency and effectiveness 2. How to improve services 3. Improvement of all phases of the service lifecycle a) 1 and 2 only b) 1 and 3 only c) 2 and 3 only d) All of the above 26. Which of the following is a type of service level agreement (SLA) described in the ITIL service design publication? a) Priority-based SLA b) Technology-based SLA c) Location-based SLA d) Customer-based SLA 27. Which of the following is the BEST definition of an event? a) An occurrence where a performance threshold has been exceeded and an agreed service level has been impacted upon b) An occurrence that has significance for the management of an IT service c) A known system defect that generates multiple incident reports d) A planned meeting of customers and IT staff to announce a new service or improvement programme Page 6

28. Which service lifecycle phase is responsible for ensuring that measurement methods will provide the required metrics for new or changed services? a) Service design b) Service operation c) Service strategy d) Service delivery 29. Which of the following should be treated as an incident? 1. A user is unable to access a service during service hours 2. An authorized IT staff member is unable to access a service during service hours 3. A network segment fails and the user is not aware of any disruption to service 4. A user contacts the service desk about slow performance of an application a) All of the above b) 1 and 4 only c) 2 and 3 only d) None of the above 30. Which of the following statements about a change model is CORRECT? a) A change process model should NOT be used for emergency changes b) A change process model should be constructed when a significant change is required c) A change process model predefines steps that should be taken to handle a change in an agreed way d) Escalation procedures are outside the scope of a change process model 31. Which is the first activity of the continual service improvement (CSI) model/approach? a) Understand the business vision and objectives b) Carry out a baseline assessment to understand the current situation c) Agree on priorities for improvement d) Create and verify a plan 32. Which service operation processes are missing from the following list? 1. Incident management 2. Problem management 3. Access management 4.? 5.? a) Event management and request fulfilment b) Event management and service desk c) Facilities management and event management d) Change management and service level management Page 7

33. Which phase of the service lifecycle provides a framework for evaluating service capability and risk profile before and during service deployment? a) Service strategy b) Continual service improvement c) Service transition d) Service operation 34. Which of the following activities should a service owner undertake? 1. Representing a specific service across the organization 2. Updating the configuration management database (CMDB) after a change 3. Helping to identify service improvements 4. Representing a specific service in change advisory board (CAB) meetings a) 2, 3 and 4 only b) All of the above c) 1, 2 and 3 only d) 1, 3 and 4 only 35. Which of the following is NOT a goal or objective of availability management? a) To monitor and report availability of components b) To ensure that service availability matches the agreed needs of the business c) To assess the impact of changes on the availability plan d) To ensure that business continuity plans are aligned to the business objectives 36. Which of the following is the CORRECT description of the Four Ps of service design? a) A four-step process for the design of effective service management b) A definition of the people and products required for successful design c) A set of questions that should be asked when reviewing design specifications d) The four major areas that need to be considered in the design of effective service management 37. Change management and release and deployment management are processes described within which phase of the service lifecycle? a) Service operation b) Service strategy c) Service transition d) Continual service improvement Page 8

38. Which of the following statements about supplier management is INCORRECT? a) Supplier management negotiates operational level agreements (OLAs) b) Supplier management ensures that suppliers meet business expectations c) Supplier management maintains information in a supplier and contract database or supplier and contractor management information system d) Supplier management negotiates external agreements to support the delivery of services 39. Which phase of the service lifecycle will identify, select and prioritize opportunities to deliver services? a) Service strategy b) Service transition c) Service design d) Service operation 40. Which of the following is MOST LIKELY to be managed as a service request using the request fulfilment process? a) A user calls the service desk to order a toner cartridge b) After a service review, a functionality change is required to an application c) A change to the level of access on a global security profile d) Updates to an element of the business continuity plan Page 9

The ITIL Foundation Examination Sample Paper B, version 4.0 Multiple Choice ANSWERS AND RATIONALES ITIL is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries This document is not to be re-produced or re-sold without express permission from The APM Group Limited ITIL Foundation Examination SampleB ANSWERSANDRATIONALES v4.0 Page 1

Q ID A Syllabus Ref Book Ref Answer Key and Rationale: Rationale 1 593 A 05-31 Given that all processes may be involved in delivering the SD service, it is logical that SLM may consult them all when 4.3.5.2 negotiating agreements. 2 585 D 05-51 ST Changes can be raised in many ways, of which the service 4.2.4.3 request is only one via the incident management process. Service desk is focussed on restoring the service as quickly as 3 397 C 06-01 SO 6.3.1 possible. They are unlikely to have time, skills or permission to perform root cause analysis on ALL incidents. Problem management is engaged in this activity. A Correct. Demand is driven by patterns of business activity. 4 116 A 03-40 B Prediction is possible (retail is busy at public holiday SS times). C Demand patterns can be influenced by, amongst 4.4.5.2 others, restricting the service. D Demand should not be driven by the service provider but by the customer. Facilities management, which refers to the management of the 5 207 C 06-02 SO 6.5.1 physical IT environment, typically a data centre or computer rooms. 6 144 A 05-45 SD 4.5.2 Performance issues are the realm of capacity management. 7 568 B 03-32 8 578 D 04-10 9 574 C 03-18 10 579 D 03-19 11 565 A 05-72 SO 4.4.7.2 CSI 4.1.12 ST 4.3.4.3 ST 4.3.4.4 SO 4.4.6.4 12 695 D 05-71 SO 4.2.5 13 117 B 03-03 SS 4.2.4.1 14 581 A 05-63 ST 4.3.2 A the KEDB is part of the SKMS and NOT the same thing. B Correct. C duplication should be avoided, but by RESTRICTING access. D the service desk should use it, but they are NOT the only ones. 1. Better to measure the whole service if possible 2. KPIs are derived from CSFs 3. Process metrics identify gaps in performance. 4. It is better to measure both the quality of the service (customer satisfaction) and quantity (no failed changes). The configuration management system (CMS) is responsible via its various data sources (CMDBs, etc) for maintaining these relationships. The DML is for media only, not hardware spares. 15 485 C 01-10 SS 2.2.2 Both statements are correct. Problem management is the source of known errors but change management and service asset and configuration management are likely to be other sources of information about the impact of changes. A There does not need to be discernable impact on the user for an incident to be raised. B Even if a workaround is available it needs to be recorded to measure the on-going impact of the incident. C All incidents must be recorded. D Correct, to restore service as soon as possible. This is amongst the goals/objectives of service portfolio management. 1 and 3 (identification and control) are two elements within the scope of SACM. Configuration baselines are important to give information such as known states for roll back of releases. 16 10 B 01.10 SS 2.2.2 A Process design would involve allocation of activities to functions but not their definition. B Correct a process should provide value or why do it? C Not ALL processes are carried out by external providers. D this is akin to the definition of a function 17 161 B 05-61 ST 4.4.2 All are roles performed during release and deployment This document is not to be re-produced or re-sold without express permission from The APM Group Limited ITIL Foundation Examination SampleB ANSWERSANDRATIONALES v4.0 Page 2

Q ID A Syllabus Ref 18 32 A 03-30 Book Ref SO 4.4.5.6 Rationale A a classic workaround which is not a permanent solution but prevents the original failure. B a lucky incident resolution. C involves the user still working but not on the same task and the incident is still unresolved. D still an incident. 19 229 D 08-02 SS 7.1 All four areas have toolsets that can be utilised. 20 95 D 03-42 CSI 3.8 The four key stages of the cycle are Plan, Do, Check and Act 21 147 D 05-46 SO 4.6.1 ITSC provides the subject matter expertise and supplier management the contract negotiation and selection process. 22 166 C 05-71 SO C is the book answer in this case, matching the definition of an 4.2.4.2 incident model. 23 501 A 07-02 SD Another book answer. 3.7.4.1 24 572 D 02-03 SS 1.1.1 25 31 D 02-11 CSI 1.1.1 Deciding what services are offered and to whom is an integral part of service strategy. 1. CSI looks for ways to improve process effectiveness, efficiency as well as cost- effectiveness. 2. CSI identifies and implements improvements to IT services 3. CSI is responsible for improvement activities that support the lifecycle approach through service strategy, service design, service transition and service operation. 26 592 D 05-31 SD There are no such SLA types as priority-based, technologybased or location-based. 4.3.5.1 27 49 B 03-24 SO 4.1 A and C may lead to events being raised or generated. D is a meeting. B closely matches the book definition of an event. 28 576 A 04-04 SD 3.1.1 You must design measurements and metrics into your service. 29 52 A 03-26 SO 4.2 30 587 C 05-51 ST 4.2.4.5 In ITIL terminology, an incident is defined as: An unplanned interruption to an IT service or reduction in the quality of an IT service. Failure of a configuration item that has not yet impacted on service is also an incident. All of the options fit this definition. A A change model can still be used for emergency changes. B Although this is possible many significant changes will be unique and therefore unsuitable for such a change model. C is correct. D Escalation procedures can be included in a change model. 31 97 A 04-09 CSI The improvement approach begins with embracing the vision 3.1.1 by understanding the high-level business objectives. 32 189 A 05-81 05- SO 4.1.1 Book answer. 82 4.3.1 33 466 C 02-07 ST 1.1.1 Service transition is responsible for this as part of its deployment of new services. 34 430 D 07-01 SD 6.3.1 1, 3 and 4 are all part of the service owner role. Option 2 is the responsibility of the configuration administrator/librarian. 35 699 D 05-42 SD 4.4.1 D is the responsibility of IT service continuity management. 36 67 D 04-03 SD 3.1.5 A the Four Ps are not a process. B this has some truth but only addresses two of the four elements. C the Four Ps are not a checklist or set of questions, though they may be adapted into this. D is correct. 37 121 C 02-07 ST 1.1.2 Book answer. 38 140 A 05-44 SD 4.8.1 All are objectives of the supplier management process except A which is a responsibility of service level management. 39 20 A 02-03 SS 1.1.1 This happens in service strategy. 40 57 A 03-28 SO 4.3 Service requests are small, low-risk, frequently occurring, lowcost, etc. B, C and D do not fit this profile. This document is not to be re-produced or re-sold without express permission from The APM Group Limited ITIL Foundation Examination SampleB ANSWERSANDRATIONALES v4.0 Page 3