ELFR The European Lead Fast Reactor DESIGN, SAFETY APPROACH AND SAFETY CHARACTERISTICS. Alessandro Alemberti

Similar documents
Analysis of Unprotected Transients in the Lead-Cooled ALFRED Reactor

Safety design approach for JSFR toward the realization of GEN-IV SFR

Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety. Trieste,12-23 October 2015

LFR core design. for prevention & mitigation of severe accidents

Westinghouse Small Modular Reactor. Passive Safety System Response to Postulated Events

Safety Design Requirements and design concepts for SFR

Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development

Safety Provisions for the KLT-40S Reactor Plant

Evolution of Nuclear Energy Systems

AP1000 European 15. Accident Analysis Design Control Document

Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency

ACR-1000: ENHANCED RESPONSE TO SEVERE ACCIDENTS

The ESBWR an advanced Passive LWR

NuScale Power Modular and Scalable Reactor. NuScale. Integral Pressurized Water Reactor. Light Water. Light Water.

The design features of the HTR-10

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

AP1000 European 19. Probabilistic Risk Assessment Design Control Document

Post-Fukushima Assessment of the AP1000 Plant

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011

HPR1000: ADVANCED PWR WITH ACTIVE AND PASSIVE SAFETY FEATURES

Safety Challenges for New Nuclear Power Plants

THE FUKUSHIMA ACCIDENT: IMPLICATIONS FOR NUCLEAR SAFETY. Edwin Lyman Union of Concerned Scientists May 26, 2011

CAREM: AN INNOVATIVE-INTEGRATED PWR

Concepts and Features of ATMEA1 TM as the latest 1100 MWe-class 3-Loop PWR Plant

Passive Cooldown Performance of Integral Pressurized Water Reactor

Progress report on the Italian national program on fast reactors

Preparedness at PFBR Kalpakkam to meet the challenges due to Natural events Prabhat Kumar, Project Director, PFBR, Director construction BHAVINI

CANDU Safety #6 - Heat Removal Dr. V.G. Snell Director Safety & Licensing

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

NUCLEAR PLANT WITH VK-300 BOILING WATER REACTORS FOR POWER AND DISTRICT HEATING GRIDS

Gas Cooled Fast Reactors: recent advances and prospects

Application of the Defense-in-Depth Concept in the Projects of New-Generation NPPs Equipped with VVER Reactors. JSC ATOMENERGOPROEKT Moscow

Safety Issues for High Temperature Gas Reactors. Andrew C. Kadak Professor of the Practice

The Westinghouse Advanced Passive Pressurized Water Reactor, AP1000 TM. Roger Schène Director,Engineering Services

Controlled management of a severe accident

Safety enhancement of NPPs in China after Fukushima Accident

Design of Traditional and Advanced CANDU Plants. Artur J. Faya Systems Engineering Division November 2003

Design Safety Considerations for Water-cooled Small Modular Reactors As reported in IAEA-TECDOC-1785, published in March 2016

FUKUSHIMA DAIICHI BWR REACTOR SPRAY AND FEED WATER SYSTEMS EVALUATION FOR EARLY FAILURE Dean Wilkie

CFD Analysis of Decay Heat Removal Scenarios of the Lead cooled ELSY reactor. Michael Böttcher

Concept and technology status of HTR for industrial nuclear cogeneration

CAREM Prototype Construction and Licensing Status

In April 1986, unit 4 of the Chernobyl nuclear

NSSS Design (Ex: PWR) Reactor Coolant System (RCS)

The Westinghouse AP1000 : Passive, Proven Technology to Meet European Energy Demands

GIF Lead-cooled Fast Reactor Development Status Alessandro Alemberti (EURATOM / Ansaldo Nucleare)

SAFETY GUIDES. Deterministic Safety Assessment РР - 5/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY

IAEA Training in level 1 PSA and PSA applications. Other PSA s. Low power and shutdown PSA

LEAD-COOLED FAST-NEUTRON REACTOR BREST. Yu.G. Dragunov, V.V. Lemekhov, A.V. Moiseyev, V.S. Smirnov (NIKIET, Moscow, Russia)

ANTICIPATED ANALYSIS OF FLAMANVILLE 3 EPR OPERATING LICENSE - STATUS AND INSIGHTS FROM LEVEL 1 PSA REVIEW

EPR: Steam Generator Tube Rupture analysis in Finland and in France

RELAP 5 ANALYSIS OF PACTEL PRIMARY-TO-SECONDARY LEAKAGE EXPERIMENT PSL-07

Design and Safety Aspect of Lead and Lead-Bismuth Cooled Long-Life Small Safe Fast Reactors for Various Core Configurations

BARC BARC PASSIVE SYSTEMS RELIABILITY ANALYSIS USING THE METHODOLOGY APSRA. A.K. Nayak, PhD

Nuclear Power A Journey of Continuous Improvement

Assessing and Managing Severe Accidents in Nuclear Power Plant

Verification of the MELCOR Code Against SCDAP/RELAP5 for Severe Accident Analysis

Isolation Condenser; water evaporation in the tank and steam into the air. Atmosphere (in Severe Accident Management, both P/S and M/S)

Seismic isolation of LFR Reactor Buildings

CLASSIFICATION OF SYSTEMS, STRUCTURES AND COMPONENTS OF A NUCLEAR FACILITY

NUCLEAR FUEL AND REACTOR

WORKING MATERIAL. Technical Meeting on Impact of Fukushima event on current and future FR designs

SMR/1848-T03. Course on Natural Circulation Phenomena and Modelling in Water-Cooled Nuclear Reactors June 2007

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

RESULTS OF THE GRADUAL UPGRADING AT BOHUNICE WWER - 440/230 NPP

System Analysis of Pb-Bi Cooled Fast Reactor PEACER

Technology Development, Design and Safety Features of the CNP300 and A New Small PWR

Design, Safety Technology and Operability Features of Advanced VVERs

The Evolution of System Safety in the Canadian Nuclear Industry

Thermal Fluid Characteristics for Pebble Bed HTGRs.

GT-MHR OVERVIEW. Presented to IEEE Subcommittee on Qualification

Introduction to Level 2 PSA

Sodium Fast Reactors Systems and components (Part 2)

RELAP5/MOD3.2 INVESTIGATION OF A VVER-440 STEAM GENERATOR HEADER COVER LIFTING

NPP Simulators Workshop for Education - Passive PWR NPP & Simulator Overview

DEVELOPMENT AND APPLICATION OF PROBABILISTIC SAFETY ASSESSMENT PSA IN DAYA BAY NUCLEAR POWER STATION

Harmonized EUR revision E requirements corresponding to currently available technical solutions

Regulatory Guide Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

ASTEC Model Development for the Severe Accident Progression in a Generic AP1000-Like

Brazilian Operator s Response to Fukushima Daiichi Accident Luiz Soares Technical Director

The Lead-cooled Fast Reactor: Status Report for 2012 GIF Symposium

Workgroup Thermohydraulics. The thermohydraulic laboratory

INL/EXT Key Design Requirements for the High Temperature Gascooled Reactor Nuclear Heat Supply System

NUCLEAR POWER NEW NUCLEAR POWER PLANTS IN 2012

Risks Associated with Shutdown in PWRs

This description was taken from the Advances in Small Modular Reactor Technology Developments 2016 Edition booklet.

INVESTIGATION OF CRITICAL SAFETY FUNCTION INTEGRITY IN CASE OF STEAM LINE BREAK ACCIDENT FOR VVER 1000/V320

Generation IV Reactors

ANTARES Application for Cogeneration. Oil Recovery from Bitumen and Upgrading

Post Fukushima actions in India. Mukesh Singhal, Chief Engineer, Reactor Safety & Analysis Directorate NPCIL

Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident and Consequent Safety Improvements

SUPER-SAFE, SMALL AND SIMPLE REACTOR (4S, TOSHIBA DESIGN)

Status report Chinese Supercritical Water-Cooled Reactor (CSR1000)

Institute of Nuclear Technology and Energy Systems

EFIT: THE EUROPEAN FACILITY FOR INDUSTRIAL TRANSMUTATION OF MINOR ACTINIDES. II.A. Core

SYSTEMATIC AND DESIGN SAFETY IMPROVEMENTS OF NPPS IN CZECH REPUBLIC

Reactivity requirements can be broken down into several areas:

Design Features, Economics and Licensing of the 4S Reactor

Small and Modular Reactor Development, Safety and Licensing in Korea

NuScale SMR Technology

Transcription:

ELFR The European Lead Fast Reactor DESIGN, SAFETY APPROACH AND SAFETY CHARACTERISTICS Alessandro Alemberti Alessandro.Alemberti@ann.ansaldo.it TECHNICAL MEETING ON IMPACT OF FUKUSHIMA EVENT ON CURRENT AND FUTURE FAST REACTOR DESIGNS 19-23 MARCH 2012: HELMHOLTZ-ZENTRUM DRESDEN-ROSSENDORF DRESDEN, GERMANY

SUMMARY From ELSY to ELFR (The LEADER project) ELFR DESIGN LEAD: Advantages (how they are used in ELFR) Disadvantages (design provisions to limit.) SAFETY APPROACH MAIN DBA and DEC Results ELFR response to extreme natural events Conclusion

LFR development in Europe - The ELSY project In 2006 the EC partially funded, within the FP6 programme, the ELSY project (European Lead-cooled System) The ELSY project has been conducted by a large consortium of European organizations to demonstrate the feasibility of a competitive and safe Lead Fast Reactor using simple engineered features, fully complying with Generation IV goals ELSY project ended on February 2010, but LFR development continued with the LEADER project (Lead-cooled European Advanced Demonstration Reactor) started on April 2010 in the frame of EC FP7 Steam generator: FA Support System B C Safety Vessel B DHR deep cooler Reactor Vessel Core C

LFR development in Europe The LEADER project Advanced nuclear systems for increased sustainability FP7-Fission 2009 2.2.1 Conceptual Design for Lead Cooled Fast Reactor Systems (LEADER) 16 European Organization are participating to the project Ansaldo Nucleare is the Project Coordinator 3 year Project (2010-2013), started April 1 st 2010 LEADER Objectives Deep analysis of the hard points of ELSY design to identify improvements with the goal to reach an European Lead Fast Reactor (ELFR) configuration Definition of a new frozen ELFR configuration to be used as a reference plant Conceptual design of a scaled down facility respect to the reference plant the Advanced Lead Fast Reactor European Demonstrator - ALFRED (300 MWth)

LEADER first step: Analysis of ELSY Critical Issues Steam generator: Manufacturability FA Support System: Floating core DHR deep cooler: Tank injection, dip cooler, Steam to chimney Containment boundary inside Reactor Vessel Inner Vessel/ Reactor Vessel bottom interface: No lateral restraints FA / Inner Vessel bottom interface: No lateral restraints

LFR Design Evolution - from ELSY to ELFR STRATEGY: Maintain the good solutions, change the rest SG manufacturability faced with a LEADER specific task Expected advantage of open square FA not verified, back to the wrapped option of ELSY, FA support provided, easy FA continuous monitoring for flow blockage Bottom grid introduced, lateral restraint for core and shroud, FAs weighted down by Tungsten ballast Need to develop alternative DHRs, ICS maintained.

ELFR Reactor Block Reactor block vertical section Top view

ELFR - Fuel Assembly weighted down whit Tungsten ballast Top Spring Spike Core Core Outlet Ballast Ballast Core Outlet Core Spike

ELFR - Fuel Assembly, with Tungsten ballast, connected to Lower and Top Core Plate

ELFR - Inner Vessel, Core support and Fuel Assembly Top core plate Pin Core diagrid

ELFR Control and Shutdown systems 2 independent passive shutdown systems gravity driven system (only shutdown) passively inserted by a pneumatic system (by depressurization) from the top of the core. In case of failure of the pneumatic system, the safety rods are equipped with tungsten ballast that forces the absorber down by gravity with a lower velocity control/shutdown system inserted from below the active core zone using the strong buoyancy available in lead. The inadvertent ejection from the core active part is avoided by means of a mechanical device in the core upper part to stop the control rod, once inserted, at the end of the active zone.

ELFR - Decay Heat Removal Systems strategy One non safety-grade system, the secondary system, is used for the normal decay heat removal following the reactor shutdown Two INDEPENDENT, DIVERSE, PASSIVE and REDUNDANT safety-grade Decay Heat Removal systems (DHR N1 and DHR N2): in case of unavailability of the secondary system the DHR N1 system is called and in the unlike event of unavailability of DHR1 the DHR N2 is used to evacuate the decay heat DHR N1: 4 Isolation Condenser Systems connected to 4 secondary systems DHR N2: 4 Water Decay Heat Removal System in the cold pool (dip cooler) Independence: Diversity: Redundancy: Passive: DHR Systems features two different systems with nothing in common two systems based on different physical principles three loops sufficient to remove decay heat Active actuation (but independent from grid), Passive operation

ELFR - Decay Heat Removal Systems DHR N1 ICS DHR N2 WDHRS dip cooler bundle continuous monitoring Loop closed using an HX inside a pool No release outside containment HX/Tank Water Helium Lead

ELFR Advantages and Safety characteristics Advantages of Lead and how they are used in the ELFR design Lead does not react with water or air Possibility to eliminate the intermediate loop; SGU installed inside the Reactor Vessel R&D needed on SGTR (no expected safety concern) No stringent requirements on reactor leak tightness Lead has very high boiling point and very low Partial Pressure Reduced core voiding risk (Lead boiling point is 1745 C, Pressure at 400 C 3. 10-5 Pa) Lead has a higher density than the oxide fuel No need for core catcher to face core melt (molten clad and fuel dispersion) No risk of re-criticality in case of core melt Lead is a low moderating medium and has low absorption cross-section. No compact Fuel Assemblies fuel rods p/d design not imposed by core designers Core pressure loss drastically reduced high natural circulation capability

ELFR only Advantages? Issues mainly operational High Lead melting point (~ 327 C) assure Lead T above 340 C Overcooling transient (secondary side) may cause Lead freezing Corrosion / erosion of structural materials due to lead environment. Slugging of primary coolant loop (lead-oxide accumulation) seismic risk due to large mass of lead in-service inspection of core support structures spent fuel management by remote handling Steam Generator Tube rupture inside the primary system Flow blockage and mitigation of core consequences

ELFR only Advantages? Issues countermeasures High Lead melting point (~ 327 C) assure Lead T above 340 C Active heating system, design and operating procedures Overcooling transient (secondary side) may cause Lead freezing FW requirement diversification and redundancy may be not a safety issue Corrosion / erosion of structural materials due to lead environment. Coatings, oxygen control, limit flow velocity Slugging of primary coolant loop (lead-oxide accumulation) Oxygen control or strategy at low oxygen content seismic risk due to large mass of lead 2-D seismic isolators, vessel hanged, specific design (EU FP7 SILER project) in-service inspection of core support structures Similar to other HLM reactors but high T, all components replaceable spent fuel management by remote handling Develop appropriate cooling system (probably active passive) Steam Generator Tube rupture inside the primary system Show no effect on core, provide top cover rupture disks to limit max pressure Flow blockage and mitigation of core consequences Hexagonal wrapped FAs outlet temperature continuous monitoring Full unprotected flow blockage causes cladding damages to a max of 7 FAs

ELFR SAFETY APPROACH safety is built-in-the-design rather than added on full implementation of the Defence in Depth principles Exhaustive: complete identification of initiating events Progressive: no major consequences from short sequences Tolerant: no cliff edge effects Forgiving: sufficient grace period and repair possible during accidental situations Well-balanced: no sequence contributes in an excessive way to damaged plant states risk-informed approach deterministic approach and probabilistic approach ISAM and in particular the Objective Provision Tree (OPT) adopted in the design process. for each level of DiD (normally level 1 to 5) and for each safety objective/function identification of: the possible challenges to the safety functions, the plausible mechanisms which can materialize these challenges, the provided provision(s) to prevent, control or mitigate the consequences

Summary of LFR safety analyses (DBA) Loss of Primary Flow (failure of one pump or loss of all primary pumps) Transient Over Power (at Hot full power and cold zero power conditions) Loss of Heat Sink Loss of Primary Flow + Heat Sink (Station Black-Out) Over-Cooling of Primary Side Loss of Primary Coolant Steam Generator Tube Rupture Loss of Primary Flow + Heat Sink without DHR systems available

Summary of LFR safety analyses (DBA) Results ACCIDENT Max Fuel temperature ( C) Loss of Primary Flow 2070 759 Transient Over Power (HFP) 2178 540 Transient Over Power (CZP) 619 405 Loss of Heat Sink 2062 550 Loss of Primary Flow + Heat Sink (Station Black-Out) 2062 664 Over-Cooling of Primary Side 2192 525 Loss of Primary Coolant 2062 553 Max Cladding temperature ( C) Loss of Primary Flow + Heat Sink without DHR systems available 2062 664

Summary of LFR safety analyses (DBA) Results The highest fuel temperature is reached during the Primary side Overcooling Transient after reactor trip this value suddenly decreases and there is no further concern for fuel melting. The highest clad temperature is observed in Loss of primary flow transient within the first seconds of transient (< 30 s) After 1 hour, all the temperatures are well below 500 C In general, there is no real safety concern for any of the DBC accidents. The system is very forgiving and even in worst conditions (concomitant Loss of Primary Flow and Heat sink, without DHR system availability), there is an extended margin in time The steam generator tube rupture event does not jeopardize the integrity of the plant and the reactivity effects related to core void formation are clearly enveloped by the current overpower transient analysis.

Summary of LFR safety analyses (DEC) There are only a few transients during which the core conditions could approach clad failure unprotected complete loss of all heat sinks with and/or without the operation of the primary pumps clad temperature under EOC core conditions will most likely exceed limits, leading to possible local cladding failure (peak pins). No whole core clad failure is however to be expected. Potential positive reactivity insertions are judged to be enveloped by +200 pcm insertion in 10 sec case for HFP and by +350 pcm insertion in 10 sec case for CZP conditions. The results of the calculations have shown that power spikes exceeding a factor 1.6 nominal power are buffered as reactivity feedback effects decrease the power quickly towards nominal conditions. In order to prevent freezing of the lead coolant, a strict control of the secondary coolant conditions (feedwater inlet temperature, feedwater flow rate) is needed. In general, the safety analysis demonstrates the extremely forgiving nature of the ELFR design, ascribable to the intrinsic properties of the coolant taken and used from the beginning in the design of the core and primary system

LFR RESPONSE to extreme natural events Response to earthquakes enhanced adoption of 2D seismic isolators (EU-FP7 SILER Project) Reactivity insertion due to core compaction anticipated adoption of wrapped hexagonal FAs, with lateral restrains. Two Decay Heat Removal Systems independent, redundant and diverse DHR systems completely passive. Only actuation (through valves alignment) is active, using local stored energy the Station Blackout does not represent a concern any initiating event is managed without AC power Even in case of Station Blackout without DHR systems available, the safety analyses demonstrated that the fuel and cladding temperatures do not represent a concern Complete core melt is practically impossible due to favorable intrinsic lead characteristics: high thermal inertia, very high boiling point, higher density with respect to oxide fuel with enhancement of the fuel dispersion respect to fuel compaction. In the very unlikely event of an extreme Fukushima like scenario (or beyond) leading to the loss of all heat sinks (both DHR and secondary systems), the heat can still be extracted injecting water in the reactor cavity between the reactor and safety vessels, while in case of reactor vessel breach the decay heat can still be removed by the same system that cools the concrete of cavity walls.

Conclusion In the framework of the LEADER project, the safety approach for a Leadcooled fast reactor has been defined and, in particular, all the possible challenges to the main safety functions and their mechanisms have been specified, in order to better define the needed provisions. On the basis of the above and taking into account the results of the safety analyses performed during previous project (ELSY), a reference configuration of the ELFR plant has been consolidated, by improving and updating the plant design features. In particular, the emerged safety concerns have been analyzed in the LEADER project and a new set of design options and safety provisions have been proposed. The combination of favourable Lead coolant inherent characteristics and plant design features, specifically developed to face identified challenges, resulted in a very robust and forgiving design, even in very extreme conditions, as a Fukushima-like scenario.

Thank you for your attention