Sept 30, 2004 Page 1

Similar documents
A. Source Limitations: Obtain each type of building insulation through one source.

BEARING METAL STUD FRAMING

EcoTouch Insulation with PureFiber Technology

Recommended Design Considerations. and. Guide Specifications For. Commercial Building Insulation

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

SECTION PRE-ENGINEERED BUILDING INSULATION

GOWANDA, NEW YORK SEPTEMBER 18, 2008 ARCH PROJECT NO

Magnum Board Section Digicon Information Inc. Page 1

SECTION EXTERIOR INSULATION AND FINISH SYSTEMS

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

Gold Bond BRAND Gypsum Sheathing

SPECIFICATION GUIDELINE

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

C. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for each product.

SECTION GYPSUM BOARD

SPECIFICATION GUIDELINE

SECTION REFLECTIVE-FACED, MASONRY CAVITY WALL INSULATION

Siding and Soffit Installation Guidelines

Magnum Board Section Digicon Information Inc. Page 1

Section Pre-Applied Sheet Membrane Waterproofing

Floor Insulation Underlayment Section Sound Control Matting

(Project Location) (your firm's name)

SECTION CEMENT BOARD SUPPORTED ADHERED MASONRY VENEER. 2. Installation materials including adhesives, mortars, and pointing mortars.

ENKASONIC FLOOR UNDERLAYMENT 9110

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008

Page 1 of 5

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

Residential Building Inspections

SECTION HVAC INSULATION

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

1.2.1 Section Cold-Formed Metal Framing: Metal framing for support of aluminum soffits.

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

SECTION MODIFIED BITUMINOUS SHEET WATERPROOFING

SECTION SHEET MEMBRANE WATERPROOFING AND CRACK ISOLATION

SECTION MANUFACTURED MASONRY VENEER

Stonecraft Industies 8300 County Road Holmesville, OH

Alply CLASSIC WALL Architectural Insulated Panel Wall System

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction

ROCKWOOL Blanket (and Batt) Insulation Section Master Guide Specification Page 1 Jan 2017

Guideline Specifications

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars

by Rollfab Metal Products

SECTION GYPSUM WALLBOARD SYSTEMS. A. Gypsum board at new wall partitions or where indicated on drawings. B. ASTM C442 - Gypsum Backing Board

BULLETIN FROM THE FIRST COAST CHAPTER ICC~BOAF

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

2010 National Building Code Adoption and Associated Process Changes

May 19, 2006 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES

NOVABRIK MORTARLESS CONCRETE BRICK VENEER SPECIFICATION. MASTERFORMAT SECTION (Mortarless Concrete Brick Veneer)

SECTION GYPSUM BOARD ASSEMBLIES

Wall Insulation: Selection, Application and Specification

City of High Point Airport Overlay District Noise Level Reduction Design Standards

ROCKWOOL Board Insulation Section Master Guide Specification (ROCKBOARD 80) Page 1 January 2017

REPORT HOLDER: OMEGA PRODUCTS INTERNATIONAL, INC CALIFORNIA AVENUE CORONA, CALIFORNIA EVALUATION SUBJECT:

DIVISION 9 - SECTION QTscu Re-bonded Recycled Rubber Impact Sound Insulation Patent No. RE 41,945

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

APPLICATION AND FINISHING OF GYPSUM PANEL PRODUCTS

Regupol AktivPro RESILIENT ATHLETIC SURFACING REGUPOL RECYCLED RUBBER MOLDED TILES

Eclipse Energy Guard. Product Information & Installation Manual General Installation Requirements

ICC-ES Evaluation Report Reissued May 1, 2010 This report is subject to re-examination in two years.

Thermasheath -3. Insulation for the Building Envelope ROOF WALL SPECIALTY

Chevy Chase Club June 30, 2008 Bowie Gridley Architects SECTION GYPSUM BOARD SHAFT WALL ASSEMBLIES

Senergy Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor GPS Plus Rigid Insulation Board

SECTION 07530CP EPDM MEMBRANE ROOFING

EDGEWATER, FLORIDA JUNE 14, 2010

Application Specification:

ELEVATION FOR DETAIL REFERENCE ONLY

SECTION UNIT MASONRY SYSTEM

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION ROOF SPECIALTIES

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK

application instructions

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

General. Moisture. Secondary Water-Resistive Barrier. Storage. Gaps & Sealants. Stud Spacing. Flashing, Windows, Doors & Openings

Design & Construction Standards, Revised January

ROXUL Blanket (and Batt) Insulation Section Master Guide Specification (AFB) Page 1 April 2015

SECTION NON-STRUCTURAL METAL FRAMING

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

GYPSUM BOARD SECTION GYPSUM BOARD PART 1 - GENERAL

GigaCrete Specification PlasterMax. PlasterMax : Fire Rated Plaster for Direct Application over Cement Masonry Units (CMU) Interior Walls

1. Interior gypsum wallboard. 2. Exterior gypsum board panels for ceilings and soffits. 3. Tile backing panels.

RAMAPO COLLEGE OF NEW JERSEY PHASE II HOUSING REHABILITATION #05-221C 2012

DIVISION: FINISHES SECTION: PORTLAND CEMENT PLASTERING REPORT HOLDER: PROWALL BUILDING PRODUCTS, INC.

Acoustic Ceiling Products (ACP) Fasäde Thermoplastic Panels Section Digicon Information Inc. Page 1

THERMAL INSULATION

MASTERFORMAT SPECIFICATION

SECTION BUILDING INSULATION. Display hidden notes to specifier. (Don't know how? Click Here)

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

2006 INTERNATIONAL ENERGY CONSERVATION CODE

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: WATER-RESISTIVE BARRIERS/WEATHER BARRIERS

0331 Brick and block construction

A. Product Data: Submit manufacturer s product data, with complete general and specific installation instructions, recommendations, and limitations.

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

Transcription:

Sept 30, 2004 Page 1 This section includes a manufacturer's guide specification for TERRAFOAM EPS building insulation. Refer also to Product Description for detailed product properties, options, and other technical information. This section includes performance, proprietary, and descriptive type specifications; edit to avoid conflicting requirements. Part 1 General 1.1 SECTION INCLUDES In this article, select the components that are intended to be part of the content of this section and will not be included in other sections. Keep the statements brief and concise..1 Board insulation at [cavity wall construction,] [perimeter foundation wall,] [underside of floor slabs,] [exterior wall behind [ ] wall finish,] [and] [roof] [ ]. 1.2 RELATED SECTIONS.1 Section [ - ]: Preparation of adjacent work to receive work of this Section..2 Section [ - ]: Roofing membrane..3 Section 04815 - Cavity Wall Masonry System: Cavity space for thermal board insulation..4 Section 07260 - Vapour Retarders: Vapour retarder materials to adjacent insulation..5 Section 07270 - Air Barriers: Air seal materials to adjacent insulation..6 Section 07213 - Batt Insulation..7 Section [ - ]: [ ] insulation. 1.3 REFERENCES List reference standards that are included within the text of this section. Edit the following as required to parallel any reference standards statements within this section. Acronyms used for well known standards (first example) and defined text for less or named standards (second example)..1 ASTM C177 - Standard Test Method for Steady-State Heat Flux Measurements and Thermal Transmission Properties by Means of the Guarded-Hot-Plate Apparatus..2 ASTM C578 Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation..3 ASTM D1621 - Standard Test Method for Compressive Properties of Rigid Cellular Plastics..4 ASTM D2842 - Standard Test Method for Water Absorption of Rigid Cellular Plastics..5 ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials.

Sept 30, 2004 Page 2.6 ASTM E96 - Standard Test Methods for Water Vapor Transmission of Materials.7 CAN/ULC-S701 Standard for Thermal Insulation, Polystyrene, Boards and Pipe Covering. 1.4 SUBMITTALS Do not request submittals if drawings sufficiently describe the products of this section or if proprietary specifying techniques are used. The review of submittals increases the possibility of unintended variations to drawings, thereby increasing the Specifier's liability. The following submittals are intended for review and acceptability..1 Section [01300] [01 33 00]: Submission procedures..2 Product Data: Provide data on product characteristics, performance criteria, limitations, [and] [ ]. When manufacturer's instructions for specific installation requirements are referenced in PART 3 Execution include the following request for submittal of those instructions. Edit the PART 3 statements to avoid conflict with manufacturer's instructions..3 Manufacturer's Installation Instructions: Indicate special environmental conditions required for installation, installation techniques, [and] [ ]..4 Manufacturer's Certificate: Certify that [products] [ ] meet or exceed [specified requirements.] [.] 1.5 QUALITY ASSURANCE.1 Manufacturer: ISO 9001:2000 registered company..2 Design structural support framing components under direct supervision of a Professional Structural Engineer experienced in design of this Work and licensed [at the place where the Project is located.] [in the Province of [ ].] 1.6 MOCK-UP Use this article for assessing full sized erected assemblies for review of construction, coordination of work of several sections, testing, or observation of operation. A mock-up may also be used for assessing field applied finishes..1 Section [01400] [01 45 00]: Requirements for mock-up..2 Provide <[ x ] mm> <<[ x ] feet>> mock-up including [ ]..3 Locate [where directed.] [.].4 Mock-up may [not] remain as part of the Work. 1.7 DELIVERY, STORAGE, AND PROTECTION.1 Section [01600] [01 61 00]: Transport, handle, store, and protect products..2 Deliver, store and handle materials in accordance with manufacturer's written instructions.

Sept 30, 2004 Page 3.3 Deliver materials in manufacturer's original, unopened, undamaged containers with identification labels intact..4 Store materials off ground, protected from direct sunlight..5 Protect Products from exposure to harmful weather conditions. Store at temperature and humidity conditions recommended by manufacturer..6 Remove damaged or deteriorated Products from site. 1.8 ENVIRONMENTAL REQUIREMENTS.1 Section [01600] [01 61 00]: Environmental conditions affecting products on site..2 Do not install insulation adhesives when temperature or weather conditions are detrimental to successful installation. 1.9 SPECIAL WARRANTY This article extends the contract warranty period beyond one year..1 Section [01700] [01 78 00]: Warranties..2 Provide a [five] [ ] year warranty to include coverage for failure to meet specified requirements. Part 2 Products 2.1 MANUFACTURERS:.1, model "TERRAFOAM "..2 Substitutions: [Refer to Section [01600] [01 25 00].] [Not permitted.] [Refer to Instructions to Bidders.] 2.2 MATERIALS.1 Moulded Polystyrene Insulation: [ASTM C578 Type [1] [2] [3],] polystyrene board with the following characteristics:.1 Board Size: <[ x ] mm> <<[ x ] inches>>..2 Board Thickness: <[ ] mm> <<[ ] inches>>..3 Thermal Resistance:.1 [Type 1: <0.65 RSI/25 mm> <<R-3.7/inch>>]..2 [Type 2: <0.70 RSI/25 mm> <<R-4.0/inch>>]..3 [Type 3: <0.74 RSI/25 mm> <<R-4.2/inch>>].

Sept 30, 2004 Page 4 2.3 ADHESIVES.4 Water Absorption: In accordance with ASTM D2842 [6] [4] [2] percent by volume maximum..5 Compressive Strength: Minimum <[70] [110] [140] kpa> <<[10] [16] [20.4] psi>>..6 Flame/Smoke Properties: 25/450 in accordance with ASTM E84..7 Board Edges: [Square] [Shiplap] edges..1 Adhesive [Type 1]: Type recommended by insulation manufacturer for application. [OR].2 Adhesive [Type 1]: Gun grade, mastic type, compatible with insulation and substrate; bond strength of <[ ] N> <<[ ] lbs>>..3 Adhesive [Type 2]: Vapour retarder type, trowel consistency; [fire retardant] compatible with insulation and substrate, conforming to the following: 2.4 ACCESSORIES.1 Tape: [Bright aluminum] [Polyethylene] [Polyester] self-adhering type, [mesh reinforced], <[50] [ ] mm> <<[2] [ ] inch>> wide. Insulation fasteners can be adhered or mechanically fastened to surfaces which are to receive insulation..2 Insulation Fasteners: Impaling clip of [unfinished] [galvanized steel] [plastic] [nylon] [ ] with washer retainer [and clips], to be [adhered] [mechanically fastened] to surface to receive board insulation, length to suit insulation thickness and substrate, capable of securely and rigidly fastening insulation in place; [ ] manufactured by [ ]..3 Protective Boards: [Cementitious] [Wood fiberboard] [ ], <[6] [ ] mm> <<[1/4] [ ] inch>> thick; [ ] manufactured by [ ]. Part 3 Execution 3.1 EXAMINATION.1 Section 01700: Verify site conditions..2 Verify that substrate, adjacent materials, and insulation boards are dry and ready to receive insulation [and adhesive]..3 Verify substrate surface is flat, free of [honeycomb,] [fins,] [irregularities,] [materials or substances that may impede adhesive bond]. 3.2 WORKMANSHIP.1 Install insulation to maintain continuity of thermal protection to building elements and spaces.

Sept 30, 2004 Page 5 Verify clearances with local building regulations and safety codes. Check requirements for chimney vents and specify type required. Edit the following paragraph to suit project requirements..2 Keep insulation minimum <[75] mm><<[3] inches>> from heat emitting devices such as recessed light fixtures, and minimum <[50] mm><<[2] inches>> from [sidewalls of CAN4-S604 type A chimneys] [and] [CAN/CGA-B149.1 and CAN/CGA-B149.2 [type B] [and] [L] vents]..3 Cut and trim insulation neatly to fit spaces. Butt joints tightly, offset vertical joints. Use only insulation boards free from chipped or broken edges. Use largest possible dimensions to reduce number of joints..4 Offset both vertical and horizontal joints in multiple layer applications. 3.3 INSTALLATION - FOUNDATION PERIMETER.1 Adhere a <[ ] mm> <<[ ] inch>> wide strip of polyethylene sheet over [construction] [ ] joints with [double] [ ] beads of Type [ ] adhesive each side of joint..1 Tape seal joints..2 Extend sheet [full height of joint] [ ]..2 Apply Type [ ] adhesive [in [three] [ ] continuous beads per board length] [to full bed <[3] [ ] mm> <<[1/8] [ ] inch>> thick]..3 Install boards on foundation [wall] [grade beam] [ ] perimeter, [vertically] [horizontally]..1 Place boards in a method to maximize contact bedding..2 Stagger [side] [end] joints..3 Butt edges and ends tight to adjacent board and to protrusions..4 Extend boards over [control] [expansion] [ ] joints, unbonded to foundation <[ ] mm> <<[ ] inches>> on one side of joint..5 Cut and fit insulation tight to protrusions or interruptions to the insulation plane..6 Immediately following application of board insulation, place protective boards over exposed insulation surfaces, [apply Type [ ] adhesive in [five] [ ] continuous beads per board length]..1 Install boards [horizontally] [vertically] from [base of foundation] [ ] to [top of insulation] [ ]..2 Butt board joints tight; stagger from insulation joints. 3.4 INSTALLATION CRAWLSPACE.1 Install insulation to inside face of foundation wall in crawl space area using approved [adhesive] [impaling pins] [furring strips spaced <610 mm> <<24 inches>> oc maximum].

Sept 30, 2004 Page 6 3.5 INSTALLATION - EXTERIOR WALLS Use the following where insulation occurs behind cement plaster, a synthetic surfacing, metal siding, or other finishing material. Minor editing can identify application to soffit surfaces and interior applications..1 Apply Type [ ] adhesive [in [three] [ ] continuous beads per board length] [to full bed <[3] [ ] mm> <<[1/8] [ ] inch>> thick]. Daub adhesive tight to protrusions..2 Install boards on [wall surface] [ ], [vertically] [horizontally]. [Place [ ] membrane surface of insulation against adhesive.].3 Place boards in a method to maximize contact bedding. Stagger end joints. Butt edges and ends tight to adjacent board and to protrusions..4 Cut and fit insulation tight to protrusions or interruptions to the insulation plane. Coordinate the following paragraphs with Section 07260 - Vapour Retarders and Section 07270 - Air Barriers..5 Place <[ ] mm> <<[ ] inch>> wide [polyethylene] [ ] sheet at perimeter of wall openings, from adhesive vapour retarder bed to [window] [door] [ ] frame. Tape seal in place to ensure continuity of vapour retarder and air seal..6 [Tape insulation board joints.] 3.6 INSTALLATION - CAVITY WALLS Utilize this article where rigid insulation occurs in cavity walls, placed on outer surface of inner masonry wythe or other substrate. Ensure insulation board is sized to suit spacing of through wall reinforcement. The use of impale fasteners will improve positioning and bond of insulation. If another mechanical method of fastening insulation is employed, edit the following paragraphs accordingly..1 Secure impale fasteners to substrate at a frequency of [[6] [ ] per insulation board] [[ ] per <3 sq m> << 10 sq ft>>]..2 Adhere a <[ ] mm> <<[ ] inch>> wide strip of polyethylene sheet over [control] [ ] joint with [double] [ ] beads of Type [ ] adhesive each side of joint between sheets. Extend sheet [full height of joint] [ ]..3 Apply Type [ ] adhesive [in [three] [ ] continuous beads per board length] [to full bed <[3] [ ] mm> <<[1/8] [ ] inch>> thick on substrate]. [Daub adhesive tight to protrusions to ensure continuity of vapour retarder and air seal.].4 Install boards [horizontally between wall reinforcement] [vertically] [ ]. On full bed adhesive, place membrane faced boards against adhesive. On bead adhesive, boards may be placed with membrane facing out to permit joint taping..5 [Place membrane surface against adhesive.] [Place membrane surface facing out, [butter with adhesive] [tape seal] board joints.].6 Place boards in a method to maximize contact bedding. Stagger [side] [end] joints. Butt edges and ends tight to adjacent board and no protrusions. [Place impale fastener locking discs].

Sept 30, 2004 Page 7.7 Cut and fit insulation tight to protrusions or interruptions to the insulation plane. Coordinate the following paragraphs with Section 07260 - Vapour Retarders and Section 07270 - Air Barriers..8 Place <[ ] mm> <<[ ] inch>> wide [polyethylene] [ ] sheet at perimeter of wall openings, from adhesive vapour retarder bed to [window] [door] [ ] frame. Tape seal in place to ensure continuity of vapour retarder and air seal. 3.7 INSTALLATION - UNDER CONCRETE SLABS.1 Place insulation under slabs on grade after base for slab has been compacted [and vapour barrier installed]..2 Cut and fit insulation tight to protrusions or interruptions to the insulation plane..3 Prevent insulation from being displaced or damaged while [placing vapour retarder and] placing slab..4 Extend boards <[ ] mm> <<[ ] inches>> in from perimeter foundation wall] [as indicated]. 3.8 INSTALLATION ROOF INSULATION.1 Install roof insulation in accordance with Section [ ]. 3.9 PROTECTION OF FINISHED WORK.1 Section [01700] [01 45 00]: Protect finished Work..2 Do not permit work to be damaged prior to covering insulation. END OF SECTION