The existing stress measurement of the PC bridges by slit stress relief techniques using the optical full-field measurement method

Similar documents
Application of Tensioned CFRP Strip Method to an Existing Bridge

Strengthening Effect on Prestressed Concrete members Affected by Alkali-Silica Reaction(ASR)

CHAPTER 11: PRESTRESSED CONCRETE

SHEAR BEHAVIOR OF RC BEAMS USING U-SHAPED UFC PERMANENT FORMWORK WITH SHEAR KEYS OR BOLTS

ULTIMATE LOAD-CARRYING CAPACITY OF SELF-ANCHORED CONCRETE SUSPENSION BRIDGE

Experimental investigation of the use of CFRP grid for shear strengthening of RC beams

Appendix D.2. Redundancy Analysis of Prestressed Box Girder Superstructures under Vertical Loads

ST7008 PRESTRESSED CONCRETE

CHAPTER 7: SERVICEABILITY LIMIT STATES

Reinforced Concrete Design. A Fundamental Approach - Fifth Edition

Extreme Loading for Structures Version 3.1

Ultimate strength prediction for reinforced concrete slabs externally strengthened by fiber reinforced polymer (FRP)

Analysis and design of balanced cantilever prestressed box girder bridge considering constructions stages and creep redistribution

SHEAR STRENGTH CAPACITY OF PRESTRESSED CONCRETE BEAM- COLUMN JOINT FOCUSING ON TENDON ANCHORAGE LOCATION

Flexure Design Sequence

PERFORMANCE-BASED DESIGN OF CONCRETE STRUCTURES

Innovative Design of Precast/Prestressed Girder Bridge Superstructures using Ultra High Performance Concrete

Nonlinear Models of Reinforced and Post-tensioned Concrete Beams

BRIDGE GIRDERS TECHNICAL GUIDE

Progressive Erection Applied to Box Girder with Strutted Wing Slab

Scientific Seminar Design of Steel and Timber Structures SPbU, May 21, 2015

Stress distributions of PSC box girder bridge due to creep shrinkage effect

Appendix D.1. Redundancy Analysis of Composite Spread Box Girder Superstructures under Vertical Loads

Effect of perpendicular beams on failure of beam-column knee joints with mechanical anchorages by 3D RBSM

GFRP-STEEL HYBRID REINFORCED CONCRETE BRIDGE DECK SLABS IN QUEBEC, CANADA

FLEXURAL BEHAVIOR OF RC BEAMS REINFORCED WITH NSM AFRP RODS

UNIVERSITY OF BOLTON WESTERN INTERNATIONAL CENTRE FZE. BEng (HONS) CIVIL ENGINEERING SEMESTER ONE EXAMINATION 2015/2016

ADAPT-PT 2010 Tutorial Idealization of Design Strip in ADAPT-PT

FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE BRIDGE PIER COLUMNS SUBJECTED TO SEISMIS LOADING

Design of Steel-Concrete Composite Bridges

Assessment of Long-Time Behavior for Bridge Girders Retrofitted with Fiber Reinforced Polymer

Post-tensioned prestressed concrete bridge - assignment

Parametric Study of Continuous Concrete Beam Prestressed with External Tendon

About the Causes of the Koror Bridge Collapse

1.7 Prestressing Steel

ADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode

Structural behaviour and failure mechanisms of concrete monoblock railway sleepers

Shear Behavior of R/C Beams with Web Openings Reinforced by Prestress Force

STRENGTHENING OF UNBONDED POST-TENSIONED CONCRETE SLABS USING EXTERNAL FRP COMPOSITES

DESIGN FOR PROGRESSIVE COLLAPSE 1

DESIGN OF STEEL FIBRE REINFORCED CONCRETE BEAMS USING THE NEW FIB MODEL CODE 2010 AN EVALUATIVE

Behavior of a multiple spans cable-stayed bridge

BrD Superstructure Tutorial

CRACKING BEHAVIOR AND CRACK WIDTH PREDICTIONS OF CONCRETE BEAMS PRESTRESSED WITH BONDED FRP TENDONS

DESIGN OF POST-TENSIONED MEMBERS IN BENDING USING ACI SIMPLIFIED PROCEDURE

MIDAS Training Series

Types of Foundations

ECO INSTRUMENT (NS M)

Proposed Modifications to the LRFD Design of U-Beam Bearings

This project incorporates elements of the following engineering disciplines:

EFFECTIVENESS OF COHESION ON HORIZONTAL SHEAR TRANSFER FOR COMPOSITE PRESTRESSED CONCRETE GIRDERS

REVIEW ON SHEAR SLIP OF SHEAR KEYS IN BRIDGES

Initial Tests of Kevlar Prestressed Timber Beams

CONCREEP 10. September 21-23, 2015 Vienna, Austria. SPONSORED BY RILEM Engineering Mechanics Institute of ASCE

DESIGN GUIDELINES FOR BRIDGE DECK SLABS REINFORCED by CFRP and GFRP

STRENGTHENING STEEL-CONCRETE COMPOSITE BRIDGES WITH HIGH MODULUS CARBON FIBER REINFORCED POLYMER (CFRP) LAMINATES

Strength Design of Reinforced Concrete Structures

SHEAR BEHAVIOR OF RC DEEP BEAMS WITH SOLID CIRCULAR CROSS SECTION UNDER SIMPLY SUPPORTED CONDITION AND ANTI-SYMMETRIC MOMENT

Seismic Fragility of Concrete Bridges with Deck Monolithically Connected to the Piers or Supported on Elastomeric Bearings

SHEAR BEHAVIOR OF REINFORCED HIGH-STRENGTH CONCRETE MEMBERS

SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE

Bijan Khaleghi, Ph, D. P.E., S.E.

This final draft of the fib MC2010 has not been published; it is intended only for the purpose of voting by the General Assembly.

DISPLACEMENT-BASED SEISMIC DESIGN OF CONCRETE BRIDGES

ADAPT Floor Pro 2009/2010 Tutorial Export Design Strip to ADAPT PT or ADAPT RC

Bridging Your Innovations to Realities

RESILIENT INFRASTRUCTURE June 1 4, 2016

5.4 Analysis for Torsion

GROUND ANCHOR TENDONS IN CARBON FIBRE-REINFORCED POLYMERS

A Guide for the Interpretation of Structural Design Options for Residential Concrete Structures

The bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge.

mortarless Design Manual Part 1 (AS 3600:2009) Section 1 Page 1 AS 3600:2009 PLAIN AND REINFORCED CONCRETE - CODE OF PRACTICE

STUDY ON MODELING OF STEEL RIGID FRAME BRIDGE FOR DYNAMIC ELASTO-PLASTIC ANALYSIS

Finite Element Simulation of Cantilever Construction Structure

IMPROVEMENT OF THE DEFORMATION CAPACITY BY THE USE OF FIBERS

SHEAR BEHAVIOR OF DOUBLY REINFORCED CONCRETE BEAMS WITH AND WITHOUT STEEL FIBERS AFFECTED BY DISTRIBUTED CRACKS

WHEEL TRUCKING TEST FOR WELD OF U-SHAPED RIB AND DECK PLATE IN THE ORTHOTROPIC STEEL DECK. Susumu Inokuchi 1

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure

Bond Characteristics of GFRP Sheet on Strengthened Concrete Beams due to Flexural Loading

FRP FOR CONSTRUCTION IN JAPAN

Introduction of a Japan Concrete Institute Guideline: Practical Guideline for Investigation, Repair and Strengthening of Cracked Concrete Structures

Testing and analysis of masonry arches subjected to impact loads

Design Methods of Elements from Cross-Laminated Timber Subjected to Flexure

COMPERATIVE STUDIES OF REINFORCEMENT CONCRETE BEAM DESIGN USING BS 8110 AND ACI 318 AHMAD ADLI BIN JAMALUDIN AA07192

Service life extension of existing precast concrete girders

EXPERIMENTAL STUDY ON THE EFFECT OF TENSION FOR RUBBER BEARINGS

Flexural Behavior of RC T- Section Beams Strengthened with Different Configurations of CFRP Laminates

Wood-based beams strengthened with FRP laminates Improved performance with pre-stressed systems

Influence on Durability of Concrete Slab in Composite Bridge due to Use of Elastic Supports

PRESTRESSED CONCRETE PLATES WITH HIGH STRENGTH FABRIC

Applications of sustainable post-tensioned concrete slabs

Seismic Retrofit of Reinforced Concrete Building Structures with Prestressed Braces

Deflection Assessment of an FRP-Reinforced Concrete Bridge. By Danielle K. Stone, Andrea Prota, and Antonio Nanni

In-plane testing of precast concrete wall panels with grouted sleeve

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND

L Shaped End Anchors to Eliminate Premature Plate End Debonding in Strengthened RC Beams

Crack detection in composite bridges with relative displacement sensors

Repair and upgrading of concrete structures with FRP materials

Tensile/Tension Test Fundamentals

EXPERIMENTAL RESULTS

Transcription:

More Info at Open Access Database www.ndt.net/?id=18357 The existing stress measurement of the PC bridges by slit stress relief techniques using the optical full-field measurement method Kenichi HIDA 1, Yukihiro ITO 2, Katsuya MITA 2, Akira DEMIZU 3, Takuji OKAMOTO 4, Masaki YONEMOTO 4 1 K&T Consultant Co. Ltd; Tokyo, Japan, Phone: +81-4-7141-0115, Fax: +81-4-7141-0116; e-mail: k-hida@kt-c.co.jp 2 Saga University; Saga, Japan, e-mail: itoy@cc.saga-u.ac.jp, mita@cc.saga-u.ac.jp 3 Nagasaki University; Nagasaki, Japan, e-mail: demizu@nagasaki-u.ac.jp 4 Keisoku Research Consultant Co. Ltd; Hiroshima, Japan, e-mail: okamoto@krcnet.co.jp,yonemoto@krcnet.co.jp Abstract Tendon of pre-stressed concrete bridge corrodes for damage from chloride attack, and pre-stress decreases. And a bridge falls by corrosion of PC-tendon. It is necessary to grasp the stress which acts on concrete of PC bridges.therefore authors have developed the existing stress measurement method by slit stress relief techniques using the optical full-field measurement method.this report introduces a measurement method of pre-stress by the existing stress measurement method by slit stress relief techniques using the optical full-field measurement method.the following measured case of pre-stress of PC bridges will be reported. 1) Cause investigation in the central hinge bridge where I transformed abnormally 2) Confirmation of safety of the PC bridge damaged by chloride attack. 3) Decision of the strengthening amount of the PC bridge damaged by chloride attack Keywords: optical full-field measurement method, slit stress relief technique, existing stress measurement 1. Introduction Concrete structures are believed to be durable permanent structures. However, in recent years, remarkable changes in condition have been observed in some concrete structures. These changes include cracks and corrosion of reinforcing steel due to deterioration caused by chloride attack, carbonation, alkali-aggregate reaction, etc. In post-tensioned prestressed concrete (hereinafter, PC) girders, cases of severe cracking or bridge collapse as a result of corrosion and rupture of PC tendons occurred due to chloride attack or hydrogen embrittlement fracture at points where grout filling was incomplete have been reported. There have also been cases in which prestress was reduced by unexpected creep/shrinkage, and deflection exceeding the design value occurred. Since a decrease in the prestress of a PC structure has a large effect on its load bearing capacity and leads to reduced safety, an accurate grasp of existing stress is necessary for proper maintenance of PC structures. However, the amount of existing prestress is not controlled; only the tensioning force of the PC tendons in the initial stage is controlled. The current methods for measuring the existing stress of PC structures include an estimation method in which strain gauges are placed on 3 axes and core stress is relieved, and a slot stress method developed in France, among others. [1] Because techniques for PC structures have same problems and have not been applied practically very much, a technique that enables accurate estimation is demanded. In order to improve accuracy in comparison with the conventional existing stress measurement methods, in this research, the authors developed an existing stress measurement method for PC structures by the stress relief method which is an existing stress measurement method, and the digital image correlation method. This method has features of highly accurate, noncontact and full-field measurement.

2. Existing stress measurement by slit stress relief technique using optical full-field measurement method 2.1 Overview If a slit is cut perpendicular to the direction of stress in a concrete member on which uniform compressive stress acts, liberating strain will be generated in the area surrounding the slit. The analytical model of this technique is shown in Fig. 1. Figure 2 shows the relationship between the liberating strain and the distance from the slit center when the slit cutting depth in the model is changed from 10 mm to 20 and 30 mm. As a feature of the existing stress measurement method by the slit relief technique developed in this research (hereafter, slit stress relief technique), the optical full-field measurement method is used in order to improve accuracy in comparison with the conventional method when measuring the liberating strain caused by slit-cutting. In the slit stress relief technique, the area around the slit is measured with a full-field strain measurement device before and after cutting the slit, and the distribution of liberating strain is obtained from the measured images by the digital image correlation method, which is one optical full-field measurement method. By using the optical full-field measurement method, strain measurements can be performed with high accuracy extending to micro areas in the vicinity of the slit. The existing stress of the concrete member is calculated based on the measured liberating stress distribution by inverse analysis by FEM analysis. 2.2 Optical full-field measurement method International Symposium The specifications of the optical full-field strain measurement device are shown in Table 1, and the appearance of the device is shown in Fig. 3. A mechanism that enables highly accurate travel was realized by fixing the drive device for sub-scanning on a high-rigidity frame to improve travel accuracy in the sub-scanning direction, and adopting two moveable linear guide rails for the line sensor and using a stepping motor in a precision ball screw in this part. A linear encoder with resolution of 0.1 μm is used to control the movement distance in the sub-scanning direction. A jig is attached so that the device can be attached easily and firmly to the object of measurement. 400 6.00E-04 10N/mm 2 5.00E-04 4.00E-04 10mm 20mm 30mm 400 Slit 10,20,30mm Releasing strain 3.00E-04 2.00E-04 400 Ec= 25000 N/mm 2 Figure 1. Analytical model liberating Strain 1.00E-04 0.00E+00 0 50 100 150 200 Distance from slit (mm) Figure 2. Distribution of liberating strain by slitcutting

Table 1. Specifications Main- 2.3 Existing stress measurement by slit stress relief technique The released strain distribution and change ratio distribution of the distance between the optical marks is obtained by applying the digital image correlation method to the photographed images. The digital image correlation method, as shown in Fig. 4, is an image Sensor type Greatest manuscript size Optics resolution(main scanning vice-scanning) Source of light Power supply Electricity consumption Size (width depth height) Subset (N x N pixels) Weight N (pixels) N (pixels) Digital information in subset CIS 210 210mm 1200dpi 1200dpi (About0.021mm/pixel) LED DC15V 15W 387mm 262mm 90mm About 8000g Vice scanning Figure 3. Optical full-field measurement device Line sensor analysis technique in which the amount of movement from the position before slit-cutting is obtained based on digital information of the pixel clusters in the initial image, by locating pixel clusters for the same digital information from the image after slit-cutting. The change ratio distribution of the 0 1,000 Distance from slit center mm Before deformation Displacement amount Change ratio distribution of distance of optical marks ε= L/L The strain or the object point(μ) 2,000 3,000 Analytica Measurement Displacement direction 4,000 5,000 After deformation 6,000 Figure 4. Digital image correlation method Figure 5. The object point distance rate of change Figure 6. Example of the strain distribution of object point distance between the optical marks is obtained from the measured images by the digital image correlation method, and existing stress is then estimated by obtaining a change ratio distribution between optical marks that approximates the measured change ratio distribution by inverse analysis by FEM analysis. The change ratio distribution between optical marks, as shown in Fig. 5, is the ratio of the change in distance between two points, assuming the slit is the center of that distance. Existing stress is estimated from the analysis values obtained by inverse analysis by FEM analysis which coincide with the measured values by using the analytical model shown in Fig. 7 and the mesh diagrams shown in Fig. 8. Figure 6 shows an example of the change ratio distribution of the optical marks of the analytical values and the measured values at the center of a span. Figure 9 shows the work procedure.

Slit depth T Before cutting After cutting Figure 7. Analytical model Figure 8. Mesh diagrams 1. Rebar probe Using a reinforcing bar probe, the PC tendon position is confirmed and the measurement position is decided. 4. Initial image The initial image is photographed with a flat scanner. 2. Surface treatment The surface is smoothed to enable photography of focused images. 5. Slit-cutting slit-cutting is performed with a dedicated cutter. 3. Surface condition before stress relief A random black and white pattern is attached. 6. Photography after stress relief The image after slitcutting is photographed with the flat scanner. Figure 9. Work procedure 3. Cause investigation of abnormal deformation of central hinge bridge 3.1 Overview This bridge is a 3-span hinge PC box girder rigid frame bridge which was constructed in a mountainous area in 1989. Abnormal deflection occurred in the central hinge part. The maximum deflection, as shown in Fig. 10, is approximately 140 mm. Focusing on inadequate prestress and creep deformation in the pier capital section, a study of stress (strain) in the central hinge bridge was carried out to determine the cause of this abnormal deformation. [2] In this stress investigation, the existing strain of the reinforcing steel was measured by the slit stress relief technique and the rebar cutting method. The investigation positions are shown in Fig. 11. Cross sections of pier capitals P1 and P2 were taken.

Slit stress relief technique Rebar cutting method Figure 10. Transition of deflection Figure 11. Investigation positions Measurement position P1 pier capital P2 pier capital Upper slab Lower slab Upper slab Lower slab Table 2. Measurement results Slit stress relief technique Existing stress σ C Strain of concrete ε C Rebar cutting method Strain of rebar ε r 3.89±0.38 N/mm 2 177 10-6 1334 10-6 5.10±0.59 N/mm 2 232 10-6 1378 10-6 1.73±0.44 N/mm 2 79 10-6 916 10-6 6.33±0.63 N/mm 2 288 10-6 1328 10-6 3.2 Measurement results The measurement results are shown in Table 2. From the results of sample core tests, the elastic modulus of the concrete was assumed to be EC=22 kn/mm 2. Creep/Shrinkage and elastic strain, which were the existing strain at those positions, had occurred in the reinforcing steel arranged in the PC bridge. That is, the liberating strain which was measured by the rebar cutting method included elastic strain and creep/shrinkage. Therefore, if the existing stress of the concrete can be measured, creep/ shrinkage strain can be separated from the liberating strain obtained by the rebar cutting method by using Eq. (1). εr=εl+εφs=σc/ec+εφs (1) where, εr: rebar strain, εl: elastic strain of rebar (εl=σc/ec), εφs: creep/shrinkage strain of concrete, σc: concrete stress (N/mm 2 ), Ec: elastic modulus of concrete (N/mm 2 ). 3.3 Estimation of cause of abnormal deflection of center hinge Figure 12 shows the strain distribution diagram of the P1 pier capital for rebar strain (εr), which includes concrete strain (εc), i.e., a type of elastic strain, and drying shrinkage. εr and εc show substantially the same slopes. Assuming that drying shrinkage strain (εsh) and

Elastic strain εc Creep/Shrinkage strain εφs Rebar strain εr Figure 12. Strain distribution (measured) of P1 pier head Figure 13. Deflection distribution by estimated creep coefficient Table 3. Estimated creep coefficients and shrinkage Measurement position P1 pier capital P2 pier capital Girder height (m) ε r 10-6 ε c 10-6 ε φs 10-6 n ε sh 10-6 φ 4.300 1330.7 172.7 1158.0 2.3 469.2 3.99 4.050 1334.0 176.8 1157.2 2.3 462.3 3.93 0.700 1378.0 231.8 1146.2 1.9 385.9 3.28 0.000 1387.2 243.3 1143.9 1.9 372.8 3.17 Average 422.6 3.59 4.300 885.3 63.0 822.2 2.7 535.4 4.55 4.050 916.0 78.6 837.4 2.5 501.9 4.27 0.700 1328.0 287.7 1040.3 1.5 301.9 2.57 0.000 1414.1 331.4 1082.7 1.4 283.6 2.41 Average 405.7 3.45 * Average creep coefficient of P1 and P2 pier capitals: φ=3.52 creep strain (εφ) are proportional to the design shrinkage strain and the design creep coefficient, the shrinkage and creep coefficient of the P1 and P2 pier capital parts can be obtained by Eq. (2). εφs =εsh +εφ=n (εsh0+εc φ0) (2) εsh= n εsh0, εφ= n εc φ0, φ= n φ0 where, εsh: shrinkage strain, εφ: creep strain, φ: estimated creep coefficient, εsh0: design shrinkage (200 10-6 ), φ0: design concrete creep coefficient (1.7). Table 3 shows the estimated creep coefficients and shrinkage. As these values are approximately the same, they are considered to express the creep coefficient and drying shrinkage of the actual bridge. Figure 13 shows the calculated deflection values calculated using the average estimated creep coefficient (φ=3.52) and the results of longitudinal leveling. Because the calculated values of deflection using the estimated creep coefficients are in good agreement with the results of longitudinal leveling, it is thought that the main cause of the abnormal deflection in this bridge is creep deformation.

4. Confirmation of safety of PC bridge damaged by chloride attack 4.1 Overview This bridge is a post-tensioned PCT girder bridge which passes over a sea area and had been in service for approximately 40 years since construction. The bridge, as shown in Fig. 14, had suffered progressive deterioration in the forms of loose and peeling scale and corrosion of the reinforcing steel, and a reduction of load bearing performance was feared as a result of progress of corrosion of the members due to chloride attack and corrosion of the PC tendons. Therefore, a stress investigation, etc. was carried out to confirm the load bearing capacity of the bridge. [3] In the stress investigation, generated strain was measured by the slit stress relief technique and a dynamic load test assuming the service load. The measurement positions are shown in Fig. 15. 4.2 Measurement results International Symposium Table 4 shows the results of measurements by the slit stress relief technique, and Table 5 shows the results of the dynamic load test. As the elastic modulus, the design elastic modules at the time of construction, Ec=35 kn/mm 2 was assumed. In the dynamic load test, a dump truck with a gross weight of 20 t and a 50 t class rafter crane with a gross weight of approximately 40 t were assumed as the load vehicles. One lane was closed to traffic, the load vehicles were stopped in the center of the span on the closed lane, and the vehicles were allowed to travel on the open land when no general vehicles were passing. Measurements were performed under the following three load vehicle patterns. Pattern 1: Dump truck stops on closed lane, dump truck travels on open lane. Pattern 2: Dump truck stops on closed lane, rafter crane travels on open lane. Pattern 3: Rafter crane stops on closed lane, dump truck travels on open lane. G1 G2 G3 G4 Strain measurement Slit stress relief technique Figure 14. Deterioration of main girder Figure 15. Measurement positions (span center) Table 4. Results of measurement by slit stress relief technique Measurement position Existing stress (N/mm 2 ) Error G3 3.46 ± 0.15 3.31-3.61 4.3% G4 3.21 ± 0.25 2.96-3.46 7.7%

Pattern 1 Pattern 2 Pattern 3 Max. tensile stress Table 5. Results of dynamic load test G1 G2 G3 G4 (A) Dump truck load -0.2-0.5-0.8-0.8 (B) Dump truck load (traveling) -1.1-0.9-0.6-0.3 (A)+(B) -1.3-1.4-1.4-1.1 (A) Dump truck load -0.3-0.5-0.8-0.9 (B) Crane load (traveling) -1.6-1.4-0.9-0.5 (A) + (B) -1.9-1.9-1.7-1.4 (A) Crane load -0.5-0.9-1.3-1.3 (B) Dump truck load (traveling) -1.0-0.9-0.6-0.4 (A)+(B) -1.5-1.8-1.9-1.7 Dump truck single load -1.1 Crane single load -1.6 Dump tuck + dump truck parallel load -1.4 Dump tuck + crane parallel load -1.9 Unit: N/mm 2 Compressive (+), tensile (-) 4.3 Evaluation of load bearing performance In the PC girder of this bridge, from Table 4, the existing stress, which was stress on the resistance side, has become compressive stress of approximately 3.0 N/mm 2 or more. On the other hand, from Table 5, the maximum tensile stress due to single loading by a dump truck, which seems to have a high possibility of being the actual loading mode, is on the order of 1.0 N/mm 2. The maximum tensile stress due to single loading by a dump truck and parallel loading by dump trucks, which appear to have a small possibility, is about 1.5 N/mm 2, and the maximum tensile stress due to parallel loading by a dump truck and a rafter crane, which seems to have an extremely small possibility, is about 2.0 N/mm 2. Accordingly, the PC girder of this bridge is considered to be safe at the present point in time. 5. Design of Strengthening for PC bridge damaged by chloride attack 5.1 Overview This structure is a pre-tensioned PCT girder comprising the superstructure of a rock shed which is in contact with the sea coast. It had been in service for approximately 30 years. In the structure, as shown in Fig. 16, deterioration in the forms of loose and peeling scale and corrosion of steel materials has progressed, and a reduction of load bearing performance was feared as a result progressive corrosion of the steel materials due to chloride attack and corrosion of the PC tendons. Therefore, an investigation by the slit stress relief technique was performed to confirm the loading bearing performance of the structure. The investigation positions were the six main girders on the lower side of the structure. 5.2 Measurement Results The measurement results are shown in Table 6. As the elastic modulus of the concrete, the design elastic modulus at the time of construction, EC=35 kn/mm 2 was assumed.

Table 6. Results of measurement by slit stress relief technique Figure 16. Damage of main girder Existing Standard Measurement Error stress deviation position (N/mm 2 ) (N/mm 2 ) (%) No. 14 Sea 2.27 1.67 71.3 No. 15 Mountain -0.62 0.05 7.1 No. 16 Mountain 1.18 0.51 40.8 No. 20 Sea 0.95 0.64 63.1 No. 25 Mountain 0.11 0.04 35.5 No. 29 Sea 0.8 0.46 54.3 Existing stress : Compressive (+), tensile (-) Measurement position Table 7. Reduction of prestress Existing stress Prestress Tensioning force Reduction (N/mm 2 ) (N/mm 2 ) (kn) (%) σ cl ' σ cp '=σ cl '-σ dl -σ sl P t '=σ cp '(1/A c +y ep /Z l ) Pt'/Pt No 14 Sea 2.27 5.16 405.4 119.60% No. 15 Mountain -0.62 2.27 178.2 52.60% No. 16 Mountain 1.18 4.07 319.7 94.30% No. 20 Sea 0.95 3.84 301.6 89.00% No. 25 Mountain 0.11 3.00 235.6 69.50% No. 29 Sea 0.80 3.69 289.8 85.50% Section area Ac= 2.93E+05 (mm 2 ) Average 85.10% Section modulus Zl= -3.29E+07 (mm 3 ) Standard deviation 20.80% Steel eccentricity y ep = -305.5 (mm) Lower limit 64.30% Effective tensioning force Pt= P t0 *η= 338.9 (kn) Upper limit 105.90% 5.3 Evaluation of load bearing performance The estimated results of the decrease of prestress are shown in Table 7. The amount of decrease of the prestress of the PC girders of this rock shed was 85.1% ±20.8% of the design prestress. Therefore, for the amount of prestress of the PC girders of the rock shed, the amount of strengthening was set assuming 60% of the design prestress, which was the lower limit of the estimated reduction of prestress. 5.4 Design of Strengthening Bending strengthening of the PC girders of the PC rock shed, assuming 60% of the design prestress, was carried out by using 1 layer of high modulus carbon fiber sheet by the carbon fiber sheet adhesive method. In addition, 2 layers of middle modulus type carbon fiber sheet were used for shear strengthening. The cross section of the strengthening of the rock shed is shown in Fig. 17.

Figure 17. Sectional view of reinforcement 6. Conclusions 1) It is possible to separate creep/drying shrinkage strain from concrete stress (strain), which is a type of elastic stress, and estimate the creep coefficient of existing structures by using a combination of the slit stress relief technique and strain measurement of reinforcing steel by the rebar cutting method. 2) The load bearing capacity of existing PCT girder bridges, in which a reduction of prestress due to deterioration caused by chloride attack is an issue, can be evaluated by a comparative study of the resistance stress obtained by the slit stress relief technique, and the acting stress obtained by strain measurements in the dynamic load test supposing the service load. 3) The amount of reduction of prestress can be estimated from the results of the slit stress relief technique, and the proper load bearing performance can be evaluated. The proper amount of strengthening can then be set based on the amount of prestress (existing prestress) in the current condition. References 1. Akira Demizu, Kenichi Hida, Yukihiro Ito, Masakazu Uchino, Takuji Okamoto, Hiroshi Matsuda: Measurement of existing stress of post-tensioned girders by optical technique and stress release method, Proceedings of the Annual Conference on Experimental Mechanics, Japanese Society for Experimental Mechanics, No. 10 GS5-5, pp281-286, 2010 2. Kenichi Hida, Yukihiro Ito, Mitsuaki Tsukihara, Haruyuki Koitabashi: Report of investigation of central hinge bridge in which abnormal deformation occurred after approximately 30 years in service, Proceedings of the 22 nd Symposium, pp345-348, 2013.10 3. Kenichi Hida, Yukihiro Ito, Akira Demizu, Masakazu Omachi: Report on investigation of load bearing capacity of post-tensioned PCT girder bridge with damage by chloride attack, Proceedings of the 23 rd Symposium, pp649-652, 2014.10