EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT

Similar documents
Updates on FAA Order F. Agenda. Communicate FAA Order Updates. Educate attendees on the changes to FAA Order

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS

Mitigation Monitoring and Reporting Program for the Concord Community Reuse Project

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

Appendix H Support Facilities Preliminary and Intermediate Alternatives Analysis

Northwest State Route 138 Corridor Improvement Project

5.0 PROJECT ALTERNATIVES

Chapter 10 Natural Environment

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA

California Environmental Quality Act Findings LAX Terminals 2 and 3 Modernization Project 1. Project Description Summary

This page intentionally left blank.

4 ALTERNATIVES. LAFCo also received input as a part of the Notice of Preparation (NOP) and scoping process regarding potential alternatives.

1.0 INTRODUCTION 1.1 EIR REQUIREMENT

3.0 COMMENTS AND RESPONSES

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures

ES Executive Summary. Introduction. Overview of the Project Area

Table of Contents. City of Redlands - Redlands Crossing Center

Environmental Setting, Impacts, and Mitigation Measures

Airport Master Plan Update June 14, 2017

ENVIRONMENTAL IMPACT STATEMENT (EIS)

Addendum No.9 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement/ Environmental Impact Report

DRAFT INITIAL STUDY/NEGATIVE DECLARATION LEAD AGENCY: CITY OF EL SEGUNDO Planning and Building Safety Department

DRAFT Environmental Impact Report

Factor Potential Effects Mitigation Measures

Appendix H Mitigation Plan

August 8, 2017 Community Engagement Panel Meeting #3 Alternatives Evaluation Process & Identification of Preferred Alternatives

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

California Environmental Quality Act Summary of Environmental Issues/Impacts Summary of Potential Mitigation Measures

The following sections from the CEQA Guidelines define the role and purpose of an EIR:

3 PROJECT DESCRIPTION

Campus Photovoltaic Energy Project at California State University Channel Islands

CEQA FINDINGS & STATEMENT OF OVERRIDING CONSIDERATIONS. For the Smart Energy Transport System SCH# Lead Agency: City of Los Angeles

NOTICE OF PREPARATION

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

FINAL ENVIRONMENTAL IMPACT REPORT VERONICA MEADOWS SPECIFIC PLAN. January 2005

3.9 Land Use and Agriculture

Draft Environmental Impact Report Serramonte Views Condominiums and Hotel Project

Columbia Regional Airport (COU) Columbia, Missouri. Draft Environmental Assessment Airside, Landside, and Surface Transportation Developments

POND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION

UC Davis Medical Center Education Building Project Phase 2 Telemedicine Resource Center and Rural PRIME Facility January CEQA Findings

CHAPTER 14. ROADWAYS AND MARINE TRANSPORTATION

Chapter 5.0 Alternatives Analysis

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County

Aviation Capital Construction Program Update

Chapter ES Executive Summary. Introduction

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA

California Environmental Quality Act Part 1: CEQA Basics

CHAPTER 4 IDENTIFICATION AND EVALUATION OF ALTERNATIVES

4.1 Alternatives Screening Process. Chapter 4 Alternatives Analysis

4.10 LAND USE/RECREATION 4.10 LAND USE/RECREATION

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

32. Relationship Between Short-term Uses and Long-term Productivity

3.0 ERRATA TO THE DRAFT EIR

APPENDIX H. Capital Improvement Program Detail Project Costs NORTH PERRY AIRPORT MASTER PLAN UPDATE APPENDICES

actions and approvals by the Federal Aviation Administration ( FAA) and the Federal

Purpose of the EIR. Chapter 1 Introduction

The Santa Rosa Plain Conservation Strategy

FINDINGS OF FACT AND STATEMENT OF OVERRIDING CONSIDERATIONS

CEDARS-SINAI MEDICAL CENTER WEST TOWER PROJECT ENV EIR APPENDIX A NOTICE OF PREPARATION INITIAL STUDY PUBLIC SCOPING COMMENTS

B. ALL RESIDENTIAL ALTERNATIVE

Chapter 13: Wildlife and Vegetation

NOTICE OF PREPARATION OF A DRAFT FOCUSED ENVIRONMENTAL IMPACT REPORT

RIPARIAN CORRIDOR STUDY FINAL PARLEYS CREEK MANAGEMENT PLAN TABLE OF CONTENTS

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows:

Environmental Checklist Form

General Plan Update Workshop 6 Agriculture, Conservation, & Open Space February 23, 2005

3 REVISIONS TO THE DRAFT EIR

Initial Study/ Mitigated Negative Declaration. Sunset Hills Development. General Plan Amendment # , Zone Change # ,

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

APPENDIX A. Project Scoping

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

STREAM AND BUFFER AREA PROTECTION/RESTORATION

COMPARISON OF ALTERNATIVES

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION

Los Angeles International Airport (LAX) Terminals 2 and 3 Modernization Project

RIPARIAN CORRIDOR STUDY FINAL CITY CREEK MANAGEMENT PLAN TABLE OF CONTENTS

Environment & Conservation Introduction

CEQA BASICS. The California Environmental Quality Act. Prepared for: Orange County Department of Education. Prepared by:

NOTICE OF PREPARATION AND SCOPING MEETING

Environmental Information Worksheet

FINDING OF NO SIGNIFICANT IMPACT AND RECORD of DECISION

Pullman-Moscow Regional Airport

Description of Proposed Project

Conventional vs. Sustainable: A Matrix for Decision Making. APWA National Sustainability Conference Pittsburg, PA June 26, 2012

Charles M. Schulz Sonoma County Airport STS DEVELOPMENT STANDARDS

HELENA CHEMICAL COMPANY NELSON TERMINAL PROJECT USE PERMIT UP Butte County Board of Supervisors January 29, 2013

Nestlé Waters North America Inc. Special Use Permit San Bernardino National Forest Project Proposal

PROGRAMMATIC AGREEMENT FOR APPROVAL OF CERTAIN CATEGORICAL EXCLUSIONS

Neighborhood Advisory Committee. EIR Process Overview. Chapman University April 20, 2016

III. Corrections and Additions

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN

Transcription:

EXECUTIVE SUMMARY ES.1 BACKGROUND The purpose of this Draft Environmental Report (DEIR) is the implementation of improvement projects at Charles M. Schulz Sonoma County Airport (the Airport). The improvement projects are based on the Airport s Master Plan Update, which identifies Federal Aviation Administration (FAA) safety improvements. Sonoma County, which owns and operates the Airport, has commissioned the DEIR for the following purposes: to evaluate the environmental effects associated with the implementation of the Proposed Project, as required by California Environmental Quality Act (CEQA); to inform the general public, the local community, and responsible trustee, state, and federal agencies of the nature of the Proposed Project, its potentially significant environmental effects, feasible mitigation measures to mitigate those effects, and its reasonable and feasible alternatives; to enable the County of Sonoma decision-makers (i.e., Planning Commission and Board of Supervisors) to consider the environmental consequences of the Proposed Project; to provide a basis for preparation of any future environmental documents; and to facilitate responsible agencies in issuing permits and approvals for the Proposed Project. ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT In compliance with Section 15124(b) of the CEQA (California Environmental Quality Act) Guidelines, the County is required to identify its objectives associated with the Master Plan Implementation project. As the project proponent, the County has identified eight primary objectives for the implementation of the Proposed Project. The first three objectives are the key objectives and are associated with meeting FAA standards and providing adequate runway length to accommodate regional jets. A detailed description of how the County intends to meet these three key objectives is provided below. The last five objectives are associated with the County providing air transportation services to the local community and providing the physical facilities that will allow for these air transportation services to be provided. These are the key objectives for the Proposed Project: comply with the congressional mandate (Public Law 109-115) that owners or operators of commercial service airports with scheduled airline service (i.e., airports certified under Part 139 of Title 14 of the Code of Federal Regulations) be brought into conformance with FAA standards for Runway Safety Areas (RSAs) by 2015. As part of this law, the FAA is mandated to annually report to Congress its progress toward improving the runway safety areas at Part 139 airports 1 ; decouple the approach ends of Runways 14 and 19 and continue to meet the runway length requirements of existing commercial and general aviation aircraft; and provide sufficient runway length to accommodate regional jet operations. 1 U.S. Code. 1996. Airport Operating Certificates, 49 USC Subsection 44706. ES-1

The following objectives support the key objectives listed above: continue to provide aviation services that meet the present and future air transportation needs of local residents and the business community; support and contribute to the economic well-being of Sonoma County by facilitating tourism, business travel, and air cargo movement; develop a land use and facility plan that designates the most efficient and productive aviation-related use of all Airport property in conformance with all applicable FAA standards; identify a phased program that accommodates (to the extent reasonably feasible) current and future demand for commercial air transportation services in a manner that is consistent with the County of Sonoma Air Transportation Element (ATE), and balance future development of the Airport with the protection of the environment 2. ES.3 PROPOSED PROJECT The Proposed Project would implement FAA-required airfield safety improvements and other actions included in the Airport Master Plan Update. These actions are necessary to meeting RSA requirements and to achieve the decoupling of the ends of Runways 14 and 19 where these two runway ends converge. The Proposed Project would incorporate 40 project elements that are categorized based on the nature of each project elements. Table ES-1 identifies those project elements that would be implemented by 2015 (short-term project elements) and Table ES-2 identifies those project elements that would be implemented between 2015 and 2030 (long-term project elements). The short-term project elements are being reviewed at a project level analysis while the long-term project elements are being reviewed at a programmatic level of analysis. 2 California Public Utilities Code Section 21666(e). ES-2

Table ES-1 SHORT-TERM PROJECT ELEMENTS /a/ /b/ ID Project Element 1A1 Extend Runway 14/32 by 885 feet for a total pavement length of 6,000 feet 1A2 Extend Runway 1/19 by 200 feet for a total pavement length of 5,202 feet 1A3 Extend Taxiway Y / construct bypass taxiway to Runway 14/32 1A4 Construct 200-foot blast pad for Runway 14 approach end 1A5 Construct replacement run-up apron located between Taxiway Y and A 1A6 Remove existing run-up and taxiways at approach end of Runway 14 1A7 Construct new taxiway between Runway 14/32 and Taxiway Y 1A8 Widen RSA to 500 feet and add runway edge lights to Runway 1/19 1A9 Construct Taxiway V with edge lights and standard signage 1A10 Reconstruct and widen Taxiway B between Runway 14/32 and Runway 1/19 1A11 Remove segment of Taxiway D and re-grade site 1A12 Construct connecting taxiway to Runway 1/19 and Taxiway Y 1A13 Construct 200-foot -blast pad for Runway 19 approach end 1S1 Realign Airport Creek and put portion of creek into a culvert 1S2 Place high-water ditch into a culvert 1S3 Construct RSA beyond approach ends of Runways 1, 14, and 19 1S4 Relocate and pave access roads outside RSA for all runways 1S5 Remove trees and vegetation for airspace clearance 1S6 Temporarily cover or disturb land used for haul roads, staging and spoils areas 1S7 Create three stormwater basins 1N Relocate localizer antenna, equipment building, and construct standby generator 1P Acquire three parcels of land for RSA construction and approach protection 2A1 Extend Taxiway D to approach end of Runway 32 2A2 Remove eastern segment of Taxiway D SOURCE: Mead & Hunt, 2011 PREPARED BY: RS&H, 2011 ES-3

Table ES-2 LONG-TERM PROJECT ELEMENTS /a/ /b/ ID Project Element 2A3 Remove Taxiway Z and regrade site 2A4 Construct replacement run-up apron for approach end to Runway 32 2A5 3A 4S 5L1 5L2 5L3 6L1 6L2 7A 8L 9A 10L1 10L2 11P 12S Remove existing run-up apron for approached end to Runway 32 and regrade site Maintain existing airfield pavement through the use of slurry seals, overlays or repairs of isolated failures Trim or remove individual trees in the vicinity of the airport that grow into the airspace required to be protected Construct a replacement airline passenger terminal Re-use or demolish the existing airline passenger terminal building Demolish helipads that are currently not operational Demolish the existing ARFF (Aircraft Rescue and Fire Fighting) building Construct a replacement ARFF building Construct new taxilanes to provide access to new private-use hangars Designate a site for an air cargo facility to serve small-package shipping Identify an on-airport aiming point for helicopter landings Develop a new Air Traffic Control Tower (ATCT) Reuse or demolish existing ATCT Acquire property designated in the Master Plan Update (and not associated with the Runway 14-32 extension) for approach protection, including: relocation of residents; demolition of buildings; filling man-made ponds on these properties; and installing new perimeter fencing. Relocate and/or construct miscellaneous aviation support facilities. Examples include replacing landing aids (replace the VASI with a PAPI) or construction of individual hangars as in-fill projects. SOURCE: Mead & Hunt, 2011 PREPARED BY: RS&H, 2011 ES.4 ALTERNATIVES As required under Section 15126(d) of the CEQA Guidelines, an Environmental Report (EIR) must discuss a range of reasonable alternatives to a proposed project that would feasibly attain most of the basic objectives of the project while avoiding or lessening significant environmental effects. An evaluation of the comparative merits of the project alternatives also is required. This EIR evaluates two alternatives in an equal level of detail: the Proposed Project and the No Project Alternative. Each of these two alternatives functions as an alternative to the other alternative in conformance with Section 15126(d) of the CEQA Guidelines. 3 3 California Code of Regulations, Title 14, Division 6, Chapter 3, California Environmental Quality Act, sections 15000 15387 ES-4

ES.5 ENVIRONMENTAL CONSEQUENCES AND MITIGATION MEASURES Two alternatives were includes in the EIR; the Proposed Project and the No Project Alternative. presents the results of the environmental consequences that compares the Proposed Project with the No Project Alternative (existing conditions). For each environmental impact category, the matrix identifies in bold text whether any significant impacts would occur as result of the Proposed Project. With the implementation of identified mitigation measures, four impacts would be considered significant and unavoidable. ENVIRONMENTAL IMPACTS SUMMARY MATRIX Aesthetics 3.1.1: Change in Lighting as a Result of Short-Term Project 3.1.2: Change in Lighting as a Result of Construction of Short-Term Project 3.1.3: Change in Visual Character as a Result of Short-Term Project 3.1.4: Change in Lighting Associated with Long-Term Project 3.1.5: Change in Visual Character Associated with Long-Term Project Agricultural Resources 3.2.1: Conversion of Farmland as a Result of Short-Term Project 3.2.2: Acquisition of Property Containing Farmland as a Result of Short-Term Project 3.2.3: Acquisition of Property Containing Farmland Associated with Long-Term Project 3.2.4: Acquisition of Property Containing Williamson Act Farmlands Associated with Long-Term Project Air Quality 3.3.1: Short-Term Increases in Air Pollution Emissions due to Project Construction Activity 3.3.2: Operational Increases in Criteria Air Pollutant Emissions in 2015 3.3.3: Operational Increases in Greenhouse Gas Emissions in 2015 ES-5

ENVIRONMENTAL IMPACTS SUMMARY MATRIX (cont.) Air Quality (cont.) 3.3.4: Changes in Cancer Risk due to TAC Emissions in 2015 3.3.5: Changes in Acute Non-Cancer Hazards TAC Emissions in 2015 3.3.6: Changes in 8-Hour Non-Cancer Hazards TAC Emissions in 2015 3.3.7: Changes in Chronic Non-Cancer Hazards due to TAC Emissions in 2015 3.3.8: Operational Increases in Criteria Air Pollutant Emissions in 2030 3.3.9: Operational Increases in Greenhouse Gas Emissions in 2030 3.3.10: Changes in Cancer Risk due to TAC Emissions in 2030 3.3.11: Changes in Acute Non-Cancer Hazards TAC Emissions in 2030 3.3.12: Changes in 8-Hour Non-Cancer Hazards TAC Emissions in 2030 3.3.13: Changes in Chronic Non-Cancer Hazards TAC Emissions in 2030 3.3.14: On-Airport Worker Exposures to TACs Biological Resources 3.4.1: Loss or Disturbance of a Pappose Tarplant Population as a Result of as a Result of Short-Term Project 3.4.2: to Occupied and Suitable Habitat for Burke's Goldfields, Sebastopol, Meadowfoam, and Sonoma Sunshine as a Result of Short-Term Project 3.4.3: Loss of Suitable CTS Habitat as a Result of Short-Term Project 3.3.4: Loss of Western Pond Turtles and Loss of Western Pond Turtle Habitat as a Result of Short-Term Project 3.4.5: Potential s to Occupied Burrowing Owl Burrows as a Result of Short- Term Project 3.4.6: Removal or Disturbance of Nesting Birds as a Result of Short-Term Project 3.4.7: Disturbance of Roosting Bats as a Result of Short-Term Project Significant ES-6

ENVIRONMENTAL IMPACTS SUMMARY MATRIX (cont.) Biological Resources (cont.) 3.4.8: Potential Destruction or Disturbance of American Badger Dens as a Result of Short-Term Project 3.4.9: Conflicts with Approved Conservation Plans as a Result of Short-Term Project 3.4.10: Loss of Jurisdictional Wetlands and Other Waters of the United States and State of California as a Result of Short-Term Project 3.4.11: Loss of Riparian Woodland and Non-Jurisdictional Willow Scrub as a Result of Short-Term Project 3.4.12: Loss of Oak Woodland and Individual Native Trees as a Result of Short-Term Project 3.4.13: Disturbance of Avoided Sensitive Habitats during Construction as a Result of Short-Term Project 3.4.14: Loss of Airport Creek Wildlife Movement Corridor as a Result of Short- Term Project 3.4.15: Loss of Suitable Habitat for Burke s Goldfields, Sebastopol Meadowfoam, and Sonoma Sunshine Associated with Long-Term Project ( 3.4.15) 3.4.16: Loss of Suitable CTS Habitat and Destruction or Adverse Modification of Proposed Critical Habitat for CTS Associated with Long-Term Project 3.4.17: Potential Loss of Occupied Burrowing Owl Habitat Associated with Long-Term Project 3.4.18: Removal or Disturbance of Nesting Birds Associated with Long-Term Project 3.4.19: Potential Destruction or Disturbance of American Badger Dens Associated with Long-Term Project 3.4.20: Conflicts with Approved Conservation Plans Associated with Long-Term Project 3.4.21: Loss of Jurisdictional Wetlands and Other Waters of the United States and State of California Associated with Long-Term Project 3.4.22: Disturbance of Avoided Wetlands during Construction of Long-Term Project Cultural Resources 3.5.1: s to Known Archaeological Cultural Resources as a Result of Short-Term Project 3.5.2: s to Unknown Archaeological Cultural Resources and Human Remains as a Result of Short-Term Project Significant ES-7

ENVIRONMENTAL IMPACTS SUMMARY MATRIX (cont.) Cultural Resources (cont.) 3.5.3: s to Architectural Cultural Resources as a Result of Short-Term Project 3.5.4: s to Paleontological Resources as a Result of Short-Term Project 3.5.5: s to Archaeological Cultural Resources Associated with Long-Term Project 3.5.6: s to Architectural Cultural Resources Associated with Long-Term Project 3.5.7: s to Paleontological Resources Associated with Long-Term Project Geology and Soils 3.6.1: Geologic and Seismic s 3.6.2: Potential Loss of Topsoil Hazards and Hazardous Materials 3.7.1: Potential Increase in Contaminant Discharge from Existing Hazardous Materials Sites 3.7.2: Increase in Use of Hazardous Materials 3.7.3: Hazards s Associated with Long-Term Project Hydrology and Water Quality 3.81: Increase in Runoff as a Result of Short-Term Project 3.8.2: Changes to Airport Creek and Ordinance Creek as a Result of Short-Term Project 3.8.3: Construction-Related Degradation of Surface Waters 3.8.4: Runoff-Related Degradation of Surface Waters 3.8.5: Changes to Groundwater Recharge as a Result of Short-Term Project 3.8.6: Increase in Runoff and Changes to Groundwater Recharge Associated with Long-Term Project ES-8

ENVIRONMENTAL IMPACTS SUMMARY MATRIX (cont.) Land Use and Planning 3.9.1: Implications on 2001 Comprehensive Airport Land Use Plan (CALUP) 3.9.2: Implications on Local General Plans as a Result of an Amended CALUP 3.9.3: Implications for Air Transportation Element 3.9.4: Implications for Master Plan Noise 3.10.1: Construction Noise s as a Result of Short-Term Project 3.10.2: Change in Noise Contours for 2015 3.10.3: 2015 Traffic Noise s 3.10.4: Construction Noise s as a Result of Long-Term Project 3.10.5: Change in Noise Contours for 2030 3.10.6: Single-Event Noise s 3.10.7: 2030 Traffic Noise s Safety 3.11.1: Changes to the RPZ and Land Acquisition as a Result of Short-Term Project 3.11.2: Changes to the CALUP Safety Zones as a Result of Short-Term Project 3.11.3: Land Acquisition Associated with Long-Term Project Transportation and Traffic 3.12.1: Construction Traffic as a Result of Short-Term Project 3.12.2: Intersection Service for 2015 Significant ES-9

ENVIRONMENTAL IMPACTS SUMMARY MATRIX (cont.) Transportation and Traffic (cont.) 3.12.3: Intersection Signal Warrant Evaluation for 2015 3.12.4: U.S. 101 Freeway Operation for 2015 3.12.5: s to Pedestrian and Bicycle Facilities in 2015 3.12.6: Construction Traffic Associated with Long-Term Project 3.12.7: Intersection Service for 2030 3.12.8: Intersection Signal Warrant Evaluation for 2030 3.12.9: U.S. 101 Freeway Operation for 2030 3.12.10: s to Pedestrian Facilities for 2030 3.12.11: to Bicycle Facilities for 2030 Significant SOURCE: RS&H, 2011 PREPARED BY: RS&H, 2011 ES-10