Analysis of changes in LCOE for wind power since REFIT 2009

Similar documents
PES ESSENTIAL. PES: Europe

Cost Reduction Potentials of Offshore Wind Power in Germany: comparison with Offshore Wind Cost Reduction Pathways Study

HVDC Transmission and the Future of Clean Energy

CHAPTER THREE. Load Curves The curve showing the variation of load on the power station (power plant) with reference to time is known as load curve.

REFIT comments AND Recommendations to Nersa

Feasibility Study and Cost-Benefit Analysis of Tidal Energy: A Case Study for Ireland

CONTENTS 2. PROJECT DESCRIPTION NEED FOR THE PROJECT ABOUT THE PROPONENT SITE SELECTION OVERVIEW OF THE PROJECT 2 5

OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY

The Husker Power Plan: A New Energy Plan for Nebraska

ENERKITE AIRBORNE WIND ENERGY

Short Term Energy Outlook March 2011 March 8, 2011 Release

Global Wind Turbine Technology Trends

GE Renewable Energy CAPACITY FACTOR LEADERSHIP IN HIGH WIND REGIMES. GE s

High Voltage Direct Current

Why Distributed Energy Systems Becoming More Popular in Remote Areas, City Districts and Industrial Facilities ACEF 2017, Decentralized Energy Systems

COMPETING IN THE ENERGY SECTOR

Wind Energy: Opportunities and Challenges for Offshore Applications. Presentation Outline

The goals for renewable energy share of all energy

A REPORT ON THE EFFICIENCY OF A WHALEPOWER CORP. 5 METER PROTOTYPE WIND TURBINE BLADE

The German Wind Energy Market

An Energy Bill Proposal for the State of Colorado. BGE Consulting Angela Cook Erica Johnson Nick Goldstein Chris Bunch Jake Walter Kindra Priest

DIRECTORATE FOR FUEL AND ENERGY SECTOR. Development of Wind Energy Technology in the World

Steps in Building a Wind Farm

Methodology for calculating subsidies to renewables

Renewable Energy in South Africa Resources and Opportunities STIAS Energy Workshop 5 March2013 Stellenbosch

OPTIMUM NUMBER OF WIND TURBINES CUSTOMER-SIDE IN THE STATE OF KANSAS USING HOMER. A Thesis by. Michelle Lim

Wind Power at a Distance: A Voyage around the Globe, the US and Africa

France Energy efficiency report

Why does a wind turbine have three blades?

The European offshore wind industry. Anne-Bénédicte Genachte Regulatory Affairs Advisor Offshore Wind Power The European Wind Energy Association

An ETI Perspective. Larger Blade Technology An innovation case study

WIND ENERGY GROUP 3 MEMBERS: ALEJANDRO ESPINOLA JUAN C. ENRIQUEZ LINDA ALAMILLO THOMAS BROWN BRUCE SAENZ

Initial Plant Assessment Report

COGENERATION: Opportunities in Today s Power Markets

SCAP ENERGY MANAGEMENT COMMITTEE

Strategy Profitable Growth for Vestas

Ian Curry Managing Director BR Energy South Africa

Prospects and Economics of integrating Wind Energy into the Lebanese Electricity System. Hassan Harajli UNDP CEDRO Project

GE Renewable Energy BEST-IN-CLASS CAPACITY FACTOR. GE s

Carbon Carbon economy: Energy Consumption Consumption in the United States,

Renewable Power Generation Costs in 2017 KEY FINDINGS AND EXECUTIVE SUMMARY

H APAC LCOE UPDATE

ANALYSIS OF CRETE S INTERCONNECTION SCENARIOS TOWARDS THE LARGE SCALE DEVELOPMENT OF RES ON THE ISLAND

Public Benefit Programs: Energy Efficiency and Renewable Energy in Deregulated Energy Markets

An Imagination Breakthrough: Offshore Wind Energy

Town of Babylon Cost Accounting: Long Island Offshore Wind Project

Innovation Paths in Wind Power: Insights from Denmark and Germany

USAID s SCALING UP RENEWABLE ENERGY

V MW. One turbine for one world. vestas.com

FINDING YOUR CHEAPEST WAY TO A LOW CARBON FUTURE. The Danish Levelized Cost of Energy Calculator

Causes of residential electricity bill changes in Victoria, 1995 to prepared for: Victorian Electricity Distribution Businesses

Vestas Presentation. Javier Ojanguren Sales Manager Central America & Caribbean

SOLAR REPORT JANUARY 2018

Luxembourg Energy efficiency report

Renewables: challenges and opportunities for the power grid Cédric PHILIBERT Renewable Energy Division International Energy Agency

Trends in renewable energy and storage

Citizens Participation - The Key to Barbados Sustainable Energy Future

WIND ENERGY RESOURCE ASSESSMENT: A CASE STUDY

RENEWABLE AND ALTERNATIVE ENERGIES

Slovenia Energy efficiency report

Towards mega size wind turbines

Floating Wind Power in Deep Water Competitive with Shallow-water Wind Farms?

Optimized Design of Wind Farm Configuration: Case Study

INTERIM RESULTS. Wind energy sector in Brazil Developments and future outlook for Dutch parties. Larive - Your partner in emerging markets

Turbine subsystems include: What is wind energy? What is a wind turbine and how does it work?

Status Quo - Storage systems and PV in a global context

Cost of Service and Public Policy. Ted Kury Director of Energy Studies, PURC

Onshore Wind Services

U.S electricity flow, 2005

The Role of the Renewable Energy in Reconstruction of University of Benghazi: A Proposal

Wind Farms 1. Wind Farms

V MW

Wind Farms. December Stjepan Čerkez

RENEWABLE POWER GENERATION COSTS IN 2014

Indonesia s Generation Fuel Mix in an Era of Price Uncertainty Tom Parkinson 14 April 2015

7. Electrical Facility Ratings

RES - Status Quo, Potential and Prospects Vasileios Tsolakidis, CRES

MH s Draft of Application for Approval of Energy Intensive Industrial Rate, Tab 1

Quantifying the capital requirement: 19% RE by 2030

Renewable sources of energy, dispatching priority and balancing the system, facts and options: Part I

Executive Summary. A Wind Resource Assessment for Near-Shore Lake Erie

SOLAR CHIMNEYS A Promising Alternative. Salah El-Din E. El-Metwally Wai-Fah Chen David Ma University of Hawaii at Manoa

Renewable Energy Hybrid System for OGERO Telecom Station in Lebanon

Attractive wind turbines and solar cell facilities

Slovak Republic Energy efficiency report

Renewable Resources. David Jacobs Manager, Resource Planning and Procurement

Croatia Energy efficiency report

2014 Integral Analytics, Inc.

An economic assessment of the benefits of storage in South Africa

Economic impacts of South Africa s energy mix

Published by and copyright 2009: Siemens AG Energy Sector Freyeslebenstrasse Erlangen, Germany

The Cost of CCS for Natural Gas-Fired Power Plants

WindEurope considers that repowered projects could be further provided with a clear path-to-market via:

Preliminary Cost Assessment for Offshore Wind Energy in Puerto Rico

ASHENDEN WIND TURBINE TRIAL: PHASE I RESULTS

SOLAR ENERGY Recent growth and future prospects South Africa s Electricity Supply Conference

Exclusive Turbine Technology Workshop Limited places 30th June 2016 Location: Fitzwilliam Hotel, Dublin 2

Sustainable energy solutions for South African local government. A practical guide

Sharing knowledge across Mediterranean Jordan. Cost factors of nuclear electriciy. Jean-Jacques GAUTROT Special Advisor to the AREVA CEO

Published on Market Research Reports Inc. (

Transcription:

14-7-211 ejs Analysis of changes in LCOE for wind power since REFIT 29 Levelised cost of electricity (LCOE) is a simple way of comparing unit costs of different generation technologies and is widely used in policy decisions. The LCOE can be seen to represent a breakeven tariff per MWh for a electricity generating facility based on the sum of all costs over the lifetime of a given project, discounted to the present time, and levelised based on annual energy production. NERSA approved a feed-in tariff for wind power and other renewable energy technologies in 29 with the aim of achieving the South African government s target of 1, GWh of renewable energy production annually by the end of 213. The feed-in tariff for each technology was based on LCOE calculations. The tariff was developed at a time when wind turbine prices per MW were at a peak and demand for turbines outstripped supply. Once the economic downturn set in at the close of 28 the demand for turbines cooled somewhat. This resulted in the cost per MW for wind turbines falling significantly. This trend persists and wind turbine prices are expected to continue to fall over the next couple of years. This is due to overcapacity in manufacturing and increased international competition from Asian based turbine manufacturers. Currently the market for wind turbines is very much a buyers market. Especially for the large, international developers who play a more and more dominant role on the market. This analysis is based on data from the International Energy Agency s Wind Task 26: Cost of Wind Power, work package 2. All LCOE calculations are made using the IEA Wind Task 26 LCOE excel sheet for calculating LCOE for wind power. Information on this can be accessed at http://www.ieawind.org/task_26.html. 1 Analysis of changes in LCOE for wind power since REFIT 29-14-7-211

Changes in performance and costs of wind turbines The downward pressure on turbine prices has coincided with the introduction of a new generation of wind turbines with higher hub heights and larger rotor diameters. These factors increase the performance of turbines as more wind energy is captured by the larger rotors and wind speeds are greater at e.g. 8m compared to 6m due to shear effect. This results in higher capacity factors for wind turbines and therefore greater production per installed MW. Figure 1 below shows how the average rotor diameter and hub height for onshore turbines installed in Denmark each year since 2 has increased and the effect this has had on the average capacity factor for all turbines commissioned in that year. The average capacity factor for turbines has been calculated from actual generation figures for wind turbines in Denmark for 21 adjusted to represent a normal wind year. The capacity factor for onshore turbines in Denmark has increased by approximately 5 % over the last ten years. The spike in 24 is due to the commissioning of a number of prototype wind turbines at a test site in Denmark. meter 11 1 9 8 7 6 5 4 3 2 1 1% 9% 8% 7% 6% 5% 4% 3% 2% 1% % Capacity factor Rotor diameter Hub height Capacity factor in Denmark Figure 1: Development in average rotor diameter, hub height and capacity factor for onshore wind turbines commissioned in Denmark between 2 and 21 based on generation data for 21. (No turbines commissioned in 27) During the high price years increasing performance of turbines played an important role in keeping the cost of energy from wind power more or less stable despite increasing costs per MW. If one compares the costs per installed kw and LCOE from wind turbines commissioned in Denmark from 21 to 2 Analysis of changes in LCOE for wind power since REFIT 29-14-7-211

21 it can be seen that despite a sharp increase in costs per kw the LCOE increased at a much slower rate between 25 and 29 before falling again in 21 1. This is illustrated in Figure 2 below. 28 Euro/kW 14 12 1 8 6 4 2 8 7 6 5 4 3 2 1 LCOE, 28 Euro/MWh Figure 2: Average costs per kw for wind turbines commissioned in Denmark (columns) compared to development in average LCOE for wind power projects commissioned in that year (line) in Denmark. Data for 24 and 27 are estimates based on offers made to developers as no project cost data could be accessed for commissioned projects. The trend of falling prices and increasing performance since 28 has had a marked effect on the cost of wind power from new projects. The latest price data available indicates that high performance turbines ordered in 211 will cost from $1,3 to $1,8/kW as turnkey projects in the US including connection costs and transmission upgrades. This compared to prices in 28/9 where wind power projects cost on average $2,15/kW in the US. Change in LCOE for wind turbines in South Africa from 29 to 211 The two major reasons for the cost of wind power falling internationally over the last three years are increased performance and lower prices per kw as explained above. In South Africa these and some other parameters have influ- 1 It should be kept in mind that the LCOE for wind power in Denmark cannot be directly compared with the LCOE for wind power in South Africa as Denmark has historically had some of the lowest turbine prices due to a large local manufacturing base and the project owner only having to pay shallow connection costs, which have traditionally been low when compared internationally. This is not the case in South Africa. 3 Analysis of changes in LCOE for wind power since REFIT 29-14-7-211

enced the LCOE for wind power since the first REFIT tariffs were released in 29. Most turbines ordered in 28/9 could be expected to have a capacity factor of approximately 3-35 % at an average wind speed of 7.5 m/s at hub height and a Weibull K factor 2. The new GE 1.62 8/1 has an expected capacity factor of approximately 41 % under the same wind conditions whilst the Vestas V1 1.8MW is expected to have a capacity factor of 38 %. This will have a significant influence on the LCOE for wind power, over and above the fact that both turbines are more currently than $3 cheaper per kw than turbines were in 28/9. The capacity factor used in REFIT 29 was 27 %, which is in line with expectations for turbines ordered from 23 to 27 with an average wind speed of 7. m/s and a Weibull K factor 2. It is assumed that high performance turbines will be able to achieve capacity factors of approximately 35 % in South African conditions with average wind speeds at hub height of 7 7.5 m/s and Weibull K factor 2. This is the equivalent of approximately 3 full load hours. If one changes the capacity factor and the price of wind power projects to those expected for a project ordered in 211 and leave all other parameters from REFIT 29 unchanged then the LCOE for projects ordered in 211 will be in the vicinity of ZAR 8/MWh. The figure below compares the LCOE for REFIT 29 and a calculated LCOE for 211 using new performance data and project prices per kw. The green columns show that increased performance results in savings of approximately ZAR 265/MWh and lower investment costs in savings of approximately ZAR 183/kW. 4 Analysis of changes in LCOE for wind power since REFIT 29-14-7-211

14 12 1 8 1.25 264 183 82 LCOE (ZAR/MWh) 6 4 2 Parameters Figure 3: Influence of performance and investment costs on LCOE for wind power in 211 compared with REFIT 29. Other parameters There have been changes in other important parameters apart from performance and investment costs for determining the LCOE for wind power. The choice of interest rate used in determining REFIT tariffs has been somewhat controversial. If one considers a 15 year interest rate swap the nominal interest rate for projects ordered in 211 will be in the vicinity of 12 to 13 %. If using the Reserve Bank s target maximum inflation rate of 6 % one gets a real interest rate of approximately 7 %. This is more or less the same level as used in 29 despite the fact that interest rates have generally been at a low level since then. The reason for this is that an inflation rate of 8 % was used in calculating the real interest rate in REFIT 29, whilst 6 % is used at this time based on Reserve Bank expectations and targets. The discount rate used in calculating LCOE for 211 is, therefore, unchanged compared to REFIT 29. The USD/ZAR exchange rate used in the REFIT 29 calculations was ZAR 1 per dollar. This is quite high compared to the average exchange rate from January 2 to mid-july 211, which was ZAR 7.62 per dollar according to data from the Federal Reserve. This exchange rate is used in LCOE calculations for 211. This has a strong influence on the investment costs compared to those used in REFIT 29 calculations and in Figure 3. The current exchange rate is a bit lower than ZAR 7.62 being approximately ZAR 6.9 per dollar. 5 Analysis of changes in LCOE for wind power since REFIT 29-14-7-211

Operating and maintenance costs used in the REFIT model were given as $24/kW. The expected operating and maintenance costs for the turbines referred to in the previous chapter are in the vicinity of $.2/kWh. This is higher than assumed in the REFIT calculations of 29. If one takes these additional parameters and include them in a LCOE calculation for wind projects ordered in 211 the result is a LCOE of ZAR 73/MWh. This is shown in Figure 4 below. The effect of the lower exchange rate on investment costs is clearly seen when compared with Figure 3. 14 12 1 8 1.25 264 355 73 LCOE (ZAR/MWh) 6 4 2 72 Parameters Figure 4: Influence of different parameters on LCOE for wind power in 211 compared with REFIT 29.The green columns indicate parameters that have reduced the 211 LCOE compared with REFIT 29, whilst the red columns indicate parameters that increase LCOE 211 compared to REFIT 29. Conclusion The performance of new generation wind turbines has increased due to developments in rotor diameter and hub heights. This together with lower cost of wind turbines per installed kw has resulted in the LCOE for new wind power projects being at a lower level than was the case in 29. It is estimated that the LCOE for wind power may be up to 4 % lower than in 29 and be in the vicinity of ZAR 7/MWh to ZAR 8/MWh. The cost data is taken from projects in mature wind power markets in the US. Costs in South Africa may well be slightly higher due to the lack of experience in erecting turbines in the country as well as the small size of the market. This is more likely to be relevant for local project developers as large international 6 Analysis of changes in LCOE for wind power since REFIT 29-14-7-211

developers will be better positioned to utilise the buyers market to their advantage and their experience in building wind power projects. The LCOE may, therefore, vary quite substantially from project to project due to the volatility of the wind turbine market, the positioning of the developer on the international market for turbines and other variables such as the ZAR/USD exchange rate as well as the usual variables such as wind resource, geological conditions, access etc at the selected site. It should, however, be kept in mind that the costs used here are taken from the high end of the US price margin and include connection costs and transmission upgrades. 7 Analysis of changes in LCOE for wind power since REFIT 29-14-7-211