AT THE FOREFRONT OF THE CONSTRUCTION INDUSTRY WITH BUILDING INFORMATION MODELING (BIM): THE CHALLENGES

Similar documents
ICES Core Cost Engineering Competencies

BIM for Contractors: Kickin It Off the Right Way

- DATA REQUIREMENTS BIM

BIM 2016 and the NEC. Simon Rawlinson, 20 April 2015

BIM Checklist. Introduction

A Presentation on. BIM Implementation for Construction Projects and Developer

Building Services Engineer (mechanical) model career pathway Version 1.0

Project Management Partner Project Management Partner. How to Utilize BIM for Project Delivery Ahmed Balawi BIM Manager-Arabtec LLC

The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM

Emanuel Marreel Siemens Chairman Smart Building Committee

BIM EXECUTION PLAN PROJECT INFORMATION PROJECT NUMBER

Roadmap for the BIM Implementation in Hong Kong s Construction Industry and CICHK s Upcoming Initiatives

Coordination of Consultants

ATTACHMENT D SCOPE OF SERVICES

9/11/2009. Return on Investment. Building Information Modeling & Virtual Design and Construction

BIM Design & Construction Requirements. Follow-up Seminar. September 10,

AIA 2009 BIM AWARDS. Category B: Design/Delivery Process Innovation Using BIM

Member level the optimum standard is given against each activity statement

23/01/1438. Management of BIMProject: BIM Management Plan. Mohamed Mohsen Kamel. Prof. Dr. Emad Elbeltagi

The Changing Face of Quantity Surveying Practices in Construction Industry

BIM and the Consultant / Client s Quantity Surveyor

Experience at Hinkley Point C: building Information Modelling (bim) and Enterprise Lifecycle Management Solutions Presented By: Sue Hewish & Jason

Autodesk. The objectives of the forums were to:

also report to the Project Manager on a day to day basis).

Continuing Education Credits

Experiences with the construction of EPR at Flamanville and Taishan

BIM: Risks & Responsibilities: Can a BIM Protocol provide the solutions?

HYBRID COLLABORATIVE DELIVERY TEAM/ INTEGRATED PROJECT DELIVERY DOCUMENTS SUBMITTAL PROCESS

APC Requirements and Competencies

Employer s information requirements (EIR) An overview of facilities management requirements

BEST PRACTICE COLLABORATION

(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better

Benjamin D. Hall Interdisciplinary Research Building

Realizing Complex Design Through BIM The Louisiana State Museum and Sports Hall of Fame

Procurement Options for NZ Construction Contracts

IMPLEMENTING BIM ON LARGE INFRASTRUCTURE PROJECTS

BIM Execution Plan Template. CPG-DGN-PLN-085 Revision 0 08/08/2016

Owner s Representative SCOPE OF SERVICES

PLANNING AND EVALUATION PRELIMINARY DESIGN

Building information modeling (BIM) The holistic view by Siemens. Unrestricted Siemens Switzerland Ltd 2016

Cookham Wood and BIM: Practical Lessons Learnt Fiona Moore Cirrus Consultant Services 10 July 2014

Airport Owners Guide to Project Delivery Systems White Paper Update

Building information modeling (BIM) The holistic view by Siemens

IAEA Procurement Engineering and Supply Chain Activities John Moore Division of Nuclear Power

ConsensusDocs. Catalog. Updated Docs Inside

OPPORTUNITY PROFILE PROJECT MANAGER

Promoting better business outcomes through the use of BIM and digital technologies.

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K

Applied Research Briefing on KPI and Smart Cities

Building Information Modeling (BIM) Execution Plan

Building Intelligence 2017 Building a Collaborative Future : BIM in HK

Management Excluded Job Description

PLAN SUBMITTAL GUIDELINES FOR THE HYBRID COLLABORATIVE DELIVERY TEAM

PREPARED BY ORGANIZATION DATE

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

Suva. Structural Design Manager

Request for Proposal: Controlled System Separation Feasibility Study

BSC (HONS) QUANTITY SURVEYING (PART-TIME, TOP- UP) E 413

CONSTRUCTION MANAGEMENT

John Kunz CIFE, Stanford University

Position Description

Project Manager Regional Projects Manager Department Division/Region Community Location

Facilities Management Project Delivery Model - Process Map - v

Quality Management System Manual

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

Chartered Membership Programme

AFRIPANCON PROJECT MANGEMENT, CONSTRUCTION, SAFETY, HEALTH, ENVIRONMENTAL, COST AND ENGINEERING CONSULTANTS COMPANY PROFILE

State of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements. Version 1.0

28.00 Project Briefing & Procurement

ANALYSIS OF CONTRACTUAL OBLIGATIONS FOR INTEGRATED PROJECT DELIVERY IN CONSTRUCTION

Design Build - Project Delivery Model Trends

WE DESIGN! ENGINEERS. CONTRACTORS.. PROJECT MANAGEMENT CONSULTANTS WE ENGINEER!! WE BUILD!!!

HS2 s approach to BIM and Beyond

BIM ADOPTION AND IMPLEMENTATION FOR ENGINEERING & CONSTRUCTION INDUSTRY PRACTICES

BIM & TRA The holistic view by Siemens

Apply communication strategies in the workplace

Office of the City Auditor. Committed to increasing government efficiency, effectiveness, accountability and transparency

Quantity Surveying and Construction

International Research Journal of Engineering and Technology (IRJET) e-issn: Volume: 03 Issue: 01 Jan p-issn:

Project Management in the Design and Construction Industry

Benefits of Employing BIM on Unique Designs: Art Gallery of Alberta. Bob Walker Ledcor Construction Limited Edmonton, Alberta May 2011

THE KEY ELEMENTS OF QUANTITY SURVEYING WORK

London Borough Lambeth. Job Description

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program?

Click to edit Master title style

Life Cycle of BIM at the Port Authority

General Contractor Regulatory Agency. [Info] Construction budget is defined as all hard costs including overhead and profit

Synchronous Building Information Model-Based Collaboration in the Cloud: a Proposed Low Cost IT Platform and a Case Study

November Introduction. What was your role with the company? Has your business awareness and use of BIM advanced in the last twelve months?

Bronx Mental Health Redevelopment Project

United Nations Development Programme (UNDP) FOR THE

Design-Bid-Build Vs Design Build Projects: Performance Assessment of Commercial Projects In Sri Lanka

Third Party Risk Management ( TPRM ) Transformation

Application of Building Information Modeling Tool for Building Project

Sawdey Solution Services

Life Cycle Costing as part of decision making - use of building information models

Shared Services Management - Chargeback

CIC Guidelines Construction Administration and Observation

TENDER FOR INTEGRATED FEASIBILITY STUDY AND OBTAINING RAILWAYS APPROVALS FOR THE RAILWAY SIDING AT PROPOSED SITE AT JAMMU

Dynamic Netsoft Construction Suite for AX

Transcription:

AT THE FOREFRONT OF THE CONSTRUCTION INDUSTRY WITH BUILDING INFORMATION MODELING (BIM): THE CHALLENGES 19 th October 2016 BY: IR. SHARIFAH AZLINA RAJA KAMAL

What is BIM?

WHAT IS BIM? TECHNOLOGY? SOFTWARE? PROCESS

WHAT IS BIM? Building Information Modelling A process in Developing, Collating & Managing high level information of an asset, from its inception, design, construction and ultimately operation & maintenance.

BIM PROJECT LIFE CYCLE

Why BIM?

Why BIM? WHY BIM? Enhances all stage progress visibility Increases productivity through collaboration amongst industry players Reliably and accurately visualize the project at early stage providing clearer understanding of design intent & facilitate in modification to achieve desired outcome Identifies interface issues, detects & addresses conflicts / clashes early Eliminates time-consuming changes at later stage Eliminates time-waste by resolving complex construction details before going on-ground

MAJOR ISSUES IN CONSTRUCTION Lack of project co-ordination Time & Cost over-runs Manual bill of quantities or no integration No accuracy in Job Costing & Budgeting Not feasible to integrate with facility management applications and preventive, corrective maintenance Further investment needed for data procurement & incurring cost per year

BIM: RETURN ON INVESTMENT Up to 40% elimination of unbudgeted change Up to 80% reduction in time taken to generate a cost estimate Cost estimation accuracy within 3% A savings of up to 10% of the contract value Through clash detections Up to 7% reduction in project time Ongoing saving in Facility Management System Source : Stanford University Center for Integrated Facilities Engineering (CIFE) figures based on 32 major projects using BIM

BIM: RETURN ON INVESTMENT Five Top-Rated Positive Impacts of BIM Metrics for the Impact of BIM on Cost. Schedule, RFIs and Safety Improved Constructability of Final Design Increased Owner s Understanding of Proposed Design Solutions Improved Quality / Function of Final Design Generated Better Construction Documents Improved Ability to Plan Construction Phasing and Logistics Respondent Type % Rating High or Very High Contractors 74% Owners 73% Engineers 71% Owners 70% Owners 70% Source : Dodge Data & Analytics Smart Market Report Published on 2015 in Associate with Building Smart Alliance

PROJECT FLOWCHART (Design & Supervision) Site Reconnaissance Conceptual Report & Cost Estimate Award of Project Preliminary Design & Cost Estimate Obtain Existing Info from Client KM Survey Site Investigation No Info To Carry Out Engineering Survey & Soil Investigation Works DESIGN STAGE Drawings, reports, Specifications, BQ & Cost estimates TENDER STAGE Tender Document, Drawings, Cost Estimate & Contract Awarded Address Comments Not approved Submission to Local Authorities Project Close Out DLP CMGD Final Account CONSTRUCTION STAGE Site supervision, Inspection & testing, CPC

BIM PROCESS Conceptual Phase Architectural 3D Modelling LOD 100 Project Management with BIM Preliminary Design Phase Design Coordination Phase Architectural 3D Modelling Structural Civil MEP Clash Detection Quantity Take-off LOD 200 LOD 300 Construction Phase Shop Drawing s Creation Construction Simulation 4D / 5D LOD 400 As Built Phase As Built Model LOD 500 Handing Over Phase Facility Management

IPD - BIM Deliverables BIM - IPD To provide IPD (Integrated Project Delivery) using BIM technology to manage and maintain projects effectively 3D modelling & Outputs Clash detection Clash Resolution Quantity take off 2D Extraction Construction simulation 4D & 5D Facility Management Solutions

CHALLENGES Education, Training & Support Legal & Contractual CHALLENGES Delivery Standard & Processes Institutional Support Digital Capabilities Investment

Signature Address in KL 55-storey Hotel & Condominium D&B Contract Design Simultaneously with Construction Foreign Contractor Participation Challenges Collaborative design contribution including from contractor / builders Departure from traditional delivery method of isolated responsibilities

SMART TOWNSHIP 2300 Acre Township in Sungai Buloh Conventional Contract Modeling of external infrastructure on design completion Updating by contractor Challenges BIM was not in initial procurement Correct software & Inter-Operability issues Quantity measurement (earthwork & contingencies)

HYPERMARKET IN SETAPAK & KAMPAR Hypermarkets Simple Buildings Conventional Contract 13,500 sqm & 14,000 sqm. Challenges Collaboration amongst project proponents

Transit Station in Klang Valley Transit Station in Klang Valley 24 Stations 1 Depot Klang Valley Vicinity Challenges BIM process and deliverables Workshop participations Time & Schedule Station Walkthrough Video

HOTEL IN ABU DHABI Hotel built over F1 Race circuit in Abu Dhabi 499 rooms, 75 suites, 7 restaurants 85,000 sqm Modeling include temporary works Challenges Modelling temporary structure to achieve cost economy Construction simulation to achieve design intent Decision Making process

CHALLENGES IN BQ QUANTITY TAKE-OFF Raft Slab Concrete Quantities CROSS REFERENCE BOQ

CHALLENGES Ownership of model Design liability / Modelling liability Legal & Contractual Responsibility of design / Modelling Integration of BIM with existing contracts Professional indemnity Commercial rates for BIM Consultants

CHALLENGES Protocols to be set on processes Delivery Standard & Processes Clear definition of roles & responsibility Deliverables to be defined

PROJECTS WITH BIM

TERIMA KASIH THANK YOU 19 th October 2016 BY: IR. SHARIFAH AZLINA RAJA KAMAL