CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

Similar documents
ANNEXURE B SECTION 1

Schedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules

Residencial Las Américas - Edificio California C/ Sierra de Gredos,

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

Building Systems and Design Elements included in SliDeRulE

BBA 001 Documents included under the scope of BBA s ISO UKAS accreditation

BUILDING SKILLS. Building Skills : Basic Painting. Building Skills : Plaster & Tiler. Course Content : Course Content : Duration : 10 Days

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

METHODOLOGICAL EXPLANATION CONSTRUCTION COST INDEX FOR NEW RESIDENTIAL BUILDINGS

Division 09 FINISHES TABLE OF CONTENTS

BILL NO 1 MASONRY SUPPLEMENTARY PREAMBLES BRICKWORK. Rectification Project Illinge, Eastern Cape Roof Replacement (Partially Done)

SCHEDULE OF FINISHES FOR THE AGREEMENT BETWEEN ZOTOS BROTHERS (PTY) LTD AND

INDICATIVE FEASIBILITY BUDGET (RIBA STAGE 1) for ST JAMES'S CHURCH : WEYBRIDGE SURREY. June 2016

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

CONSTRUCTION SMARTSCREEN

ANNEXURE A. Fixtures and Fittings 3 Mona Crescent

BILL NO 1 MASONRY SUPPLEMENTARY PREAMBLES BRICKWORK. Rectification Project Illinge, Eastern Cape Demolish and Rebuild (Partially Done)

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

GN18: BREEAM Recognised Responsible Sourcing Certification Schemes and BREEAM Scheme Applicability V3.1

B. Provide fire-rated access doors where indicated or scheduled.

Appendix 4. Bills of Quantities

Building Inspection Report

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

ANNEXURE G SPECIFICATIONS & NOTES

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE. Annex A - BILL OF QUANTITIES 1/9

SAMPLE. Slab On Ground Construction. Carpentry - Residential Construction. Product Code: 5597

Description. Location: Pervolia - Larnaca Area of plot: 1710 m2 Size: 3 three-bedroom villas Delivery: Under Study

SLIDING Product Information

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Our standard inclusions.

SNAGGING REPORT. Plot 19 Snag Close Unfinished Avenue Oxford OX90 1AB. for. Mr T & Mrs N Sample

Building Construction Occupations

BUILDING ON THE CADASTRAL LOT NO. 713, MISLOĐIN, OBRENOVAC BILL OF QUANTITIES

SECTION ACCORDION FOLDING PARTITIONS

Our standard inclusions.

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised

RODINNÉ DOMY STODŮLKY. Standards

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised

ADMIL ADHESIVES SILICONE, SEALANTS & ADHESIVES CATALOGUE. Professional Products for Demanding Applications

11 FLAT ROOF CONSTRUCTION

Verve Inclusions. 3 Corporate Avenue Rowville VIC T 1800 SIENNA E

SECTION SHEET MEMBRANE WATERPROOFING AND CRACK ISOLATION

Subject to soil test, survey & site conditions. Price may change without further notice.

BILL NO 1 ALTERATIONS SUPPLEMENTARY PREAMBLES

THE UNIVERSITY OF ALABAMA AT BIRMINGHAM (UAB) BIRMINGHAM, ALABAMA

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

ARCHITECTURAL DRAWINGS

Affordable Quality - Easy Build. Building Specifications. Kitset Homes. latitudehomes.co.nz

DIPLOMA IN BUILDING Qualification code: DBSC17 - NQF Level 6 (360 credits)

RCC PRECAST TOILET UNITS

D Bulk Excavate in black cotton soils depth exceeding 1.5 M but not exceeding 3.0m 2,488 CM 450 1,119,600.00

Series 3000 Pocket Doors

The Express Range. It s your home. The Express 12

Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification

60 years. of progressive development

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

BARING HEAD s Keepers Houses. Building Inspection Report - BARING HEAD PROJECT

Passivhaus certified housing project with G-Brick SIP panels by Garnica

Name of work: Renovation of toilets in main building near molecular biology lab. Sl Rate Amount Description Quantity Unit No Rs Ps Rs Ps Schedule A

DEKO PF. Profile Free System Partition

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

Civil Engineering Construction Chapter 5

SECTION PRECAST CONCRETE BUILDING PREFABRICATED. ACI , "Building Code Requirements for Reinforced Concrete".

Bill of Quantity B. CIVIL WORKS Project :

MODULAR BUILDING SPECIFICATIONS

RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing

ENGINEERING MATERIALS

Notification of a Body pursuant to article 18 of the Construction Products Directive 89/106/EEC

WALNUT CREEK - DETAILS OF TECHNICAL SPECIFICATIONS SPECS FOR VASWANI PORTION. 200 mm solid concrete blocks. Reinforced Cement Concrete - Flat Roof

Aluminum Component Pipe Railings

F.C.L. INTERIOR FINISHES CHECK LIST 2010 PRODUCT SELECTION - FLOORING GENERAL ITEMS PRODUCT SELECTION GENERAL ITEMS

Your home. Dream it. Do it. Dec 17. Affinity Inclusions. wincrest.com.au

CTE - CIP Course Details Catalog

Semi-Detached Industrial Units. freehold

MARLIN WINDOWS, INC 3500 HC SERIES 3 3 8" SLIDING WINDOW PAGE 1

Chapter 73. Articles of iron or steel

IP: Investment. For resilience, durability and a complete turn-key solution

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

GROOT PARYS LIFESTYLE VILLAGE FINISHING SCHEDULE

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

ONLINE EXPORT OPPORTUNITIES IN CONSTRUCTION. e-business Issue.

TWO Dublin Airport Central Accommodation Schedule. TWO Dublin Airport Central Ground Floor

Measuring Walls in Accordance with ARM4 - An Introductory Demonstration

SECTION UTILITY MANHOLES AND STRUCTURES

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

Underground Exhaust System

DIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories

SECTION FABRICATED PRE-ENGINEERED PRECAST CONCRETE STRUCTURES. 10 x 12 PRECAST CONCRETE BUILDING EASI-SET FIELD ASSEMBLED

ADOS MS SEALANT. Product. Scope. Appraisal No. 924 [2016] Appraisal No. 924 (2016) BRANZ Appraisals

TENANT CRITERIA MANUAL INSERT PHOTO HERE

Property Condition Assessment

SITE ANALYSIS, DESIGN BRIEF AND CASE STUDY

m 2 Distribution Center Bergen op Zoom

for the master tradesman Setcrete Product Guide

ALL-ALUMINUM DOOR & WINDOW FRAMING

BRIEF DESCRIPTION. "L'HORLOGERIE" Rue de Genève FERNEY VOLTAIRE. COLLECTIVE BUILDING 19 apartments for sale

Transcription:

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP) Work Groups Composition and Weightings of Sub-indices CURRENT AS AT 1 JANUARY 2017 Issued by the CPAP Committee Distributed by the Association of South African Quantity Surveyors

CONTRACT PRICE ADJUSTMENT PROVISIONS Work Groups Composition with Weighting of Sub-indices Work Group Weight Sub-indices 102 Alterations 1.00 Labour cost - CPI 104 Earthworks 0.50 Labour cost - CPI 0.50 Plant, Civil engineering 106 Piling 0.27 Labour cost - CPI 0.03 Sand 0.10 Cement 0.06 Aggregate, crushed stone 0.12 Reinforcing steel 0.42 Civil engineering plant 110 Concrete (excluding formwork) 0.22 Labour cost - CPI 0.45 Cement 0.13 Sand 0.20 Aggregate, crushed stone 111 Formwork 0.50 Labour cost - CPI 0.15 SA pine, kiln dried 0.20 Structural steel products 0.15 Building boards 112 Precast concrete 0.30 Labour cost - CPI 0.14 Cement 0.05 Sand 0.06 Aggregate, crushed stone 0.09 SA pine, kiln dried 0.09 Building boards 0.09 SEIFSA steel price index, Table E-A light sections 0.12 Reinforcing steel 0.06 Structural steel products 113 Post tensioning 0.27 Labour cost - CPI 0.55 Strand 0.18 Anchors 114 Reinforcement 0.30 Labour cost - CPI 0.70 Reinforcing steel 116 Brick and block work 0.45 Labour cost - CPI 0.06 Cement 0.04 Sand 0.35 Bricks, stock 0.10 Bricks, face 118 Masonry 0.46 Labour cost - CPI 0.54 Natural stone, cut and sawn 120 Waterproofing 0.20 Labour cost - CPI 0.68 Bitumen Sheeting, modified 0.12 Bitumen & Acrylic Emulsion 122 Non-metallic roof coverings 0.20 Labour cost - CPI 0.40 Roof tiles, concrete 0.40 Roof sheets, fibre cement Page 2 of 6

Work Group Weight Sub-indices 124 Metal roofing (steel) 0.15 Labour cost - CPI 0.85 GMS sheeting, coated & profiled (roofing) 125 Metal roofing (aluminium) 0.10 Labour cost - CPI 0.90 Aluminium sheeting, profiled, distributor level 126 Carpentry and joinery 0.35 Labour cost - CPI 0.20 SA pine, kiln dried 0.10 Building boards 0.20 Meranti, imported 0.15 Flush doors 129 Ceilings 0.25 Labour cost - CPI 0.25 Gypsum board 0.20 Drop-in ceiling tiles (Gypsum) 0.15 Drop- in ceiling tiles (Masonate) 0.10 Aluminium sections, extruded, distributor level 0.05 SEIFSA steel price index, Table E-A light sections 130 Resilient floor and wall coverings 0.24 Labour cost - CPI 0.27 Vinyl tiles, flooring 0.27 Vinyl sheeting, flooring 0.22 Carpeting, woven needle punch 132 Ironmongery 0.22 Labour cost - CPI 0.78 Locks and padlocks, clasps, keys and parts thereof of base metal - PPI 134 Structural steel works in buildings 0.48 Labour cost - CPI 0.52 Structural steel products 136 Metalwork 0.30 Labour cost - CPI 0.30 Structural steel products 0.30 Steel sections, small 0.10 SEIFSA steel price index, E-A light sections 138 Partitioning systems 0.36 Labour cost - CPI 0.24 Gypsum board 0.16 Doors, flush 0.09 Aluminium sections, extruded, distributor level 0.05 Ironmongery selected, WG 132 0.05 SEIFSA steel price index, Table E-A light sections 0.05 Glass, building industry, cut to size 140 Aluminium work 0.40 Labour cost - CPI 0.60 Aluminium sections, extruded, distributor level 141 Stainless steel work 0.50 Labour cost - CPI 0.50 Stainless steel products, flat rolled Page 3 of 6

142 In situ finishes 0.67 Labour cost - CPI 0.20 Cement 0.10 Sand 0.03 Aggregate, crushed stone 144 Tiling 0.42 Labour cost - CPI 0.50 Glazed ceramic tiles, white 0.08 Tiles adhesives 146 Drainage 0.60 Labour cost - CPI 0.30 PVC pipes 0.10 Concrete pipes 148 Plumbing 0.40 Labour cost - CPI 0.10 Wash hand basin 0.10 WC s 0.10 Stainless steel products,flat rolled 0.20 Piping, copper 0.10 Piping PVC 149 Aluminium shop fronts and 0.40 Labour cost - CPI Preglazed aluminium windows 0.25 Aluminium sections, extruded, distributor level 0.35 Glass, building industry use, cut to size 150 Glazing 0.10 Labour cost - CPI 0.90 Glass, building industry use, cut to size 152 Painting 0.65 Labour cost - CPI 0.35 Paints - PPI 154 Roadworks 0.20 Labour cost - CPI 0.34 Aggregate, crushed stone 0.21 Bitumen, road surfacing 0.20 Engineering plant, civil 0.05 Diesel 160 Electrical installation 0.10 Labour cost - CPI 0.10 SEIFSA Actual labour cost index Table C3 0.50 Electrical engineering materials 0.15 SEIFSA steel price index, Table E-A light sections 0.15 SEIFSA Metal prices, Copper Table F 162 Electrical Reticulation 0.10 Labour cost - CPI 0.10 Labour cost - SEIFSA 0.30 Electrical engineering materials 0.20 SEIFSA steel price index, Table E-A light sections 0.30 SEIFSA Metal prices, Copper Table F 170 Mechanical services 0.32 Labour cost - SEIFSA table C4 0.20 Machinery SEIFSA table 0 0.25 Machinery Electrical table 0 0.03 Domestic steel medium sections Table E-A 0.15 Electrical contracting materials 0.05 Steel tubes, pipes and fittings SEIFSA Table 1 171 Ductwork installations 0.40 Labour cost - SEIFSA table C4 0.50 Sheet, galvanised 0.10 Angles mild steel Page 4 of 6

172 Refrigeration installations 0.45 Labour cost - SEIFSA table C4 0.40 SEIFSA Metal prices, Copper Table F 0.10 Electrical contracting materials 0.05 Angles, mild steel 173 Steel water pipe installations 0.40 Labour cost - SEIFSA table C4 0.40 Steel tubes, pipes and fittings SEIFSA Table 1 0.08 Angles, Mild steel 0.12 Foam insulation material 180 Lump sum contracts 0.02 WG 104 - Earthworks 0.04 WG 110 - Concrete 0.01 WG 114 - Reinforcement 0.20 WG 116 - Brick and blockwork 0.01 WG 120 - Waterproofing 0.03 WG 122 - Non-metal roof coverings 0.03 WG 124 - Metal roofing 0.10 WG 126 - Carpentry and joinery 0.04 WG 130 - Resilient floor and wall coverings 0.01 WG 132 - Ironmongery 0.05 WG 136 - Metal work 0.08 WG 142 - In situ finishes 0.03 WG 144 - Tiling 0.02 WG 146 - Drainage 0.10 WG 148 - Plumbing 0.01 WG 150 - Glazing 0.04 WG 152 - Painting 0.10 WG 160 - Electrical installation 0.08 WG 190 - Preliminaries 181 Commercial Industrial 0.02 WG 104 - Earthworks Buildings 0.01 WG 106 - Piling 0.06 WG 110 - Concrete 0.05 WG 111 - Formwork 0.01 WG 112 - Precast concrete 0.04 WG 114 - Reinforcement 0.04 WG 116 - Brick and block work 0.01 WG 120 - Waterproofing 0.02 WG 122 - Non-metal roof coverings 0.02 WG 124 - Metal roofing 0.01 WG 125 - Metal roofing (aluminium) 0.06 WG 126 - Carpentry and joinery 0.03 WG 129 - Ceilings 0.04 WG 130 - Resilient floor and wall coverings 0.01 WG 132 - Ironmongery 0.02 WG 134 - Structural steel 0.02 WG 136 - Metal work 0.02 WG 138 - Partitioning systems 0.06 WG 142 - In situ finishes 0.03 WG 144 - Tiling 0.02 WG 146 - Drainage Page 5 of 6

0.10 WG 148 - Plumbing 0.01 WG 150 - Glazing 0.03 WG 152 - Painting 0.02 WG 154 - Roadworks 0.10 WG 160 - Electrical installation 0.07 WG 170 - Mechanical services 0.07 WG 190 - Preliminaries 190 Preliminaries 0.55 Labour cost - CPI 0.30 Civil engineering plant 0.15 Diesel oil (retail) 200 0.80 Reinforcement 0.05 SEIFSA C1 0.15 SEIFSA C1 Changes: 1 January 2017 WG 132 Ironmongery 1 January 2013 1 January 2017 WG 152 Painting 0.22 Labour cost - CPI 0.22 Labour cost - CPI 0.31 Lever locks 0.78 Locks and padlocks, clasps, keys and 0.26 Hinges parts thereof of base metal - PPI 0.08 Cylinder lock set 0.13 Aluminium lever furniture 1 January 2013 1 January 2017 0.65 Labour cost - CPI 0.65 Labour cost - CPI 0.18 Paints, cementitious 0.35 Paints - PPI 0.17 Paints, enamel Page 6 of 6