Eletronuclear ( Brazil) Fukushima Response Plan

Similar documents
Brazilian Operator s Response to Fukushima Daiichi Accident Luiz Soares Technical Director

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

Post Fukushima actions in India. Mukesh Singhal, Chief Engineer, Reactor Safety & Analysis Directorate NPCIL

European level recommendations Sect. in NAcP 2 Generic recommendation for WENRA, Finland participates and follows the work.

Development and use of SAMGs in the Krško NPP

CNE Cernavoda Response to Fukushima Event/EU Stress Test Requirements

Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency

Safety enhancement of NPPs in China after Fukushima Accident

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011

Post-Fukushima Actions in Korea

Post-Fukushima Assessment of the AP1000 Plant

3 Steps Approach : KHNP s Implementation of Post Fukushima Actions. ST(Sung-Tae) Yang. General Manager Corporate Safety Department KHNP

Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

Improvements Needed in Nuclear Power Plant Probabilistic Risk Assessments: Lessons Learned from Fukushima

Enhancement of Nuclear Safety

India s HWR Activities S.G.Ghadge Executive Director (Reactor Safety & Analysis) Nuclear Power Corporation of India Limited

Provision of containment integrity at Russian VVER NPPs under BDBA conditions

The Risk of Nuclear Power

FOSH Forsmark Safety Enhancement Project Post-Fukushima actions at Forsmark NPP

Isolation Condenser; water evaporation in the tank and steam into the air. Atmosphere (in Severe Accident Management, both P/S and M/S)

Lessons learned from Angra 1 & Angra 2 NPP s Outages

Meetings for Sharing International Knowledge and Experience on Stress Tests

Dr.-Ing. Rainer Kaulbarsch, Gösgen Power Plant (CH) August, 26th, 2013, Vienna

Recent Approaches related to Safety Enhancement of Operating NPPs in Korea Tae Eun JIN KEPCO E&C

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

IAEA Training in level 1 PSA and PSA applications. Other PSA s. Low power and shutdown PSA

HPR1000: ADVANCED PWR WITH ACTIVE AND PASSIVE SAFETY FEATURES

APR1400 Safe, Reliable Technology

Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident and Consequent Safety Improvements

in China Nuclear and Radiation Safety Center, Ministry i of Environmental Protection, ti P. R. China August , Vienna

SYSTEMATIC AND DESIGN SAFETY IMPROVEMENTS OF NPPS IN CZECH REPUBLIC

RESULTS OF THE GRADUAL UPGRADING AT BOHUNICE WWER - 440/230 NPP

Chapter VI. VI.Situation regarding efforts to address lessons learned (28 items)

Westinghouse Small Modular Reactor. Passive Safety System Response to Postulated Events

Comprehensive Safety Assessment for Kashiwazaki Kariwa NPS

INSIGHTS FROM COMPARISON OF TURBINE HALL FIRE RISK EVALUATED BY THE SIMPLIFIED AND DETAILED APPROACHES

Safety Enhancement of Nuclear Power Plant Post Fukushima. Kumiaki Moriya

OPG Proprietary Report

Monitoring of the EU Stress test improvement actions in neighbouring countries

Research Article Extended Station Blackout Coping Capabilities of APR1400

SAMGs for German NPPs Main Features and Implementation Engineering & Projects (E&P)

Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety. Trieste,12-23 October 2015

Harmonized EUR revision E requirements corresponding to currently available technical solutions

DESIGN AND SAFETY PRINCIPLES LEONTI CHALOYAN DEPUTY CHIEF ENGINEER ON MODERNIZATION

THE FUKUSHIMA ACCIDENT: IMPLICATIONS FOR NUCLEAR SAFETY. Edwin Lyman Union of Concerned Scientists May 26, 2011

Nuclear Power in Taiwan

FRANCE LWR activities

OPG Proprietary Report

International Atomic Energy Agency. Impact of Extreme Events on Nuclear Facilities following Fukushima. Dr C H Shepherd Nuclear Safety Consultant, UK

Accident Management under Extreme Events

Safety Challenges for New Nuclear Power Plants

Attachment VIII-1. July 21, 2011 Nuclear and Industrial Safety Agency

Updating on NPP Life Management, Long Term Operation and post-fukushima Issues in Spain

Example Pressurized Water Reactor Defense-in-Depth Measures For GSI-191, PWR Sump Performance

ANTICIPATED ANALYSIS OF FLAMANVILLE 3 EPR OPERATING LICENSE - STATUS AND INSIGHTS FROM LEVEL 1 PSA REVIEW

The ESBWR an advanced Passive LWR

Small Modular Reactors: A Call for Action

National Nuclear Safety Administration, P. R. China

Post-Fukushima Action Plan in Korea. WNU-SI 2011, August 11 Christ Church, Oxford

Lessons learned from the accident at the Fukushima Daiichi Nuclear Power Plant

Plant-specific safety review (RSK-SÜ) of German nuclear power plants in the light of the events in Fukushima-1 (Japan)

The Westinghouse Advanced Passive Pressurized Water Reactor, AP1000 TM. Roger Schène Director,Engineering Services

The EU-Stresstest Dr. Christoph Pistner

Safety Provisions for the KLT-40S Reactor Plant

Probabilistic Safety Assessment (PSA): Case Study Leibstadt NPP. Dr. Olivier Nusbaumer Probabilistic Safety Analysis Kernkraftwerk Leibstadt AG

CLASSIFICATION OF SYSTEMS, STRUCTURES AND COMPONENTS OF A NUCLEAR FACILITY

Randy Lockwood, Senior Vice President CMD 18-H6.1A. PICKERING NUCLEAR GENERATING STATION Part I Hearing Licence Renewal April 4, 2018

Tsunami Countermeasures at Hamaoka Nuclear Power Station

IV. Occurrence and Development of the Accident at the Fukushima Nuclear Power Stations

NUCLEAR POWER NEW NUCLEAR POWER PLANTS IN 2012

The 2011 Tohoku Pacific Earthquake and Current Status of Nuclear Power Stations

AP1000 European 15. Accident Analysis Design Control Document

Evaluation of AP1000 Containment Hydrogen Control Strategies for Post- Fukushima Lessons Learned

Main Steam & T/G Systems, Safety

Design of Traditional and Advanced CANDU Plants. Artur J. Faya Systems Engineering Division November 2003

SAFETY GUIDES. Deterministic Safety Assessment РР - 5/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY

SUMMARY OF SE NNEGC ENERGOATOM PERFORMANCE IN POST-FUKUSHIMA PERIOD

STATUS, ACHIEVEMENTS & FUTURE CHALLENGES

Application of the Defense-in-Depth Concept in the Projects of New-Generation NPPs Equipped with VVER Reactors. JSC ATOMENERGOPROEKT Moscow

CANDU Safety #6 - Heat Removal Dr. V.G. Snell Director Safety & Licensing

The Nuclear Crisis in Japan

NuScale SMR Technology

Measures against Earthquakes and Tsunamis in View of the Accident at Fukushima Daiichi Nuclear Power Station

SEVERE ACCIDENT FEATURES OF THE ALTERNATIVE PLANT DESIGNS FOR NEW NUCLEAR POWER PLANTS IN FINLAND

Regulatory Guide Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

Risks Associated with Shutdown in PWRs

IAEA GIF Design Extension in Post Fukushima Scenario

Concepts and Features of ATMEA1 TM as the latest 1100 MWe-class 3-Loop PWR Plant

FUKUSHIMA DAI-ICHI ACCIDENT: LESSONS LEARNED AND FUTURE ACTIONS FROM THE RISK PERSPECTIVES

Introduction to the 2015 Darlington NGS Probabilistic Safety Assessment. Carlos Lorencez and Robin Manley Ontario Power Generation August 2015

CNSC Evaluation of Plant-Specific SAMG

Preparedness at PFBR Kalpakkam to meet the challenges due to Natural events Prabhat Kumar, Project Director, PFBR, Director construction BHAVINI

Design Safety Considerations for Water-cooled Small Modular Reactors As reported in IAEA-TECDOC-1785, published in March 2016

Spent Fuel and Spent Fuel Storage Facilities at Fukushima Daiichi

The Westinghouse AP1000 : Passive, Proven Technology to Meet European Energy Demands

Seismic PRA Insights and Lessons Learned

GUIDELINES FOR REGULATORY REVIEW OF EOPs AND SAMGs

Applicability of PSA Level 2 in the Design of Nuclear Power Plants

SENIOR REGULATORS MEETING Strengthening the Implementation of Defence in Depth IAEA Perspective

Transcription:

Eletronuclear ( Brazil) Fukushima Response Plan Edmundo Selvatici Site Manager Mario de Mello Ferreira Junior Manager, Materials Engineering Technical Meeting on Operational Experience with Implementation of Post-Fukushima Actions in Nuclear Power Plants 25-27 march 2017 1

Angra Nuclear Power Station (single NPP site in Brazil) ANGRA 1 PWR Power: 640 MW Technology: Westinghouse Operation start: Jan. 1985 ANGRA 2 PWR Power: 1,350 MW Technology: KWU/ Siemens Operation start: Jan. 2001 ANGRA 3 PWR Power: 1,405 MW Technology: KWU/ Siemens/ Areva Under construction Planned start of operation: 2022 (illustrative view) ANGRA 1 ANGRA 2 RADIOACTIVE WASTE STORAGE CENTER 500kV Switchyard 2

Plan in Full Integration with Nuclear Industry Initiatives Brazilian Nuclear Authority 3

Response to Fukushima Main Safety Goals 29 6 4

Response to Fukushima Evaluation of ST Report Basis: WENRA Specification for Stress Test Report FORO Angra 1 and Angra 2 NPPs Stress Test Report Evaluation 5

Protection from Hazard Events External Events Earthquakes; Rainfalls; Landslides; Tidal Waves; Tornadoes. Assessment of existing DB external event scope and design criteria for completeness and updating Assessment of safety margins of existing design in case of BD external events 1st step: simplified calculations, engineering/expert judgement 2nd step: detailed deterministic and probabilistic analyses. Internal Events Fire; Internal Flooding. Reevaluation considering up-to-date safety requirements; Identification of design gaps. 6

Protection from Hazard Events - Results Earthquakes Plants Seismic Design Low seismicity site (intraplaque region). Largest recorded earthquake 5.2 Richter scale at 300 km (PGA 0.002g at site); Design PGA for SSE: 0.1g (p< 10-4 /yr) based on deterministic seismic response spectrum. Evaluation of margins estimated safety margins relative to Design PGA by expert walkdown and judgement : 2-2.5 for Angra 1 and 2.5-3.0 for Angra 2; Extensive updating of geological and seismological database (three-years program completed); PGMRS( Probabilistic Ground Motion Response Spectrum) determined for use in the Seismic PSA; Seismic PSA for Angra 2 completed (safety margin: up to 4xDesign PGA) 8

Protection from Hazard Events - Results Rainfall and Landslides Evaluation of margins Studies considering heavy rains and consequential or seismic induced landslides concluded. Extreme case of full rupture of slope covering material evaluated. Slopes very steep around the site Residual and colluvial soils High rainfall rates Station protected by slope stabilization works and slope monitoring system 8 Results: For worst case switchyard and discharge channels may be affected however no impact on Plants buildings; Recommendation for enlargement of slope drainage system and reinforcement of some stabilization works (ongoing) 9

Protection from Hazard Events - Results External Flooding plant construction level access to safety buildings Angra 1 and 2 + 5.15m + 5.60m 0 CNG Evaluation of margins: Reevaluation of flooding level under more severe conditions concluded (rainfall rate higher than 10,000 years rainfall, blockage of site drainage channels and circulating water discharge tunnel due to landslides, highest sea level). Results: Current design flooding level includes sufficient safety margin (up to 75.000 years rainfall); Recommendation for checking and reinforcement of existing flooding barriers (finished). 9

Protection from Hazard Events - Results Tidal Waves calculation of tidal waves for severe metereological conditions( sea storms and hurricanes) at Ilha Grande Bay concluded; largest waves> maximum design wave for wave breaker design evaluation of wave breaker stability through physical model by international lab being contracted; Results may lead to recommendation of breaker structural reinforcement Angra NP Station Ilha Grande Bay Bay area, natural protection from Atlantic Ocean 11

Protection from Hazard Events - Results Tornadoes Tornadoes were not originally considered for Angra 1 and 2 due to low probability (~10-7/y); Tornado hazard study developed for Angra 3; Impact on Angra 1 and 2 evaluated and actions plans issued for further evaluation and/or protection of selected structures and components. Internal Fire Internal Flooding Fire Hazard of Angra 1 revised by EPRI (risk based evaluation); design modification packages under evaluation. Reevaluation of Angra 1 design against internal flooding; Recommendation to increase the safety margins under evaluation 11

Evaluation of Station Blackout Scenarios (SBO) Existing power supply conditions for Angra 1 and Angra 2 (Design or backfit) Cachoeira Paulista São José SE 500kV Zona Oeste SE 138kV Santa Cruz Off site Power Angra 1: 2x100% DG ( Plant Design) + 2x100% DG (backfit) Same cooling system for all DG A2 A1 Angra 2 Angra 1 4 x 50% 2 x 100% 4x 2x M G M G UBP D1 EDE 3/4 A2 A1 Emergency Diesels 1 st Emergency Power System Angra 2: 4x50% EDG + 4x50% EFDG in dedicated bunkered building with independent cooling system. M 4x G ULB D2 Minimum batery duration 2x 2x M G EAS 1A/1B 2,5h 4,0h 2 nd Emergency Power System both meet NRC requirements for exclusion of SBO 14

Existing SBO Emergency Procedures SG feeding through steam turbine driven pumps (Auxiliary Feedwater Turbine Pumps) in Angra 1 and Diesel Driven Emergency Feedwater Pumps in Angra 2); at least 20 hours in Angra 1 and 33 hours in Angra 2 of feeding from, respectively, Auxiliary Feedwater Tank - AFT and Demineralized Water Pools - DWP; possibility of AFT and DWP refilling from Fire Fighting Water Supply System - FFWS (5,000 m 3 reservoir, located on an elevation 110 m above the site level); possibility of full passive secondary B&F from the FFWS reservoir (connection before SG becomes empty, in case AF-2 or LAS pump fails, about 50 minutes). 15

Evaluation of Loss of Main Heat Sink Existing design conditions: water intake structures protected from open sea hazards (Ilha Grande Bay); water intake structures protected by wave breaker 8.0 m high above average seawater level; Availability of alternative heat sink by means of Fire Fighting Water Supply System - FFWS (5,000 m 3 reservoir, located on an elevation 110 m above the site level); alternative already incorporated in Emergency procedures for both Plants. Not designed for earthquake.. Main implications for the plants: Angra 1: failure of both Emergency Diesel Generator Systems (failure of common cooling system); Angra 2: Only EDG fail. Bunkered Emergency Feedwater Diesels (EFDG) not dependent of Service Water; impossibility of operating the RHR chain. 16

Provision of Cooling Capacity extreme conditions Deterministic evaluation approach (WENRA/FORO guidelines) no credit given to special design features or former backfits at the Angra plants no possibility of external support within 72h after the accident onset; Event Initial Conditions Loss of Offsite and Onsite Power (SBO) and Loss of Ultimate Heat Sink (LUHS) Plant in Power Operation 100% reactor power; Plant at Refueling (worst condition for fuel pool temperature) full core transferred to fuel pool; full loading of fuel pool storage racks; 15

Stress Test results Based on the Stress Tests results mobile equipment to provide additional means to supply power and cooling capacity for the core and the fuel pools were identified, specified and purchased, comprising different sizes of Diesel Generators, Diesel driven pumps and associated connection fixtures. General Concept adopted for Mobile equipment Equipment stored on site in location that is not affected by the external events that would affect the site, housed in a light tent-like structure commercial grade equipment; Mobile equipment connections specified in accordance to the Requirement Category of the systems where the connection is applied. Mobile equipment incorporated to the decision trees of the EOPs; Mobile equipment have specific procedures; not incorporated to the Tec Specs. 16

Stress Test results Design modification processes have been developed for the short and medium term strategies, in case of loss of all AC power and/or UHS, as follows: Short term (1 to 3 hours): recharging of batteries and Steam Generator feed. Mobile equipment : one 250 KVA DG and 2 Diesel Driven pumps per Plant; Countermeasure: Bleed and Feed through the secondary side. Medium term (1 to 2 days): in case of available UHS. Countermeasure: repowering one RHR cooling train Mobile equipment: 3 large DG, of 600 KVA each for Angra 1; 2 large DG, of 600 KVA each for Angra 2. Medium term (1 to 2 days): in case UHS is unavailable Countermeasure: continue Secondary B&F and replenish source of water for SG cooling (tank/pool) with sea water; Mobile equipment: 2 submergible Diesel powered pumps 16

Stress Test results The implementation of a new water reservoir of 4000 m 3 meeting seismic requirements located at a height able to provide means of feeding the steam generators in a totally passive way, is in phase of design completion. An alternative means of cooling the Diesel Groups in Angra 1, in case of loss of the Service Water System (SWS), was developed by installing a connection in the SWS piping for sea water injection with a mobile Diesel powered pump. 16

Overview of Additional Emergency Supply Alternatives Mobile DG (Emergency Power Supply for essential Safety Systems) 2017 status (completed) 2017 status (completed) Mobile DG (Emergency Power Supply for essential Safety Systems) Interconnection of Diesel Systems D1 and D2 (intended) 2017 status (design concluded) Alternative cooling chain for Angra 1 Emergency Power DG ANGRA 2 ANGRA 1 Mobile DG (extension of batteries autonomy) 2017 status (final implementation) 2017 status (final implementation) Mobile DG (extension of batteries autonomy) 17

Additional Alternatives for Reactor Cooling Alternatives for Reactor Cooling Via Steam Generators Angra 1 and Angra 2: Secondary side bleed-and-feed through the Steam Generators. (2017 status final implementation) Alternatives for Direct Reactor Cooling Angra 2 Primary side bleed-and-feed : Installation of additional valves in the Pressurizer valve station with dedicated power supply and I&C. (2017 status completed). Ensures depressurization of Primary System(bleed). 18

Additional Alternatives for Reactor Cooling Mobile Pumps for SG Feeding Mobile Pumps for Refilling Water Reservoirs Fire Hoses Mobile Ar Compressor for Remote Valve Actuation (Angra 1) 19

Mobile Equipment maintenance and storage Testing and Maintenance activities: - All tests and maintenance are being performed according the equipment supplier manuals; - Weekly sequence of DG performance tests, mobile pumps and mobile air compressor; 21

Loss of Fuel Pool Cooling Fuel Pool Temperature Increase after Loss of Cooling Unit Plant condition Time until start boiling Time until fuel element exposure Angra 1 Angra 2 Power Operation 28 h 179 h Refueling (*) 9 h 56 h Power Operation 23 h 136 h Refueling (*) 5 h 31 h (*) Full core unloaded and full occupation of pool racks Fuel Pool Cooling alternatives : Angra 1 (SFP in external Fuel Building): Feed to the SFP from outside fire fighting FF) water reservoir or FF truck. (2017) Angra 2( SFP inside Containment): fuel pool cooling using fire fighting water 2018) 22

Mitigation of Radiological Consequences Containment Protection: Passive H2 catalytic recombiners (PARs) already installed in Angra 1 and 2 (completed) Containment Filtered Venting (CFV): AREVA CFV (wet option) under design for Angra 2. Implementation in steps due to budget limitations Not yet decided for Angra 1. Severe Accident Management Guidelines (SAMGs): Angra 1: WOG SAMGs have been implemented and integrated with the Emergency Planning (EP) procedures. Angra 2: AREVA SAMGs have been developed, implemented and integrated with the Emergency planning procedures. Other improvements of the infrastructure for Emergency Planning Implementation of trails in emergency planning zones (completed) Improvements in Emergency Centers (underway) Improvements in radiological protection controls for Severe accident situations( underway) 23

Thank you for your attention. edsel@eletronuclear.gov.br 24