County of El Dorado. El Dorado Hills Apartments Project Draft Environmental Impact Report. SCH No Prepared For: Prepared by:

Similar documents
Table of Contents. City of Redlands - Redlands Crossing Center

County of El Dorado Notice of Preparation Tilden Park Project

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

ANDORA AVENUE TTM PROJECT Subsequent Draft EIR

CITY OF CLOVIS Traffic Impact Study Guidelines

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

Appendix H Traffic Study

Draft Environmental Impact Report Serramonte Views Condominiums and Hotel Project

City of Palo Alto (ID # 7047) City Council Staff Report

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that:

TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT

El Dorado Water & Power Authority. El Dorado Water Reliability Project

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

2035 General Plan Update, Belmont Village Specific Plan, and Climate Action Plan

CITY OF LOS ANGELES SAN PEDRO COMMUNITY PLAN

CHAPTER 11 Climate Change Considerations

5.0 PROJECT ALTERNATIVES

TRANSPORTATION IMPACT ANALYSIS GUIDELINES

Greenhouse Gas Emission Reduction Strategies

SUBSEQUENT MITIGATED NEGATIVE DECLARATION

VEHICLES MILES TRAVELED (VMT) TRAFFIC IMPACT METRIC

3.0 COMMENTS AND RESPONSES

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION

B. ALL RESIDENTIAL ALTERNATIVE

4. ENVIRONMENTAL IMPACT ANALYSIS 11. TRANSPORTATION AND CIRCULATION 1. TRAFFIC

South of Woodward Avenue Project

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

Simbol Calipatria II CUP # SmCP-2 Project Trip Assignment

Can They Peacefully Coexist? Presentation by Al Herson, JD, FAICP Attorney, Sohagi Law Group SSU 2014 Planning Commissioners Workshop

City of White Plains Westchester County, NY. Draft Generic Environmental Impact Statement

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings

ADDENDUM TO THE EIR. Specifically, Section of the CEQA Guidelines states:

DRAFT ENVIRONMENTAL IMPACT REPORT SOLEDAD VILLAGE SCH NO Lead Agency:

COMPARISON OF PROJECT AGAINST EXISTING CONDITIONS

Notice of Preparation of an Environmental Impact Report. Case No.: E Reception: 41.

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

HELENA CHEMICAL COMPANY NELSON TERMINAL PROJECT USE PERMIT UP Butte County Board of Supervisors January 29, 2013

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows:

RAND CORPORATION HEADQUARTERS BUILDING. Final Environmental Impact Report

RENAISSANCE EAST ADDENDUM TO THE RENAISSANCE SPECIFIC PLAN FINAL ENVIRONMENTAL IMPACT REPORT VOLUME 1 OF 2 STATE CLEARINGHOUSE #

Why a Regional Plan?

5.3 Air Quality and Greenhouse Gas Emissions

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

Appendix Y-3. Environmental Impact Comparison Social Sciences Interdisciplinary Building

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS

6.2.2 Environmental Consequences and Mitigation Measures

Subsequent or Supplemental Impact Report; Conditions.

Problem Screening Guideline January, 2016

State of the Practice - How Public Transportation is addressed in Traffic Impact Studies ITE Transit and Traffic Impact Studies Committee

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR

Clean Air Act History

Re: Mobility Plan 2035 FEIR Greenhouse Gas Emissions Analysis

3.0 ERRATA TO THE DRAFT EIR

3.6 GROUND TRANSPORTATION

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

- FACT SHEET - THE GUIDING PRINCIPLES

You Can t Build Without CEQA!

FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA

Neighborhood Advisory Committee. EIR Process Overview. Chapman University April 20, 2016

Volume I Walnut Creek BART Transit Village Draft EIR. for the City of Walnut Creek

Woodburn Interchange Project Transportation Technical Report

NIGHTTIME ILLUMINATION

DRAFT Environmental Impact Report City of Napa General Plan Housing Element City of Napa, Napa County, California

South Coast Air Quality Management District

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

3.14 TRANSPORTATION AND TRAFFIC

Alder Drive / Blair Road Bridge Replacement Projects

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

COMPARISON OF ALTERNATIVES

CEQA BASICS. The California Environmental Quality Act. Prepared for: Orange County Department of Education. Prepared by:

CHAPTER V Other CEQA Considerations

Northwest State Route 138 Corridor Improvement Project

4.12 AIR QUALITY INTRODUCTION

Montgomery County, MD

San Francisco Transportation Sustainability Program

California Environmental Quality Act Findings LAX Terminals 2 and 3 Modernization Project 1. Project Description Summary

Citizen s Guide: A Handbook to the Draft Environmental Impact Report and Review Process

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures

CHAPTER 12 TRANSPORTATION. Introduction Setting Impacts and Mitigation Measures of the 2015 Plan Alternatives

CEQA and Health Effects

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations

Countywide Comprehensive Transportation Plan

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN

Standard Performance Attributes for Transportation Projects

GLOBAL WARMING AND RESIDENTIAL REAL ESTATE DEVELOPMENT: THE CALIFORNIA EXPERIENCE

Environmental Setting, Impacts, and Mitigation Measures

ADDENDUM TO THE AVIANO ADULT COMMUNITY PROJECT ENVIRONMENTAL IMPACT REPORT

Executive Summary Introduction and Background

TRAFFIC STUDY GUIDELINES

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

The Secrets to HCM Consistency Using Simulation Models

SMUD Franklin Electric Transmission Project. Initial Study and Mitigated Negative Declaration Addendum July 2017

11 February 13, 2013 Public Hearing APPLICANT& PROPERTY OWNER: EVERGREEN VIRGINIA, LLC

Active Risk Management - Charles River Basin

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

CITY OF OAKLAND CEQA THRESHOLDS OF SIGNIFICANCE GUIDELINES OCTOBER 28, 2013

SUPERIOR COURT OF THE STATE OF CALIFORNIA FOR THE COUNTY OF LOS ANGELES. Case No.

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW

Transcription:

County of El Dorado El Dorado Hills Apartments Project Draft Environmental Impact Report SCH No. 2017042017 Prepared by: 505 14th Street, Suite 1230 Oakland, California 94612 Prepared For: County of El Dorado Planning and Building Department 2850 Fairlane Court, Building C Placerville, CA 95667 June 2017

EL DORADO HILLS APARTMENTS PROJECT Draft Environmental Impact Report SCH No. 2017042017 Prepared for: County of El Dorado Planning and Building Department 2850 Fairlane Court, Building C Placerville, CA 95667 Prepared by: Impact Sciences, Inc. 505 14 th Street, Suite 1230 Oakland, California 94612 (510) 267-0494 June 2017

TABLE OF CONTENTS Section 1.0 Introduction...1.0-1 2.0 Summary...2.0-1 3.0 Project Description...3.0-1 4.0 Environmental Setting, Impacts, and Mitigation Measures...4.0-1 4.1 Air Quality...4.1-1 4.2 Biological Resources...4.2-1 4.3 Cultural Resources and Tribal Cultural Resources...4.3-1 4.4 Greenhouse Gas Emissions...4.4-1 4.5 Land Use and Planning...4.5-1 4.6 Noise...4.6-1 4.7 Public Services and Recreation...4.7-1 4.8 Transportation and Traffic...4.8-1 4.9 Utilities and Service Systems...4.9-1 4.10 Energy... 4.10-1 5.0 Alternatives...5.0-1 6.0 Other CEQA Considerations...6.0-1 7.0 Report Preparation/Agencies Consulted...7.0-1 Appendices (on CD attached to the back cover) 1.0 Notice of Preparation, Initial Study, and Scoping Comments 4.1 Air Quality Impact and Greenhouse Gas Analysis 4.2 Biological Resources Assessment 4.3 Archaeological Resources Assessment 4.6 Noise Modeling Data 4.8 Transportation Impact Study 4.9 Water Supply Evaluation Impact Sciences, Inc. i El Dorado Hills Apartments Project Draft EIR

LIST OF FIGURES Figure 3.0-1 Project Vicinity and Location...3.0-3 3.0-2 County General Plan Land Use Designation...3.0-4 3.0-3 EDHSP Village U and Village T Location Map...3.0-5 3.0-4 EDHSP Village T Planning Area Locations...3.0-6 3.0-5 Existing and Proposed EDHSP Land Use Designation...3.0-7 3.0-6 Existing and Proposed Zoning...3.0-8 3.0-7 Project Site Plan... 3.0-11 3.0-8 Preliminary Landscape Plan... 3.0-12 3.0-9 Project Site Plan First Level... 3.0-15 3.0-10 Project Site Plan Second Level... 3.0-16 3.0-11 Project Site Plan Levels 3 and 4... 3.0-17 3.0-12 Roof Plan... 3.0-18 3.0-13 Illustrative Project Elevations... 3.0-19 3.0-14 Illustrative Project Elevations... 3.0-20 3.0-15 Illustrative Project Elevations... 3.0-21 3.0-16 Town Center Piazza Rendering... 3.0-22 3.0-17 Preliminary Utility Plan... 3.0-24 3.0-18 Preliminary Grading and Drainage Plan... 3.0-27 4.2-1 Aerial Photo...4.2-3 4.5-1 Surrounding Land Uses...4.5-2 4.5-2 County of El Dorado General Plan Land Use Designation...4.5-4 4.5-3 El Dorado Hills Specific Plan Villages T and U...4.5-5 4.5-4 El Dorado Hills Specific Plan Town Center Plan Planning Area 2...4.5-6 4.8-1 Project Location and Study Area...4.8-2 4.8-2 Existing and Planned Bicycle Facilities...4.8-7 4.8-3 Existing Conditions Peak Hour Intersection Turning Movement Volumes... 4.8-11 4.8-4 Project Trip Distribution... 4.8-26 4.8-5 Project Trip Assignment... 4.8-27 4.8-6 Existing Plus Project Conditions Peak Hour Intersection Turning Movement Volumes... 4.8-28 4.8-7 Peak Hour Traffic Volumes and Lane Configurations Near-Term No Project... 4.8-31 4.8-8 Peak Hour Traffic Volumes and Lane Configurations Near-Term Plus Project... 4.8-32 Impact Sciences, Inc. ii El Dorado Hills Apartments Project Draft EIR

LIST OF TABLES Table 2.0-1 Summary of Project Impacts and Mitigation Measures...2.0-7 2.0-2 Comparison of Alternatives to the Proposed Project... 2.0-29 3.0-1 Residential Unit Mix Summary...3.0-9 4.0-1 Related Projects...4.0-3 4.1-1 Sources and Health Effects of Air Pollutants...4.1-3 4.1-2 Ambient Air Quality Standards...4.1-4 4.1-3 Highest Measured Air Pollutant Concentrations near the Project Site...4.1-7 4.1-4 National Ambient Air Quality Standard Designations MCAB...4.1-9 4.1-5 California Ambient Air Quality Standard Designations MCAB... 4.1-10 4.1-6 Operational Emissions (Unmitigated Maximum Daily lbs/day)... 4.1-24 4.1-7 Operational Emissions (Mitigated Maximum Daily lbs/day)... 4.1-25 4.1-8 Operational Emissions Pollutant Concentration/Significance Determination (CO)... 4.1-26 4.1-9 Operational Emissions Pollutant Concentration/Significance Determination (PM10)... 4.1-26 4.1-10 CARB Minimum Separation Recommendations of Siting Sensitive Land Uses... 4.1-31 4.2-1 Special Status Species Reported for Nine Quad Area Surrounding the El Dorado Hills Apartments Project Site...4.2-7 4.4-1 AB 32 Scoping Plan Measures (SPMs)... 4.4-11 4.4-2 Greenhouse Gas Emissions Thresholds Efficiency Matrix... 4.4-20 4.4-3 Estimated Construction GHG Emissions... 4.4-21 4.4-4 Operational GHG Emissions (2020)... 4.4-23 4.5-1 Proposed Project Land Use Approvals... 4.5-12 4.5-2 General Plan Land Use Element Consistency Analysis... 4.5-14 4.5-3 General Plan Housing Element Consistency Analysis... 4.5-15 4.5-4 El Dorado Hills Specific Plan Policy Consistency Analysis... 4.5-16 4.5-5 Draft El Dorado Hills TCE Urban Infill Residential Area Design Guidelines and Development Standards Consistency Analysis... 4.5-18 4.6-1 Representative Environmental Noise Levels...4.6-2 4.6-2 Existing Roadway Modeled Noise Levels...4.6-7 4.6-3 Maximum Allowable Noise Exposure for Transportation Noise Sources...4.6-9 4.6-4 Noise Level Performance Protection Standards for Noise Sensitive Land Uses Affected by Non-Transportation Sources... 4.6-10 4.6-5 Maximum Allowable Noise Exposure for Non-transportation Noise Sources in Community Regions and Adopted Plan Areas Construction Noise... 4.6-11 4.6-6 Operational Roadway Noise Levels Existing Plus Project Conditions... 4.6-15 4.6-7 HVAC Noise Levels... 4.6-16 4.6-8 Parking Noise Levels... 4.6-17 4.6-9 Maximum Noise Levels Generated by Typical Construction Equipment, Lmax... 4.6-19 4.6-10 Construction Noise Levels (Site Preparation)... 4.6-20 4.6-11 Cumulative Mobile Source Noise Levels... 4.6-22 4.8-1 Signalized Intersection Level of Service Definitions...4.8-9 4.8-2 Unsignalized Intersection Level of Service Definitions... 4.8-10 4.8-3 Freeway Facility Level of Service Criteria... 4.8-12 4.8-4 Existing Conditions Study Intersection LOS Summary... 4.8-13 4.8-5 Existing Conditions Study Freeway Segments and Ramps LOS Summary... 4.8-14 Impact Sciences, Inc. iii El Dorado Hills Apartments Project Draft EIR

LIST OF TABLES (CONT.) Table 4.8-6 Project Trip Generation Rates and Estimates... 4.8-24 4.8-7 Capacity-Enhancing Roadway Improvements (Construction within 10 years)... 4.8-26 4.8-8 Existing and Existing Plus Project Intersection LOS Summary... 4.8-34 4.8-9 Existing and Existing Plus Project Conditions Study Freeway Segment LOS Summary... 4.8-35 4.8-10 Intersection LOS and Delay Near-Term Conditions... 4.8-38 4.8-11 Freeway Facility Peak Hour Level of Service Near-Term Conditions... 4.8-39 4.8-12 Intersection LOS and Delay Near-Term Plus Project Conditions... 4.8-40 4.8-13 Freeway Facility Peak Hour Level of Service Near-term Conditions... 4.8-42 4.8-14 Capacity Enhancing Roadway Improvements (Anticipated Completion by 2035)... 4.8-44 4.8-15 Long-Term Cumulative Conditions Study Intersection LOS Summary... 4.8-48 4.8-16 Long-Term Cumulative Conditions Study Freeway Facilities LOS Summary... 4.8-52 4.9-1 EID Projected Supply...4.9-2 4.9-2 EID Recycled Water Supply Reliability, AFY...4.9-4 4.9-3 Minimum Levels of Service Utilities...4.9-9 4.9-4 Projected Water Demand... 4.9-14 4.9-5 Projected Potable and Recycled Water Demand... 4.9-15 4.9-6 Summary of Potable Water Demand versus Supply... 4.9-16 4.9-7 Summary of Recycled Water Demand versus Supply (During Hydrologic Normal, Single Dry, and Multiple Dry Years for EID, AFY)... 4.9-17 4.10-1 Project Operational Natural Gas and Electricity Usage (Unmitigated Scenario)... 4.10-9 4.10-2 Project Operational Natural Gas and Electricity Usage (Mitigated Scenario)... 4.10-9 4.10-3 On-road Mobile Fuel Generated by Project Construction Activities By Phase... 4.10-11 5.0-1 No Project/Existing Zoning Alternative Trip Generation... 5.0-10 5.0-2 Reduced Density Alternative Trip Generation... 5.0-16 5.0-3 Summary Comparison of Project Alternatives... 5.0-21 Impact Sciences, Inc. iv El Dorado Hills Apartments Project Draft EIR