Cutting-edge Wirtgen technology in successful operation on Interstate 81

Similar documents
Binder with a proven track record worldwide. Foamed bitumen

Remixer 4500: Rehabilitation of the B 9 using the Remix-Plus process, Germany

Efficient hot recycling the internationally recognized method. The World of Wirtgen Hot Recyclers

Efficient hot recycling an accepted method around the globe The World of Wirtgen Hot Recyclers

Successful operations in soil stabilization and cold recycling

Job Report Cold Milling. Top job in motorway rehabilitation Wirtgen milling machines on the A99

Job Reports WR 240 / WR 240 i. Performing to highest quality standards whatever the job

Full Depth Reclamation

Cold Recycling a method of road construction with low CO 2

Puerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration

What is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process

Cold Foam In-Place Recycling (CIR)

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

Economical paving of 4.0-m to 12.0-m wide concrete slabs Slipform Paver SP 1200

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

An Overview of Low Cost Pavement Alternatives in Canada

Dear Friends, Welcome on behalf of EvoCrete & CCL International Ltd.

COLD IN-PLACE RECYCLING (CIR) Starting with what is there i.e. in situ materials

Airport Pavement Rehabilitation 2015 Minnesota Airports Conference

How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc.

Pavement Recycling Technology for Highways in Japan

SUPER Paves Top Quality Wearing Course without Joints

Cold In-Place Recycling

A Case Study of Work done by a HOT IN-PLACE RECYCLING (HIR) Machines

Efficient milling and granulating of road pavements. The World of Wirtgen Cold Milling Machines

TechnoSoil. stand on firm ground with TechnoSoil IMPROVEMENT AND STABILIZATION OF PRESENT SOILS FOR EACH KIND OF EARTHWORK AND ROAD CONSTRUCTION

COLD-IN-PLACE RECYCLING

FIELD STUDY OF REPAIR METHODS FOR TRANSVERSAL CRACKS

January 2008 No. 700

Double-layer Asphalt Pavement in a Single Process and Noise Reductions Properties of Double-Layer Porous Asphalt

ROAD PAVEMENTS GENERAL

Highway construction C 5

Reclamation Guidelines

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer

Cement Stabilized Soil (CSS) (Portland cement)

Efficient milling in the 1-m class Cold Milling Machine W 100 / W 100 i

Full-Depth Reclamation with Cement

Module 1 - Introduction. Asphalt Plant Level 1. Release 10 4/19/

550 Surface Treatments

InLine Pave Train Widens Highway While Open to Traffic

Hydraulically Bound Mixtures

MNDOT PAVEMENT DESIGN MANUAL

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA

Successful Implementation of Warm Mix Asphalt in Ontario

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION...

Nova Scotia 2009 Pavement Preservation. Jim Chisholm Highway Construction Services

Paver Operations for Quality

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING)

Renae Kuehl, PE, SRF Consulting Group Dan Wegman, PE, Braun Intertec Corporation November 2, 2017

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

7.1 INTRODUCTION 7.2 MATERIALS 7.1 ROAD PAVEMENT REPAIRS - GENERAL

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

Review of Cold In-Place Recycling: Environmental, Economical, and Performance Analysis

asphalt applications Asphalt surfacings for high stress areas mpa asphalt Asphalt Information Service Mineral Products Association

Longitudinal Joint Construction

1. Evolution of Screeds in the USA A. Fixed Screeds with Hydraulic Strike-off, Becoming Obsolete B. Rear Mount Screeds with & without strikeoff C. Fro

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 1 SPECIFICATION FOR HIGHWAY WORKS SERIES 700 ROAD PAVEMENTS GENERAL

Shell Bitumen Shell U.K. Oil Products Limited Rowlandsway House Rowlandsway Wythenshawe Manchester M22 5SB United Kingdom

BASE CONSTRUCTION MATERIALS A Aggregate

Guidelines for pothole repairs

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

Mix Design & Construction -1-

Cement Stabilized Aggregate Base

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Pavement Management Systems

Rehabilitation Recommendations for FM 97 in Gonzales County

1985: FT02 Kuala Lumpur - Kuantan (Temerloh) 1988: FT08 Pagar Sasak - Merapoh, Pahang

Sasobit the versatile additive for asphalt mixes

Technology Transfer Program

Alligator Cracking. Light. Medium. High

Innovative Sustainable Pavement Solutions

FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES. OTEC - October 27, 2015

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

DIVISION 32 EXTERIOR IMPROVMENTS

Shrinking the carbon footprint with sustainable pavement

Prevention of Transverse Bumps Over Crack Sealant During Asphalt Overlay Construction

SERVICE INFORMATION SYSTEMS: KNOW-HOW FOR YOUR SUCCESS.

Concrete Overlays. ACPA Pennsylvania Chapter. ACPA Pennsylvania Chapter. Versatile & Sustainable Solutions. Reasons to Consider a Concrete Overlay

PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE

Performance of Aggregate Base Course Pavements in North Carolina

4-07 Asphalt Treated Permeable Base (ATPB)

The Cardiac Arrest of Hot Mix Asphalt Pavements

Distresses within Asphalt Concrete Pavements and use of repave tool for Pavement Distress Management Paige Jordan 03/ 01/ 2016 Bradley University

Low-temperature asphalt with Ammann Foam

Pavement Design. TTP Orientation Seminar 2011

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.

Flexible Pavement of Ohio

SECTION FLEXIBLE PAVING

Proposed Structure and Construction Method for Improved Interlocking Concrete Block Pavement Used in Residential Parking Spaces

LIFE CYCLE COST ANALYSIS OF ROAD PAVEMENTS IN RURAL AREAS

Technical specification Slipform Paver SP 1600

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

PERFORMANCE EVALUATION OF CEMENT STABILISED ROAD BASE USING FALLING WEIGHT DEFLECTOMETER

Cost Considerations of Asphalt Rubber Hot Mix

CHAPTER 1 INTRODUCTION

Transcription:

Cold recycling: pioneering, economical, resource-efficient. Cutting-edge Wirtgen technology in successful operation on Interstate 81 JOBREPORTS ANDREFERENCES

02 03 Cold recycling Leading technology in structural road rehabilitation One of the major north-south routes in the eastern United States of America runs across the state of Virginia with two lanes in each direction Interstate I-81. Having been built in the late 1960s, I-81 had been in service for well over forty years. And time had not passed without leaving its mark on the heavily frequented highway. Continuously increasing traffic volumes and in particular the loads imposed by heavy-vehicle traffic had taken a heavy toll on the road pavement and caused damage to varying degrees. As a result, the pavement surface was covered with innumerable alligator cracks, wheel ruts, deformations and patches where minor repairs had been carried out. On several sections of Interstate 81, however, more and far greater evil was hiding a little bit deeper: the right-hand truck lane, which suffered the most from the high volumes of heavy-vehicle traffic, showed significant structural damage and an inadequate load-bearing capacity in its lower pavement layers. In previous years, Virginia Department of Transportation (VDOT), the building authority in charge, had been able to keep traffic up and running by carrying out extensive repair and maintenance operations at regular intervals but limited to the surface layer. In the spring of 2011, however, a 6-km long stretch of I-81 had clearly reached the end of its service life, and suitable measures that would go really deep needed to be taken as quickly as possible in the interests of traffic safety. Conclusion: a structural rehabilitation of the aged section of Interstate I-81 required more than just milling off the existing pavement and placing new base course and surface course layers. Instead, the asphalt layers of the right-hand truck lane needed to be removed at full depth and the subgrade needed to be stabilized. The asphalt material reclaimed during this operation was to be recycled and then reused in a cost-efficient and environmentally-friendly process. As it was mostly used by passenger cars and was therefore subject to

lower loads, the left-hand lane was to be rehabilitated by cold recycling to a depth of 12 cm. In this highly challenging construction project, rehabilitating the complete pavement structure involved the use of as many as three different recycling methods. All the more reason for VDOT to rely on the tried-and-tested high-per formance machines from the Wirtgen Group and use powerful cold milling machines and cold recyclers, a mobile cold recycling mixing plant from Wirtgen and an entire fleet of Hamm rollers to breathe new life into the age-worn road. REHABILITATION OF THE RIGHT-HAND LANE 1 Remove asphalt pavement to a depth of 25 cm 2 Pre-spread 5% of binding agent 1 2 In a first step, the schedule of operations specified the renewal of the right-hand truck lane over a length of 6 km. The compact dimensions of the Wirtgen Group machines used in the process caused only minimal disruptions to traffic: both the trucks and passenger cars were guided past the job site on the adjacent, left-hand lane, thus maintaining a continuous flow of traffic. 3 4 5 In the first step of the construction project, W 210 and W 2100 large milling machines from Wirtgen reported for duty. The two workhorses removed the entire asphalt material down to a depth of 25 cm in a single pass. 3 Stabilize to a depth of 30 cm 4 Pave 20 cm of cold recycled material 5 Pave 5 cm of asphalt Steps involved in rehabilitating the right-hand lane.

04 05 Off to a perfect start: the W 210 cold milling machine showed its mettle when excavating the right-hand lane at full depth. A big help in this truly demanding job: LEVEL PRO the levelling system specifically designed by Wirtgen for use in cold milling machines precisely maintained the selected milling depth. At the same time, the powerful conveyor systems of the two cold milling machines kept the waiting trucks busy. The trucks transported the reclaimed granulated material to the mobile mixing plant, which had been set up in the vicinity of the construction site, for recycling and subsequent reuse. In addition, traffic conditions required the entire milling operation to be carried out during night hours it was completed just in time thanks to the machines excellent lighting systems and backlit control panels. A Wirtgen WR 2400 cold recycler with a working width of 2.40 m was at the ready for the soil stabilizing operation to be carried out next, which would restore the subgrade to the required bearing capacity. Prior to stabilizing, a binding agent spreader spread 5 % of a lime-cement mixture in the milled cut. The WR 2400 then travelled over the milled cut and binding agent. In the process, the recycler s milling and mixing rotor mixed the existing, damaged subgrade material and pre-spread binding agent down to a depth of 30 cm, adding specified amounts of water to produce a homogeneous construction material. At the same time, the recycler pushed a tanker truck which provided water for the mixing process via a hose connection. The WR 2400 cold recycler thus produced a perfect foundation with excellent load-bearing properties that merely required compacting by single-drum compactors from Hamm and levelling by a grader. While the WR 2400 was completing the soil stabilizing operation, the KMA 220 cold recycling mixing plant was busy recycling the reclaimed asphalt material in an in-plant process for full reuse. The binding agents added to the recycling process included 1 % of cement and 2.2 % of innovative foamed bitumen.

1 2 1 The Wirtgen WR 2400 cold recycler stabilized the existing subgrade material and pre-spread binding agent to a depth of 30 cm. 2 The high-performance KMA 220 mobile mixing plant set up in the vicinity of the construction site produced high-quality cold mix. Preliminary investigations using the Wirtgen WLB 10 S laboratory plant enabled the foamed bitumen quality and, in combination with the Wirtgen WLM 30 laboratory mixer, the optimal mix proportion to be defined even prior to the start of construction. The powerful twin-shaft continuous mixer of the KMA 220 transformed the source material and the two additives into a homogeneous cold mix of high quality that was directly discharged into a waiting truck via a loading conveyor. Its mobile design enabled the mixing plant to be set up in the immediate vicinity of the construction site, which not only reduced the distance to be covered by the transport trucks, fuel consumption rates and CO 2 emissions but, in the final analysis, also resulted in a significant reduction of the overall construction costs. The material recycled and upgraded by the KMA 220 mixing plant was transported back to the construction site by trucks. In the next step, asphalt pavers placed it on the stabilized subgrade as a 20-cm thick layer that was then effectively compacted by tandem rollers from Hamm. The base course built from the recycled cold mix impressed with optimal resistance to deformation, improved flexibility and excellent durability. The last operational step in the rehabilitation of the right-hand lane consisted in a 5-cm thick asphalt layer being placed on top of the base course prior to the lane being reopened for use by traffic.

1 2 06 07 1 The 3800 CR recycled the subgrade in a single pass while adding foamed bitumen to the process. 2 Hamm tandem and pneumatictyred rollers quickly and reliably compacted the lefthand lane previously produced in an in-situ process. REHABILITATION OF THE LEFT-HAND LANE Following completion of the right-hand truck lane, the second project phase was next on the agenda: rehabilitation of the left-hand traffic lane. As it had mostly been used by passenger cars in the past, it was not as severely damaged, meaning that it also required less extensive rehabilitation methods. Similar to the rehabilitation of the right-hand lane, the traffic was guided past the construction site on the adjacent lane, this time on the previously recycled right-hand lane. In a first step, the schedule of operations specified milling off the 5-cm thick surface course at a gradient of 2% over the entire length of the construction site. The W 2100 large milling machine tackled this part of the job, completing it with great ease in cooperation with the tried-and-tested LEVEL PRO levelling system. After pre-spreading 1 % of pure cement, the Wirtgen 3800 CR cold recycler equipped with a 3.8-m wide integrated paving screed gained centre stage for the in-situ processing of the traffic lane.

It is a major advantage of the in-situ recycling process that neither the source material nor the recycled construction material mix require any transport effort. Preceding tanker trucks delivered bitumen and water to the 3800 CR via hose connections. The cold recycler milled off and granulated the damaged asphalt layer down to a depth of 12 cm in a single pass while the milling and mixing rotor mixed in foamed bitumen, cement and water at the same time. Foamed bitumen was produced by the 3800 CR by injecting water and compressed air into hot bitumen. The precise mix proportion was again determined in advance by the WLB 10 S laboratory plant and WLM 30 laboratory mixer. Following recycling, the 3800 CR paved and pre-compacted the recycled mix by means of the integrated Vögele paving screed, thus producing a bituminous bound base course of superior quality even at this early stage. Final compaction was, as usual, a routine job for the tandem rollers and pneumatic-tyred rollers from Hamm. Rehabilitation of the left-hand traffic lane and therefore the entire construction project was completed by paving an asphalt course on top of the recycled base. 3 1 2 1 Remove asphalt pavement to a depth of 5 cm 2 Process 12 cm of cold recycling material 3 Pave 5 cm of asphalt WIRTGEN TECHNOLOGY MAKES THE DIFFERENCE Ground-breaking cold recycling technologies from Wirtgen were the key to success in this showcase project: traffic on Interstate I-81 flowed smoothly again after a short construction period on a roadway of optimal structural integrity on a roadway of excellent durability on a roadway recycled in an economical, resource-efficient and environmentally-friendly process. Steps involved in rehabilitating the left-hand lane.

Illustrations and texts are non-binding and may include customized fi ttings. Subject to technical changes. Performance data depend on operational conditions. Nr. 2464764 EN-01/16 by Wirtgen GmbH 2016. Printed in Germany Wirtgen GmbH Reinhard-Wirtgen-Str. 2 53578 Windhagen Germany Phone: +49 (0) 26 45 / 131-0 Fax: +49 (0) 26 45 / 131-392 Internet: www.wirtgen.com E-Mail: info@wirtgen.com