THREE-DIMENSIONAL NUMERICAL ANALYSIS ON EXCAVATION AND SUPPORT OF DEEP PIT NEAR THE SUBWAY TUNNEL BY COMPUTER SIMULATION TECHNIQUE

Similar documents
Non-linear Time History Response Analysis of Low Masonry Structure with tie-columns

Zoning Supporting Design of Deep Foundation Pit Based on Controlling Deformation of Surrounding Buildings

Comparison of geotechnic softwares - Geo FEM, Plaxis, Z-Soil

Finite Element Simulation of Low Concrete Strength Beam-Column Joint Strengthened with CFRP

Open Access The Analysis of the Seepage Characteristics of Tailing Dams Based on FLAC 3D Numerical Simulation

Northport Berth 3 design and construction monitoring

Nonlinear Models of Reinforced and Post-tensioned Concrete Beams

BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY

BEHAVIOR OF PILES IN SAND SUBJECTED TO INCLINED LOADS

Static Response of Reinforced Soil Retaining Walls with Modular Block Facing

Seismic Design of a Slope Stabilization Work Using Piles and Tendons

Seepage-Stress Coupled Analysis on Shield Tunnel Face Stability in Layered Soil

Numerical Analysis of a Novel Piling Framed Retaining Wall System

Geotechnical Engineering Software GEO5

A Case History of Super-Large Scale Bridge Pile Foundation in Soft Soil

Non Linear Analysis of Composite Beam Slab Junction with Shear Connectors using Ansys.16

Numerical Simulation of Flexural-tensile Properties of Reinforced Concrete Beam

BEHAVIOR OF REINFORCED CONCRETE BEAM WITH OPENING

Modelling the response of single passive piles subjected to lateral soil movement using PLAXIS

Analysis of Shear Wall Transfer Beam Structure LEI KA HOU

Modelling shearing characteristics of reinforced concrete

Design Illustrations on the Use of Soil Nails to Upgrade Loose Fill Slopes

An example of finite element modelling of progressive collapse

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure

ANALYSIS OF DIFFERENT LOADS AFFECTING THE URBAN RAILWAY TUNNEL SYSTEMS OF CAIRO METRO UNDERNEATH THE RIVER NILE

Research Article Classification of Soft-rock Tunnels and the Corresponding Large-section Construction Methods

Journal of Asian Scientific Research EVALUATION OF RECTANGULAR CONCRETE-FILLED STEEL-HOLLOW SECTION BEAM-COLUMNS

Computational Modeling of a Large Pile Group Under Lateral Load

In-plane testing of precast concrete wall panels with grouted sleeve

Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata

Experiment and Finite-element-method Analysis of Steel Frame Joints Transferring Forces Outside Box Columns

Determining radius of influence of the face in EPB shield tunneling by finite difference method.

Settlement assessment of running tunnels a generic approach

Hyperstatic (Secondary) Actions In Prestressing and Their Computation

TEST STUDY ON BASIC STATIC CHARACTERISTICS OF CABLE SUPPORTED BARREL VAULT STRUCTURE

Influence of unloading soil modulus on horizontal deformation of diaphragm wall

Journal of Engineering Science and Technology Review 7 (2) (2014) Research Article

SEISMIC RETROFIT OF AN UNDERGROUND RESERVOIR. Robert Small 1, Rob Jameson 2

VOL. 11, NO. 16, AUGUST 2016 ISSN ARPN Journal of Engineering and Applied Sciences

Numerical study of shear wall behavior coupled with HPFRCC beam and diagonal reinforcements

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 2, No 2, 2011

PILE RAFT FOUNDATION BEHAVIOR WITH DIFFERENT PILE DIAMETERS

A Finite Element Model for Optimum Design of Plain Concrete Pressure Tunnels under High Internal Pressure

Numerical Modeling of Dynamic Soil-Structure Interaction in Bridges with HP Driven Piles

Structural Evaluation and Strengthening Strategy for a Reinforced Concrete Commercial/Residential Complex in Northern Beirut

New Replaceable Coupling Beams for Shear Wall Structures

Jurnal Teknologi EXPERIMENTAL AND NUMERICAL ANALYSIS OF INTERACTION BETWEEN SUBSOIL AND POST- ENSIONED SLAB-ON-GROUND. Full Paper

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 1, 2012

Numerical Modeling of Slab-On-Grade Foundations

Finite Element Analysis of Reinforced Concrete Corbels

1. INTRODUCTION. (a) Sand/ Fabric-coated (b) Sand-coated deformed. (c) Helical wrapped/ribbed Fig.1 FRP anchors with different outer surfaces

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

Behavior and Strength of Slab-Edge Beam-Column Connections under Shear Force and Moment

Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil

Compressive strength of double-bottom under alternate hold loading condition

Effect of FRP strengthening on the behavior of shear walls with opening

1. Stress Analysis of a Cantilever Steel Beam

Effects of Misalignment in Cylindrical Roller Bearings on Contact between Roller and Inner Ring

Compressive strength of double-bottom under alternate hold loading condition

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND

Analysis of working behavior of Jinping-I Arch Dam during initial impoundment

Residual Strengths of Reinforced Concrete Beams With Heavy Deterioration

5.4 Analysis for Torsion

Optimization of Supports in a Road Tunnel through Conglomerate during Construction

IGC. 50 th. 50 th INDIAN GEOTECHNICAL CONFERENCE INFLUENCE OF TUNNELING ON AN EXISTING PILE FOUNDATION

Girder-End Cracking in Prestressed I-Girders

Influence of Vertical Acceleration on Seismic Response of Endbearing

Using EPS Buffers for Diaphragm Walls

Fagà, Bianco, Bolognini, and Nascimbene 3rd fib International Congress

CFD/FEM Based Analysis Framework for Wind Effects on Tall Buildings in Urban Areas

Simplified Finite Element Modelling of Multi-storey Buildings: The Use of Equivalent Cubes

PILE SETTLEMENT ZONES ABOVE AND AROUND TUNNELLING OPERATIONS

Burst Pressure Prediction of Cylindrical Shell Intersection

DYNAMIC TEST ON A MULTI TOWER CONNECTED BUILDING STRUCTURE ABSTRACT

UNDERPINNING A CRANE FOUNDATION

Topic: Site Formation

TUNNEL LINER PLATE INTRODUCTION GENERAL APPLICATIONS CHAPTER 11

DYNAMIC RESPONSE ANALYSIS OF THE RAMA 9 BRIDGE EXPANSION JOINT DUE TO RUNNING VEHICLE

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

Journal of Engineering Science and Technology Review 9 (5) (2016) Research Article. Received 21 July 2015; Accepted 2 November 2016

NON-LINEAR FEM ANALYSIS FOR CES SHEAR WALLS

INTRINSIC SEISMIC PROTECTION OF CANTILEVERED AND ANCHORED RETAINING STRUCTURES

ULTIMATE LOAD-CARRYING CAPACITY OF SELF-ANCHORED CONCRETE SUSPENSION BRIDGE

Seismic Behaviour of RC Shear Walls

SHAKING TABLE TEST AND NUMERICAL ANALYSIS ON STRUCTURAL MODEL OF BEIJING NEW POLY PLAZA

A THREE DIMENSIONAL STUDY OF THE EFFECT OF SOIL EROSION ON RIGID PIPES

Testing of ground anchorages for a deep excavation retaining system in Bucharest

ON THE BEHAVIOR OF A STUCK CURVED PIPE JACKING

Finite Element Study Using FE Code (PLAXIS) on the Geotechnical Behavior of Shell Footings

SOIL PRESSURE IN EMBANKMENT STABILIZATIONS

Finite Element Analysis of Ground Modification Techniques for Improved Stability of Geotubes Reinforced Reclamation Embankments Subjected to Scouring

Development of New H-Section Steel Shape with Inner Rib, J-grip H, and Its Application to Steel Concrete Composite Diaphragm Wall

This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore.

NLFEA Fire Resistance of 3D System Ceiling Panel

IJSER 1. INTRODUCTION 2. LITERATURE REVIEW. Indramohan 1, Anand Singh 2,Pankaj Goswami 3

FINITE ELEMENT ANALYSIS OF REINFORCED CONCRETE BRIDGE PIER COLUMNS SUBJECTED TO SEISMIS LOADING

Fig. 1: Schematic of roughing rolling unit of Mobarakeh Steel Company

Foundation Engineering

Analysis of Seismic Performance of Steel Moment Connection with Welded Haunch and Cover Plate

Transcription:

THREE-DIMENSIONAL NUMERICAL ANALYSIS ON EXCAVATION AND SUPPORT OF DEEP PIT NEAR THE SUBWAY TUNNEL BY COMPUTER SIMULATION TECHNIQUE 1, 2 DAPENG ZHU, 1 YUNDIAN LIN, 3 ECHUAN YAN 1 School of Civil Engineering and Architecture, Southwest Petroleum University, Chengdu 610500, Sichuan, China 2 Key Laboratory of Road & Bridge and Underground Engineering of Gansu Province, Lanzhou Jiaotong University, Lanzhou 730070, Gansu, China 3 Faculty of Engineering, China University of Geosciences (Wuhan), Wuhan 430074, Hubei, China ABSTRACT Computer simulation technique was an effective method to analyze the influence of pit excavation on the stress-strain of soil around pit. Based on ANSYS and FLAC simulation software, in order to ensure the safety of building and subway tunnel nearby the pit excavation, the processes of excavation and support of deep foundation pit were simulated by the finite difference method, this paper obtained stress and deformation characteristics of the soil around pit and underground structures such as subway tunnel. The results showed that the method reflected interaction effects of retaining structure and soil in excavation process, and it could predict stress-strain and stability accurately when the pit was excavated to the designed depth. The study provided a scientific basis for pit design and safety assessment of pit excavation near the subway tunnel. Keywords: Excavation, 3-D Simulation Analysis, Subway, Pit Deformation, Support Structure 1. INTRODUCTION With the rapid development of urbanization, some high-rise buildings and underground space were developed and utilized, so foundation pit had become one of the main geotechnical engineering in city [1, 3]. Due to the site limitations, the foundation pit with the support system had become more and more popular, deformation even failure of buildings surrounding the pit was one of the multiple engineering accidents in recent years [4, 5]. Rock and soil could be seen as a half-space infinite mass with complex stress-strain relationship [6, 8]. Before the pit excavation, the rock mass kept a relative equilibrium states, and the existed equilibrium was broken because of excavation, and stress field will be changed within a certain range of soil until it reached a new equilibrium state [9, 11]. In the two changed equilibrium processes,a slip deformation and stress variation occurred on the soil,so it affected the near building, and especially for underground structures (such as subway tunnel). However, now the studies that how pit excavation effects the nearby subway tunnel is fewer. In order to ensure the safety of the deep foundation pit excavation, the building and its nearby subway tunnel during pit excavation, the processes of excavation and support were simulated by ANSYS and FLAC software, stress and deformation characteristics of the soil around pit and underground structures such as subway tunnel were obtained, it provided a strong basis optimization for designing and safety assessment of the subway tunnel near the pit. 2. OVERVIEW ON DEEP PIT PROJECT The deep foundation pit is in the south of the Tianfu Square and the north of the mosque in Chengdu, the total construction area is 64161 m 2 which includes ground floor area of 38239 m 2 and underground construction area of 25921 m 2. Stories of building over and in the ground are 5 and 4 floors respectively. 621

The local part of a building over the ground is the large span cantilever, and the local part in the ground is at the top of the subway. The average depth of excavation pit is -25.4m, and the base of the structure is an isolation system. The total supporting structure of foundation pit is the pile-anchor composite structure, and west side of the slope supporting system is double pile with diameter 1m and space of 2m 4m,and other sides of supporting system is single pile with diameter 1m and space of 2m (see Figure 1). Anchor cable support system is located between the piles and anchoring force passed to pile by steel beams. E -10.3m 7# Channel Single pile support for pit 8' Dewatering well Sidewall structure Elevation at the bottom of pit -25.4m 8-13.6m subway tunnel 8# and 9# Channel Figure 1: Floor Plan Of Supporting Structure Of Foundation Pit The engineering has the following characteristics. (1)The condition of on-site construction is relatively poor. The construction site is located in the core area of Chengdu and near Tianfu Square, three sides of the pit are the main city's thoroughfares and the other side is close to dense buildings of the Xiaohe Street. (2)The environment surrounding the deep foundation is complex and the subway passed near deep pit. The distance between the excavation location and the nearest tunnel is only 12m, and the supporting piles margin and the nearest subway tunnel is 5m. (3)The supporting structure of the deep pit engineering is different from the ordinary temporary support structure, but as part of the building maintenance infrastructure, so it is permanent structure. 3. COMPUTER SIMULATION TECHNIQUE 3.1 Introduction Of Ansys And Flac ANSYS is a general finite element modeling package for numerically solving a wide variety of mechanical problems. The software allows researchers to construct models of structures, stratum medium, and it apply operating loads and study physical responses, such as stress, pressure, E' etc. It permits an evaluation of a design without having to build and destroy multiple prototypes in testing. FLAC is a general-purpose code that can simulate a full range of nonlinear static and dynamic mechanical problems, with coupled fluid flow, heat flow and structural interaction. Any geometry can be represented, and the boundary conditions are quite general. FLAC simulates the behavior of nonlinear continua by the generalized finite difference method. Computer simulation technique on deep pit includes two steps. Firstly, based on the ANSYS platform and geotechnical distribution characteristics of site, finite element model containing geological interface was established, and the model was mainly composed by tetrahedral element. Second, ANSYS model was imported the FLAC software. 3.2 Calculation Model X-axis and Z-axis were toward the east and south direction, and Z-axis was upward vertically, stratum medium is the layer of miscellaneous fill and loose gravel, slightly dense gravel layer, medium dense gravel layer, dense gravel layer and the weathered mud rock layer from top to bottom. The length of model along X-axis, Z-axis and Y-axis is 500m, 300m and 75.4m respectively. The computational model includes he south mosque and Xiaohe Street dense buildings. Taking into account the calculation accuracy, grid of the excavation and the subway tunnel (radius 6m) area is encrypted, the grid outside excavation area is relatively coarse, and the ANSYS model was composed of 39659 nodes, 194 grids. 21392 structural units including piles, beams and cables were joined when ANSYS model was imported into the FLAC software, and at last the simulation analysis of excavation and supporting realized. Grids of computing model were shown in Figure 2. Y Z X Figure 2: Grid Mesh Chart 622

3.3 Boundary Conditions The ground was set to be free boundary, the deformation in all directions was allowed. Displacement in X-direction was constrained on the boundary of X=0m and x=500m, and also displacement in Z-direction was constrained on the boundary of Z=0m and Z=300m, the bottom (Y=- 75.4m) of the model was the fixed constraint boundary in all directions, so the displacement was zero. For shallow soil, the initial stress field could be considered by the gravity stress, the influence of tectonic stress was ignored. 3.4 Selection On Calculation Parameters Computational model included the zone units and structural units, and geotechnical materials were considered to be the Mohr-Coulomb material. Model consists of the six kinds materials. Geotechnical material parameters were shown in table 1, the calculation parameters about concrete and rebar, channel were selected based on the specifications. (1)Remove the non-soil units, and impose the displacement boundary conditions and gravity loads, and calculate the initial stress field. (2)Remove the soil unit within the scope of the subway tunnel excavation, and implementation the equivalent supporting structure of the subway tunnel, and solve the model to reach equilibrium (3)Impose pile ahead, and implement the first excavation, remove the soil units within first excavation. (4)Add the first layer of surface units and the anchor cable unit, and solve the model to reach equilibrium. (5)Repeat the above step 3 and step 4 until a maximum excavation depth reaches -25.4m. Table I: Geotechnical Material Parameters Order 1 2 3 4 5 6 Stratum Miscellaneous loose slightly medium dense weathered fill gravel dense gravel dense gravel gravel mud rock Density ρ (10 3 kg/m 3 ) 1.75 2.00 2.10 2.15 2.20 2.30 Deformation modulus E 0 (MPa) 30 40 50 60 70 500 Poisson's ratio μ 0.35 0.30 0.28 0.25 0.22 0.30 internal friction Angle φ ( ) 9.0 32.0 38.0 43.0 45.0 35.0 internal friction force c (MPa) 0.01 0 0.0 0.0 0.0 0.3 Tensile strength σ t (MPa) 0 0 0 0 0 0.1 Because foundation pit has been precipitation before excavation and it didn t taken into account the effect of groundwater. In order to save paper space, only the stress and deformation characteristics of a maximum depth were analyzed. 4. RESULTS ANALYSIS 4.1 Deformation Of Soil Around Pit And Tunnel Figure 3 showed the three-dimensional total displacement after pit was excavated to -25.4m.the displacement increased because of unloading excavation. Bomb deformation mainly occurred inner the pit, and uplift phenomenon at the bottom of the pit was about 3.844cm. Surface morphology of displacement can be regarded as a series of the same minor axes oval. Compared to the previous excavation step, the range of deformation parallel to the long axis outside pit expands further. The range of deformation which was more than 1 cm (green narrow bands) at the central part of long axis increases further. Z: 1.500e+002 Z: 0.000 Dist: 1.419e+003 Mag.: 1 2.5000e-002 to 3.0000e-002 3.0000e-002 to 3.5000e-002 3.5000e-002 to 3.8447e-002 Figure 3: Three-Dimensional Displacement Graph Of Pit Figure 4 and Figure 5 showed the displacement graph of the main 8-8' cross section perpendicular to the long axis and E-E longitudinal section perpendicular to the short axis. Deformation contour was half-closed oval extending to the top of 623

the pit, and the axis of oval was short side or long side. The displacement in the middle foundation pit was more than in two both sides (footings). Displacement decreased gradually from the bottom down. Figure 6 showed total three-dimensional displacement of spray layer. The displacement in east spray was more than other sides, due to the obvious constraint role of cross-angle in each direction, so the displacement at southwest and northwest corner was smaller than at the middle part. The Z displacement of the south and north sprayed layer was greater than of the eastern and western, the X displacement of the eastern and western sprayed layer was greater than of the south and north. 2.5000e-002 to 3.0000e-002 3.0000e-002 to 3.5000e-002 3.5000e-002 to 3.6991e-002 Figure 4: Displacement Graph Of 8-8' Cross Section 2.5000e-002 to 3.0000e-002 3.0000e-002 to 3.5000e-002 3.5000e-002 to 3.7558e-002 Figure 5: Displacement Of E-E' Longitudinal Section Contour of Displacement Mag 6.5450e-004 to 2.5000e-003 2.5000e-003 to 5.0000e-003 5.0000e-003 to 7.5000e-003 7.5000e-003 to 1.0000e-002 1.0000e-002 to 1.2500e-002 1.2500e-002 to 1.5000e-002 1.5000e-002 to 1.7500e-002 1.7500e-002 to 2.0000e-002 2.0000e-002 to 2.2500e-002 2.2500e-002 to 2.4549e-002 Interval = 2.5e-003 Figure 6:Three-Dimensional Displacement Of Spray Layer (Unit:M) Figure 7 showed total displacement graph of subway tunnel when pit was excavated to -25.4m. 5.4947e-004 to 1.0000e-003 1.0000e-003 to 2.0000e-003 2.0000e-003 to 3.0000e-003 3.0000e-003 to 4.0000e-003 4.0000e-003 to 5.0000e-003 5.0000e-003 to 6.0000e-003 6.0000e-003 to 7.0000e-003 7.0000e-003 to 8.0000e-003 8.0000e-003 to 9.0000e-003 9.0000e-003 to 9.4273e-003 Interval = 1.0e-003 Figure 7: Total Displacement Graph Of Subway Tunnel The top deformation of tunnel support structure was about 0.5mm by tunnel itself excavation, but it is about 9mm and approximately 0.07% in the span of 12.5m by pit excavation. Thus, pit excavation affected the deformation of subway tunnel significantly, so we should pay more attention to the pit excavation near subway tunnel. 4.2 Stress Analyses On Soil Around Pit And Tunnel Figure 8 ~ 9 and Figure 10 ~ 11 showed the maximum and minimum principal stress distribution of the main 8-8' cross section and E-E longitudinal section, where the positive stress value indicated tension and negative stress value indicated compression. The main stress of strata was compressive, surface and sidewall of pit appeared tensile stress, so the range gradually expanded with the excavation depths. The stress concentration was very obvious at the foot of the slope and around tunnel. Contour of SMax -6.7139e+002 to -5.0000e+002-5.0000e+002 to 0.0000e+000 0.0000e+000 to 5.0000e+002 5.0000e+002 to 1.0000e+003 1.0000e+003 to 1.5000e+003 1.5000e+003 to 2.0000e+003 2.0000e+003 to 2.3190e+003 Interval = 5.0e+002 Figure 8:Maximum Principal Stress Of 8-8' Cross Section Contour of SMin -5.2184e+003 to -5.0000e+003-5.0000e+003 to -4.0000e+003-4.0000e+003 to -3.0000e+003-3.0000e+003 to -2.0000e+003-2.0000e+003 to -1.0000e+003-1.0000e+003 to 0.0000e+000 0.0000e+000 to 3.3148e+000 Interval = 1.0e+003 Figure 9:Minimum Principal Stress Of 8-8' Cross Section Contour of SMax -6.4492e+002 to -5.0000e+002-5.0000e+002 to -2.5000e+002-2.5000e+002 to 0.0000e+000 0.0000e+000 to 2.5000e+002 2.5000e+002 to 5.0000e+002 5.0000e+002 to 7.5000e+002 7.5000e+002 to 1.0000e+003 1.0000e+003 to 1.2500e+003 1.2500e+003 to 1.5000e+003 1.5000e+003 to 1.7500e+003 1.7500e+003 to 1.9723e+003 Interval = 2.5e+002 Figure 10: Maximum Principal Stress Of E-E' Longitudinal Section 624

Journal of Theoreticalth and Applied Information Technology 30 November 2012. Vol. 45 No.2 2005-2012 JATIT & LLS. All rights reserved. ISSN: 1992-8645 www.jatit.org E-ISSN: 1817-3195 Contour of SMin -3.7126e+003 to -3.5000e+003-3.5000e+003 to -3.0000e+003-3.0000e+003 to -2.5000e+003-2.5000e+003 to -2.0000e+003-2.0000e+003 to -1.5000e+003-1.5000e+003 to -1.0000e+003-1.0000e+003 to -5.0000e+002-5.0000e+002 to 0.0000e+000 0.0000e+000 to 1.2501e+002 Interval = 5.0e+002 Z: 1.500e+002 Dist: 1.419e+003 Contour of Shear Strain Increment -3.8287e-003 to 0.0000e+000 0.0000e+000 to 1.0000e-002 1.0000e-002 to 2.0000e-002 2.0000e-002 to 3.0000e-002 3.0000e-002 to 4.0000e-002 4.0000e-002 to 5.0000e-002 5.0000e-002 to 6.0000e-002 6.0000e-002 to 7.0000e-002 7.0000e-002 to 7.7134e-002 Interval = 1.0e-002 Figure 11: Minimum Principal Stress Of E-E' Longitudinal Section Figure 12 and Figure 13 showed the maximum and minimum principal stress distribution of subway tunnel. The maximum principal stress was tensile and located at the bottom and top of the tunnel, the maximum tensile stress was 4.1e3 kpa, two lateral walls of the tunnel were compressive, and the maximum was 2.5e3kPa, and the minimum principal stress was also compressive. Y: -3.870e+001 Z: 1.500e+002 Dist: 1.419e+003 Z: 0.000 Mag.: 1 Y: 360.000 Z: 0.000 Mag.: 1.25 Contour of SMax -2.5066e+003 to -2.0000e+003-2.0000e+003 to -1.0000e+003-1.0000e+003 to 0.0000e+000 0.0000e+000 to 1.0000e+003 1.0000e+003 to 2.0000e+003 2.0000e+003 to 3.0000e+003 3.0000e+003 to 4.0000e+003 4.0000e+003 to 4.1010e+003 Interval = 1.0e+003 Figure 15: 3D Shear Strain Increment Of Pit The shear and tension yield deformation appeared around the pit outside. Compared to the previous step excavation depth of 21m, the shear yield zone increased at the eastern side and tensional yield zone of ground outside pit significantly. Shear strain increment of E-E ' longitudinal profile is greater than 8-8' cross section (Figure 16 and Figure 17). Compared to the previous step excavation, the shear strain increment increased significantly on foot of slope and at the central parts of lateral wall, and it appeared three rectangular strips with the same symmetry axis. Contour of Shear Strain Increment -1.2796e-005 to 0.0000e+000 2.5000e-002 to 2.8593e-002 Figure 12: Maximum Principal Stress Of Tunnel Support Structure Z: 1.500e+002 Dist: 1.419e+003 Z: 0.000 Mag.: 1.25 Contour of SMin Figure 16: Shear Strain Increment Of 8-8' Cross Section -1.2344e+004 to -1.2000e+004-1.2000e+004 to -1.0000e+004-1.0000e+004 to -8.0000e+003-8.0000e+003 to -6.0000e+003-6.0000e+003 to -4.0000e+003-4.0000e+003 to -2.0000e+003-2.0000e+003 to 0.0000e+000 0.0000e+000 to 1.4714e+002 Interval = 2.0e+003 Contour of Shear Strain Increment 3.5287e-006 to 1.0000e-002 1.0000e-002 to 2.0000e-002 2.0000e-002 to 3.0000e-002 3.0000e-002 to 4.0000e-002 4.0000e-002 to 5.0000e-002 5.0000e-002 to 6.0000e-002 6.0000e-002 to 7.0000e-002 7.0000e-002 to 7.6897e-002 Interval = 1.0e-002 Figure 13: Minimum Principal Stress Of Tunnel Support Structure 4.3 Analyses On Failure Mode Figure 14 showed the 3D plastic zone distribution, and Figure 15 showed the 3D shear strain increment. Block State None shear-n tension-n Figure 14: 3D Plastic Zone Distribution Of Pit Figure 17: Shear Strain Increment Of E-E' Longitudinal Section 5. CONCLUSION (1)Based on ANSYS and FLAC software, the three-dimensional finite difference model of foundation pit was established, and the model could truly reflect the excavation process of retaining structure and soil interaction effects, and it also could predict stress-strain characteristics accurately when the pit was excavated to the designed depth. (2)Three-dimensional numerical calculation could reflect the changes in stability of foundation pit accurately. Soil outside the pit occurred shear 625

yielding and the tension yield deformation mainly REFRENCES: in shallow. Three rectangular strips appeared on foot of the slope and the central parts of the lateral [1] W.D. Wang, H.H. Zhu, Geotechnical wall from the three-dimensional shear strain engineering and new technology, Chinese diagram. The plastic zone and the shear strain Journal of Underground Space and Engineering, didn t yet fully pass through, so the stability of Vol. 7, No. z1, 2011, pp. 1274-1291. foundation pit was good. [2] Q.H. Pan, Y.M. Yin, Cause of collapse and (3)Three-dimensional numerical calculation treatment for a deep foundation excavation could reflect deformation variation of foundation shoring pile, Construction Technology, Vol. 40, accurately. When pit was excavated to the designed No. z1, 2011, pp. 117-119. elevation, the maximum uplift displacement was [3] S.H. Kim, N. Li, Interaction behaviours about 4cm in the bottom of the pit, and maximum between parallel tunnels in soft ground, displacement outside the pit was about 1.5cm, and Tunneling and Underground Space Technology, displacement of sprayed layer was about 2.5cm, so Vol. 44, No. 19, 2004, pp. 448-450. the above displacements met the specification [4] Y. Wang, The cause and countermeasures for requirements. The displacement at the top of accident at shallow and big foundation pit in support structure was approximately 9mm, and it Shanghai, Chinese Journal of Underground was relatively small. Displacement of pit outside Space and Engineering,, Vol. 7, No. 3, 2011, pp. the north and south side was significantly greater 599-603. than the east side, so pit construction had influence [5] T. Li, S.B. Shi, Constitutive model for on the south side of building, and construction unsaturated cohesive soils with a unified yield should pay close attention to the trend of the surface, Journal of Beijing University of deformation of buildings nearby the south side. In Technology, Vol. 37, No. 11, 2011, pp. 1684- addition, pit excavation affected the deformation of 1691. subway tunnel significantly, so we should pay more [6] J.W. Zhou, Z.Y. Li, A new damage model for attention to the pit excavation near subway tunnel. structured soils, Building Science, Vol. 27, No. (4) Three-dimensional numerical calculation 11, 2011, pp. 28-32. obtained stress-strain characteristics of the pit and [7] Z.M. Chen, K.M. Ouyang, Analysis of the the supporting structure accurately. It was changed Impact of the metro station excavation on the the stress state of soil surrounding by pit adjacent building, Journal of Lanzhou Jiaotong excavation, when pit was excavated to the designed University, Vol. 28, No. 4, 2009, pp. 25-29. elevation, the maximum compressive stress of the [8] X. Han, N. Li, Study on characteristics of maximum principal stress on the typical cross structural deformation caused by urban section remained unchanged, but the maximum excavation, China Civil Engineering Journal, tensile stress increased significantly. The maximum Vol. 44, No. S1, 2011, pp. 135-142. compressive stress of the minimum principal stress [9] W.H. Huang, Application of wireless adhoc on the typical cross section increased significantly, network in monitoring of steel support stress: but the maximum tensile stress remained case study on construction of deep foundation unchanged. Pit excavation increased the maximum pit of Guangxi University metro station, tensile and compressive stress of the maximum Tunnel Construction, Vol. 32, No. 4, 2012, pp. principal stress of the subway tunnel support 561-565. structure, and reduced the maximum tensile and [10] Z.C. Cheng, J.P. Miao, Research on compressive stress of the minimum principal stress. displacement and stresses of soldier pile structure in foundation pit of metro station in ACKNOWLEDGEMENTS Chengdu, Tunnel Construction, Vol. 32, No. 3, 2012, pp. 309-314. This work was supported by Open Fund of Key [11] V.M. Ulitskii, S.I. Alekseev, Preservation of Laboratory of Road & Bridge and Underground buildings during the installation of foundation Engineering of Gansu Province (Kfjj-11-01), pits and the laying of utilities in saint science and technology projects from Ministry of Petersburg, Soil Mechanics and Foundation Housing and Urban-rural Development (2012-K3- Engineering, Vol. 39, No. 4, 2002, pp. 133-138. 14) and A Project Supported by Scientific Research Fund of Sichuan Provincial Education Department (10ZA074,12ZA197). 626