Nothing is more useful than water, but it will purchase scarce anything; scarce anything can be had in exchange for it. Adam Smith, The Wealth of

Similar documents
Fort Collins WSDMP Update Additional Supplies and Facilities. Community Working Group Meeting #4 June 22, 2011

2018 Platte River Power Authority Water Resources Reference Document

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

Water Conservation Plan February 12, 2009

Colorado Division of Water Resources

Raw water sources, facilities, and infrastructure

Informational Meeting- July 21, Boxelder B-2/B-3 Watershed Planning Study

Raw Water Supply Master Plan Development

Ute Mountain Ute Tribal Water. Celene Hawkins Associate General Counsel Ute Mountain Ute Tribe

NORTH TEXAS MUNICIPAL WATER DISTRICT EAST FORK RAW WATER SUPPLY PROJECT

V. DRAINAGE IMPROVEMENTS

Stanley J. Woodcock, Michael Thiemann, and Larry E. Brazil Riverside Technology, inc., Fort Collins, Colorado

WATER RESOURCE PROGRAM

A Review of the Likely Agricultural Impacts from the Northern Integrated Supply Project

South Platte River Importance of Return Flows and Replacing Depletions to Down-Stream Water Users

City and County of Broomfield, Colorado CITY COUNCIL AGENDA MEMORANDUM. 11f - Page 1

TECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

III. INVENTORY OF EXISTING FACILITIES

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project

PUBLIC NOTICE Section 404 of the Clean Water Act - Permit Review ENVIRONMENTAL IMPACT STATEMENT U.S. ARMY CORPS OF ENGINEERS REGULATORY BRANCH

CASE NO. 10CW4 LOWER ARKANSAS VALLEY WATER CONSERVANCY DISTRICT

Pipelines to Nowhere? Structural Responses to Climate Change and Population

OPERATIONS IN THE MONO BASIN*

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

AGENDA ITEM SUMMARY September 5, 2017 City Council

Utah State Group: Lake Powell Pipeline. Meaghan Stertzer Jon Flechsenhaar Christian Nelson Brandon Shepherd

STATE OF COLORADO. From: Rod K1.I. harich ewes Director. Date: January 17, 2006 Acting Deputy Director

Highlights of South Platte Protection Plan

FEMA s Mitigation Support for Resiliency: Innovative Drought and Flood Mitigation Projects

Chapter 9 Wetlands Park Study Team

Committee on Water. Desalination as a Water Source

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce

Request for Water Acquisitions Pilot Process Instream Flow Workshop Part 2

Chapter 6 Water Resources

Los Angeles 3 rd Regional

Madera Irrigation District Water Supply Enhancement Project

Over 150 Years of Irrigation Implications for Montana s Water Resources

Community. Restoration. Prevention.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

APPLICANT: Board of Water Commissioners for the City and County of Denver (Denver Water)

C-111 SPREADER CANAL Western Project and Design Test

DISTRICT COURT, WATER DIVISION 3, STATE OF COLORADO ALL PERSONS INTERESTED IN WATER APPLICATIONS FILED IN WATER DIVISION 3.

OVERVIEW OF COLORADO S INSTREAM FLOW PROGRAM & ANALYSIS TOOLS

NGWA INFORMATION BRIEF

2015 Water Resources Status Report

Start-up of a Secondary Water Supply Company. and First Phase Design of a Regional System

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

Introduction to hydrology and the water balance

March 20, Dear Commissioners;

Opportunities for Improving Water Supply Reliability for Wildlife Habitat on the Tule Lake and Lower Klamath National Wildlife Refuges

HYDROGEOLOGY OF THE HUMBOLDT RIVER BASIN, IMPACTS OF OPEN-PIT MINE DEWATERING AND PIT LAKE FORMATION

Cedar River Watershed Habitat Conservation Plan

Notice of Intent to Prepare a Draft Environmental Impact Statement for the Intake. Diversion Dam Fish Passage Project, Dawson County, Montana

AGENDA. Cache La Poudre Water Quality (Meeting #1 on this topic) Topics of Interest Objectives MEETING NOTES. Cache La Poudre Water Quality

Pipelines and Penstocks Avoiding operational issues throughout the life of your project

LOWER BOISE RIVER INTERIM FEASIBILITY STUDY

Executive Summary. 3 T h o r n t o n W a t e r E f f i c i e n c y P l a n

Colorado River Basin Water Supply and Demand Study. WRRC 2013 Conference University of Arizona Tucson, AZ March 5, 2013

Big Sky Sustainable Water Solutions Forum Community Survey August - September 2017

MAJOR THEMES IN ARIZONA S WATER FUTURE

Request for Water Acquisitions Pilot Process

EMERGENCY STORAGE PROJECT

THE WYOMING FRAMEWORK WATER PLAN

Colorado's Instream Flow Program: How It Works and Why It s Good for Colorado

5 CCR , Numeric Standards Table, at p. 13 (June 30, 2015).

Chapter 1. Introduction

Hydrology and Flooding

John M. Stomp III, PE

Shortage on the Colorado River: Analysis of Impacts to Water Users in Central Arizona. Ken Seasholes

SOUTHERN NEVADA WATER BRIEFING Prepared for the Legislative Commission's Subcommittee to Study Water

Section 5 Packages. 5.1 Package Development Problem Statements A 5-1

Mark R. Norton P.E., LEED AP, ENV SP Water Resources & Planning Manager Santa Ana Watershed Project Authority

Central Valley Project (CVP) Operations: In Brief

Overview of Truckee Meadows Water Resources

Appendix A. Technical Papers

Informational Meeting- March 31, Boxelder B-2/B-3 Watershed Planning Study

West Placer Groundwater Sustainability Agency Community Meeting February 16, 6 to 8 p.m. McBean Pavilion in Lincoln

Purpose of the Comprehensive Water System Plan

CFWI STORMWATER SUBTEAM PROJECTS REPORT. Steering Committee Meeting

Desalination plant operating regime September 2010

Utah Economic and Business Review

Integrated Water Resources Master Plan

Feasibility of Aquifer Storage and Recovery in the Upper Colorado River Basin

Engineering and Hydrologic Issues in Changing Water Uses

North Central Arizona Water Supply Feasibility Study. Interim Report. Coconino Plateau Watershed Partnership February 24, 2017

Demand and Yield Analysis Final

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods.

The Central Utah Project

Design of a Collaborative Water Quality Monitoring Program for the Upper Cache la Poudre River

Instream Flow Study for the Proposed Lower Bois d Arc Creek Reservoir, Texas

Executive Summary. ES.1 Project Background

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County

Q. PLEASE STATE YOUR NAME, BUSINESS ADDRESS AND CURRENT POSITION? A. Ron Cole- Refuge Manager, Klamath Basin National Wildlife Refuge Complex

Appendix B. Operations on the Columbia River - Relationship between Columbia River Treaty, Non Treaty Storage Agreement, and Water Use Plans

DALLAS FLOODWAY PROJECT

HEADQUARTERS WEST LTD. PHOENIX - TUCSON - SONOITA - COTTONWOOD - ST. JOHNS

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project.

Hydrologic and Ecologic Impacts from the CERP Indian River Lagoon South Project

Transcription:

Nothing is more useful than water, but it will purchase scarce anything; scarce anything can be had in exchange for it. Adam Smith, The Wealth of Nations, 1776

The HSWMP Preferred Alternative Halligan Reservoir is enlarged from 6,400 ac/ft to 19,500 ac/ft. Seaman Reservoir is enlarged from 5,000 ac- feet to 53,000 ac/ft.

Project Location

HSWMP Participants Halligan Reservoir The City of Fort Collins North Poudre Irrigation Company Milton Seaman Reservoir The City of Greeley

Overview Why storage? Regional partners - Proposed project Water resources planning Environmental issues National Environmental Policy Act (NEPA) Clean Water Act 404(b)(1) guidelines Next Steps/Schedule

Why Storage? Helps manage use of existing water rights Cost-efficient way to meet future demands while benefiting existing customers SWSI Report population projections for Larimer & Weld Counties: 441,905 and 473,275, respectively, by 2030 Provides place to store water in wet and average years to use in dry years

Storage Balancing Effect Store Extra in Wet Year Amount (acre-feet) Use in Dry Year Wet Year Average Year Dry Year Yield Extra Yield Added Yield Demand

Future Storage Needs Halligan Reservoir City of Fort Collins 8,100 ac/ft North Poudre Irrigation Company 5,000 ac/ft Milton Seaman Reservoir City of Greeley 48,000 acre/feet

Benefits of Regional Project Reduced costs to participants Phase construction of projects as needed Halligan Enlargement near 2015 Seaman Enlargement near 2030 Provides a regional solution for participants with Poudre basin water rights Cooperation between the project participants offers improved water management strategies

Benefits of Regional Project Promote regional cooperation and encourage stream flow and ecosystem protection while maintaining project yields Opportunity to incorporate agricultural storage to the project

Operations of Expanded Halligan and Seaman Reservoirs North Fork Poudre River Fill Halligan Reservoir Poudre River Exchange to storage existing water rights not needed for immediate use or pump to Seaman 50 75 cfs pumped Milton Seaman Reservoir Existing ag ownership exchanged to storage

Operations of Expanded Halligan and Seaman Reservoirs Release Upper Poudre Reservoirs North Fork Poudre River Poudre River Release water from reservoirs to use at Greeley or Ft. Collins treatment plants as needed Halligan Reservoir Milton Seaman Reservoir Fort Collins Treatment Plant Greeley Treatment Plant

Preferred Alternative-Water Supply Halligan Reservoir Senior Poudre water rights owned or to be acquired Reservoir filled by capturing direct flows by exchange Seaman Reservoir Senior Poudre water rights owned or to be acquired Reservoir filled by capturing direct flows by exchange or through a 50 cfs (approximately) pump station on the main stem Poudre

HSWMP Preferred Alternative Operations Project allows participants to store water that would have been lost and diverted by the next water right. Although agricultural water rights yield in the summer months, storage and re-timing of releases will help meet the participants year-round municipal demands. During a drought, project storage enables participants to retime water stored in wet and average years. Participants will release water annually for operational purposes.

Preferred Alternative Flow Impacts The proposed operation of the HSWMP: Will increase winter time flows through Phantom Canyon on the North Fork. Will increase winter flows on the North Fork below the North Poudre Canal. May reduce flows in a small river reach of the main stem between the confluence and the City of Fort Collins as senior ag rights are exchanged up to the reservoirs. Will rarely affect historic flows through the City of Fort Collins because most of ag water rights were historically diverted up stream of the City. Will have minor impact in town due to use of junior water rights.

Firm Yield Preferred Alternative Results Participants gain firm yield from existing rights through project storage. Drought Reserve Participants gain a drought reserve to provide water to customers through droughts. Potential Stream Flow Enhancements Hopefully, together we can find some additional stream flow enhancement opportunities that work within the limits of the preferred alternative.

Fort Collins Water Resources Planning City of Fort Collins Water Supply and Demand Management Policy Directs the acquisition, development and management of the City s water supply Updated/adopted by City Council (Nov. 2012) Water Supply Planning Criteria Planning demand level: 150 gpcd (recent use) Drought criterion: 1-in-50 year drought event Storage reserve factor: maintain 20% of annual demand in storage (through 1-in-50 droughts)

FTC Water Supply Planning Criteria Determines water supply and/or facility needs (e.g., amount of storage) Should be conservative to account for planning uncertainties (e.g., population projections) Critical for long-term planning (especially storage)

Drought Criterion Defines level of reliability for supply system Supplies yield less in more severe droughts Policy approved 1-in-50 year drought Used since 1988 Water Supply Policy Has provided adequate supplies to date (Except through severe drought of 2002/03)

Storage Reserve Factor Percent of annual demand in storage (through 1-in-50) Policy approved 20% factor About 3.5 months winter and 1.5 months summer Provides short-term emergency supply (i.e., pipeline or CBT shutdown) Diversifies water supply system Minimizes reliance on CBT

Storage per Capita Comparison

Planning Demand Level Sets the amount of demand the water supply system should be developed to meet Policy approved 150 GPCD level (recent average) Recognizes that water supply projects take many years to develop Can be higher than conservation goal Accounts for future uncertainties

Potential Uncertainties??? Modeling does not include: Climate change CBT curtailment Water quality blending Supplies could be reduced by: River administration changes Competing water rights

Fort Collins Future Water Demands/Supplies Depends on population/commercial growth Build out by 2050 given surrounding districts Estimated utility population is 165,100 by 2050 (129,900 in 2010) Large contractual use increase of 3,000 acrefeet/year by 2050 Future total demands 38,000 acre-feet Existing firm yield 31,000 acre-feet

Fort Collins Planning Criteria and Halligan Enlargement would meet needs defined by the planning criteria Increases firm yield to meet future demands Provides storage reserve factor Diversifies supply system (less CBT reliance) Prepares for potential effects of climate change Helps meet legal return flow obligations Would use mostly Fort Collins existing rights Less expensive than acquiring new rights Long-term plan since 1960s

Greeley Water Resource Planning City of Greeley Water Master Plan defines the specific steps for providing a reliable water supply. Near-term (to 2020): Incrementally increase the efficiency of Greeley s water system Acquire new supplies Focus on small storage projects Conservation

Review What We Are Planning Population in Greeley is projected to increase from 95,000 to 240,000 by 2050. Demand = 25,000 ac/ft today 60,000 ac/ft projected in 2050 75,000 ac/ft in 2060 Even after implementing conservation, improving infrastructure and purchasing water rights, Greeley will not have sufficient water to meet 2050 demands. Additional storage will help meet the 2050 demands.

Seaman Reservoir Greeley Water Resources Current and Future Supply I-25 Firm Yield (acre feet) 70,000 60,000 50,000 40,000 30,000 Water Supply Milton Seaman enlargement FWA II FWA I High Mountain Reservoirs 20,000 10,000 Current supplies Horsetooth Reservoir Overland Trails (under construction) WSSC 0 Larimer and Weld Poudre Ponds City of Greeley Colorado-Big Thompson System Windy Gap System Chimney Hollow Windy Gap Firming Carter Lake Greeley-Loveland Irrigation Company Reservoirs (GLIC) Dedications Lower Equalizer 1 inch = 25,000 feet 0 2.5 5 Miles I

Greeley Water Resources Current and Future Supply Seaman Reservoir Greeley will maintain a complex and robust water system to meet 2050 I-25 water demands. Firm Yield (acre feet) Seaman enlargement FWA II FWA I High Mountain Reservoirs Overland Trails (under construction) Current supplies Horsetooth Reservoir WSSC Larimer and Weld Poudre Ponds Colorado-Big Thompson System Windy Gap System Chimney Hollow Windy Gap Firming Carter Lake Greeley-Loveland Irrigation Company Reservoirs (GLIC) Dedications Lower Equalize r City of Greeley 1 inch = 25,000 feet 0 2.5 5 Miles I

Halligan Reservoir

Halligan Reservoir Located on the North Fork of the Poudre River, northwest of Livermore Operated as an irrigation reservoir since 1910 when the dam was completed Provides 6,400 acre-feet of water storage 1987 agreement with Phantom Canyon Ranches to facilitate Halligan enlargement 1989 feasibility study completed by City

Halligan Reservoir 1993 purchase option agreement with NPIC Fort Collins City Council approval to exercise option on Nov. 4, 2003 January 2004 Fort Collins closed on property Enlargement from 6,400 acre-feet up to 19,500 acre-feet

Milton Seaman Reservoir

Milton Seaman Reservoir Located on the North Fork of the Poudre River above Fort Collins Gateway Park Owned and operated by the City of Greeley since 1943 for municipal water storage One of six Greeley reservoirs in the upper Poudre River Basin Provides 5,000 acre-feet of water storage Enlargement up to 53,000 acre-feet

Permitting: Where are we now? Review Process begins Agency and Public Scoping Develop Purpose & Need Conduct Environmental Studies September 2005 Hydrologic and Environmental Modeling February 2006 Develop Common Technical Platform Develop Alternatives 2006 to 2012 Summer 2007 to present SVP Experiment 2008-2010 Develop and Issue Draft EIS 2009-2012 2009 to 2014 2015 Public Comment Period 2015 Prepare and Publish Final EIS LEDPA Public Comment Period 2016 2016 Prepare and Publish Record of Decision

Common Technical Platform Complete Purpose and Need Report Pending No Action Alternative Draft prepared Technical reports begun to quantify impacts to Fisheries Riparian ecology Water quality Geomorphology Groundwater Permitting Progress Alternatives analysis is underway

Permitting takes a long time. Denver Moffat began in 2002. FEIS published 2012 NISP began in 2004. DEIS published in 2008. Corps required supplemental. SDEIS still not published. Windy Gap Firming began in 2003. FEIS published Nov 2011; awaiting ROD. Southern Delivery System permit took 12 years. were sued over 401 certification. In design. Then Chatfield Reallocation (Corps facility) -- 18 years of planning, began permitting 2005 DEIS published 2012

Permitting Next Steps - Long Term Corps will publish DEIS (2015) and take public comments Corps will select the Least Environmentally Damaging Practicable Alternative (LEDPA): either an enlarged Seaman or one of the alternatives. Greeley will develop mitigation plan for impacts Artificial wetlands Habitat preservation and enhancement Operational constraints

Schedule EIS process 2005-2015/16 Complete design (Halligan) 2016 Construction (Halligan) 2017 Complete design (Milton Seaman) 2028 Construction (Milton Seaman) 2029-2030 (Schedule subject to NEPA and CWA process)