TABLE OF CONTENTS INTRODUCTION... 7 CHAPTER 1-GENERAL CHAPTER 2-WIRING AND PROTECTION CHAPTER 3-WIRING METHODS AND MATERIALS...

Similar documents
NEC 2017 Code Changes Chapter 1 - General

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

SERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance.

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Specifications for Residential Overhead Electric Service Installation

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,

Article 10 - ADMINISTRATIVE SECTION

For the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion).

Photovoltaic System Inspector Job Task Analysis Guide April 2017

(Condensed from National Electric Code)

OPERATING PROCEDURE NO. 310

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

Temporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska

Electric Service Handbook

Basic Service. This Section provides information regarding a. Introduction

ELECTRICAL BULLETIN

Specifications for Residential Overhead Electric Service Installation

METERING INSTALLATION

What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin?

RESIDENTIAL BUILDING REQUIREMENTS

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES

ELECTRIC METERING GENERAL

Bulletin Working space about electrical equipment Rules 2-308, and Issued April 2010 Supersedes Bulletin 2-9-3

ELECTRICAL BULLETIN

8.1.2 Under no circumstances shall a service entrance be left unmetered. Notify the Company if an unmetered service is encountered.

ELECTRICAL CODE TRADE REFERENCE

ELECTRICAL SAFE WORK PRACTICES

Large Basic Service. This Section applies to members requiring new. Introduction. Service Types

A. Product Data shall be provided for each type of product indicated.

PORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code

Standard of Practice - Campus Electrical Distribution System

Member Service Electric Wiring Guidelines

Small Wind Turbine Electrical System Considerations

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

DESIGN & CONSTRUCTION STANDARD SPECIFICATIONS. Wireline Occupancies

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

NEC 2014 Code Changes

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th)

CAL/OSHA ELECTRICAL HIGH VOLTAGE

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

About Matt Piantedosi

4. GENERAL REQUIREMENTS

Specifications for Residential Underground Electric Service Installation

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).

General Electrical Safety Awareness Course: E100

FENCE PERMIT APPLICATION

Table of Contents. Preface

BULLETIN LICENSED ELECTRICAL CONTRACTORS. SaskPower Electrical Inspections. June 13, Item #1 Arc-Fault Receptacles, CEC Rule (f)

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

Emergency, Legally Required, and Optional Standby Power Systems

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

Permitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics

Basic Requirements for Residential Electrical Installations

WESTERN CONNECTICUT STATE UNIVERSITY ELECTRICAL SAFETY PROCEDURE S-109

TABLE OF CONTENTS CHAPTER 2 WIRING AND PROTECTION CHAPTER 1 GENERAL RULES... 19

CONSULTATION MEETING: Adoption of the 2015 edition of the Canadian Electrical Code

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

2017 NEC Changes for Renewable Energy Systems Session one by Christopher LaForge

Questions & Answers. Amendments to Ontario Electrical Safety Code 23 rd Edition/2002

WITH THE TITLE 24. replacement. story. stories, etc. R disconnects. to, PV. unit and any. supporting frame. conditions. greater than the main

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

ORDINANCE NO. ORD

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

CHAPTER 29 PLUMBING SYSTEMS

TECHNICAL PROCEDURE TABLE OF CONTENTS

CUSP Base Exams and T&D Endorsement Exam Sample Questions and Format

Building Codes in Effect: 2010 California Building, Residential, Fire, Energy and Electrical Codes, including Article 690.

Underground Service Requirements and Instructions

4. Number of drawings required: ( ) Locations of nearest streets

Electrical Safety ESWP and NFPA 70E Electrical Safe Work Practice

Pre-Delivery Instructions

SECTION CHAIN-LINK FENCES AND GATES 02821/1

Beverly Hills Fire Department SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE 2008 TABLE OF CONTENTS

Installation of CSST Gas Piping Systems

TENTS AND OTHER MEMBRANE STRUCTURES

Requirements for SPECIAL EVENTS

Tom Carpenter Crane Maintenance Technician

MARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.

INTERNATIONAL BUILDING CODE - ADOPTION AND AMENDMENTS Effective July 1, 2004

ELECTRICAL INSPECTION BULLETIN (Effective )

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

Communications Page 1 of 9

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

Energy Delivery Service Guide

Revision History. Corrected issue with spacing at top of overhead temporary drawings Corrected errors in numbered bullets in all drawings

CHAPTER 5 METERING REQUIREMENTS

GILA RIVER FIRE DEPARTMENT REQUIREMENTS

Revisions for the 2011 National Electrical Code - Part 2

2012 IBC Exit Systems

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement

Call the Experts at REA Energy Services for all of Your Electrical and HVAC Needs.

Transcription:

TABLE OF CONTENTS PREFACE... 6 INTRODUCTION... 7 ARTICLE 90 QUIZ... 9 CHAPTER 1-GENERAL... 11 ARTICLE 100 QUIZ... 14 ARTICLE 110 QUIZ... 23 CHAPTER 2-WIRING AND PROTECTION... 28 ARTICLE 200 QUIZ... 34 ARTICLE 210 QUIZ... 37 ARTICLE 215 QUIZ... 42 ARTICLE 220 QUIZ... 44 ARTICLE 225 QUIZ... 48 ARTICLE 230 QUIZ... 51 ARTICLE 240 QUIZ... 56 ARTICLE 250 QUIZ... 59 ARTICLE 280 QUIZ... 64 ARTICLE 285 QUIZ... 66 CHAPTER 3-WIRING METHODS AND MATERIALS... 67 ARTICLE 300 QUIZ... 71 ARTICLE 310 QUIZ... 73 ARTICLES 312-314 QUIZ... 75 ARTICLES 320-340 QUIZ... 77 page 3

ARTICLES 342-362 QUIZ... 79 ARTICLES 366-376 QUIZ... 83 ARTICLES 378-388 QUIZ... 87 ARTICLES 390-398 QUIZ... 89 CHAPTER 4-EQUIPMENT FOR GENERAL USE... 91 ARTICLES 400-406 QUIZ... 96 ARTICLES 410-411 QUIZ... 98 ARTICLES 422-427 QUIZ... 100 ARTICLE 430 QUIZ... 102 ARTICLE 450 QUIZ... 106 ARTICLES 455-490 QUIZ... 111 CHAPTER 5-SPECIAL OCCUPANCIES... 113 ARTICLE 500 QUIZ... 119 ARTICLE 501 QUIZ... 120 ARTICLE 502 QUIZ... 121 ARTICLE 503 QUIZ... 122 ARTICLES 504-513 QUIZ... 123 ARTICLES 514-516 QUIZ... 126 ARTICLE 517 QUIZ... 127 ARTICLES 550-590 QUIZ... 131 ARTICLES 600-605 QUIZ... 139 ARTICLES 610-626 QUIZ... 142 ARTICLE 630-650 QUIZ... 146 ARTICLE 660-675 QUIZ... 149 page 4

ARTICLE 680 QUIZ... 154 ARTICLES 682-695 QUIZ... 158 CHAPTER 7-SPECIAL CONDITIONS... 162 ARTICLE 701 QUIZ... 167 ARTICLE 702 QUIZ... 169 ARTICLE 705 QUIZ... 170 ARTICLE 708 QUIZ... 172 ARTICLE 720 QUIZ... 174 ARTICLE 725 QUIZ... 175 ARTICLE 727 QUIZ... 177 ARTICLE 760 QUIZ... 178 ARTICLE 770 QUIZ... 180 CHAPTER 8 - COMMUNICATIONS SYSTEMS... 182 ARTICLE 800 QUIZ... 185 ARTICLE 810 QUIZ... 187 ARTICLE 820 QUIZ... 188 ARTICLE 830 QUIZ... 190 CHAPTER 9-TABLES AND INFORMATIVE ANNEXES... 192 CHAPTER 9 QUIZ... 193 INFORMATIVE ANNEX QUIZ... 198 ANSWERS TO QUIZZES... 203 page 5

PREFACE The was written for electricians by electricians with generations of hands-on technical experience in the electrical business. We created this guide to simplify the electrician s studying regimen. There are a variety of 2 to 4 year programs that prolong the process of passing the Electrical Exam by including other topics that do not pertain to the exam. After taking and passing the exam, we realized time was wasted on topics that did not relate and as a result were not on the exam. That is why we have created a shortcut for those who want to get directly to the point and ace their exam. The focuses on Code book navigation, not only Code book memorization. The NEC Code book is the nucleus of the Electrical Exam. The main book of the follows the same theme of the NEC Code book so that you may become familiar with the characteristics and the writing styles of the NEC Code book. We dissect the most essential chapters for electricians to understand because the NEC Code book also pertains to engineers, manufacturers, power companies and others in the electrical field. From the beginning to the end, the will take you through the vital components that will support you in the process in passing your exam. As we stand behind our 90-day study techniques, we are certain that if you apply yourself, you can definitely pass and ace your exam on the first try. This is a major step in moving forward with your career. Obtaining your license can start you on a path to having your business and opening more doors in the electrical field. The questions of this book were written in a keyword technique (KWT) approach. When you become familiar with the KWT, it will help you identify the key terms of the questions asked on the electrical exam. Once you identify these key terms, the next step will be to quickly locate them in the NEC Code section. This will reduce your research time by 50% - 75% and answer questions more efficiently. If your are looking for a straight to the point guide that will lead you to your end goal, this is the complete guide. Here s to your success! page 6

INTRODUCTION As the, we have selected key information found within the National Electrical Code (NEC). We will start with Article 90 which covers the purpose of this Code. Section 90.1 states that the purpose of this Code is the safeguarding of people and property from the dangers of electricity. Being that this Code is a national standard, it covers many topics listed in Section 90.2 (A). You may also take note of what the code does not cover in Section 90.2(B). Special permission may be granted by the Authority Having Jurisdiction. The AHJ has the power to interpret the rules of the Code and determine the approval of the materials and equipment that may need the granting of special permission. 90.5(A) Mandatory rules pinpoint the actions that are required or prohibited with the commonly used terms shall or shall not. 90.5(B) Permissive rules identify the actions that are permitted but are not necessary with the frequently used terms shall be permitted or shall not be required. 90.5(C) Explanatory material further describes Code sections and it is used as a source of reference, such as the Informational Notes. 90.3 Code Arrangement This Code is divided into the introduction and nine chapters, Chapter 1 General Chapter 2 Wiring and Protection Chapter 3 Wiring Methods & Materials Chapter 4 Equipment for General Use Chapter 5 Special Occupancies Chapter 6 Special Equipment Chapter 7 Special Conditions Chapter 8 Communications Systems Chapter 9 Tables Annex A through Annex H Fine print notes have been renamed as Informational Notes to clarify that they are informational only and are not enforceable as requirements of this Code. They present additional supplementary information for the code section that they follow. The internal wiring need not be inspected as long as the construction material or equipment is a listed product (90.7). This Code allows for future plans or expansions by providing additional space for future increases of electrical power (90.8(A)). page 7

The number of circuits in enclosures will be listed in charts throughout this Code. They will have a variety of restrictions including the number of wires in an enclosure, ampacity and temperature rating. This is in place to limit the amount of short circuits and ground faults in one circuit (90.8(B)). Covered in this Code are: Public & private premises Buildings Structures Mobile Homes Recreation vehicles Floating buildings Yards Parking lots Carnivals Industrial sub-stations just to name a few Not covered in this Code are: Ships Watercrafts other than floating buildings Aircrafts Automotive vehicles other than mobile homes Underground mines Railways among others Now that you have read the summary for Section 90, refer to your NEC Code Book to answer the following questions. Note that the answers will only be found in Section 90. To help you begin to identify keywords on your own, we have highlighted a few keywords in bold. When you read the question, identify the most important words to quickly locate them in the code book. With time, you will notice the keywords more quickly and relate them to the appropriate section of the Code. page 8

ARTICLE 90 QUIZ Note that the answers will only be found in Article 90 1) What is the intention of the Code book? A. It is a how-to manual B. It is an instruction manual for untrained persons C. Safeguarding from hazards from the use of electricity D. Safeguarding circuits 2) This Code covers? A. Ships B. Equipment C. Automotive D. Aircraft 3) What three Chapters are used for Special Use? A. 5, 6, and 7 B. 9, 8, and 7 C. 6, 7, and 8 D. 2, 3, and 4 4) Limiting the number of circuits in a single enclosure the effects from a short circuit or ground fault in one circuit. A. Magnifies B. Minimizes C. Naturalizes D. Maximizes 5) Which governing body regulates the formal interpretation of the National Electrical Code? A. City Inspector B. Chief Inspector C. NFPA D. Permit Office page 9

6) Why do hazards occur? A. Loose wiring B. From the temperature outside C. Untrained helpers D. Overloading of wiring systems 7) This Code does not cover? A. Mobile homes B. Parking lots C. Recreational vehicles D. Floating buildings 8) Special Permission may be granted by A. Power company B. Property owner C. Authority Having Jurisdiction D. Company owner 9) When the terms shall or shall not are used, what does this indicate? A. Mandatory rules B. Permissive rules C. Explanatory material D. Standard rules 10) In this codebook what is explanatory material? A. Fine print note B. Informational notes C. Code standards D. Requirements of the NEC page 10

CHAPTER 1-GENERAL Article 100 lists definitions that are commonly used in the NEC. Before you can grasp a clear understanding of the Code you must be familiar with these terms and definitions. Review the definitions listed at the beginning of each Article in the Code book to learn how the terms are used in that Article. Article 110 d i s c u s s e s t h e g e n e r a l requirements for installations of electrical conductors and equipment (110.2). The (AHJ) shall have the final say on all electrical equipment used in electrical installations. This Code will take you through conductor sizes (110.6) which are referred to as American Wire Gauge (AWG). Also discussed is listing and labeling (110.3(B)) to make sure that equipment is properly installed according to their instructions. The discussion on voltages (110.4) explains that equipment shall operate at the voltage required. Always read the nameplate and instructions to ensure you have the proper voltage. Wiring integrity is of the utmost importance in the NEC. All installations shall be free of short circuits and ground faults (110.7). This Code provides the acceptable wiring methods (110.8) for any building or occupancy in which electricity shall be installed. Electrical connections (110.14) shall be properly installed with the use of the similar material. For example, copper conductors shall be landed on copper terminals. Conductors of dissimilar metals shall not intermixed unless listed for intermixing. The identification of disconnecting means is critical. Always ensure that the disconnecting means are legibly and permanently marked and the locations of the disconnecting means are evident (110.22). page 11 110.5 Conductors Unless otherwise noted, currentcarrying conductors are copper and the material and sizes given shall apply to copper conductors. 110.15 High-Leg Marking On 4-wire delta systems, the conductor having the higher phase voltage shall be permanently marked orange in color where the connections are made. 110.16 Arc-Flash Hazard Warning Electrical equipment that will need examination while energized shall be field marked to warn qualified persons of potential Arc Flash. 110.24 Available Fault Current Service equipment in other than dwelling shall be marked with the Maximum available fault current.

The workspace around electrical equipment is discussed from Sections 110.26-110.36. It begins with 600 volts, nominal or less to over 600 volts and the workspace clearance for both are different. Therefore, the voltages must be known to allow the proper workspace. The voltages are not from phase to phase but rather from phase to 110.26(A)(2) Width of Working Space The width of the working space in front of the electrical equipment shall be a minimum of 30 inches or the width of the equipment, whichever is greater. ground. Take a look at the table illustrated in Section 110.26(A)(1). This chart will give you the three conditions and the required amount of feet of working space for each one. While reading this section you will notice the different workspace variations between depth, width, height and clearances. The Code lists variations extending from the grade floor or platform for height requirements (110.26(A)(3)) and for headroom (110.26(E)). The minimum requirement for headroom is 6 ½ feet or not less than the height of the equipment. Most conductors and equipment follow Part 1 of this section. Part 3 of this section relates to voltage exceeding 600 volts, nominal. Some 110.34(C) Locked Rooms or Enclosures modifications are made when dealing with Where voltage exceeds 600 volts, nominal, permanent warning signs shall read: voltages above 600. As the voltage increases, so DANGER-HIGH VOLTAGEdo the requirements for workspace (110.34(A)). KEEP OUT A point to note is the separation of low voltage equipment. Other safety measures have been taken as you will find most equipment in locked rooms or enclosures (110.34(C)). For the protection of equipment and gear, foreign pipes and ducts that may endanger the operation of the electrical system shall not be located in the vicinity of electrical equipment (110.34(F)). Tunnel installations over 600 volts, nominal, shall apply to high-voltage power distributions. This section shall be additional to Code Sections 100-490. This section explains the requirements for protection against physical damage, overcurrent protection, grounding and bonding and disconnect means (110.51-110.59). Manholes and other electrical enclosures intended for personnel entry shall be a sufficient size to allow safe work (110.70). Workspace shall be a minimum of 3 feet wide with vertical headroom of 6 feet. This section also includes conductors installation (110.74) and access to manholes (110.75). 110.75 Access to Manholes 26 in. X 22 in. round access openings page 12