Date of Inspection 13/09/2017 Location of Inspection Manildra Solar Farm. ER Demelza Scott Proponent Representative Bjorn Schultz Aaron Hawkins

Similar documents
Environmental Management Plan

Site EMP Kit- Guidance Notes

8 ENVIRONMENTAL MANAGEMENT PROGRAMME (PROJECT ENVIRONMENTAL SPECIFICATION)

Chapter 13 Management and Implementation

Works, services and infrastructure code

Construction Environment Management Plan

Environmental Management Programme (EMP)

Section 75J of the Environmental Planning & Assessment Act 1979

Murra Warra Wind Farm Project Environmental Management Plan

Canberra Airport. Construction Environmental Management Plan for Airside works (EPBC 2008/4170 and EPBC 2009/4748)

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

Tasman Extension Project Environmental Impact Statement APPENDIX N PRELIMINARY HAZARD ANALYSIS

Water Pollution Control for Work in Sensitive Areas

Canadian Solar Developers Ltd.

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

ESKOM HOLDINGS LIMITED

OPERATION PHASE: ENVIRONMENTAL MANAGEMENT PROGRAMME

Kurnell Refinery Conversion Project

Australia Pacific LNG Project. Volume 2: Gas Fields Chapter 16: Waste

Hydrocarbon Management PROCEDURE

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP)

Pollution prevention (land and water)

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

SECTION EROSION AND SEDIMENTATION CONTROLS

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

9.0 Environmental Protection Program

Construction Environmental Management Plan

CONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK

Adelaide Airport Limited

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

Builder s enviro guide

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

The City of Calgary, Environmental & Safety Management, under the terms of the ECO Plan Framework Memorandum of Understanding (EXT 03 ECO MOU).

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS

Ceres Wind Farm Project Scope Construction and Environmental Management Plan

(1) Site Suitability PURPOSE

Appendix H. Construction Environmental Management Plan (CEMP)

Ouarzazate Solar Power Complex, Phase 1, Morocco

Environmental Management Programme

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING

CONTRACTOR WHS HAZARD STANDARD TRAFFIC MANAGEMENT EXTERNAL USE ONLY

Appendix B4 Construction Soil and Water Management Plan

Events in the Park Lands

6.0 CONSTRUCTION PROGRAMME

Appendix B7 Construction Waste Management Plan

NATIONAL ORGANIC PROGRAM APPLICATION & ORGANIC SYSTEM PLAN - FARMS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

Position Profile. Annexure 1 Position Profile

6. Stakeholder Engagement

Pest Control. Introduction

RIIMPO318A Conduct skid steer loader operations Unit descriptor. Employability skills Application of the unit. Competency field

Appendix General Environmental Risk Analysis

ENVIRONMENT INDUCTION. Section 5

DIEMERSFONTEIN WINE & COUNTRY ESTATE BUILDING CONTRACTORS CODE OF CONDUCT

EROSION AND SEDIMENT CONTROL PLAN (ESCP) FOR PROJECT TITLE

Hazardous Waste Management

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

Alberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects

Preliminary Environmental Assessment Report Environmental Management Plan

Chatswood to Sydenham CONSTRUCTION ENVIRONMENTAL MANAGEMENT FRAMEWORK

Construction Environmental Management Plan

QM Management of Pests and Vermin

Environmental and Social Management Plan

Kurnell Refinery Conversion Project

Technical Guidance Document for Operational Environmental Management Plan (OEMP)

Pennsylvania / NRCS Potomac Pilot Remote Sensing Project Chesapeake Bay Ag Workgroup

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

SABI Code of Practice for On-farm Irrigation Design

WHS Management Plans

Draft Protocol for managing asbestos during resource recovery of construction and demolition waste.

Pollution Incident Response Management Plan. Newell Highway Trewilga Realignment

This summary and the Report subsequently inform the recommended mitigation contained in Section 28 and will inform the Project conditions.

CCI107 ONLINE PROGRAM. Stormwater Management. Stormwater Management for Construction Activities Alberta. Market Type: Construction Level: 1

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

SACHSE EROSION CONTROL GUIDELINES

RIIMPO323A Conduct civil construction dozer operations Unit descriptor

ENVIRONMENTAL AND OPERATIONAL MANAGEMENT PLAN

CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction

Work Health and Safety Management Systems and Auditing Guidelines

Environmental Assessment Matrix

CONTRACTORS ENVIRONMENTAL RESPONSIBILITIES PACKAGE FOR: CONSTRUCTION, OPERATION, MAINTENANCE & SERVICE ACTIVITIES HIRED EQUIPMENT CONSULTANTS

ENVIRONMENTAL AND OPERATIONAL MANAGEMENT PLAN

Environmental Construction Operations (ECO) Plan. Airways Crossing McCall Way NE

Native Vegetation Precinct Plan

Appendix 5: Materials Management Plan (MMP)

INTERNATIONAL CYANIDE MANAGEMENT INSTITUTE Cyanide Transportation Verification Protocol

DRAFT TECHNICAL SPECIFICATIONS FOR

Broadmeadows (requires travel to other locations within Hume)

WORK HEALTH AND SAFETY AUDIT STANDARD

Timber harvesting in native State forests

Sydney Port Botany Terminal 3 Project

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

Environmental Policy and Guide December 2010

POWER GRID IMPROVEMENT PROJECT

Transcription:

Manildra Solar Farm ER Site Inspection Report Manildra Solar Farm Construction Environmental Representative (ER) Inspection Report For internal project use only. Document not for external release or use. Date of Inspection 13/09/2017 Location of Inspection Manildra Solar Farm ER Demelza Scott Proponent Representative Bjorn Schultz Aaron Hawkins Weather Fine and partly overcast Construction Contractor Representative Baz Tuppin Follow up from previous inspection Inspection Summary Comments / Observations Corrective Actions: CA 170810-01: Maintain spill kits in areas that are readily accessible in the event of a spill. Sighted spill kit in main RCR site compound and on refuelling trailer. CA 170810-02: Manage trenches in accordance with Protocol 4: Trenching to minimise trap hazard for fauna. RCR SCECO reported that the trench was dewatered immediately and covered with pallets to prevent fauna being trapped. Improvement Opportunity 0 Corrective Action 1 Open Corrective Actions: CA 130917 01: Conduct appropriate checks and inductions on subcontractors, their staff and plant/equipment prior to conducting any work on the project. Appendix A Corrective Action Register to track identification and close out of corrective actions. The site was still in the pre-construction phase at the time of inspection. Site buildings have been connected to a self-bunded diesel generator. The internal main access road has been completed up to the site buildings. The laydown area has been completed. The site was tidy at the time of the inspection. Erosion and sediment controls for stockpiles and earthworks were implemented and managing erosion and sediment risk well, although they are yet to be tested with significant rainfall. The site presented a low environmental risk at the time of the inspection. Signed: Demelza Scott, Environmental Representative 1

Site Compound Laydown area, private vehicle and bus parking, and main access road to laydown area and site compounds have been completed since the last inspection. On the day of the inspection, temporary barrier fencing was being installed around the laydown area, and the newly engaged civil contractor Brefni was on-site for the inception meeting. 2

The on-site sewage treatment system has been installed and connected. The trench has been filled. The irrigation area (pictured) has been seeded and erosion and sediment controls were in place. Rainwater tanks have been installed including connection for Rural Fire Service, if required. Dust Minimal dust was observed to be generated across the site. Some small amounts of dust were observed to be generated by vehicles entering and exiting the car park adjacent to the site buildings. 3

Waste Chemicals and Fuels RCR have engaged Remondis for waste management and transport for the project. Two waste skips have been provided for co-mingled recyclables and general waste. Remondis were on-site conducting the project s first waste collection at time of the inspection. RCR are yet to induct the driver and review Remondis plant and equipment to determine if it satisfies RCR s acceptance requirements for general mobile plant. Other waste materials e.g. wooden pallets have been stockpiled in the laydown area for potential reuse or later recycling/disposal. Corrective Action 130917 01: Conduct appropriate checks and inductions on subcontractors, their staff and plant/equipment prior to conducting any work on the project. A diesel generator has been installed adjacent to the site buildings to power the site compound during construction of the project. RCR advised that the generator is self-bunded. A fire extinguisher is available at the generator. N/A 4

The Rural Fire Service (RFS) have conducted an audit of fire extinguishers for the project in late August. The audit findings required installation of additional fire extinguishers and signage. These additional fire extinguishers and signage have been ordered however are yet to be received and erected. This is to be monitored at the next ER inspection to confirm that appropriate action has been taken. Spill kits were available observed in the RCR site compound and on the refuelling trailer. RCR maintain a refuelling trailer on site. RCR advised that the trailer is double bunded and a spill kit is available in the trailer. RCR plan to set up designated refuelling locations across the project site however this is yet to happen. Refuelling is occurring on a gravel pad adjacent to the site buildings. A fuel register is maintained and was sighted at the inspection. 5

Flora and Fauna Traffic The Biodiversity Offset Area has been fenced by RCR at the project boundary and signage is on order. Geolyse have conducted weed mapping (including a register) for the project site. RCR are developing a plan to manage the identified weed infestations in accordance with the Groundcover Management Plan. Geolyse have conducted a pre-clearing vegetation survey including marking trees, mapping and a register for the project. No tree clearing has been conducted to date. RCR advised that they have agreed, in conjunction with the landholder, to donate the trees to be removed for the project to the local Lions Club for use as firewood in Manildra s retirement village. Reduced speed limit signage was observed on Packham Drive on approach to the project main access. Speed limit signage was observed on the main access road into the project site. Internal access roads were observed to be pegged and are yet to be constructed. Packham Drive intersection upgrade is to be completed by the civil contractor. Brefni are to operate in accordance with the CEMP and approved Traffic Management Plan. A Vehicle Management Plan is to be developed by Brefni for review and approval by RCR for construction of on-site access roads. RCR are currently reviewing Brefni s Project Management Plan. 6

Soil and Water The topsoil stockpile sediment fences were observed to be maintained in good condition. The stockpile has been seeded and groundcover growth was evident. The effluent irrigation area sediment controls were observed to be maintained in good condition. The area had been seeded, no groundcover growth was evident. No other soil disturbance has occurred across the site. 7

Complaints Performance Monitoring Induction and Training RCR maintain a register for community complaints and enquiries. No complaints have been received to date. Majority of calls were for enquiring about sponsorship and work opportunities from labour hire companies. RCR are developing a compliance tracking program, it is currently in draft. Completed weekly inspections were sighted since the previous ER Inspection. Training packages for role-specific incident response training are currently under development. Sighted induction records for forklift operator Wes Roweth dated 11/09/2017 including Verification of Competency for forklift operation, forklift licence and construction induction (white card). 8

Appendix A Corrective Actions Register Reference Action Category A: Stop Work B: Immediate Action C: Closed within 2 weeks D: Non-critical Date Opened Responsibility Date Closed 170810 01 Maintain spill kits in areas that are readily accessible in the event of a spill. B 10/08/2017 RCR SCECO 13/09/2017 9

Reference Action Category A: Stop Work B: Immediate Action C: Closed within 2 weeks D: Non-critical Date Opened Responsibility Date Closed 170810 02 Manage trenches in accordance with Protocol 4: Trenching to minimise trap hazard for fauna. B 10/08/2017 RCR SCECO 13/09/2017 130917 01 Conduct appropriate checks and inductions on subcontractors, their staff and C 13/09/2017 RCR SCECO 10

Reference Action Category plant/equipment prior to conducting any work on the project. A: Stop Work B: Immediate Action C: Closed within 2 weeks D: Non-critical Date Opened Responsibility Date Closed 11