CLAY TOWNSHIP BUILDING DEPARTMENT

Similar documents
RESIDENTIAL BUILDING PERMIT INFORMATION

II. IDENTIFICATION A. OWNER OR LESSEE ADDRESS (number, street, P. O. Box, Apt., etc.)

The following materials and documents are required in order for you to obtain a Building Permit:

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

Plainfield Township Building and Zoning Department P.O. Box 247 Hale, MI PH(989) FX(989) Authority: P.A. 230 of 1972 As Amended

Application Requirements for obtaining a Building Permit

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Job Site Address. Lot/Parcel# Permit To: New Addition Alter/Remodel Code Compliance

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

PROCEDURE FOR REQUESTING A BUILDING PERMIT

BUILDING PERMIT APPLICATION

BOROUGH OF SWARTHMORE APPLICATION FOR BUILDING PERMIT 121 Park Ave, Swarthmore, PA (p) / (f)

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

All new construction, mobile home placement & additions.

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

PENNSAFE BUILDING INSPECTION SERVICES LLC Deck and Roof Cross Section Submittal

BUILDING PERMIT APPLICATION

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

Fill out all sections or mark with N/A (not applicable)

Application for Commercial Plan Review and Building Permit. Address:

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

Required Information for Permit Issuance

TOWN OF DEWITT PLANNING AND ZONING PERMIT REQUIREMENTS FOR DECKS

PERMITS, ADDRESSES, AND INSPECTIONS

Commercial Remodel Permit

Last Updated March 15, 2016

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Residential Building Permit & Inspection Procedures

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

MONROE COUNTY ZONING OFFICE

New York State Fire and Building Codes William LaCount Code Enforcement Official

DOUGLAS COUNTY BUILDING PERMIT APPLICATION

SUBSTANTIAL IMPROVEMENT

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

PERMIT APPLICATION REQUIREMENTS INTERIOR RENOVATIONS/BUILD OUTS CODES USED: ADOPTED FLORIDA BUILDING CODE & NEC

ORDINANCE. APPROVED EMERGENCY: (Yes) (No) VETOED: Date

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

City of Donnelly. Permit Application Information and Instructions

BUILDING PERMIT PROCEDURE PLEASE READ CAREFULLY AND FILL OUT COMPLETELY TO ASSURE QUICK AND ACCURATE SERVICE

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

BUILDING PERMIT GUIDELINES - RESIDENTIAL

City of Jacksonville Development Guide Building Permits

APPLICATION FOR PORCH / DECK PERMIT

BUILDING PERMIT SUBMITTAL REQUIREMENTS LIMITED AGRICULTURAL BUILDINGS

Building/Zoning Permit Fee Structure

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

HOW TO OBTAIN A BUILDING PERMIT

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

BUILDING PERMIT APPLICATION PACKAGE

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

THIS IS NOT A PERMIT DO NO START CONSTRUCTION. City of Pell City. Commercial Building Permit Application

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

City of Centerville Building, Zoning & Code Enforcement Department

District of Barriere A GUIDE TO BUILDING PERMITS

Requirement checklist to obtain a building permit for a: RESIDENTIAL POLE BUILDING

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

PERMIT APPLICATION REQUIREMENTS NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC

PIKES PEAK REGIONAL BUILDING DEPARTMENT

COMMERCIAL PLAN REVIEW CHECKLIST

RESIDENTIAL BUILDING PERMIT

BUILDING A STRUCTURE IN THE FLOODPLAIN. IMPORTANT REQUIREMENTS Of Warren County Floodplain Management Ordinance

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

Plan Check No. Checked by: An Appointment Is Required for Verification

CITY OF CARLISLE APPLICATION FOR BUILDING PERMIT

Application for Zoning Certificate and/or Building Permit

A homeowners/applicants guide to understanding and making application for a building permit.

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

WILL COUNTY LAND USE DEPARTMENT 2018 CONTRACTOR REGISTRATION

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

WE MUST HAVE 72 HOURS NOTICE. Phone

A Guide to Building Permits for Home Owners / Renovators

B U I L D I N G P E R M I T A P P L I C A T I O N

Building Permit Documentation Required:

PUEBLO REGIONAL BUILDING DEPARTMENT WATER CONNECTED & UTILITY CONTRACTOR LICENSING PROCEDURES

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

Property Owner's Name: Telephone #: Mailing Address: System Address (if different): Directions to location of installation:

2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

BUILDING CODES & DESIGN CRITERIA

GUIDE FOR APPLYING FOR A BUILDING PERMIT

LENAWEE COUNTY HEALTH DEPARTMENT Environmental Health Division Well and/or Sewage Disposal Construction Permit Application

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

BERKELEY COUNTY ENGINEERING AND

OLDHAM COUNTY RESIDENTIAL BUILDING APPLICATIONS

Welcome! Thank you for your interest in upgrading your service with Great Lakes Energy Cooperative (GLE).

An Applicants Guide to Residential Building Permits City of Galt Building Department

Procedure for an Application for an Garage, Gazebo, Sauna, Pump House, Shed

Detached Garage Construction Information

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC)

INC. VILLAGE OF COVE NECK OFFICE: (516) FAX: (516)

Transcription:

CLAY TOWNSHIP BUILDING DEPARTMENT 4710 PTE. TREMBLE RD. P. O. BOX 429 ALGONAC, MI 48001 (810) 794-9320 FAX: (810) 794-1964 APPLICATON FOR BUILDING PERMIT AND PLAN EXAMINATION THE DEPARTMENT WILL NOT DISCRIMINATE AGAINST ANY INDIVIDUAL OR GROUP BECAUSE OF RACE, SEX, RELIGION, AGE, NATIONAL ORIGIN, COLOR, MARITAL STATUS, HANDICAP, OR POLITICAL BELIEFS. AUTHORITY: P.A. 230 of 1972, AS AMMENDED COMPETION: MANDATORY TO OBTAIN PERMIT PENALTY: PERMIT WILL NOT BE ISSUED APPLICANT TO COMPLETE ALL ITEMS IN SECTION I, II, III, IV, V AND VI NOTE: SEPARATE APPLICATIONS MUST BE MADE FOR ELECTRICAL, PLUMBING AND MECHANICAL PERMITS I. PROJECT LOCATION PROJECT II. IDENTIFICATION OWNER/LESSEE ARCHITECT OR ENGINEER CONTRACTOR BUILDERS LICENSE NUMBER EXPIRATION DATE FEDERAL EMPLOYER ID NUMBER OR REASON FOR EXEMPTION WORKERS COMP INSURANCE CARRIER OR REASON FOR EXEMPTION MESC EMPLOYER NUMBER OR REASON FOR EXEMPTION III. TYPE OF IMPROVEMENT AND PLAN REVIEW TYPE OF IMPROVEMENT [ ] NEW BUILDING [ ] MOBILE HOME SET-UP [ ] PREMANUFACTURED [ ] RELOCATION [ ] ADDITION [ ] DECK [ ] REPAIR [ ] ALTERATION [ ] DEMOLITION [ ] SPECIAL INSTRUCTIONS [ ] CERTIFICATE OF OCCUPANCY [ ] COMMERCIAL [ ] RESIDENTIAL REVIEW(S) TO BE PERFORMED **INDIVIDUAL TRADE PERMITS ARE REQUIRED** [ ] BUILDING [ ] ELECTRICAL [ ] MECHANICAL [ ] PLUMBING Building Permit # 11/23/07

IV. PROPOSED USE OF BUILDING A. RESIDENTIAL 1. [ ] ONE FAMILY 3. [ ] HOTEL, MOTEL 5. [ ] DETACHED GARAGE NO. OF UNITS 2. [ ] TWO OR MORE FAMILY 4. [ ] ATTACHED GARAGE 6. [ ] OTHER NO. OF UNITS B. NON-RESIDENTIAL 7. [ ] AMUSEMENT 11. [ ] SERVICE STATION 15. [ ] SCHOOL, LIBRARY, EDUCTIONAL 8. [ ] CHURCH, RELIGION 12. [ ] HOSPITAL, INSTITUTIONAL 16. [ ] STORE, MERCANTILE 9. [ ] INDUSTRIAL 13. [ ] OFFICE, BANK, PROFESSIONAL 17. [ ] TANKS, TOWERS 10. [ ] PARKING GARAGE 14. [ ] PUBLIC UTILITY 18. [ ] OTHER NONRESIDENTIAL-DESCRIBE IN DETAIL PROPOSED USE OF BUILDING, E.G. FOOD PROCESSING PLANT, MACHINE SHOP, LAUNDRY BUILDING AT HOSPITAL, ELEMENTARY SCHOOL, SECONDARY SCHOOL, COLLEGE, PAROCHIAL SCHOOL, PARKING GARAGE FOR DEPARTMENT STORE, RENTAL OFFICE BUILDING, OFFICE BUILDING AT INDUSTRIAL PLANT. IF USE OF EXISTING BUILDING IS BEING CHANGED, ENTER PROPOSED USE. V. SELECTED CHARACTERISTICS OF BUILDING A. PRINCIPAL TYPE OF FRAME 1. [ ] MASONRY, WALL BEARING 2. [ ] WOOD FRAME 3. [ ] STRUCTURAL STEEL 4. [ ] REINFORCED CONCRETE 5. [ ] OTHER B. PRINCIPAL TYPE OF HEATING FUEL 6. [ ] GAS 7. [ ] OIL 8. [ ] ELECTRICITY 9. [ ] COAL 10. [ ] OTHER C. TYPE OF SEWAGE DISPOSAL 11. [ ] PUBLIC OR PRIVATE COMPANY 12. [ ] SEPTIC SYSTEM D. TYPE OF WATER SUPPLY 13. [ ] PUBLIC OR PRIVATE COMPANY 14. [ ] PRIVATE WELL OR CISTERN E. TYPE OF MECHANICAL 15. WILL THERE BE AIR CONDITIONING? 16. WILL THERE BE FIRE SUPPRESSION? F. DIMENSIONS/DATA 21. FLOOR AREA: EXISTING ALTERATION NEW 17. NUMBER OF STORIES BASEMENT 18. USE GROUP FIRST FLOOR LENGTH & WIDTH 19. CONST. TYPE SECOND FLOOR LENGTH & WIDTH 20. NO. OF OCCUPANTS TOTAL AREA IN SQUARE FEET TOTAL CONSTRUCTION VALUE OF PROJECT $ G. ELEVATION INFORMATION 22. THE LOWEST FLOOR IS FEET ABOVE SEA LEVEL, USGS DATUM H. NUMBER OF OFF STREET PARKING SPACES 23. ENCLOSED 24. OUTDOORS

VI. APPLICANT INFORMATION APPLICANT IS RESPONSIBLE FOR THE PAYMENT OF ALL FEES AND CHARGES APPLICABLE TO THIS APPLICATION AND MUST PROVIDE THE FOLLOWING INFORMATION. PHONE NO. CITY STATE ZIP CODE FEDERAL I. D. NUMBER DATE OF BIRTH / / I HEREBY CERTIFY THAT THE PROPOSED WORK IS AUTHORIZED BY THE OWNER OF RECORD AND THAT I HAVE BEEN AUTHORIZED BY THE OWNER TO MAKE THIS APPLICATION AS HIS / HER AUTHORIZED AGENT, AND WE AGREE TO CONFORM AND COMPLY WITH ALL APPLICABLE LAWS OF THE STATE OF MICHIGAN. ALL INFORMATION SUBMITTED ON THIS APPLICATION IS ACCURATE TO THE BEST OF MY KNOWLEDGE. Section 23a of the state construction code act of 1972, Act No. 230 of the Public Acts of 1972, being section 125.1523a of the Michigan Compiled Laws, prohibits a person from conspiring to circumvent the licensing requirements of this state relating to persons who are to perform work on a residential building or a residential structure. Violators of section 23a are subject to civil fines. SIGNATURE OF APPLICANT x DATE: VII. LOCAL GOVERNMENTAL AGENCY TO COMPLETE THIS SECTION ENVIRONMENTAL CONTROL APPROVALS REQUIRED? APPROVED DATE NUMBER BY A ZONING B FIRE DISTRICT C ELEVATION CERTIFICATE D DRIVE WAY PERMIT E SOIL EROSION F FLOOD ZONE G WATER SUPPLY H SEPTIC PERMIT I VARIANCE GRANTED J OTHER VIII. VALIDATION FOR DEPARTMENT USE ONLY COMMENTS: APPROVAL SIGNATURE CLAY TOWNSHIP BUILDING OFFICIAL DATE

CLAY TOWNSHIP BUILDING DEPARTMENT Requirements for Obtaining Building Permits From Clay Township Building Department RESIDENTIAL STRUCTURES: (One and Two Family Residential with less than 3,500 square feet) Building Permit/Plan Review Application Minimum of two (2) sets of plans drawn to scale with all required dimensions that include the following: Foundation and Floor Plans. Roof and Wall Section. Building Elevations. Site Plan and Survey (A Survey is required for all vacant parcels) Also: Driveway Permit (if necessary) from St. Clair County (810) 364-5720 Septic Permit (if necessary) from St. Clair County (810) 987-5300 Soil Erosion Permit (if necessary- digging within 500 of water) (810) 987-5306 Elevation Certificate (if necessary) 2009 Michigan Energy Code Compliance Certificate (All of the above must be submitted with Building Permit Application and Plans) See the following page for all Required Inspections COMMERCIAL STRUCTURES: (Including One and Two Family Residential with more that 3,500 square feet) Building Permit/Plan Review Application Two (2) sets of plans and specifications with original signature and seal of an architect or engineer registered in the State of Michigan. Also: Driveway Permit (if necessary) from St. Clair County (810) 364-5720 Septic Permit (if necessary) from St. Clair County (810) 987-5300 Soil Erosion Permit (if necessary- digging within 500 of water) (810) 987-5306 Elevation Certificate (if necessary) 2009 Michigan Energy Code Compliance Certificate See the following page for all Required Inspections MOBILE AND PREMANUFACTURED HOMES: Building Permit/Plan Review Application Minimum of two (2) sets of plans for the foundation and the method of anchoring the unit to the foundation. Site Plan and Survey. For Michigan approved pre-manufactured units; two (2) copies of the Building System Approval as approved by the State of Michigan Construction Code Commission as meeting the State Construction Code (Public Act 230 of 1972 and Public Act 371 of 1980). For mobile home units, two (2) copies of the approvals by the United States Department of Housing and Urban Development Mobile Home Construction and Safety Standards (24 CFR 3280). Required Inspections: Footing Inspection and Final Inspection INSTRUCTIONS FOR COMPLETING APPLICATION:

Page 1 of the application: Complete all applicable sections. Page 2 of the application: Enter the information as required. Page 3 of the application: Only complete Section VI. Must be completed by the permit applicant and signed. BUILDING PERMIT FEES: Approximate Building Permit Fees may be obtained from the Clay Township Building Department by calling (810) 794-9320. No money is due at time of application. You will be notified of Permit Fees when application has been approved and permit is ready to be issued. The Building Inspector will return one copy of the plans to the applicant after he has marked such copy either approved or disapproved and attested to the same by the signature on such copy. The Building Department will retain one copy of the plans similarly marked. Project must be started within the first six (6) months of Building Permit issue date. Inspections are required at least every 180 days (6months). POSTED, POSTED BUILDING PERMIT, AND APPROVED BUILDING PLANS MUST BE ON PROJECT SITE AT ALL TIMES. WHEN TO CALL FOR AN INSPECTION: Please call the Building Department's telephone number listed on your building permit at least 24 hours prior to the time you need an inspection. A minimum of six (6) inspections is required on most structures. It is the permit holder's responsibility to call for inspections. Foundation Inspection: The foundation inspection is to be made after the footings, walls, waterproofing and drain tile is installed. Call for an inspection prior to pouring the footings. Open Joist-Crawl/Backfill-Basement: This inspection is to be made before putting the decking on and after the basement has been poured. Masonry Inspection: This inspection shall be made before the installation of masonry veneer and after the installation of base course flashing and weather-resistant sheathing paper, and after the masonry construction is completed. Rough Inspection: The rough inspection is to be made after the roof, all framing, fire stopping, bracing, electrical, mechanical and plumbing rough installations are in place, rough inspected, and before the insulation is installed. Insulation Inspection: The insulation inspection is to be made after all insulation is in place and before the drywall in hung. Final Inspection: The final inspection is to be made upon completion of the building or structure, after approved final inspections of electrical, mechanical, and plumbing, and before occupancy occurs.