State of New Jersey Department of Transportation. Change Control Board Procedures

Similar documents
Scope Management Guideline January, 2016

CONSTRUCTION PROCEDURES HANDBOOK

Final Design Guideline

Problem Screening Guideline January, 2016

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSALS

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

Conflict of Interest Language

CE & I for Construction. Brian Buckel. HQ Construction Division Chief Construction Engineer

Contract Management Handbook. Texas Government Code, Title 10, Subtitle F, Chapter Statewide Contract Management

ECONOMICS COURSE. Preconstruction Operations

Missouri Department of Transportation New Product Evaluation Form Instructions

2017 Archaeology Audit Program Procedure Manual. April 2017

House Doctor Consulting Services Application Package

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:

Architectural and Engineering Consulting Firms Prequalification Indirect Cost Rate Guidelines

Air Quality Peer Exchange Support Services. From the: American Association of State Highway and Transportation Officials

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m.

REQUEST FOR QUALIFICATIONS (RFQ)

NORTH CAROLINA SCHOOL OF SCIENCE AND MATHEMATICS PERSONAL SERVICES CONTRACT

A GUIDE TO BEST PRACTICES FOR CONTRACT ADMINISTRATION

Facilities Planning and Construction (FP&C)

CITY MANAGER MEMORANDUM. John Anderson Drive Roadway Improvements - Construction Engineering and Inspection Services

~ Guidance ~ Buy America. All Federally Funded Construction Projects

Design-Builder Peformance Evaluation (DBPE)

ALTERNATIVE PROJECT DELIVERY DIVISION

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013

Guidance for Rating Each Performance Category on Contractor Performance Evaluation

Process Improvement Manual Page 1

UNIVERSITY HOSPITAL POLICY

Americans with Disabilities Act (ADA) Program Review, Training, and Support Services

RFQ CM16-01 Page 1 of 5

TOMPKINS COUNTY CIVIL SERVICE EXAMINATION Inclusion Through Diversity OPEN TO THE PUBLIC

REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION. Date Due: Friday, September 8, Time Due: 4:00 p.m.

ABSENCE MANAGEMENT POLICY

PROJECT MANUAL BID DOCUMENT 95% REVIEW CHECKLIST PROJECT BID NO EPWU PEM. CONSULTANT SUBMITTED ON / / as a 95% (A) original

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

PERSONNEL COMMISSION. Class Code: 5128 Salary Range: 34 (C1) PURCHASING AGENT JOB SUMMARY

TxDOT Internal Audit Travel Division Operations Audit (1405-1) Department-wide Report

Shutdown Requests. Gian Catano Contract Administrator December 17, 2014

Release of RFP February 9, 2017 RFP Questions and Clarifications Deadline February 16, 2017 at 4 p.m.

NW Region Tribal Transportation Symposium March 6-9, PROJECT DOCUMENTATION for Tribes Administering Construction Projects

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09

FINAL INSPECTION OF CONSTRUCTION PROJECTS

Profile 5 Basic Billing. Version 2.0

MAINTENANCE MANAGEMENT SYSTEM

SPECIFICATIONS Sodium Chloride (Bulk Road Salt)

DESIGN-BUILD PROCUREMENT AND ADMINISTRATION

Volume III ARCHITECTURE MAINTENANCE PLAN

CITY OF MODESTO REQUEST FOR PROPOSAL (RFP) CONSTRUCTION MANAGEMENT SERVICES FOR STATE ROUTE 99 AND PELANDALE AVENUE INTERCHANGE RECONSTRUCTION PROJECT

Design and Construction: CIP Project Management Review. Hampton Roads Sanitation District

INFRASTRUCTURE ONTARIO VENDOR PERFORMANCE PROGRAM

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SCOPE OF WORK. Sanitary Sewer and Water Service Installation PROJECT NO. T

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

Sendero Drilling Company

INVITATION TO BID ON TOWN PAVING PROJECTS

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017

LAP Manual Appendix 12.6B March 2016 Project Development

ADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B)

DGE 2 EUROPEAN UNION. Brussels, 21 March 2018 (OR. en) 2016/0149 (COD) PE-CONS 69/17

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Postgraduate Diploma in Marketing

SPROUTS Training Session: Procurement-Goods and Services Overview Reference Guide Date: June 23, 2015

OFFICE OF PROCUREMENT COOLING TOWER REPLACEMENT, CT BUILDING RFP NO.: RFP OPENING DATE: APRIL 16, 3:00 PM ADDENDUM #4.

SUBRECIPIENT MONITORING GUIDE

Selection of Contractor Step 5. June 2013

REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion

STRUCTURE AND BRIDGE DIVISION

Traffic Study Guidelines

DCMA Manual Corrective Action Plan Process for External and Internal Inspections, Assessments, Evaluations, and Audits

Oakland County Department of Management and Budget Purchasing Division Policies and Procedures Adopted May 24, 1990 and Revised May 1, 2004

Certificate IV in Project Management Student Assessment Guide

QUALIFICATION MATRIX ADDENDUM:

Annual Financial Sub-certification

Document B252TM 2007

Florida Department of Education/Division of Vocational Rehabilitation Consolidated Rate Contractor Question & Answer 2008

Quality Assurance Handbook for English for Speakers of Other Languages

SCOPE OF WORK. Generator Installation. NJDOT Freehold Maintenance Facility Freehold, Middlesex County, N.J. PROJECT NO. T

A REPORT FROM THE OFFICE OF INTERNAL AUDIT

APPENDIX A Configuration Change Management Concepts, Principles, and Guidance

NATO MUTUAL GOVERNMENT QUALITY ASSURANCE (GQA) PROCESS

FLEXIBLE TRAINING OPPORTUNITIES APPLICATION FORM

CHAPTER 13. New January 1, 2013 SUE. Subsurface Utility Engineering. Designation and Location. Chapter Contents

Department of Public Works Division of Engineering. Nassau County, New York

OREGON DEPARTMENT OF TRANSPORTATION CONSTRUCTION MANUAL FOREWORD

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

HR Training for Human Resources Partners. Shared Services Office HR Training

ABSENCE MANAGEMENT POLICY

APPROVAL PROCESS FOR NEW SEWER SYSTEMS & LINE EXTENSIONS

Market Procedure: Network Control Services

Request for Time Extension Under Section 14

RAPID INCIDENT SCENE CLEARANCE (RISC)

NEW ORLEANS CITY COUNCIL REQUEST FOR QUALIFICATIONS STATEMENTS (RFQ), CABLE, TELECOMMUNICATIONS AND TECHNOLOGY CONSULTING SERVICES ISSUED MAY 18, 2015

PLANNING A PROPERTY MANAGEMENT SYSTEM AUDIT (PMSA)

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

C3. CHAPTER 3 CONTRACT QUALITY ASSURANCE (CQA)

Transcription:

State of New Jersey Department of Transportation Change Control Board Procedures September, 2017 Prepared by Change Control Board

1.0 Change Requests These procedures are for processing Design Changes or Construction Changes (not Field Orders). Sources and cross references include Standard Specifications section on Scope of Work, and Construction Procedures Handbook sections on Construction Changes and Changed Field Conditions. 2.0 Definitions Change Control Board (CCB) - Established to review and approve changes and requests affecting design and construction in an effort to control costs, control scope changes, and provide historical data for quality assurance purposes. The CCB is composed of five of the Capital Program Management Directors (the Directors of Construction Services and Materials, Highway & Traffic Design, Project Management, Bridge Engineering & Infrastructure Management and Capital Program Support). The Project Manager (PM) will attend the CCB meetings to present an issue related to a project. The PM may be accompanied by the Designer or the Resident Engineer (RE) for technical support. In unusual situations a Consultant Designer maybe present during project presentation. In addition, representatives from Capital Investment Planning & Development (CIPD) and the Federal Highway Administration (FHWA) will attend the CCB meetings as appropriate. Construction Change Request submit form CON-RQST-2 form to request the review and approval of the Change Control Board on a perceived need to issue a construction order to the contractor on a project after execution of the contract. Construction Order - a written order, issued by an NJDOT engineer to the contractor after execution of the contract, authorizing one (1) or more of the following: a change in the work adjustment in the basis of payment for the work affected by the change adjustment in the contract time a change in specifications Contract Documents - As defined in the Standard Specifications for Road and Bridge Construction. Design Change - A change in a design stage of a project which modifies the concept as outlined in the proposal. Design Change Request - submit form DES-RQST-2 to request a scope or cost change to projects under design through the CCB. 3.0 Design Change Requests During Roadway Plan preparation, when a design change appears to be necessary or desirable, submit a Design Change Request to the CCB for review. A Design Change Request is required if a change occurs in a design stage of a project which modifies the concept as outlined in the proposal or if the scope development, design development or final design increases the programmed amount by more than the following amounts within one (1) fiscal year: Design - $500,000 Right of Way - $500,000 or 10% of Right of Way cost Construction - $500,000 or 5% of Construction cost 2

If the total cost increase is greater than $500,000 or the stated percentage threshold but less than $1,000,000, a CCB meeting may not be required; however, complete the Design Change Request form and forward to the Director, DPM who will determine whether a CCB meeting is needed. 3.1 Design Unit Tasks Notify the PM of potential change. 3.2 Project Management Unit Tasks Project Manager: When a design change in a project appears to be necessary or desirable, complete the Design Change Request form attaching any supporting material and submit it to the Executive Regional Manager for review and concurrence. As part of the gathering of supporting information, gain the review and/or approval of the FHWA Area Engineer if the project s oversight is PoDI. Also, review the scoping history with Project Planning and Development (if previously involved). Present the issue to the CCB at the scheduled CCB meeting. If approved, process the changes to the appropriate contract, cost and schedule documents. If rejected, notify the designer. Executive Regional Manager: Review the request for validity, completeness and accuracy. Obtain concurrence from the Division of Project Management (DPM) Director and forward the request to the CCB Administrator. Director: Review and process the request in one of the following ways: Reject: If not in favor of the proposed change, reject it and return it to the Executive Regional Manager. Concur: Indicate concurrence on the request form and return to the Executive Regional Manager for submission to the CCB Administrator to set up a meeting. Approve: Recommend for approval without a meeting of the CCB. Record the reason for, and any conditions of, approval on the decision page of the Change Request form and forward to the CCB Administrator. 3.3 Change Control Board Unit Tasks Change Control Board Administrator: Upon receipt of a Design Change Request, set up a CCB meeting within 7-10 days, attend the meeting, record the Board s decision. Upon completion, forward the request with the reason for the recommended approval to the Assistant Commissioner, DPM for concurrence. Notify the PM of the decision by forwarding a copy of the signed decision. Also forward a copy to any parties who have additional responsibilities as a result of the Board s decision. If the request was recommended for approval without a meeting, the request send to the other members of the CCB, as well as CIPD and the FHWA as appropriate, for their comment prior to forwarding to the Assistant Commissioner, DPM for concurrence. Resolve and document any comments received prior to requesting concurrence from the Assistant Commissioner. If they cannot be resolved individually, schedule a CCB meeting to present the request to the full CCB. Once the Assistant Commissioner, DPM approves or rejects the CCB decision, send it to the PM, all members of the CCB, CIPD, the Program Management Office, and the FHWA. 3

The PM will retain the original request and signed decision in the project file. Change Control Board Members: Review the Design Change Request and process it by approving it in whole or in part, with or without additional instructions or conditions, or rejecting it. If the request was recommended for approval without a meeting, forward any comments to the CCB Administrator within the requested timeframe. 3.4 Program Management Office Upon receipt of Design Change Request decisions, record the information in a database to track all change request patterns. Determine if the change is the result of a quality issue. If so, revise the Quality Assurance or Quality Control Plan or submit a Baseline Document Change Request as appropriate. 3.5 Assistant Commissioner, DPM Review the Design Change Request and dispose of it by approving it in whole or in part, with or without additional comments or conditions, or rejecting it. If approved, sign on the designated concurrence line and return it to the CCB Administrator for distribution. If rejected, indicate as such including the reason for rejection and return to the CCB Administrator for distribution. 4.0 Construction Change Requests When a construction order appears to be necessary or desirable or if a construction change is necessitated through the claim settlement process, the PM is to submit a Construction Change Request to the CCB for review prior to commencement of work. A Construction Change Request is required if there is a change in cost of more than $500,000 or more than 5 % of the construction cost. If the change in cost is greater than $500,000 or the stated percentage threshold but less than $1,000,000, a CCB Meeting may not be required; however, the Construction Change Request Form should be completed and forwarded to the CCB Administrator as well as the Design Standards Unit. 4.1 Resident Engineer Tasks Notify the PM of potential change prior to initiation of work. 4.2 Project Management Tasks Project Manager: Prepare a Construction Change Request attaching any supporting material and submit it to the Executive Regional Manager for review and concurrence. As part of the gathering of supporting information, provide the approval and/or review of the FHWA Area Engineer if the project oversight is PoDI. Also, review the funding scenario with CIPD. Present the issue to the CCB at the scheduled CCB meeting. If the Construction Change Request is approved, refer to the Construction Procedures Handbook and the Standard Specifications. Coordinate any approval conditions with the RE. If not approved, notify the RE. Executive Regional Manager: Review the request for validity, completeness and accuracy. Obtain concurrence from the Director, DPM and forward the request to the CCB Administrator. Director: Review and dispose of the request in one of the following ways: Reject: If not in favor of the proposed change, reject it and return it to the Executive Regional Manager. 4

Concur: Indicate concurrence on the request form and return to the Executive Regional Manager for submission to the CCB Administrator to set up a meeting on the issue. Approve: Recommend for approval without a meeting of the CCB. Note the reason for, and any conditions of approval on the decision page of the Change Request form and forward to the CCB Administrator. 4.3 Change Control Board Tasks Change Control Board Administrator: 1. Upon receipt of a valid Construction Change Request, set up a CCB meeting within 24 hours for emergency issues where a decision is needed immediately in order to avoid delay claims or where safety issues are involved, or within 7-10 days for all other issues. Attend the meeting and record the Board s decision. Upon Completion, forward the request with the reason for the recommended approval to the Assistant Commissioner, DPM for concurrence. 2. Notify the PM of the decision by forwarding a copy of the signed decision. Also, forward a copy to the appropriate Regional Construction Engineer as well as any parties who have additional responsibilities as a result of the Board s decision. 3. If the request was recommended for approval without a meeting, send it to the other members of the CCB, as well as CIPD and the FHWA as appropriate, for their comment prior to being forwarded to the Assistant Commissioner, DPM for concurrence. Resolve and document any comments received prior to requesting concurrence from the Assistant Commissioner. If they cannot be resolved individually, then schedule a CCB meeting to present the request to the full board. Once the Assistant Commissioner, DPM approves or rejects the CCB decision, send it to the PM, the appropriate Regional Construction Engineer, and all members of the CCB, CIPD and the FHWA. The PM will retain the original request and signed decision in the project file. Change Control Board Members: Attend the CCB meeting and process the Construction Change Request by approving it in whole or in part, with or without additional instructions or conditions, or disapproving it. If the request was recommended for approval without a meeting, forward any comments to the CCB Administrator within the requested timeframe. 4.4 Program Management Office Upon receipt of Construction Change Request decisions, record the information in a database to track all change request patterns. Determine if the change is the result of a quality issue. If so, revise the Quality Assurance or Quality Control Plan or submit a Baseline Document Change Request as appropriate. 4.5 Assistant Commissioner, DPM Tasks Review the Construction Change Request and dispose of it by approving it in whole or in part, with or without additional comments or conditions, or rejecting it. If approved, sign on the designated concurrence line and return it to the CCB Administrator for distribution. If rejected, indicate as such including the reason for rejection and return to the CCB Administrator for distribution. 5

New Jersey Department of Transportation Capital Project Support Form DES-RQST-2 Design Change Request Forward to Change Control Board Administrator Project Manager Telephone Designer Submittal Date Program Manager Concur Date Route and Section Description of Change Reason for and Value of Change, Advantages and Disadvantages Recommendation: Has the change been reviewed by other offices or CPC Screening Committee? (If yes, list office and contact person) FHWA/State Involvement PoDI Non-PoDI 100 % State Other: Cost Breakdown Original Design Cost Total Previous Revisions Current Revision Total Design Cost Construction Cost ROW Cost Total Non-Design Cost Original Incr./Decr. Original Incr./Decr. Increase/Decrease Concur (CCB meeting is necessary) Director of Project Management Signature: Director, Division of Project Management - OR - Recommend for approval without CCB meeting based on the following justification and with the following conditions: 6

Signature: Director, Division of Project Management 7

CCB Decision for Route Decision of the Change Control Board - Concurrence: Eli D, Lambert III, P.E. Assistant Commissioner Capital Program Management Disapproved: Eli D, Lambert III, P.E. Assistant Commissioner Capital Program Management 8

New Jersey Department of Transportation Capital Project Support Form CON-RQST-2 Construction Change Request Forward to Change Control Board Administrator Project Manager Telephone Resident Engineer Submittal Date Change Order or Sequential Letter Contractor Priority Urgent - 24 hours Standard 7-10 days Other specify: Program Manager Concur Date Route and Section: Description of Change: Current Process or Method: Reason for and Value of Change, Advantages and Disadvantages: Effects: Implementation: Recommendation: Has the change been reviewed by other offices or CPC Screening Committee? (If yes, list office and contact person): FHWA/State Involvement PoDI Non-PoDI 100 % State Other: Cost Breakdown Original Contingency Amount: Contingency Amount Used: Construction Cost Incr./Decr. Design Cost Incr./Decr. Row Cost Incr./Decr. 9

Actual Award Amount Total Previous Revisions Current Revision Total Cost Director of Project Management Concur (CCB meeting is necessary) Signature: Director, Division of Project Management - OR - Recommend for approval without CCB meeting based on the following justification and with the following conditions: Signature: Director, Division of Project Management 10

CCB Decision for Route Decision of the Change Control Board - Concurrence: Eli D. Lambert III, P.E. Assistant Commissioner Capital Program Management Disapproved: Eli D. Lambert III, P.E. Assistant Commissioner Capital Program Management 11