ENVIRONMENTAL STATEMENT FOR D.G.SETS OF M/s SHREE CEMENT LIMITED, BEAWAR (RAJASTHAN) FOR THE PERIOD FROM, APRIL 2009 TO MARCH 2010 PART A

Similar documents
ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

Rajasthan State Pollution Control Board

Himachal Pradesh State Pollution Control Board

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

Rajasthan State Pollution Control Board

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

Health and safety norms of CPWD should be followed during construction.

Bhushan Steel Limited 1. Name & Address of the owner/occupier of the industry, operation or process

Max. building height (m)

ZZH/CLAB-KSPCB/04/ Environmental Officer,

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

FORM V Environmental Audit Report for the financial Year ending the 31st March 2016 Company Information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

Orient Cement Ltd. 2

Mangalam Cement Ltd. (Unit-II) Stack No.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Mangalam Cement Ltd.(Unit I)

Kana Aroma Industries. Pre-Feasibility Report

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd.

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

Environmental Clearance Compliance Half Yearly Report

ACC Limited CHAIBASA CEMENT WORKS

Mangalam Cement Ltd.

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

Details of Project. Underground source

Environmental Clearance Compliance Half Yearly Report

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

ANNEXURE I LIST OF PRODUCTS

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

AMBUJA CEMENTS LIMITED

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Details of the proposed project as presented before the committee are tabulated below:

KARNATAKA STATE POLLUTION CONTROL BOARD

TECHNOLOGIES IN WASTE PRESENTATION ON EMERGING WATER TREATMENT THERMAX LTD WELCOME

PROJECT FEASIBILITY REPORT

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

Environmental Impact Assessment

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

EfW Outputs. Guidance on the management of energy outputs and residues including air pollution control residues and incinerator bottom ash

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Sr.No Condition Status A. SPECIFIC CONDITIONS:

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

Environmental Leadership Program Inspection Form Portable Asphalt Facility

Performance of Bio-medical Waste Treatment Facilities in Central Zone

Himachal Pradesh State Pollution Control Board,

Rehabilitation of historical source areas and future mitigation projects December 2014

Worldwide Pollution Control Association. August 3-4, 2010

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

BANGUR NAGAR, POST BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ "5~"

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

PRE FEASIBILITY REPORT

PRE-FEASIBILITY REPORT. for

Check-List of General Building Services

Phase II (BIA Phase-II),

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Code of Practice for Concrete Producing Plants

Bajaj Auto Limited. Waluj. You All

FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P

PRE- FEASIBILITY REPORT

3 Responsibility Centre COS - CenPEEP 4 Brief scope of work The engagement with NTPC will be in the following steps:

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes

Bulk Raw Materials Storage Selection MR. J. H. ERASMUS KRUPP MINING AND MATERIALS HANDLING

Guidance on use of Disposal and Recovery Codes (Waste Management Act, 1996 as amended)

Higg FEM Content Training Part 2 Wastewater Air Emissions Chemicals

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

Environmental Clearance Compliance Half Yearly Report

ROCK CRUSHING PLANT APPLICATIONS ADVICE

ENVIRONMENTAL PROTECTION LICENCE APPLICATION

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE

Paribesh Bhavan, A / 118, Nilakantha Nagar, Unit VIII, Bhubaneswar

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

Environmental Management Plan

Ministry of Environment and Forests Notification New Delhi, the 4 th February ( As amended up to )

Loy Yang B Environment Improvement Plan

SPECIAL CONDITIONS GENERAL PERMIT NUMBER WMGR089

Transcription:

Page 1 of 9

ENVIRONMENTAL STATEMENT FOR D.G.SETS OF M/s SHREE CEMENT LIMITED, BEAWAR (RAJASTHAN) FOR THE PERIOD FROM, APRIL 2009 TO MARCH 2010 PART A 1. Name and address of the Owner / Occupier of the Industry operation or process 2. Industry Category Primary (S.T.C. Code) Secondary (S.T.C. Code) M/s Shree Cement Limited Bangur Nagar Post Box No. 33 BEAWAR 305 901 Distt. Ajmer (Rajasthan) Red Category 3. Production Capacity -Units 14625 KVA 4. Year of Establishment Annexure-I 5. Date of the last Environmental Audit Report submitted 15/9/2009 Page 2 of 9

PART B WATER AND RAW MATERIAL CONSUMPTION (I) WATER CONSUMPTION: Process : N.A. Cooling : 180 KL Domestic : Common colony for existing Cement Plant, Shree Power and Mines. Name of Product Process Water Consumption per Unit of Product Output (Power) During Previous Financial During Current Financial Year Year Power 0.0039 KL/Kwh 0.0004 KL/Kwh (II) RAW MATERIAL CONSUMPTION (D.G.SETS): D.G.Sets are not operated on continuous basis. D.G. Sets are operated only during the breakdown/shutdown Shree power plant. The Total fuel consumption during the year 08-09 was 64390 ltrs and during year 09-10 was 114557 ltrs. Name of Raw Material Name of Product Consumption of Raw Material Per Unit of Output (Ltrs/KWH) During Previous During Current Financial Year Financial Year Fuel /Diesel Power 0.313 0.285 (III) POWER CONSUMPTION (KWH/ KWH OF POWER): During Previous Financial Year During Current Financial Year 0.031 0.044 Page 3 of 9

(IV) TOTAL D.G. POWER PRODUCTION (KWH): During Previous Financial Year During Current Financial Year 205197 401605 Pollutants PART C DISCHARGED TO ENVIRONMENTAL / UNIT OF OUTPUT Quantity of Pollutants Discharged (Mass/Day) Concentration of Pollutants in Discharge (Mass/Value) Percentage of variation from prescribed standard with reasons (a) Water The discharged water from cooling tower of D.G.Sets is after neutralization is used for dust suppression. (b) Air N.A. Domestic waste water generated from residential colony and office toilets is treated in STP and treated water is used in existing cement plant process & plantation. Residential colony is common for Shree Cement Limited Unit I & II, D.G sets, Mines & Power plants. Page 4 of 9

PART D HAZARDOUS WASTE (As specified under Hazardous Wastes (Management, Handling & Transboundary Movement) Rules amended up to 2010) Hazardous Waste From Process Total Quantity (Ltrs.) During Previous Financial Year During Current Financial Year April, 2009 to March,2010 April,2009 to March,2010 We are having a common Authorization for Hazardous waste management and handling for both SCL Unit-I & II, D.G. Sets, Power plants and Mines. Total quantity generated from April-2008 To March-2009 = 46438 Ltrs. Old stock = 6812 Ltrs. Total used oil received =53250 ltrs Total quantity generated from April-2009 to March-2010 = 41920 Ltrs. Old stock = 3050 Ltrs. Total used oil received =44970 ltrs Self used=19960 Ltrs. Sell to recyclers=30240 Ltrs. Balance quantity=3050 ltrs Self used=27035 Ltrs. Sell to recyclers=9240 Ltrs. Balance quantity=8695 ltrs (b) From Pollution Control Facilities N.A. N.A. Page 5 of 9

PART E SOLID WASTE (a) (b) (c) From Process From Pollution Control Facility 1) Quantity rejected or reutilized within the unit 2) Solid 3) Disposed During Previous Financial Year Total Quantity N.A. During Current Financial Year PART F Please specify the characterization (in terms of composition and quantum) of hazardous as well as solid wastes and indicate disposal practice adopted for both the categories of wastes: Hazardous Wastes Cement manufacturing is based on Dry Process. No Hazardous waste is generated from the process except used oil which is drained from Machineries / Equipments. It is used for lubrication in chains, Stacker and Reclaimer etc and partly sold to the registered recycler. Solid Wastes: - N.A. Page 6 of 9

PART G IMPACT OF THE POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES AND CONSEQUENTLY ON THE COST OF PRODUCTION N.A. PART H ADDITIONAL MEASURES / INVESTMENTS PROPOSAL FOR ENVIRONMENT PROTECTION INCLUDING ABATEMENT OF POLLUTION N.A Page 7 of 9

PART I ANY OTHER PARTICULATES FOR IMPROVING THE QUALITY OF ENVIRONMENT. 1. We have full-fledged Environment Department with three separate cells, one for monitoring and one for maintenance of pollution control equipment and one for Green Belt development. 2. Maintenance department is doing regular checking and scheduled maintenance of all the pollution control devices. 3. Civil dept is taking care of House keeping and water supply department is taking care of operation of STP. 4. Horticulture Department is taking care of tree plantation and green belt development. New tree plantation is continuous. On support of above, we are enclosing herewith following:- Annexure I : D.G.Sets Details Page 8 of 9

Annexure-I DETAILS OF D.G SETS Height S. No. Make Capacity (KVA) Year of Installation No. of Stacks Stack Ht. (m) above D.G. Room Stack DIA. (m) (m) 1. Cummins 1000 1985 2 18 4.5 0.25 2. Cummins 1000 1985 2 18 4.5 0.25 3. Cummins 1000 1985 2 18 4.5 0.25 4. Cummins 1000 1985 2 18 4.5 0.25 5. Cummins 1000 1985 2 18 4.5 0.25 6. Cummins 1000 1986 2 18 4.5 0.25 7. Wartsila 2875 1996 1 24 12.0 0.45 8. Wartsila 2875 1996 1 24 12.0 0.45 9. Wartsila 2875 1996 1 24 12.0 0.45 Page 9 of 9