PROJECT DESIGN GUIDE D02 COMMUNICATION PLAN

Similar documents
STRUCTURAL ENGINEER S SERVICES SCOPE

CAPITAL DELIVERY HUB. Programme Manager Education Construction. Permanent Placement Package to 67,000. Background

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE

Box Clever Consulting. Executive Summary Project Report. July Strand Plaza. Liverpool. for. Primesite Developments

Quality Management System Manual

Transformation Programme. Sourcing Workstream PROCUREMENT PLAN. Inland Revenue. 28/06/2013 v1.0 FINAL Reference:

Promoting better business outcomes through the use of BIM and digital technologies.

Box Clever Consulting. Executive Summary Project Report. June Strand Plaza. Liverpool. for. Primesite Developments

ENGINEERING MANAGEMENT

CONTRACTS MANAGER (BUILDING) THE COMPANY

The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

1.0 ABOUT THE NU GUIDELINES

NBS National BIM Survey 2011

Managing Contractors (Scotland)

CONTRACTS MANAGER (Civil Engineering) THE COMPANY

Shaping a better built and natural environment for people to live, work, learn and play

Quality Management System Guidance. ISO 9001:2015 Clause-by-clause Interpretation

Indiana University. Vice President for Capital Planning and Facilities

ECMWF Copernicus Procurement

BIM EXECUTION PLAN PROJECT INFORMATION PROJECT NUMBER

STAKEHOLDER Responsibilities ACCOUNTABLE TO...

CIC Guidelines Construction Administration and Observation

Professional Services Contract (PSC) for Consultants Selection Process for NHS Clients

WE ARE UNDERWAY! CDM 2015 CDM 2015 HAS NOW KICKED OFF. ARE YOU AWARE OF THE CHANGES? WALKER MANAGEMENT

COSBEDMO19 - SQA Unit Code FM75 04 Manage project completion and handover in built environment design management

Notes for completion of Pre-Qualification Questionnaire (P.Q.Q)

Careers List Professional Careers in Construction

The Structural Engineer and Curtain Wall Design. The design of curtain walls entails numerous inputs, including the following

City Infrastructure and Traffic Operations. Titles of Positions which report to Public Domain Team Leader are:

Digicon / IBC National BIM Survey Survey Results

CIC Guidelines Preliminary Design

RailCorp Position Description

Conception Design Construction Operation.

Code of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015

Invitation to Tender. Development Legal Services. August 2015

HUMAN RESOURCES COMMITTEE CHARTER

Chartered Membership Programme

REVIEW OF SCOTTISH PUBLIC SECTOR PROCUREMENT IN CONSTRUCTION

CDM 2015: The regulator s experience to date. Simon Longbottom Head of HSE Construction Sector. Thoughts for Conference and Beyond

GreenSquare Job Description Job Title

Template for ToR for Transaction Advisory Services

Building Intelligence 2017 Building a Collaborative Future : BIM in HK

Sustainable Design Services

This procedure applies to all produced controlled documents used during operations affecting the company s services.

Central Bank of Malta Job Description

Quality Manual ISO 9001:2015 Quality Management System

EHQMS Manual & Policy Document

Induction Policy. Document author Assured by Review cycle. 1. Introduction Policy Statement Purpose or Aim Scope...

2008 Building Information Modeling AEC Statewide BIM Adoption Survey

Annex G to Loughborough University Facilities Management Health and Safety Procedure

Chartered Membership

HSCN Migration Guidance


Level 5 NVQ Diploma in Management and Leadership Complete

O10 BIM for specialist sub-contractors and trades BIM IN PRACTICE

BIDDING FOR BIM. CIF Bidding for BIM. September

CDM FAQ Sheet

Previous applicants need not apply. Please note CV s are not accepted. For informal enquiries please contact:

CIVIL AND STRUCTURAL ENGINEERING SERVICES

Building Services Engineer (mechanical) model career pathway Version 1.0

Procurement manual for activities funded through the National Land Transport Programme

SEWSCAP CONTRACTORS FRAMEWORK CONTRACTORS CONSULTATION REPORT. For RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL. July Page 1.

Coordination of Consultants

BUSINESS CASE FRAMEWORK AND PROCEDURES

INVITATION TO TENDER TO SUPPORT ORGANISATIONAL CHANGE AND TRANSFER OF UNDERTAKINGS OF THE CHESHIRE AND WARRINGTON GROWTH HUB

Urzgan Rural Access Program

QUALITY ASSURANCE REQUIREMENTS

Procurement Options for NZ Construction Contracts

- DATA REQUIREMENTS BIM

Prova Recruit 2 Advice Pack. Position Description

GreenSquare Job Description Job Title Technical Project Manager Grade Team

Measurement Assurance and Certification Scotland

BIM 2016 and the NEC. Simon Rawlinson, 20 April 2015

BEST PRACTICE COLLABORATION

Edge Lane West Highway and Environmental Improvement Scheme

BIM Design & Construction Requirements. Follow-up Seminar. September 10,

Who Should be on Your Project Team: The Importance of Project Roles and Responsibilities

Fixed Term Staffing Policy

NSW DEPARTMENT OF EDUCATION AND COMMUNITIES

Achilles UVDB Verify Scheme Rule Book Issue 3 December Services for professional procurement. Be better informed, make better decisions.

your hospitals, your health, our priority ATTENDANCE MANAGEMENT TW10/055 HR COMMITTEE DEPUTY DIRECTOR HR STAFF SIDE CHAIR HUMAN RESOURCES DIRECTORATE

Work Plan and IV&V Methodology

Appendix A: Outline of Construction Management Functions /Roles for each phase of the project (source: Construction Management Association of America)

UoD IT Job Description

Autodesk and the UK BIM Level 2 Mandate

Invitation to Tender. External Audit Services. July 2015

This part of the Works Information sets out the obligations of the Contractor with regards to:

Achieve CRL s vision and values, including the delivery of a world class affordable railway;

NC State University OESAD GUIDELINES Contract Year

GETTING STARTED WITH LEAN CONSTRUCTION. A guide for project teams

INVITATION TO TENDER (ITT) TENDER RETURN DATE AND TIME (DEADLINE): 12 APRIL pm

AT THE FOREFRONT OF THE CONSTRUCTION INDUSTRY WITH BUILDING INFORMATION MODELING (BIM): THE CHALLENGES

Core Skills: Contributing Skills: Role Title: Senior Project Manager EXAMPLE. Reference: SFIA level 5

Quality and Environmental Business Process Manual

(iii) Senior Management Course, lasting not less than 4 weeks from a recognized Institution;

FRAMEWORK BRIEF. Consultancy & Advisory Services

BIM Execution Plan Template. CPG-DGN-PLN-085 Revision 0 08/08/2016

Work Health and Safety Management Systems and Auditing Guidelines

DATE ADVERTISED: 05 SEPTEMBER 2017 VACANCY PROPERTIES UNIT: FACILITIES MANAGER X 3 (BUTTERWORTH, MTHATHA AND EAST LONDON)

Transcription:

PDG PROJECT DESIGN GUIDES D02 PROJECT DESIGN GUIDE D02 COMMUNICATION PLAN Project Name: Name Project No.: Number Date: Date Document No.: PDG-PDG-PRO-D02.0 Date Created: 2 nd May 2012 Date Revised: R01 06.06.2014 Document Version: V01 - June 2014 Philip D G Yorke 2013 1 of 21

Revision: Revision description: Revision date: 01 Guide list omitted, graphics updated, alpha codes updated. 6 June 2014 02 03 Edited to be project specific / Revised by: Name: Position: Signature: Date: Checked by: Name: Position: Signature: Date: Authorised by: Name: Position: Signature: Date: Document Version: V01 - June 2014 Philip D G Yorke 2013 2 of 21

Document Distribution: Name Company Status Date A 00/00/2012 Status key: A Action I Information Document Version: V01 - June 2014 Philip D G Yorke 2013 3 of 21

1.0 Introduction A project team is very often made up of numerous organisations; of different sizes, disciplines and cultures, with inherent self interests. It is therefore fundamental to create and manage a project communication plan to ensure the project team are bound together, not only in terms of a common set of systems, but also with the aim to create a project specific positive culture. Alignment of systems ensures smooth and efficient information sharing and decision making. Systems are there to aid the project process and should at no point be allowed to become a hindrance. A positive project culture binds the various consultants under a common purpose, creating a team with a can do attitude. Although not part of this document, this may be achieved in a number of ways, from team building events to creating a satellite office for all consultants. This document can be used at all stages of a project, depending on the procurement route. It is, however, advisable to have it in place from RIBA stage D onwards. 2.0 Managing this document This document is to be updated whenever there is a personnel change to the project, and/or if new systems are deployed on the project, and before each stage of the project. It is to be distributed to all parties concerned upon each revision. Document Version: V01 - June 2014 Philip D G Yorke 2013 4 of 21

COMMUNICATION PLAN TEMPLATE Project Name: Project No.: Date: Doc. no.: Contents: 1.0 Systems deployed and aligned 2.0 Project Design Organisation rational 2.1 Project Design organisation structure (Initial Design Period) 2.2 Project Design organisation structure (Stage 3) 2.3 Project Design organisation structure (Stage 4) 2.4 Project Design organisation structure (Stage 5-6) 3.0 Meeting plan strategy Appendix A Meeting Matrix Appendix B Monthly Reports Appendix C Agenda proforma Appendix D Meeting Minute proforma 4.0 Resource Allocation by stage Appendix E CV s 1.0 Systems deployed and aligned The first and most essential factor is to ensure all design consultants, Contractor and client are using compatible systems. Some systems may be imposed on designers, whilst others will be dictated by in-house preference or specialism. The choice of system and the requirement to align systems must be made clear to the consultants during the appointment process. Schedule of systems: EPWMS Extranet Project Workflow Management System (e.g. BIW) Insert text refer to chosen system protocols, elements of chosen, and amended as required BIM Building Information Management (e.g. Revit) Insert text refer to BIM protocols as defined by... CAD Computer Aided Design (e.g. Autocad) Insert text refer to CAD protocols as defined by... Office software (e.g. Mircosoft Word, Excel, etc) Insert text name earliest and latest versions acceptable?? 2.0 Project Design Organisation rational This section is to be project specific. The following sub-headings are for guidinace only. Document Version: V01 - June 2014 Philip D G Yorke 2013 5 of 21

Collaboration Strategy For the purposes of clarity the overall design process can be describe in terms of key phases and, for the following work streams;????, these can be broadly understood as follows; Insert text (i.e. New Build, Refurb, Highways or by Contractor and by Client) INITIAL STUDY PERIOD Insert text SCHEME DESIGN Insert text PRODUCTION DESIGN o Development of the Scheme Design through to RIBA Stage 4 suitable for Contractor procurement and construction. Insert text Realisation stage (Tender activity, CDP co-ordination, Construction, Change Management Insert text Identified, within each of these stages, there are broadly 4 key functions or roles that the Architectural service is required to provide: Lead Consultant the provision of overall strategic leadership to the entire consultant team to ensure that the project objectives in terms of brief management, programme management, deliverables planning etc. are met. Design Leadership the provision of strategic design direction and decision making to ensure that, as the design develops, the integrity of the concept is maintained and reinforced. Design Co-ordination the activity of ensuring that the design proposals being produced are co-ordinated within the design consultant team. Design Production in simple terms, the assembly, development and maintenance of the CAD model and dataset that enables the production of the drawing and written documentation required to describe the design proposals throughout each stage of the project. This includes the implementation and monitoring of CAD and Technical Standards and the co-ordination of datasets between consultants and the contractor. Each specialist discipline will be required to provide all necessary information and expertise to the Lead designer to ensure design is compliant, co-ordinated and produced to programmed time scales. Document Version: V01 - June 2014 Philip D G Yorke 2013 6 of 21

2.1 Project Design organisation structure (Initial Design Period) Align with Consultant Appointment Matrix (to be updated before the commencement of the stage) Client Stakeholders Client (project team) Contractor Project team: Project Leader: Commercial Manager: Design Manager: Project Planner: Construction Manager: C.D.M. C Principals Architect / Engineer / Building Services / other Overall Design Lead -?? Project Architect: Package Architect 1: Package Architect 2: CAD/BIM manager: Interior Designer: Lighting Designer: Wayfinding: Landscape Architect: Geotechnical / Contamination: Structural Design: Roads & Drainage: Utilities: MEP: Security: Fire: Acoustic: Wind: Lifts: Sustainability: Other: Document Version: V01 - June 2014 Philip D G Yorke 2013 7 of 21

2.2 Project Design organisation structure (Stage 3) Align with Consultant Appointment Matrix (to be updated before the commencement of the stage) Client Stakeholders Client (project team) Contractor Project team: Project Leader: Piles: CDP:(for DfMA & Advice) L.A.P. Dept Commercial Manager: Design Manager: Project Planner: Construction Manager: Frame: Facade: MEP: C.D.M. C Principals Architect / Engineer / Building Services / other Lifts: DfMA/MMC: Overall Design Lead -?? Balustrades: Pods: Project Architect: Package Architect 1: Package Architect 2: CAD/BIM manager: Interior Designer: Lighting Designer: Wayfinding: Landscape Architect: Geotechnical / Contamination: Structural Design: Roads & Drainage: Utilities: MEP: Security: Fire: Acoustic: Wind: Lifts: Sustainability: Other: Document Version: V01 - June 2014 Philip D G Yorke 2013 8 of 21

2.3 Project Design organisation structure (Stage 4) Align with Consultant Appointment Matrix (to be updated before the commencement of the stage) Client Stakeholders Client (project team) Contractor Project team: CDP: Project Leader: Piles: L.A.P. Dept Approved Inspector Commercial Manager: Design Manager: Project Planner: Construction Manager: Frame: Facade: MEP: C.D.M. C Principals Architect / Engineer / Building Services / other Lifts: DfMA/MMC: Overall Design Lead -?? Balustrades: Pods: Project Architect: Package Architect 1: Package Architect 2: CAD/BIM manager: Interior Designer: Lighting Designer: Wayfinding: Landscape Architect: Geotechnical / Contamination: Structural Design: Roads & Drainage: Utilities: MEP: Security: Fire: Acoustic: Wind: Lifts: Sustainability: Other: Document Version: V01 - June 2014 Philip D G Yorke 2013 9 of 21

2.4 Project Design organisation structure (Stage 5-6) Align with Consultant Appointment Matrix (to be updated before the commencement of the stage) Document Version: V01 - June 2014 Philip D G Yorke 2013 10 of 21

3.0 Meeting plan Strategy All regular meetings are to be planned for a rolling 4 weeks ahead, based on an analysis of the integrated design program. This does not preclude the need to react to changes and issues as they arise. Forward planning is of particular importance where the employer and/or client is to attend meetings with their stakeholders, and is a requirement in order to get slots in stakeholder diaries. Final agendas for all meetings are to be issued a minimum of 2 working days before the meeting. As a principle a no agenda no meeting rule is to be applied. There are of course exceptions and non attendance should always be subject to a courtesy call. Design reports are to be issued fortnightly or monthly at the employers discretion, to the employers Document Controller and Lead Design Manager. The timing of the reports to be matched up with the employers time scales for preparing monthly reports to the client and/or Progress meetings. Special one off meetings are to be arranged with the agreement of all parties required to attend and in cognisance of the pre-arranged meeting schedule. Type of meetings and purpose overview Add / amend list as required Principle s meetings High level discussion on progress, information flow, critical issues, team working, etc. DTM s Regular design meetings to discuss design matters, can be workshops, aimed at creating solutions and assigning actions to time scales. Progress meetings monitoring design progress, providing feed-back, set targets 4 weeks ahead, and agree/put in place mitigation strategy if required. CDP workshops working with design sub-contractors to ensure compliance, integrity of design and resolve technical issues. Technical review presentation and discussion on specific technical issues of the project, to the employer / client / stakeholders (as needed) for the benefit of all parties. This will be issues peculiar to the project that do not have a predefined solution or method of arriving at a solution. The output of these reviews will be a Design Note that may need to be signed off by relevant parties, i.e. client and approving bodies. Client Design Presentations These are primarily early stage presentations to the client, to get feed-back and approval on Concept and Scheme Design progress. Document Version: V01 - June 2014 Philip D G Yorke 2013 11 of 21

MrA Quality Mr B Prog Mrs C Cost A DESIGN MANAGEMENT DOCUMENT D02 www.projectdesignguides.com Appendix A Meeting Matrix (?? Design Period) Content to be amended as appropriate Notes: - Design meetings are to co-ordinated with the overall project Meeting Matrix, to ensure no personnel have meeting clashes. - The meeting matrix is to be updated as the project moves through stages and the project needs change. Day Meeting Location - Time Client Contractor Design Team Other Mon Principals - Site office 9.00-13.00 Tue DTM Consultants office 9.00-13.00 M½ M½ Tue Progress Site office 9.00-11.00 M½ M½ Wed CDP workshops Site office 9.00-11.00 Wed Technical review Site office 13.00-15.00 Fri Client design presentation client office 15.00-16.00 M¼ M¼ M¼ M¼ Key: M - Attend meeting Mandatory A - Attend meeting Advisory P - Attend meeting Potentially useful M¼ - Principals meeting once a month ½ - Fortnightly Document Version: V01 - June 2014 Philip D G Yorke 2013 12 of 21

Appendix B Monthly Reports Content to be amended as appropriate PDG PROJECT DESIGN GUIDES MONTHLY REPORT FORTNIGHTLY / MONTHLY DESIGNERS REPORT Project name / no.: Date of Report: Consultant: Fortnightly / Monthly Distribution Design Manager Document Controller Other consultants Purpose: To monitor the progress of design and highlight major design issues Key Dates: Date Milestone Achieved Y/N Main Contract DfMA start Start on site Power on Meetings / Workshops / Presentations attended last period/week. Meeting Day -Time-Location Comments Meetings / Workshops / Presentations to be prepared for this/next week. Meeting Day -Time-Location Comments Document Version: V01 - June 2014 Philip D G Yorke 2013 13 of 21

Deliverables 4 week review Date Last wk (-1) Deliverable Achieved Last wk (-1) Carried forward list Last wk (0) Due this week Last wk (+1) Due next week Last wk (+2) Due week after next Last wk (-1) MITIGATION for items to be carried forward RFI s / TQ s No issued:? No. Answered satisfactorily:? No. Overdue:? Critical RFI s / TQ s list to become EWN s Ref Title Comment Critical RFI s are those that are close to affecting the construction programme and are to be identified 2/4 weeks prior to this date, to allow time for mitigating action Design Notes Ref Title Comment Approved Rejected Document Version: V01 - June 2014 Philip D G Yorke 2013 14 of 21

Pending approval Ongoing Statutory and contractual obligations L.A.P. dept For general status ensure Planning Condition tracker is updated. Critical items Ref Item Comment Building Control For general status ensure Building Control Condition tracker is updated. Critical items Ref Item Comment Other i.e. BREEAM / CODE For general status ensure relevant tracker is updated. Critical items Ref Item Comment Other i.e. Secure by Design For general status ensure relevant tracker is updated. Critical items Ref Item Comment Statutory Services 4 week look ahead Water Supply - provider Ref Item Comment / Action Document Version: V01 - June 2014 Philip D G Yorke 2013 15 of 21

Foul Water - provider Ref Item Comment / Action Electricity - provider Ref Item Comment / Action Gas - provider Ref Item Comment / Action Comms & Data - provider Ref Item Comment / Action Other - provider Ref Item Comment / Action Other Comments Document Version: V01 - June 2014 Philip D G Yorke 2013 16 of 21

Appendix C Agenda Proforma Content to be amended as appropriate PDG PROJECT DESIGN GUIDES AGENDA DESIGN TEAM MEETING AGENDA Meeting Title: Date of Meeting: Project name: Design Team Meeting Weekly / Fortnightly (throughout design period) / one off Location: Attendees: (expected) Optional (to attend on request) Purpose: To monitor the progress of design matters and ensure design issues are resolved. Desired Outcomes (amend as required) Ensure clear communication of design priorities; Design collaboration and co-ordination; Compliance reviewed and certified. Topic Process Who Time Introductions 5 mins Previous minutes Agreement and review ALL H&S/ CDM Management of design risks. ALL ITT Review ITT ALL Surveys Identify and scope ALL Architectural matters Structural matters Building Services matters Design Report Co-ordination Issues Design Report Co-ordination Issues Design Report??/?? Document Version: V01 - June 2014 Philip D G Yorke 2013 17 of 21

Co-ordination Issues Stats Landscape design matters Report progress and provider issues Design Report Co-ordination Issues H&S/ CDM Management of design risks. ALL L. A. Planning Status Update Approvals awaited Information to Submit Information Required Building Regulations Update on Submissions Details of Conditional Approval Status AD B, AD E, AD L, AD M etc Mock-ups/ samples / tests Design Programme & RFIs Item for progress meeting Progress on Deliverables Outstanding RFIs Change Log, implications, contract admin ALL AOB Date of next Meeting Refer to meeting schedule Document Version: V01 - June 2014 Philip D G Yorke 2013 18 of 21

Appendix D Meeting Minute Proforma Content to be amended as appropriate PDG PROJECT DESIGN GUIDES MINUTES MINUTES Meeting Title: Date of Meeting: Project No. + Project name + Design Team Meeting Weekly / Fortnightly (throughout design period) / one off Location: Attendees: Apologies: Distribution All present + Other Consultants Contractor Project QS / Planner / Engineer Purpose: To monitor the progress of design matters and ensure design issues are resolved. Desired Outcomes (amend as required) Ensure clear communication of design priorities; Design collaboration and co-ordination; Compliance reviewed and certified. Process Date raised Action by 1.00 Introductions 2.00 Previous minutes are a true and accurate record 3.00 CDM / H&S Follow agenda Document Version: V01 - June 2014 Philip D G Yorke 2013 19 of 21

4.0 Resource Allocation (by stage) Align with Consultant Appointment Matrix Company / Discipline Employee Position / Role Stage 1-2 Stage 3 Stage 4 Stage 5-6 Architecture Landscape Structural eng. Project Management Civil Engineering Utilities Ground Engineering MEPh Electrical Mechanical Public Health Security Lifts Acoustics Wind Fire Document Version: V01 - June 2014 Philip D G Yorke 2013 20 of 21

Appendix E CV s Document Version: V01 - June 2014 Philip D G Yorke 2013 21 of 21